Loading...
HomeMy WebLinkAboutEF&S Concrete - FY 20 Spalling Concrete Repair - Change Order #3DocuSign Envelope ID: 33538660-E54A-45E9-8558-15D286AB4B33 �Clitp of �iirup Public Works Department -Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0451; Fax (408) 846-0429 CHANGE ORDER NO. 3 COLONY WAY DRIVEWAY APPROACHES To contract for: FY20 Spelling Concrete Repair Project City Project No.: 20-PW-255 Contractor: EF&S, Inc. Contract Date: 5/28/2020 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to the City of Gilroy property filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Descriation of Work This change order is for the additional work of driveway approaches on Colony Way. The driveway approaches are required to be replaced with the sidewalk because they are part of the path of travel for pedestrians due to the lack of park strips on this street. This change order will remove and replace 14 driveway approaches on Colony Way. An additional 20 working days will be needed to complete the work. Attached is the agreed lump sum price ftom the contractor. All requirements of the original Contract Documents shall appty to the above work except as specifically modified by this Change Order. The contract flme shall not extend unless expressly provided for in this Change Order. By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. Change in working time granted by tnis cnange oraet ► All Extra Work authorized under this Change Order must be billed separately ftom the original contract. All bills for work done under this Change Order shall reference this Change Order No. 3. I (We) agree to make the above change subject to the terms of this Change Order for a NET INCREASE not to exceed $28,780.00. � . � ��� IQTRACTOR �P x V � v RECOMMENDED BY: EI"IC ACgalTlaSO Construction Manager ACCEPTED BY: EI jC Argamaso zO�Working Days � Cost Percentage Initial Original Contract Price $344,792.00 Previous Change Orders $3,400.00 0.99% EA Total to Date $348,192.00 This Change Order $28,780.00 Total Change Orders to Date $32,180.00 9.33% EA Revised Contract Price $376,972.00 ��i�eer/Project Manager ��SF�A35... ��� ,�twttMl� �OV%tS ��ubnobkry�suoauc; . mtatrator �wna. �zcr.�y City' �Ye�k:;�"�.c � .. Date: Digitally signed by Eric Argamaso DN. cn=Eric Argamaso, o, ou, email=eric.argamaso@cityofgilroy.org, c=US Date: 2020.09 18 13.33'16-07'00' Date Digitally signed by Eric Argamaso DN' cn=Enc Argamaso, o, ou, email=enc Argamaso@crtyofgtlroy.org, c=US Date. 2020 09 18 13.33:28-07'00' Date 9/21/2020 Date 9/21/2020 Date 9/21/2020 Date DocuSign Envelope ID: 33538660-E54A-45E9-8558-15D286AB4B33 �1�18 408-710-7420 efsconcrete2008Ca�vahoo.com www. efsco n Crete. corT CHANGE ORDER 2020-3 PROJECT: 2020 CONCRETE SPALLING PROJECT PROJECT No: 20-PW-255 CONTw�CTOR/ OWNER : CITY OF GILROY DATE: 8/27/20 �� �� Added Scope: Credit: Days Ext.: Description F�ctra Credit Days Fact. ADDED WORK TO CONTRACT Remove and Replace 14 driveway approaches on $28,780 20 Colony Way. Totals $28,780 20 Original Contract Amount. $344,792.00 Change order #1. - $500 Arrow board Change Order #2. $3,900 tree/stump removal Change Order#3. $28,780 Added Approaches/Colony Revised Contract Amount to date: $376,972.00 We hereby agree to the above as an additional/reduced project costs) to be added/deleted to the original scope of work: Digitally signed by Eric Argamaso Eric Argamaso DN: cn=Eric Argamaso, o, ou, email=eric.argamaso@cityofgilroy.org, c=US Date: 2020.09.18 13:33:39-07'00' Project Manager Date Co act `J \ � l_ Date vVV