Loading...
HomeMy WebLinkAbout2020-01-27 City Council Regular Meeting Agenda Packet January 27, 2020 3:42 PM City Council Regular Meeting Agenda Page1 MAYOR Roland Velasco COUNCIL MEMBERS Marie Blankley Dion Bracco Peter Leroe-Muñoz Carol Marques Fred Tovar Cat Tucker CITY COUNCIL AGENDA CITY OF GILROY CITY COUNCIL CHAMBERS, CITY HALL 7351 ROSANNA STREET GILROY, CA 95020 REGULAR MEETING 6:00 P.M. MONDAY, JANUARY 27, 2020 CITY COUNCIL PACKET MATERIALS ARE AVAILABLE ONLINE AT www.cityofgilroy.org AGENDA CLOSING TIME IS 5:00 P.M. THE TUESDAY PRIOR TO THE MEETING COMMENTS BY THE PUBLIC WILL BE TAKEN ON AGENDA ITEMS BEFORE ACTION IS TAKEN BY THE CITY COUNCIL. Persons wishing to address the Council are requested, but not required, to complete a Speaker’s Card located at the entrances. Public testimony is subject to reasonable regulations, including but not limited to time restrictions for each individual speaker. A minimum of 12 copies of materials should be provided to the City Clerk for distribution to the Council and Staff. Please limit your comments to 3 minutes. In compliance with the Americans with Disabilities Act, the City will make reasonable arrangements to ensure accessibility to this meeting. If you need special assistance to participate in this meeting, please contact the City Clerk a minimum of 72 hours prior to the meeting at (408) 846-0204. A sound enhancement system is also available for use in the City Council Chambers. If you challenge any planning or land use decision made at this meeting in court, you may be limited to raising only those issues you or someone else raised at the public hearing held at this meeting, or in written correspondence delivered to the City Council at, or prior to, the public hearing. Please take notice that the time within which to seek judicial review of any final administrative determination reached at this meeting is governed by Section 1094.6 of the California Code of Civil Procedure. A Closed Session may be called during this meeting pursuant to Government Code Section 54956.9 (d)(2) if a point has been reached where, in the opinion of the legislative body of the City on the advice of its legal counsel, based on existing facts and circumstances, there is a significant exposure to litigation against the City. Materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are available for public inspection with the agenda packet in the lobby of Administration at City Hall, 7351 Rosanna Street during normal business hours. These materials are also available with the agenda packet on the City website at www.cityofgilroy.org subject to Staff’s ability to post the documents before the meeting. The City Council meets regularly on the first and third Monday of each month, at 6:00 p.m. If a holiday, the meeting will be rescheduled to the following Monday, with the exception of the single meeting in July which lands on the first day of the month not a holiday, Friday, Saturday or Sunday. City Council Regular Meeting Agenda 01/27/2020 Page2 KNOW YOUR RIGHTS UNDER THE GILROY OPEN GOVERNMENT ORDINANCE Government's duty is to serve the public, reaching its decisions in full view of the public. Commissions, task forces, councils and other agencies of the City exist to conduct the people's business. This ordinance assures that deliberations are conducted before the people and that City operations are open to the people's review. FOR MORE INFORMATION ON YOUR RIGHTS UNDER THE OPEN GOVERNMENT ORDINANCE, TO RECEIVE A FREE COPY OF THE ORDINANCE OR TO REPORT A VIOLATION OF THE ORDINANCE, CONTACT THE OPEN GOVERNMENT COMMISSION STAFF AT (408) 846-0204 or shawna.freels@cityofgilroy.org I. OPENING A. Call to Order 1. Pledge of Allegiance 2. Invocation 3. City Clerk's Report on Posting the Agenda 4. Roll Call B. Orders of the Day C. Employee Introductions II. CEREMONIAL ITEMS A. Proclamations, Awards, and Presentations III. PRESENTATIONS TO THE COUNCIL PUBLIC COMMENT BY MEMBERS OF THE PUBLIC ON ITEMS NOT ON THE AGENDA BUT WITHIN THE SUBJECT MATTER JURISDICTION OF THE CITY COUNCIL (This portion of the meeting is reserved for persons desiring to address the Council on matters not on this agenda. The law does not permit Council action or extended discussion of any item not on the agenda except under special circumstances. If Council action is requested, the Council may place the matter on a future agenda. Written material provided by public members for Council agenda item “public comment by Members of the Public on items not on the agenda” will be limited to 10 pages in hard copy. An unlimited amount of material may be provided electronically.) City Council Regular Meeting Agenda 01/27/2020 Page3 IV. REPORTS OF COUNCIL MEMBERS Council Member Bracco – Gilroy Downtown Business Association Board (alternate), Gilroy Sister Cities Association (alternate), Santa Clara Co. Library JPA, SCVWD Joint Council-SCRWA-Board Water Resources Committee, South County Joint Planning Advisory Committee (alternate), South County Regional Wastewater Authority Board, South County Youth Task Force Policy Team (alternate), Street Naming Committee Council Member Tucker –CalTrain Policy Group, Cities Association of Santa Clara Co. Board of Directors, General Plan Advisory Committee, Santa Clara Valley Habitat Agency Governing Board, Santa Clara Valley Habitat Agency Implementation Board, Street Naming Committee, Visit Gilroy Board Council Member Blankley - ABAG (alternate), Cities Association of Santa Clara Co. Board of Directors (alternate), Economic Development Corporation Board, Gilroy Sister Cities Association, Gilroy Youth Task Force (alternate), SCVWD Joint Council-SCRWA- Board Water Resources Committee, South County Regional Wastewater Authority Board, VTA Board of Directors Alternate, VTA Policy Advisory Committee, VTA South County City Group Council Member Marques - Gilroy Downtown Business Association Board, Gilroy Gardens Board of Directors, Santa Clara Valley Habitat Agency Governing Board (alternate), Santa Clara Valley Habitat Agency Implementation Board (alternate), Silicon Valley Clean Energy JPA Board (alternate), URM Task Force Sub-Committee, VTA Committee for Transit Accessibility (alternate) Council Member Tovar –Santa Clara Co. Expressway Plan 2040 Policy Advisory Board, Recycling and Waste Reduction Commission, Santa Clara Co. Library JPA (alternate), SCVWD Water Commission (alternate), Silicon Valley Clean Energy JPA Board, South County Regional Wastewater Authority Board, South Cou nty United for Health, Street Naming Committee, VTA Committee for Transit Accessibility, VTA Policy Advisory Committee (alternate) Council Member Leroe-Muñoz - ABAG, CalTrain Policy Group (alternate), Gilroy Youth Task Force, Historic Heritage Committee, SCVWD Water Commission, Silicon Valley Regional Interoperability Authority Board, South County Youth Task Force Policy Team, VTA Mobility Partnership Mayor Velasco - Economic Development Corporation Board, General Plan Advisory Committee, Historic Heritage Committee (alternate), Santa Clara Valley Habitat Agency Governing Board, Santa Clara Valley Habitat Agency Implementation Board, South County Joint Planning Advisory Committee, South County Regional Wastewater Authority Board (alternate), URM Task Force Sub-Committee, VTA Mobility Partnership, VTA South County City Group (alternate) V. FUTURE COUNCIL INITIATED AGENDA ITEMS VI. CONSENT CALENDAR (ROLL CALL VOTE) All matters listed under the Consent Calendar are considered by the City Council to be routine and will be enacted by one motion. There will be no separate discussion of these items unless a request is made by a member of the City Council or a member of the public. Any person desiring to speak on any item on the consent calendar should ask to have t hat item removed from the consent calendar prior to the time the Council votes to approve. If removed, the item will be discussed in the order in which it appears. City Council Regular Meeting Agenda 01/27/2020 Page4 A. Minutes of the January 6, 2020 Regular Meeting B. Notice of Acceptance of Completion for the Citywide Pavement Maintenance Phase II Project No. 19-PW-252 C. Adoption of a Resolution of the City Council of the City of Gilroy to Declare Weeds and Refuse a Public Nuisance to Begin the Annual Weed and Refuse Abatement Process D. Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees E. Approval of a Letter of Opposition to Senate Bill 50 (Wiener) That if Signed into Law Would Greatly Undermine Gilroy's Local General Planning Efforts by Allowing Developers to Make Local Planning and Zoning Decisions VII. BIDS AND PROPOSALS - NONE VIII. PUBLIC HEARINGS A. Consideration of an Urban Service Area Request to Incorporate Approximately 55.66 Acres Located West of Wren Avenue, South of Vickery Avenue, and North and South of Tatum Avenue; and Just Outside the Northern City Limits Northeast of the Intersection of Vickery Lane and Kern Avenue, APNs 790-09-006, 008, 009, 010, 011; 790-17-001, 004, 005, 006, 007, 008, 009, 010; 790-06-017 and 790-06-018 into the Urban Service Area of the City of Gilroy; Applicants Wren Investors, LLC c/o Dick Oliver and Mark Hewell and David Sheedy (USA 12-01 and USA 14-02) 1. Staff Report: Karen Garner, Community Development Director 2. Disclosure of Ex-Parte Communications 3. Open Public Hearing 4. Close Public Hearing 5. Possible Action: Adopt a resolution of the City Council of the City of Gilroy approving the Wren Investors and Hewell Urban Service Area Amendment mitigated negative declaration and mitigation monitoring and reporting program and approving u rban service area applications USA 12-01 and USA 14-02, incorporating approximately 56 acres into Gilroy’s urban service area, Assessor Parcel 790-09- 006, 008, 009, 010, 011; 790-17-001, 004, 005, 006, 007, 008, 009, 010; 790-06- 017 and 790-06-018, filed by Wren Investors, LLC and Mark Hewell and David Sheedy. IX. UNFINISHED BUSINESS A. Amendment to the Fiscal Year 2019-2020 General Fund Budget by Appropriating $5.825 Million of Unassigned Fund Balance to Projects Identified by the City Council City Council Regular Meeting Agenda 01/27/2020 Page5 1. Staff Report: Jimmy Forbis, Finance Director 2. Public Comment 3. Possible Action: Adopt a resolution of the City Council of the City of Gilroy amending the fiscal year 2019-2020 budget by $5,825,000 in the general fund and appropriating those funds to projects identified by the City Council. X. INTRODUCTION OF NEW BUSINESS A. Introduction of an Ordinance of the City Council of the City of Gilroy Amending Chapter 16 of the Gilroy City Code Entitled “Offenses - Miscellaneous” Adding New Sections 16.24 and 16.25 Pertaining to Imitation Weapons 1. Staff Report: Scot Smithee, Police Chief 2. Public Comment 3. Possible Action: a) Motion to read the ordinance by title only and waive further reading . b) Introduce an ordinance of the City Council of the City of Gilroy amending Chapter 16 of the Gilroy City Code entitled “Offenses - Miscellaneous” adding new sections 16.24 and 16.25 pertaining to imitation weapons. B. Request to Waive Permit and Service Fees by the Gilroy Memorial Day Events Committee and Determination that the Waiving of Fees for the 2020 Memorial Day Parade and Activities Constitutes a Public Purpose 1. Staff Report: Gabriel Gonzalez, City Administrator 2. Public Comment 3. Possible Action: Declare that the Memorial Day parade and activities constitute a public purpose and approve an estimated $11,341 fee waiver request by the Gilroy Memorial Day Events Committee for the 2020 Memorial Day parade and activities XI. CITY ADMINISTRATOR'S REPORTS A. Presentation on Pavement Management and the Pavement Condition of City of Gilroy Streets 1. Staff Report: Girum Awoke, Public Works Director 2. Public Comment 3. Possible Action: Receive report. XII. CITY ATTORNEY'S REPORTS XIII. CLOSED SESSION City Council Regular Meeting Agenda 01/27/2020 Page6 A. CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED LITIGATION Significant Exposure to Litigation Pursuant to Paragraph (2) of Subdivision (d) of Government Code Section 54956.9, and Gilroy City Code Section 17A.11 (3) (b) One (1) Case as Defendant B. CONFERENCE WITH REAL PROPERTY NEGOTIATORS Pursuant to GC Sec. 54956.8 and GCC Sec.17A.8 (a) (2); Properties:10th Street Bridge: APNs 808- 19-007, 799-30-006, 799-30-007, 808-19-020, 808-50-999, Thomas Luchessa Bridge: APNs 808-21-025, 808-21-023, 808-21-021, 808-21-018, New Fire Station: APNs 808-18-003, 808-19-029 Negotiators: Gabriel Gonzalez, City Administrator; Other Party to Negotiations: Glen Loma Corporation, John M. Filice, Jr.; Negotiating Price and terms of payment regarding purchase, sale, exchange or lease 1. Public Comment on Closed Session Items 2. City Attorney’s Advice Re: Entering into Closed Session 3. Adjourn to Closed Session ADJOURN TO OPEN SESSION Report of any action taken in Closed Session and vote or abstention of each Councilmember if required by Government Code Section 54957.1 and Gilroy Code Section 17A.13 (a); Public Report of the vote to continue in closed session if required under Gilroy Code Section 17A.11 (5) ADJOURNMENT MEETING DATES JANUARY, 2020 27* Regular Meeting - 6:00 p.m., City Council Chambers FEBRUARY, 2020 3* Regular Meeting - 6:00 p.m., City Council Chambers 10* Special Meeting/Study Session - 6:00 p.m., City Council Chambers 24* Regular Meeting - 6:00 p.m., City Council Chambers MARCH, 2020 2* Regular Meeting - 6:00 p.m., City Council Chambers 16* Regular Meeting - 6:00 p.m., City Council Chambers * meeting is webstreamed and televised 1 City Council Meeting Minutes 01/6/2020 City of Gilroy City Council Meeting Minutes January 6, 2020 I. OPENING A. Call to Order The meeting was called to order at 6:00 PM by Mayor Roland Velasco 1. Pledge of Allegiance Mayor Velasco then led the pledge of allegiance. 2. Invocation The invocation was given by Pastor Greg Quirk of South Valley Community Church. 3. City Clerk's Report on Posting the Agenda City Clerk Shawna Freels announced the agenda had been posted on December 27, 2019 at 10:00 a.m. Attendee Name Title Status Arrived Roland Velasco Mayor Present 5:59 PM Marie Blankley Council Member Present 5:57 PM Dion Bracco Council Member Present 5:59 PM Peter Leroe-Muñoz Council Member Present 6:03 PM Carol Marques Council Member Present 5:51 PM Fred Tovar Council Member Present 5:59 PM Cat Tucker Council Member Present 6:00 PM B. Orders of the Day There were no agenda changes. C. Employee Introductions There were none. II. CEREMONIAL ITEMS A. Proclamations, Awards, and Presentations 1. Recognition of Gilroy 150th Anniversary Logo Contest Participants Mayor Velasco thanked the artists for their participation in the 150th anniversary logo contest and they each shared details of their logo submittal. 