Loading...
HomeMy WebLinkAboutEF&S Concrete - FY 20 Spalling Concrete Repair - Change Order #1DocuSign Envelope ID: 33538660-E54A-45E9-8558-15D286AB4633 Q�itp of �%Irlop Public Works Department -Engineering Division 7351 Rosanna 5t., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 1 (CMS CHANGE ORDER) To contrack for. FY20 Spoiling Concrete Repair Project City Project No.: 20-PW-255 Contractor: EF&S Corporation, Inc. Contract Date: 5/28/2020 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. Ali copies forwarded to Contractor for signature shall be retumed to the City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work This change order adjusts the contract amount by adjusting the bid item for traffic control. Per the Project Specifications Section 700-10.C, "Contractor shall provide (2) portable Changeable Message Signs (CMS) for public notification for the duration of the project. CMS shall be installed and operational at least one week in advance of each phase of the work". A Request far information (RFI) was received from the Contractor regarding the need for CMS for this project. Due to the ongoing pandemic there is less vehicular traffic in the area. With this area being a residential area, there is little need far the usage of CMS within the project limits. The City's response to the RFI was that the CMS boards would not be necessary for these reasons. However, "if CMS were not used/partially used for the duration of the work, the City would require compensation on this item of work°. The Contractor's price for the bid item traffic control, which is where the CMS would be paid for, is $3,000. The City and Contractor agreed on $500 for the usage of CMS for the duration of the project, which is 1/8 of the total cost of the bid item for traffic control. There are no changes to the working days for this change order. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change C+rder. The contract time shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by this change order All Extra Work authorized under this Change Order must be billed separately from the original contract. All bills for work done under this Change Order shall reference this Change Order No. 1. I (V1/e) agree to make the above change subject to the terms of this Change Order for a NET DECREASE of $500A0. � ��� �_ CO�ITRACTOR- RECOMMENDED BY: Eric /�rgamaso Working Days Original Contract Price Previous Change Orders Total to Date This Change Order Total Change Orders to Date Revised Contract Prise Construction Manager ACCEPTED BY: ErIC Argamaso ga�GtF�rg�3e�r/Project Manager ��y �� ,SQ.iL��� 35 ^t�''L��TTTT��� �bV'�tS �i��fli�t�to� >s�c�wri,a- �zee�a �j�-�.f 4.S 41Jtit l.UClb4b I... Cost Percentage Initial $a44,7s2.00 EA ¢o-oe N/A $344.7s2.oa ($soo.00) EA 5344,2s2.00 Date: D�e�fauy served br eric Areameso DN' cn=Enc Argamaso, o, ou, email=enc.argamaso@cifyofgilroy orq, c=US Date. 2020.09.18 i6'.3046-0]'00' Date Digitally signed by Eric Argamaso DN: en=Eric Argamaso, e, eu, email=enc.argamase@cifyofgilrey.org, c=US Dafe 2020 09.18 16'.30 64-0]'00' Date 9/21/2020 Date 9/21/2020 Date 9/21/2020 Date