Loading...
HomeMy WebLinkAboutGeocon Amendment No.1DocuSign Envelope ID: 44CA7F99-4C8A-48F7-8686-6B434D7F7B478/4/2021 6671 Brisa Street ■ Livermore, California 94550 ■ Tel (925) 371-5900 Page 1 of 2 2021 SCHEDULE OF FEES PROFESSIONAL SERVICES Engineering Assistant/Laboratory Technician .......................................................................................................................................... $80/hr. Engineering Field Technician/Special Inspector I ................................................................................................................ 85/125(PW)*/hr. Engineering Field Technician/Special Inspector II ............................................................................................................... 95/135(PW)*/hr. Engineering Field Technician/Special Inspector III/Equipment Operator ........................................................................... 105/145(PW)*/hr. Word Processor/Technical Editor/Draftsman .......................................................................................................................................... 80/hr. Research Assistant/Technical Illustrator/Senior Draftsman................................................................................................................... 95/hr. Project Coordinator/GIS Specialist ........................................................................................................................................................... 105/hr. Staff Engineer/Geologist/Scientist/Field Supervisor .............................................................................................................................. 120/hr. Senior Staff Engineer/Geologist/Scientist ............................................................................................................................................... 130/hr. Project Engineer/Geologist/Scientist/Construction Supervisor .............................................................................................................. 140/hr. Senior Project Engineer/Geologist/Scientist ............................................................................................................................................ 155/hr. Senior Engineer/Geologist/Scientist/Certified Industrial Hygienist ........................................................................................................ 170/hr. Associate Engineer/Geologist/Scientist ................................................................................................................................................... 200/hr. Principal Engineer/Geologist/Scientist/Litigation Support ..................................................................................................................... 240/hr. Deposition or Court Appearance ............................................................................................................................................................... 400/hr. Attorney Fees (General) ............................................................................................................................................................................ 350/hr. Overtime (>8 to 12 hrs), Saturday, and Night Rate ................................................................................................ 1.5X Regular Hourly Rate Overtime (>12 hrs), Sunday, and Holiday Rate ........................................................................................................... 2X Regular Hourly Rate Minimum Field Services Fee (per day or call-out) ................................................................................................................................... 2 Hours *Prevailing Wage (PW) per requirements of California Labor Code §720, et. Seq. TRAVEL Personnel ............................................................................................................................................................................ Regular Hourly Rate Subsistence (Per Diem) ........................................................................................................................................................................ $175/day Vehicle Mileage .................................................................................................................................................................................... City Rate EQUIPMENT & ANALYTICAL TESTS Nuclear Gauge ......................... Included in Technician Hourly Rate Level D PPE/Decon Rinse Equipment ............................ $50/day Pick-up Truck ................................................................... $125/day pH/Conductivity/Temperature Meter ............................. 60/day Equipment Truck .............................................................. 200/day 55-gallon drum ................................................................65/ea. Direct-Push Rig/Operator ............................... 185/225(PW)*/hr. TPHg (EPA 8015M) .......................................................... 90/ea. Direct-Push Sample Liner ................................................ 10/ea. TPHd/mo (EPA 8015M) ................................................... 80/ea. Equipment Trailer ............................................................. 100/day Fuel Oxygenate Compounds (EPA 8260B) ..................... 110/ea. Wenner 4-Pin Earth Resistivity Meter .............................. 150/day Volatile Organic Compounds (EPA 8260B) ..................... 150/ea. Coring Machine (concrete, asphalt, masonry) ................. 200/day Semi-Volatile Organic Compounds (EPA 8270) ............. 300/ea. Dynamic Cone Penetrometer ........................................... 250/day CAM 17 Metals (EPA 6010B) .......................................... 170/ea. Dilatometer (DMT) Test Equipment ................................. 800/day Single Metal (EPA 6010B) ............................................... 30/ea. Generator or Air Compressor ............................................ 150/day STLC or TCLP Extraction .................................................. 75/ea. GPS Unit ............................................................................ 160/day Soil pH (EPA 9045C) ........................................................ 25/ea. Drive-Tube Sampler or Hand-Auger ................................. 40/day Organochlorine Pesticides (EPA 8081) ........................... 125/ea. Soil Sample Tube (Brass or Stainless) ............................ 10/ea. Naturally Occurring Asbestos (CARB 435) ...................... 90/ea. Water Level Indicator ....................................................... 40/day Asbestos PLM ................................................................... 20/ea. Battery-Powered Pump .................................................... 75/day Asbestos 1,000-pt Count ................................................. 80/ea. Photo-Ionization Meter .................................................... 150/day 48-hr/24-hr Turnaround Time .................... 