150th Anniversary Committee Chair Rudeen spoke on the year's celebration. III. PRESENTATIONS TO THE COUNCIL Connie Rogers of the Historical Society invited the Council to attend the National Register plaque dedication celebration on Saturday, January 18, 2020 at 10 a.m. 6.A Packet Pg. 7 Communication: Minutes of the January 6, 2020 Regular Meeting (CONSENT CALENDAR (ROLL CALL VOTE)) 2 City Council Meeting Minutes 01/6/2020 Geno spoke on speeding in his neighborhood and the need for more sp eed limit signs, and then detailed other improvement needs in the community. A. Presentation by the Wineries of Santa Clara Valley Association Geoff Mace, President of the Wineries of Santa Clara Valley Association, spoke on the local wineries and the promotional activities of the Association. B. Personnel Commission Annual Presentation to Council The presentation was given by Commission Chair Mitchell. IV. REPORTS OF COUNCIL MEMBERS Council Member Tucker wished everyone a happy new year and thanked the Police Department for the recent successful gun buy-back event and recognized Connie Rogers for the recommendation. Council Member Marques spoke on the waiver of certain downtown URM building penalties and presented a concern from the Downtown Business Association regarding the need for the City to promote the downtown opportunity zones. She then spoke on stolen City utility payments, suggesting that a letter be sent to customers in the future, and concluded by wishing everyone a happy new year. Council Member Tovar wished everyone a happy new year and spoke on his upcoming meetings. He then suggested that the City be proactive in messaging "Gilroy Proud" to drive more business downtown and communicate a positive message throughout the community. Council Member Leroe-Muñoz thanked the Downtown Business Association for the coordination of the holiday parade and shared the success of the recent gun buy-back event. Mayor Velasco remarked on the ribbon cutting of the new Santa Clara County Association of Realtors office, describing their planned activities in Gilroy. V. FUTURE COUNCIL INITIATED AGENDA ITEMS There were none. VI. CONSENT CALENDAR (ROLL CALL VOTE) Mayor Velasco asked that one change be made to Item VI.D. changing the Cities Association Board of Directors Member to Council Member Tucker and Alternate to Council Member Blankley. RESULT: APPROVE [UNANIMOUS] MOVER: Fred Tovar, Council Member SECONDER: Cat Tucker, Council Member AYES: Velasco, Blankley, Bracco, Leroe-Muñoz, Marques, Tovar, Tucker A. Minutes of the December 2, 2019 Regular Meeting B. Adoption of a Resolution 2020-01 of the City Council of the City of Gilroy Approving a Fiscal Year 2019-2020 Budget Amendment of $194,201 in the Gang Prevention/Intervention Grants Fund 6.A Packet Pg. 8 Communication: Minutes of the January 6, 2020 Regular Meeting (CONSENT CALENDAR (ROLL CALL VOTE)) 3 City Council Meeting Minutes 01/6/2020 C. Adoption of a Resolution 2020-01 of the City Council of the City of Gilroy Amending the Fiscal Year 2019-2020 Budget Adding $81,099 to the Miscellaneous Police Department Grants Fund D. Council Appointment of Members to Serve in Regional Representative Seats and Suggested Appointees to Serve on the Gilroy Economic Development Corporation Board, Gilroy Downtown Business Association Board and Visit Gilroy California Welcome Center Gilroy Board E. Selection of Mayor Pro Tempore F. Claim of John Baumgardner (The City Administrator recommends a “yes” vote under the Consent Calendar shall constitute the denial of the claim) G. Claim of Guadalupe Cisneros (The City Administrator recommends a “yes” vote under the Consent Calendar shall constitute the denial of the claim) VII. BIDS AND PROPOSALS A. Amendment to the Agreement with Dewberry Architects, Inc. in the Amount of $60,205 for the Design of the Development Services Center, Project No. 19-RFP-PW-429 The staff report was presented by Public Works Director Awoke. There were no public comments. Possible Action: Approve an amendment to the agreement with Dewberry Architects, Inc. in the amount of $60,205 for the development services center project, project no. 19-RFP-PW-429, and authorize the City Administrator to execute the amendment and associated documents. RESULT: APPROVE [5 TO 2] MOVER: Cat Tucker, Council Member SECONDER: Fred Tovar, Council Member AYES: Velasco, Leroe-Muñoz, Marques, Tovar, Tucker NAYS: Marie Blankley, Dion Bracco VIII. PUBLIC HEARINGS There were none. IX. UNFINISHED BUSINESS A. Annual Appointments to City Boards, Commissions and Committees With Seats Vacant or Expired as of December 31, 2019 The staff report was presented by City Clerk Freels. There were no public comments. Appointments of Sean Reedy to the Bicycle Pedestrian Commission, Sumana Reddy to the Library Commission, Theresa Graham, Ermelindo Puente and Angela Reinhart to the Parks and Recreation Commission, Marco Machado to the Physically Challenged Board of Appeals, and John Doyle and Fabian Morales Medina to the Planning Commission. 6.A Packet Pg. 9 Communication: Minutes of the January 6, 2020 Regular Meeting (CONSENT CALENDAR (ROLL CALL VOTE)) 4 City Council Meeting Minutes 01/6/2020 Possible Action: Appoint Members to Boards, Commissions and Committees with seats vacant or expired as of December 31, 2019. RESULT: APPROVE [UNANIMOUS] MOVER: Fred Tovar, Council Member SECONDER: Marie Blankley, Council Member AYES: Velasco, Blankley, Bracco, Leroe-Muñoz, Marques, Tovar, Tucker X. INTRODUCTION OF NEW BUSINESS A. Council Consent to the Appointment of Mark Bisbee as Interim Fire Chief The staff report was presented by Human Resources Director McPhillips. There were no public comments. Possible Action: Council consent to the appointment of Mark Bisbee as Interim Fire Chief pursuant to Charter Section 703. RESULT: APPROVE [UNANIMOUS] MOVER: Peter Leroe-Muñoz, Council Member SECONDER: Fred Tovar, Council Member AYES: Velasco, Blankley, Bracco, Leroe-Muñoz, Marques, Tovar, Tucker B. Approval of a Grant Agreement in the Amount of $1,298,850 with the Land Trust of Santa Clara Valley for Ongoing Stewardship and Monitoring of a Conservation Easement of a Property Located at 7665 Crews Road, Gilroy (Van Dyke Ranch), APN 841-46-004 The staff report was presented by Senior Management Analyst Barber. There were no public comments. Possible Action: Approve a grant agreement in the amount of $1,298,850 with the Land Trust of Santa Clara Valley for ongoing stewardship and monitoring of a conservation easement for a property located at 7665 Crews Road, Gilroy (Van Dyke Ranch) APN 841-46-004, and authorize the City Administrator to execute the agreement and associated documents. RESULT: APPROVE [UNANIMOUS] MOVER: Cat Tucker, Council Member SECONDER: Carol Marques, Council Member AYES: Velasco, Blankley, Bracco, Leroe-Muñoz, Marques, Tovar, Tucker XI. CITY ADMINISTRATOR'S REPORTS There was none. XII. CITY ATTORNEY'S REPORTS 6.A Packet Pg. 10 Communication: Minutes of the January 6, 2020 Regular Meeting (CONSENT CALENDAR (ROLL CALL VOTE)) 5 City Council Meeting Minutes 01/6/2020 City Attorney Faber spoke on the recently enacted state housing legislation explaining that he would be preparing an informational memo for the Council. XIII. CLOSED SESSION There were none. ADJOURNMENT The Council adjourned at 7:35 p.m. /s/ Shawna Freels, MMC City Clerk 6.A Packet Pg. 11 Communication: Minutes of the January 6, 2020 Regular Meeting (CONSENT CALENDAR (ROLL CALL VOTE)) City of Gilroy STAFF REPORT Agenda Item Title: Notice of Acceptance of Completion for the Citywide Pavement Maintenance Phase II Project No. 19-PW -252 Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Public Works Department Submitted By: Girum Awoke Prepared By: Girum Awoke Nirorn Than Strategic Plan Goals ☐ Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services  Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION a) Approve a contract Change Order with Teichert and Son Inc. for a decrease in contract value of $201,771.48 and to authorize the City Administrator to execute the change order and associated documents. b) Approve Notice of Acceptance of Completion for the Citywide Pavement Maintenance Phase II Project No. 19-PW -252. EXECUTIVE SUMMARY The City’s roadway network, consisting of 125 lane-miles of roads, is our biggest asset with a total value of $220M. Due to its high value, it is important for the City to maintain it at a high level for the community both as an asset, and as the backbone of our transportation network. The City uses annual funding for its local streets maintenance program operated by the Public Works Operations Division. In coordination with this 6.B Packet Pg. 12 effort, Public Works contracts out an annual roadway rehabilitation project for types of work not performed by City crews. These types of projects include roadway resurfacing, repaving and reconstruction projects. The Public Works Department has completed the construction for the FY19 Citywide Pavement Maintenance Phase II Project (the Project) and has reviewed all project documentation. Staff recommends the City Council approve the Notice of Acceptance of Completion for the FY19 Citywide Pavement Maintenance Phase II Project No. 19 -PW - 252. This Project consisted of paving, micro-surfacing, and striping seven street segments. Staff also recommends the City Council approve Change Order No. 1 to decrease the contract value in the amount of $201,771.48. This reduction in cost was part of the reduction in scope for Church Street from First Street to Howson Street. Public W orks eliminated this segment in anticipation of the future waterline replacement project after further coordination with our Water Division. Once this utility project is completed, Public Works will bid this segment as a new project along with a future street resurfacing project. BACKGROUND The City Council awarded the contract to Teichert & Son during the May 20, 2019 regular meeting. The original Project allocation amount was $2,041,215 (including 10% contingency) with the bid price of $1,855,648.95. This bid amount include d the following segments: 1. South Bound Santa Teresa Blvd: from Day Road East to Long Meadow Dr. 2. South Bound Santa Teresa Blvd: from Long Meadow Dr. to Mantelli Dr. 3. Westwood Dr.: from First Street to Third Street. 4. I.O.O.F. Ave.: from Murray Ave. to Forest St. 5. Church St.: from First St. to Howson St. 6. Bid Alternates 6A. Church St.: from Tenth St. to Seventh St. 6B. Sunrise Dr.: from Santa Teresa Blvd. to Rancho Hill Dr. Public Works Department staff selected the above street segments based on the City Pavement Management Program, StreetSaver, with feedback from Public Works’ Operation Division street maintenance crews. StreetSaver allows staff to establish and maintain a list of streets and their associated pavement maintenance type based on a given budget. The program also assists staff in preparing a pavement condition index (PCI) evaluation of our pavement network. ANALYSIS In summary, this Project completed the following:  Crack Sealed and Microsurfaced (seal) 11 Lane Miles of road 6.B Packet Pg. 13  Overlaid 1.5 Lane Miles of Road  Retrofitted 50 Existing Concrete Curb Ramps for ADA Compliance  Removed and Replaced 18 Concrete Curb Ramp Although Church Street from 1st Street to Howson Street was scheduled to be completed, this segment was eliminated from the contract in anticipation for the future water line project. In general, pavement rehabilitation and maintenance projects typically follow the utility project. This phasing scheme eliminates the need for utility cut or street excavation to a newly resurfaced street and extends the service life of the road as a whole. For this reason, Church Street from 1st Street to Howson Street was eliminated from this contract until the water line project is completed. Church Street from 1st Street to Howson Street will be completed in the future project. With the elimination of Church Street, staff extended Segment 6A (Church Street) from 7th Street to 6th Street. This addition was evaluated through StreetSaver and provided for a complete repaved segment from 6th Street to 10th Street. For the above changes, 51 bid items were affected, 33 of which had a decrease in quantity and 18 of which had an increase in quantity. All of the quantity changes were captured in the Change Order No. 1 attached. These changes allow for a total decrease in contract value of $201,771.48. For this reason, staff recommends the City Council to approve Change Order No. 1 to decrease the contract value in the amount of $201,771.48. This will bring the total contract value from $1,855,648.95 to $1,653,877.47. Including contingency, the total project cost was reduced by $387,337.53. The overall schedule for the Project is 40 working days starting on July 15, 2019. Due to changes requested by Staff, the project ultimately was substantially completed on September 18, 2019 at 47 working days. To-date, the Project documentation is completed and all punch-list items were addressed by the contractor. For this reason, staff recommends the City Council to approve the Notice of Acceptance of Completion for the FY 19 Citywide Pavement Maintenance Phase II Project No. 19-PW -252. FISCAL IMPACT/FUNDING SOURCE With the reduction in scope, the total project cost was reduced by $387,337.53. Attachments: 1. Change Order No. 1 6.B Packet Pg. 14 2. Notice of Acceptance of Completion Attachments: 1. Change Order No. 1 for Teichert Construction 2. Acceptance of completion 6.B Packet Pg. 15 To Contract for: FY 19 Citywide Pavement Miantenance Project No. 19-PW-252 Contractor: Teichert Construction Contract Date: May 20, 2019 This order shall become effective when it has been signed by the City Administrator, City Engineer, Project Engineer, and Contractor. All copies forwarded to Contractor for signature shall be returned to The City of Gilroy properly filled out. Upon acceptance by the City, the Contractor's copy will be returned to him as his authority to proceed with the work. Description of Work Item No.Description Qty Unit Unit Cost Cost Ext. 3 4” Grind & Replace AC Pavement (19,778.00)SF $ 5.50 $ (108,779.00) 5 6” Grind & Replace AC Pavement (8,000.00)SF $ 10.00 $ (80,000.00) 6 