60%/100% surcharge LABORATORY TESTS COMPACTION CURVES SOIL AND AGGREGATE STABILITY 4-inch mold (D1557/D698) ............................................. $225/ea. Resistance Value, R-Value (D2844/CAL301) ................. $300/ea. 6-inch mold (D1557/D698) ............................................. 225/ea. R-Value, Treated (CAL301) .............................................. 325/ea. California Impact (CAL216) .............................................. 225/ea. California Bearing Ratio (D1883) .................................... 175/pt. Check Point ....................................................................... 100/ea. Stabilization Ability of Lime (C977) ................................. 180/ea. Exhibit DDocuSign Envelope ID: 44CA7F99-4C8A-48F7-8686-6B434D7F7B47 6671 Brisa Street ■ Livermore, California 94550 ■ Tel (925) 371-5900 Page 2 of 2 SOIL AND AGGREGATE PROPERTIES #200 Wash (D1140/C117) ............................................. $90/ea. Moisture Determination, tube sample (D2216) ............. $20/ea. Wet Sieve Analysis to #200 (D422/CAL202) .................. 120/ea. Moisture Determination and Unit Weight (D2937) ........ 40/ea. Dry Sieve Analysis, 1.5”+ Aggregate (D6913) ................. 350/ea. Atterberg Limits: Plasticity Index (D4318) ...................... 200/ea. Hydrometer Analysis (D422) ............................................ 165/ea. Sand Equivalent (D2419/CAL217) ................................. 100/ea. Sieve Analysis with Hydrometer (D422) .......................... 200/ea. pH and Resistivity (CAL643) ............................................ 120/ea. Specific Gravity, Soil (T100) ............................................. 100/ea. Sulfate Content (CAL417) ................................................ 90/ea. Specific Gravity Coarse Aggregate (C127) ....................... 60/ea. Chloride Content (CAL422) .............................................. 50/ea. Specific Gravity Fine Aggregate (C128) ........................... 75/ea. Organic Content (D2974)................................................. 60/ea. Cut/Extract Shelby Tube .................................................. 100/ea. SHEAR STRENGTH Unconfined Compression (D2166) .................................. $100/ea. CONCRETE / MASONRY / REINFORCING STEEL Direct Shear (D3080) (3pt) .............................................. 325/ea. Compressive Strength, Cast Cylinders (C39) .................. $30/ea. Unconsolidated-Undrained Triaxial Shear (D2850) ........ 125/pt. Compressive Strength, Cores (C42) ................................ 60/ea. Unconsolidated-Undrained Triaxial Staged (D2850) ...... 175/ea. Flexural Strength Beam (C78/C293) .............................. 80/ea. Consolidated-Undrained Triaxial Shear (D4767) ............ 300/pt. Splitting Tensile Test (C496)............................................ 80/ea. Consolidated-Undrained Triaxial Staged (D4767) .......... 375/ea. DSA Masonry Shear (DSA-207) ....................................... 75/ea. Consolidated-Drained Triaxial Shear (EM1110) ............. 400/pt. Shotcrete Panel Coring and Comp. Strength (C1140) ... 80/ea. Consolidated-Drained Triaxial Staged (EM1110) ............ 500/ea. Rebar Tensile / Bend (up to #11/#11 and Larger) 200/250/ea. CMU Compressive Strength (C140) ................................ 100/ea. PERMEABILITY, CONSOLIDATION AND EXPANSION Compressive Strength, Grout (C1019/UBC 21-19) ........ 30/ea. Permeability, Flexible Wall (D5084) ................................ $300/ea. Compressive Strength, Mortar (C109/UBC 21-15,16) .. 30/ea. Permeability, Rigid Wall (D5856) ..................................... 300/ea. CMU Unit Wt., Dimen., Absorption (C140) ...................... 75/ea. Consolidation (D2435) ..................................................... 60/pt. Compressive Strength, Masonry Prism (C1314) ............ 250/ea. Expansion Index (D4829/UBC 29-2) ............................... 225/ea. Swell/Collapse (D4546) ................................................... 165/pt. HOT MIX ASPHALT Density, Hveem (D2726/CAL308) .................................. $110/pt. AGGREGATE QUALITY Stabilometer Value (D1560/CAL366) ............................. 175/pt. Sieve Analysis to #200 (C136) ........................................ $115/ea. Theoretical Max. Specific Gravity (D2041/CAL309) ...... 175/ea. L.A. Rattler Test (500 rev.) (C131) ................................... 200/ea. Ignition/Sieve Analysis (C136/CAL202) ......................... 215/ea. Durability Index (D3744/CAL229) ................................... 165/ea. HMA Core Unit Weight (D1188/CAL308) ........................ 60/ea. Fine Aggregate Angularity (CAL 234) ............................... 125/ea. % Asphalt, Ignition Method (D6307/CAL382) ................ 125/ea. Flat and Elongated Particles (D4791/CAL 235) ............. 150/ea. % Asphalt, Ignition Calibration (D6307/CAL382) ............. 400/ea. Percent Crushed Particles (CAL205) ............................... 150/ea. Rice Density/% Voids (CAL367)……………………………… ..... 285/ea. *2X surcharge on rush turnaround for laboratory testing TERMS AND CONDITIONS 1.Listed are typical charges for the services most frequently performed by Geocon. Prices for unlisted services as well as special quotations for programs involving volume work will be provided upon request. Laboratory test prices shown are for laboratory work only, and include reporting of routine results not calling for comments, recommendations or conclusions. 2.Sampling and testing is conducted in substantial conformance with the latest applicable or designated specifications of the American Society for Testing and Materials, Caltrans, American Association of State Highway and Transportation Officials, or other pertinent agencies. 3.Saturday, night work, and overtime hours are charged at time and one-half; Sundays and holidays at double time. Per diem may apply when location of work dictates. 4.Equipment and materials will be billed at cost plus 15%. Outside services including subcontractors are billed at cost plus 10%. 5.Invoices will be submitted at four-week intervals. Terms of payment are met upon presentation of invoice. Invoices become delinquent thirty (30) days from invoice date and subject to one and one-half percent (1-1/2%) service charge per month, or the maximum rate allowed by law, whichever is lower. If Client objects to all or any portion of any invoice, Client will so notify Geocon in writing within fourteen (14) calendar days of the invoice date, identify the cause of disagreement, and pay that portion of the invoice not in dispute. The parties will immediately make every effort to settle the disputed portion of the invoice. Payment on delinquent invoices will first be applied to accrued interest and then to the principal amount. All time spent and expenses incurred (including any attorney's fees and costs) in connection with collection of any delinquent amount will be paid by Client to Geocon per Geocon's current fee schedule. DocuSign Envelope ID: 44CA7F99-4C8A-48F7-8686-6B434D7F7B47