3” Coldmill AC Pavement (35,899.00)SF $ 0.40 $ (14,359.60) 7 3” AC Pavement HMA Overlay (716.60)TON $ 118.00 $ (84,558.80) 8 Portland Cement Concrete Curb & Variable Width Gutter Remove & Replace (343.00)LF $ 150.00 $ (51,450.00) 13 Lower / Raise Water Valve, Survey Monuments & Handholds (10.00)EA $ 900.00 $ (9,000.00) 14 Lower / Raise Manholes (2.00)EA $ 2,100.00 $ (4,200.00) 17 PCC Access Ramps with Truncated Domes (1.00)EA $ 7,300.00 $ (7,300.00) 19 Crack Seal (58,163.00)SF $ 0.10 $ (5,816.30) 20 Type II Micro-Surface (78.69)ELT $ 400.00 $ (31,476.00) 25 Caltrans Striping Detail 9 (Thermoplastic) (224.00)LF $ 1.25 $ (280.00) 26 Caltrans Striping Detail 21 (Thermoplastic) (675.00)LF $ 2.00 $ (1,350.00) 27 Caltrans Striping Detail 22 (Thermoplastic) (27.00)LF $ 3.00 $ (81.00) 29 Caltrans Striping Detail 27 (Thermoplastic) (817.00)LF $ 2.40 $ (1,960.80) CHANGE ORDER NO. 001 City of Gilroy Engineering Division 7351 Rosanna St., Gilroy, CA 95020 Phone (408) 846-0450; Fax (408) 846-0429 This change order provides for the following: Item 1: Per the direction from the City, the contractor shall remove and reconstruct the stormdrain catch basin cover and lid per the approved standards at the south east corner of 9th Street and Church Street Intersection. All works associated with this additional scope shall be paid for under Force Account per Section 01035 Item 3.0 of the specification. The total cost for this work is $10,598.32 Item 2: Per the direction from the City, the contractor shall repair the pavement distresses on Santa Teresa Boulevard from Sunrise Drive to Mantelli Dr. The said distresses were not marked in the plan and required additional mobilization and different crew and equipment set-up. Therefore, all works associated with this additional scope shall be paid for under Force Account per Section 01035 Item 3.0 of the specification. The total cost for this work is $31,735.37 Item 3: ( Bid Quantity Adjustment) The purpose of this item is to revise the contract amount to reflect the final installed quantities based on actual field conditions and deductions from the contract for items not performed and/or required to complete the work. Section 00310, Bid Schedule, shall be adjusted to include the following: Decrease in Contract Items of Work: 6.B.a Packet Pg. 16 Attachment: Change Order No. 1 for Teichert Construction (2516 : Notice of Completion for the Pavement Maintenance Phase II Project) 35 Caltrans Striping Detail 38A (Thermoplastic) (328.00)LF $ 1.20 $ (393.60) 36 Caltrans Striping Detail 39 (Thermoplastic) (3,349.00)LF $ 1.00 $ (3,349.00) 37 Caltrans Striping Detail 39A (Thermoplastic) (323.00)LF $ 1.00 $ (323.00) 37-1 Triple-4 Crosswalk (1.00)EA $ 1,200.00 $ (1,200.00) 38 Pavement Markings (Thermoplastic) (215.00)SF $ 6.50 $ (1,397.50) 19A Crack Seal (36,588.00)SF $ 0.10 $ (3,658.80) 20A Type II Micro-Surface (16.12)ELT $ 400.00 $ (6,448.00) 22A Caltrans Striping Detail 1 (Thermoplastic) (199.00)LF $ 1.00 $ (199.00) 24A Caltrans Striping Detail 8 (Thermoplastic) (118.00)LF $ 1.00 $ (118.00) 26A Caltrans Striping Detail 21 (Thermoplastic) (63.00)LF $ 2.00 $ (126.00) 28A Caltrans Striping Detail 24 (Thermoplastic) (200.00)LF $ 1.00 $ (200.00) 32A Caltrans Striping Detail 31 (Thermoplastic) (1,506.00)LF $ 2.00 $ (3,012.00) 34A Caltrans Striping Detail 38 (Thermoplastic) (94.00)LF $ 1.75 $ (164.50) 35A Caltrans Striping Detail 38A (Thermoplastic) (1.00)LF $ 1.40 $ (1.40) 36A Caltrans Striping Detail 39 (Thermoplastic) (1,406.00)LF $ 1.00 $ (1,406.00) 37A Caltrans Striping Detail 39A (Thermoplastic) (120.00)LF $ 1.00 $ (120.00) 37-1A Triple-4 Crosswalk (3.00)EA $ 1,200.00 $ (3,600.00) 35B Caltrans Striping Detail 38A (Thermoplastic) (12.00)LF $ 1.40 $ (16.80) 39B Paint Red Curb (300.00)LF $ 3.00 $ (900.00) Total Decrease $ (427,245.10) Item No.Description Qty Unit Unit Cost Cost Ext. 6.1 4” Coldmill AC Pavement 24,342.00 SF $ 0.60 $ 14,605.20 7.1 4” AC Pavement HMA Overlay 468.77 TON $ 119.00 $ 55,783.63 18 Retro fit existing Access Ramps with Truncated Domes 6.00 EA $ 1,500.00 $ 9,000.00 22 Caltrans Striping Detail 1 (Thermoplastic) 663.00 LF $ 1.00 $ 663.00 31 Caltrans Striping Detail 28 (Thermoplastic) 3,365.00 LF $ 2.00 $ 6,730.00 34 Caltrans Striping Detail 38 (Thermoplastic) 835.00 LF $ 1.75 $ 1,461.25 3A 4” Grind & Replace AC Pavement 2,739.00 SF $ 7.00 $ 19,173.00 18A Retro fit existing Access Ramps with Truncated Domes 2.00 EA $ 1,350.00 $ 2,700.00 31A Caltrans Striping Detail 28 (Thermoplastic) 29.00 LF $ 2.00 $ 58.00 38A Pavement Markings (Thermoplastic) 844.00 SF $ 6.00 $ 5,064.00 3B 4” Grind & Replace AC Pavement 5,388.00 SF $ 5.20 $ 28,017.60 17B PCC Access Ramps with Truncated Domes 2.00 EA $ 8,000.00 $ 16,000.00 23B Caltrans Striping Detail 2 (Thermoplastic) 337.00 LF $ 1.25 $ 421.25 27B Caltrans Striping Detail 22 (Thermoplastic) 523.00 LF $ 3.00 $ 1,569.00 Increase in Contract Items of Work: 6.B.a Packet Pg. 17 Attachment: Change Order No. 1 for Teichert Construction (2516 : Notice of Completion for the Pavement Maintenance Phase II Project) 36B Caltrans Striping Detail 39 (Thermoplastic) 1,615.00 LF $ 1.00 $ 1,615.00 37B Caltrans Striping Detail 39A (Thermoplastic) 99.00 LF $ 1.00 $ 99.00 37-1B Triple-4 Crosswalk 1.00 EA $ 1,200.00 $ 1,200.00 38B Pavement Markings (Thermoplastic) 1,138.00 SF $ 6.00 $ 6,828.00 Total Increase $ 170,987.93 $ (256,257.17) P.M. Cost Teichert Construction hereby agree to Original Contract Price 1,855,648.95$ make the above changes Previous Change Orders -$ subject to the terms of this Change Order Total to Date 1,855,648.95$ for the NET DECREASE of: This Change Order (201,771.48)$ Total Change Orders to Date (201,771.48)$ Revised Contract Price 1,653,877.47$ Date: Percentage 0% -11% $201,771.48 CONTRACTOR PRINT NAME AND TITLE By signing this Change Order, Contractor acknowledges and agrees that the adjustments to cost and time contained herein are in full satisfaction and accord, and are accepted as payment in full, for any and all costs and expenses associated with this Change Order, (the "Extra Work"), including but not limited to labor, materials, overhead and profit, delay, disruption, loss of efficiency and any and all other direct and/or indirect costs or expenses associated with the Extra Work and hereby waives any right to claim any further cost and time impacts at any time during and after completion of the Contract associated with the Extra Work. All requirements of the original Contract Documents shall apply to the above work except as specifically modified by this Change Order. Item 4: ( Unit Price Adjustment Per Section 01035 Item 4) Per Section 01035 Item 4, Adjustement in unit prices have been made in accordance with Section 9-1.06B, Increase of More Than 25 Percent, or Section 9-1.06C, Decreases of More Than 25 Percent. This adjustment accounts for all the increased and decreased in quantities. This adjustment is agreed upon as a lump sum change order for a total of $6,734.00 Net Decrease due to this item Item 5: Per the direction from the City, the contractor shall repair the pavement marking along Northbound Santa Teresa from Mantelli Dr. to Day Road East. The total cost for this work is $5,418.00 6.B.a Packet Pg. 18 Attachment: Change Order No. 1 for Teichert Construction (2516 : Notice of Completion for the Pavement Maintenance Phase II Project) RECOMMENDED BY: Construction Manager Date ACCEPTED BY: Project Engineer Date City Engineer Date City Administrator Date 6.B.a Packet Pg. 19 Attachment: Change Order No. 1 for Teichert Construction (2516 : Notice of Completion for the Pavement Maintenance Phase II Project) RECORDING REQUESTED BY: City of Gilroy WHEN RECORDED, MAIL TO: Shawna Freels, City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 (SPACE ABOVE THIS LINE FOR RECORDER'S USE) Notice of Acceptance of Completion FY 19 Citywide Pavement Maintenance Project No. 19-PW-252 Teichert & Son, Inc. SEPARATE PAGE PURSUANT TO GOVT. CODE 27361.6 6.B.b Packet Pg. 20 Attachment: Acceptance of completion (2516 : Notice of Completion for the Pavement Maintenance Phase II Project) RECORDING REQUESTED BY: City of Gilroy WHEN RECORDED MAIL TO: City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 NOTICE OF ACCEPTANCE OF COMPLETION NOTICE IS HEREBY GIVEN that work agreed to be performed under the property agreement between the City of Gilroy, a municipal corporation, whose address is 7351 Rosanna Street, Gilroy, CA 95020, and the Contractor mentioned below who developed said project, was accepted as completed by the City of Gilroy on the 27th Day of January, 2020. Project No.: 19-PW-252 Contractor Name: Teichert & Son, Inc. Contractor Address: 5200 Franklin Dr., Ste 115, Pleasanton, CA 94588 Surety on Contract: Liberty Mutual Insurance Company Location of Project: Gilroy, CA Description of Work: Improvements Interest of City: X Owner in Fee: Vendee under Agreement to Purchase; Lessee; Owner of Easements; Holder of License; x Owner of Streets; Owner of Utilities, Water, Sewer, Storm Systems Owner's Name: City of Gilroy, 7351 Rosanna Street, Gilroy, CA 95020 Work Done: Construct all work as required by Project Plan and Specification. This notice is given in accordance with the provisions of Section 1192.1 of the Code of Civil Procedure and Section 3093 of the Civil Code of the State of California. The undersigned, being duly sworn, deposes and say: That he is an officer of the City of Gilroy, that he has read the foregoing Notice of Acceptance of Completion and knows the contents thereof; and that the same is true of his own knowledge, except as to those matters that he believes it to be true. I certify under penalty of perjury that the foregoing is true and correct. Executed at the City of Gilroy, County of Santa Clara, State of California, on , . CITY OF GILROY STATE OF CALIFORNIA COUNTY OF SANTA CLARA BY Gary Heap TITLE City Engineer Subscribed and sworn to before me on this day of , by , personally known to me or proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. Notary Public in and for the County of Santa Clara, State of California This document is for the benefit of the City of Gilroy. Request for Recordation without fee is made in accordance with Section 27383 of the Government Code of the State of California. 6.B.b Packet Pg. 21 Attachment: Acceptance of completion (2516 : Notice of Completion for the Pavement Maintenance Phase II Project) City of Gilroy STAFF REPORT Agenda Item Title: Adoption of a Resolution of the City Council of the City of Gilroy to Declare Weeds and Refuse a Public Nuisance to Begin the Annual Weed and Refuse Abatement Process Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Fire Department Submitted By: Mark Bisbee Prepared By: Mark Bisbee Miguel Trujillo Strategic Plan Goals ☐ Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services  Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION Adopt a Resolution of the City Council of the City of Gilroy declaring certain weeds growing in the City and accumulations of refuse in the City to be a public nuisance, describing said weeds and refuse which constitute such nuisance, and providing notice of the adoption of the resolution by publication thereof . EXECUTIVE SUMMARY Gilroy City Code, Chapter 12, Article III, establishes a procedure for abatement of weeds and refuse. The annual weed and refuse abatement program includes an initial resolution declaring weeds and refuse a public nuisance. The resolution sets April 6, 2020 for a public hearing of the list of properties subject to abatement. The list created for public hearing includes sites identified as having a weed or refuse problem in the 6.C Packet Pg. 22 current year as well as during any one of the prior three years. Adoption of the list at the public hearing provides authority for the City (or its contractor) to perform the abatement of weeds and/or refuse for the listed sites, and provides for cost recovery by adding it to the property owners property tax bill as an assessment. BACKGROUND Pursuant to an agreement signed in 2010 between the City of Gilroy and the Santa Clara County Agriculture Commissioner’s Office, the County Vegetation Management Program has been implementing the weed abatement program as a contractor to the City. Under the agreement, all abatement activities are conducted by the County to include the noticing of property owners, property inspections, and the collection of abatement fees and inspection costs. The City is responsible for adopting necessary resolutions and conducting public hearings on the matter. ANALYSIS Program Details The list created for the public hearings includes sites identified as having a weed or refuse problem in the current year as well as during any one of the prior 3 years. County staff will mail the initial abatement notice to identified property owners within 2 weeks of the resolution adoption. Required information in the weed abatement notice includes the public hearing date, instructions on proper abatement of the sites, and the May 15, 2020 deadline for abatement activities. In addition, the notice also identifies the consequences for not meeting the deadline. All identified sites will be required to pay the initial inspection fee, currently set at $101. If a site is abated by the May 15, 2020 abatement deadline then additional fees, such as re-inspection fees and/or abatement oversight fees, will not be assessed. The property owner is required to maintain the abated site and failure to do so will result in the assessment of additional fees. All properties must be free of fire hazards throughout the year to meet minimum safety standards. Sites that are identified to have weed and/or refuse problems will remain on the list for at least three years. However, property owners have the ability to have their property removed from the list. For instance, a site that has achieved three “compliant” years in a row, or a vacant site that has since been developed and is fully landscaped may be removed from the list. After the initial outreach, the County will also send all property owners a reminder letter 30 days prior to the May 15, 2020 abatement deadline. After May 15, 2020 the County will conduct inspections and notify those property owners who have not abated their properties. For sites not in the Wildland Urban Interface (WUI) Hazardous Fire Area, the property owner has two weeks to complete 6.C Packet Pg. 23 the work. If abatement is completed prior to the next inspection, these properties will not be subject to additional fees. The two-week extension is not provided to properties in the WUI Hazardous Fire Area because these areas are considered to have high fire hazards. In addition, the Public Resources Code requires weed abatement in these areas without any extensions. For sites in the WUI Hazardous Fire Area, the County will immediately assign the site for abatement by a private contractor. Any site that is abated by the County will be assessed the inspection fee ($101), the failed inspection fee ($582) and the cost incurred by the abatement contractor, which is based on square footage of the site, as well as the abatement oversight cost ($984). Since the implementation of this program in 2010, the number of sites on the County’s list has fluctuated from year to year but the numbers for Gilroy have dropped consistently in the last three years. In Gilroy, there were 288 s ites identified in 2017, 166 sites were identified in 2018, and as of the end of 2019, there are146 sites identified on the list. Key dates associated with this year’s program are as follows: January 27, 2020 City Council Resolution of Public Nuisance February 11, 2020* County Notification to Listed Property Owners April 6, 2020 Public hearing to consider List of Properties requiring abatement April 16, 2020* County Notification of Abatement Deadline May 15, 2020 Abatement Deadline May 30, 2020* County conducts initial inspections June 12, 2020* Extended Deadline for non-WUI properties only August 3, 2020* Public hearing for City Council to Authorize Assessments *Dates are approximate at this time, and provide an estimate as determined by responsible Agency. FISCAL IMPACT/FUNDING SOURCE The use of the County as a contract agency to carry out their portions of the program has been self-funded through cost recovery from property owners that have failed to abate their sites. The Fire Marshal’s office absorbs the staffing cost for coordination and communication with the County, the pre-hearing meeting when a property owner appeals the fees, and processing of the Council Resolutions and Public Hearings. If the County does not collect adequate funds to meet th e program budget, they will prorate the shortfall to the cities based on the percent of the properties from each City in 6.C Packet Pg. 24 the program. We will not know until later in the year if there is a budget shortfall because abatement activities will continue through October. Historically, the County has not had a budget shortfall because they have collected adequate fees directly from the property owners to cover the cost of the program. NEXT STEPS If Council adopts the resolution, the public hearing of sites needing abatement will be set for April 6, 2020. In addition, a report of the property assessments will be presented to City Council at a public hearing on August 3, 2020. Prior to the hearing, property owners are invited to contact the Fire Marshal to review any assessments they believe are in error. A final list will be presented to the City Council for approval of the assessment. The County Property Tax Assessor will then place the fees on the next property tax bill as an assessment. PUBLIC OUTREACH As part of the annual program, property owners receive two Weed and Refuse Abatement notices that clearly identify the requirements of the program. Pursuant to the program requirements, the County also notifies property owners when their properties fail inspections. Attachments: 1. Resolution 2020 Weed Abatement Initiation 2. 2020 Gilroy Commencement report 6.C Packet Pg. 25 1 RESOLUTION NO. 2020-XX 6RESOLUTION NO. 2020-XX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY DECLARING CERTAIN WEEDS GROWING IN THE CITY OF GILROY AND ACCUMULATIONS OF REFUSE IN THE CITY OF GILROY TO BE A PUBLIC NUISANCE, DESCRIBING WEEDS AND REFUSE WHICH CONSTITUTE SUCH NUISANCE, AND PROVIDING NOTICE OF THE ADOPTION OF THE RESOLUTION BY PUBLICATION THEREOF WHEREAS, certain weeds are growing in the City of Gilroy (“City”) upon the various streets, alleys, sidewalks and upon private property, which weeds bear seeds of a wingy or downy nature, or which may attain such growth as to become, when dry, a fire menace, or which are otherwise noxious and dangerous; and WHEREAS, certain refuse is accumulating in the City upon public and private property; and WHEREAS, said weeds and refuse constitute a public nuisance. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Gilroy as follows: 1. That such weeds and refuse do now constitute and will continue to constitute a public nuisance, and it is ordered that said public nuisance be abated in the manner provided by Article III of Chapter 12 of the Gilroy City Code. 2. That said nuisance exists upon all of the streets, alleys, sidewalks and private property within said City as shown, described and delineated on the several maps of the property in the City which are recorded in the Office of the County Assessor of the County of Santa Clara, reference in each instance for the description of any particular street, alley or private property being hereby made to the several maps aforesaid, and in the event of there being several subdivision maps on which said lots are shown, reference is hereby made to the latest subdivision map. 3. That it is ordered that Monday, the 6th of April 2020, at the hour of 6:00 o'clock p.m. in the Council Chambers of the City Council of the City, 7351 Rosanna Street, Gilroy, California, is hereby fixed as the time and place when objections to the proposed destruction or removal of said weeds and refuse shall be heard and given due consideration. 6.C.a Packet Pg. 26 Attachment: Resolution 2020 Weed Abatement Initiation (2574 : Resolution to Declare Weeds and Refuse a Public Nuisance) 2 RESOLUTION NO. 2020-XX 4. That the Chief of the Fire Department of the City is hereby ordered and directed to cause notice of the adoption of this resolution and notice of said hearing to be given to all of the affected property owners at their stated mailing address on the latest tax assessor’s role, and also to be given in the manner and form provided in Sections 14.29 and 12.53 of the Gilroy City Code, and to cause said notice to be published in the City, at least ten (10) days prior to said hearing; and 5. That nothing in this Resolution prohibits the issuance of citations for violations of City Code Section 12.46 or City Fire Code with regards to Section 304.1.2. PASSED AND ADOPTED this 27th day of January, 2020 by the following roll call vote: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: APPROVED: ______________________________ Roland Velasco, Mayor ATTEST: Shawna Freels, City Clerk 6.C.a Packet Pg. 27 Attachment: Resolution 2020 Weed Abatement Initiation (2574 : Resolution to Declare Weeds and Refuse a Public Nuisance) 2O2O WEED ABATETI'IENT PROGRAMCOMMENCEMENT REPORTCITY OF GILROYSitusHECKER PASSHECKER PASSWINTERWINTERCALLE DELGUAYMASHOLLYHOCKSUNFLOWERPHEASANTFOXGLOVEV/ILD IRISWILD IRISLAVENDERPEREGRINEHOYAHOYABANYANGUNNERACAROBCAROBCAROBTEATREETEATREEAPN783-01 -033783-02-026783-03-073783-03-077783-34-121783-37-01 5783-45-044783-47-003783-50-050783-52-019783-52-029783-52-031783-52-035783-55-01 I783-64-021783-64-022783-65-022783-65-024783-72-011783-72-016783-72-018783-72-023783-72-024CITY/STATEGILROYGILROYGILROYGILROYCARLSBADGARDENDALECUPERTINOSARATOGAGILROYGILROYCUPERTINOGILROYSANTACLARAGILROYSAN JOSEGILBERTGILROYHOUSTONGILROYCAMPBELLMERCEDMORGAN HILLGILROY95020-88369s020-883795020-7931950208822135071-4tts950149s07095020-8203950209501495020-0000950519s0209s123-2t4t8529795020-00007708495020-000095008-23339534095037-000095020-0000l 70517358340835 I9298907500l 3838772877587551950l38l2311233123549l2l1881l 830l8l0904590s0HYHYCTCTSTCTLNCLDRCTDRDRWYDRLNLNSTLNCTCTCTV/YWYGO}/4EZ, RAMIRO AND MARISELARLUTHERAN CHURCH OF THE GOODMARQUES,ALBERTSLTNSET HILLS DEVELOPMENT LLCHERNANDEZ, ESMERALDA ETALBASS, CLARENCE AAND KIMBERLY AENTERPRISE REI 8 LLCENTERPRISE REI 8 LLCARDANUY, PAUL AND JACQUELYN MSAULAN, KIMCHAU THI TRUSTEEKOLLAREDDY, SRIDHARZARGARIAN, HELGAVERMA, ASHISH TRUSTEE & ETALSANTO EDWIN ICHIRO TRUSTEEREYES, OSCAR JAND SHIRLEYANN GHARALAMBIDIS, CATHRYNE ET ALKARßALEINEMATMOEINI,VU, FRANK H TRUSTEEHY SANG ANDYEH, V/EN CHUANARAKELIAN,ELIZAOP DEVELOPMENT INCCHAKAMIAN, SHARAREH H ANDPAWLICKI,AGNIESZKAI7O5 HECKER PASS HY1735 HECKER PASS HY2O2O ROCKROSE CT575 SOUTHSIDE DR STE C0 P.o. Box 46343OO SPRINGBROOK LNIO44O DEANZABL STE D5A24168 BIG BASIN WY1383 PHEASANT DR4125 HECKERPASS RD7948MCCLELLAN RD APT I8755 WILD IRIS DR970 WOOD DUCKAV1381 PEREGRINE DR85 HAYESAV2991 PORTOLAVALLEYDRE2I2I CRUDENBAYWYI45O FRY RDI841 CAROB CT760 CAMPBELLAV EAPT IOI45 RIGGSAVI94O PEARDR9O5O TEATREE WYCACACACANMALCACACACACACACACACAAZCATXCACACACACA23 records of 146Santa Clara County Weed Abatement ProgramPage I6.C.bPacket Pg. 28Attachment: 2020 Gilroy Commencement report (2574 : Resolution to Declare Weeds and Refuse a Public 2O2O WEED ABATEÍUIENT PROGRAMCOMMENCEMENT REPORTCITY OF GILROYSitus APN979 STORYRD#7024T94SMCCLELLANRDAPT 138 PARK FLETCHER PL2250 CEDARSIDE CT2165 HOLLYHOCK CT1940 KILLARNEY CTI5858 RICAVISTAWY407 UNIVERSITYAVI9O FENNEL CT222MARGARITAAV1940 PEARDR1225 VIENNADR#2512224 BANYAN CT1784 LENNOX WY3087 OAKBRIDGE DR2253 BANYAN CT8937 HIDDEN CANYON RD901 CALLE SERRA39224 GUARDINO DR 21675 FARRELLAV1952 EISENHOWER DR3295 KLOETZEL LN946 STANLEYAVCITY/STATESAN JOSECUPERTINOSAN JOSESAN JOSEGILROYGILROYSAN JOSELOS GATOSMORGAN HILLPALOALTOMORGAN HILLSUNNYVALEGILROYSALINASSAN JOSEGILROYSALINASSAN DIMASFREMONTGILROYSANTACLARASAN JOSELOSALTOS9030902s89628981897189s I8950089839005220422032224224392lt22532283220216817595t7l8877TEATREEMIMOSATEATREETEATREETEATREETEATREEMIMOSAMIMOSAMIMOSAMIMOSABANYANBANYANBANYANBANYANMAHOGANYBANYANBANYANCOLUMBINELONGMEADOFARRELLFARRELLRONANMONTEREYwY 783-72-026cr 783-72-027v/Y 783-72-030wY 783-72-031wY 783-72-033wY 783-72-034cr 783-72-035cr 783-72-036cT 783-72-037cT 783-72'038cr 783-72-039cr 783-72-040cr 783-72-042cr 783-72-043cr 783-72-049cr 783-72-050cr 783-72-052cr 783-72-061cr 783-75-081AV 790-07-006AV 790-07-007AV 790-15-009RD 790-15-036DO,NGOC BICHTHI ETALKOLLAREDDY, USHARANI ETALTHIEN, TRACYNRIASSOCIATES LLCLIU, HONGXUANBALAGANI, VENKATA AND SLINITHAPHAM, LAN ETALSR BUILDING BLOCKS LLCTRAN, THANH QUANG AND CHAU,SMITH, DARRYL AND SMITH-LEE,CHAKAMIAN, SANJAR ANDROBLES, RONALD EAND MARIARNAKANO, NANCYN ETALWANG, LEO AND DIAN HNGUYEN, THUAN TUNGZHANG, HONGXIN AND TANG, WEILUEDTKE, GREGORY AND YOLINGGIKRUPA, STANISLAW TRUSTEE & ETDHALIWAL, JASDEEP S ETALLEAL, PALMINA ANDAMADORKUANG, WEIWEINGUYEN, THUAN AND LE, HUONGMARGARETICH, BOZO AND VANJACACACACACACACACACACACACACACACACACACACACACACACA951229501495136-240395 I I 6-00009s020-00009s020-305495127-000095032-441195037-000094306-282295037-00009408995020939069s12195020-000093907917739453895020-761695054-162195 148-000094024-s06746 records ol 146Santa Clara County lVeed Abatement ProgramPage 26.C.bPacket Pg. 29Attachment: 2020 Gilroy Commencement report (2574 : Resolution to Declare Weeds and Refuse a Public 2O2O WEED ABATEMENT PROGRAMCOMMENCEMENT REPORTCITY OF GILROYAPN9145 JARDIN WAY1437 LEIMERT BL #C750 MENLO AV STE 25043I WELBURNAVPO BOX 15571648 Mutberrv Ln1071 WHILLCTII FIRST STISOO TAPO CANYON RDISOO TAPO CANYON RDISOO TAPO CANYON RDISOO TAPO CANYON RDISOO TAPO CANYON RD1648 MULBERRY LNI5I9I KARLAV409 WASHINGTON ST 2OI12005 TURLOCKAV860 MAPLEAV335I M STREET #1OO8IO SAN PEDRO ST STE 2OO0 3050 3057750 EIGLEBERRY STCITY/STATEGILROYOAKLANDMENLO PARKGILROYGILROYSan JoseCUPERTINOGILROYSIMI VALLEYSIMI VALLEYSIMI VALLEYSIMI VALLEYSIMI VALLEYSAN JOSEMONTE SERENOMONTEREYSAN MARTINSAN MARTINMERCEDSAN JOSESAN JOSESAN JOSEGILROY9145913091604314018051026s2552953053158365137513 s58771305108773377 t\7750JARDINKERNKERNWELBURNBROADWAYCHURCHCHURCHCHURCHGURRIESGURzuESGURRIESGURzuESGURRIESCHURCHCHURCHlSTlSTCHURCHCOHANSEYCHICKADEEMONTEREYMONTEREYEIGLEBERRYwY 790-16-257AV 790-17-002AV 790-17-003AV 790-30-065sr 790-33-019st 790-35-001sr 790-35-002sr 790-35-008DR 790-35-040DR 790-35-041DR 790-35-042DR 790-35-043DR 790-35-044sr 790-36-002sT 790-36-038sr 790-39-019sr 790-39-030sr 790-53-087AV 790-65-092LN 790-66-057RD 799-03-054RD 799-03-055sr 799-03-069BROOKS JULIAM ETALCRC KERN INVESTORS LLCST FRANCIS INVESTMENT IIITORRES, MARGARETFLORESANTHONYRHowson IndustriesMAWEIMIN TRUSTEE & ETALROMAN CATHOLIC BISHOPOF SANDEUTSCHE BANK NATIONAL TRUSTDEUTSCHE BANK NATIONAL TRUSTDEUTSCHE BANK NATIONAL TRUSTDEUTSCHE BANK NATIONAL TRUSTDEUTSCHE BANK NATIONAL TRUSTHOWSON INDUSTRIESMONTANO, AL TRUSTEE & ETALFRI SONE FAMILY PARTNERSHIPYOUMANS, KRAIG AND FORTINO,GORAYA, MANU KCENTRAL VALLEY COALITIONPACIFIC BAY CAPITAL GROUP LLC771I MONTEREYRD LLC77II MONTEREYRDLLCBECERRA, CLEMENTE PINEDA ANDCACACACACACaCACACACACACACACACACACACACACACACACA95020946029402595020-432595021-tss79st2s-494295014-506395020930639306393063930639306395125-494295030-222993940-305495046-943295046-9s38953489stt395 13895 1389s020-5r2569 records oÍ 146Santa Clara County Weed Abatement ProgramPage 36.C.bPacket Pg. 30Attachment: 2020 Gilroy Commencement report (2574 : Resolution to Declare Weeds and Refuse a Public 2O2O WEED ABATETIIENT PROGRAMCOMMENCEMENT REPORTCITY OF GILROYSitus76010720101957421756006700800000000APNMONTEREYEIGLEBERRYEIGLEBERRYEIGLEBERRY9THHANNAMILLERRD 799-04-008sr 799-09-028sr 799-09-038sT 799-10-042sT 799-10-057sr 799-18-031AV 799-24-024799-24-025sr 799-33-001sr 799-34-036DR 799-44-093wY 799-44-094wY 799-44-095wY 799-44-096wY 799-44-097wY 799-44-098RD 799-44-109799-44-110sr 808-01-021DR 808-01-024LN 808-20-008AV 808-21-009DR 808-26-0525387 SILVER TRAIL CT14639 BADGERPASS RD8265 V/ATSONVILLE RD3435 HARBOR CT0 Po Box 193742I HANNAST858I AMANDAWY858I AMANDAWY6700 CHURCH ST965 LAUREL GLEN DR144 WESTLAKEAVI44 WESTLAKEAVI44 WESTLAKEAVI44 WESTLAKEAVI44 WESTLAKEAVI44 WESTLAKEAVI44 WESTLAKEAVI44 WESTLAKEAV21701 STEVENSCRKBLV0PoBox23278886 MURAOKADR6300 MONTEREYRD7698 BENASSI DRCITY/STATESAN JOSEMORGAN HILLGILROYSAN JOSESAN MARTINGILROYGILROYGILROYGILROYPALOALTOWATSONVILLEWATSONVILLEWATSONVILLEWAISONVILLEWATSONVILLEWATSONVILLEWATSONVILLEWATSONVILLECUPERTINOGILROYGILROYGILROYGILROYCHURCHlOTHFILBROROYALROYALROYALROYALROYALTHOMASNO SITUSISTPONDEROSATHOMASWESTBENASSIBIIOUX LLCAPOR, PETE EAND ROSARIO JMATOS, CARLOSALFREDO B ETALBAINS, JAGJIT SINGHDIAZ, JUANJEUNG MICHAELAETALTHOMA, MELINDA WAND PAUL FTHOMA, MELINDA WAND PAUL FMONSEF, CYRUSNAJAFI, HAMID AND SHAHRZADELITE DEVELOPMENTS INCELITE DEVELOPMENTS INCELITE DEVELOPMENTS INCELITE DEVELOPMENTS INCELITE DEVELOPMENTS INCELITE DEVELOPMENTS INCELITE DEVELOPMENTS INCELITE DEVELOPMENTS INCEAGLE GARDEN LLCPIROZZOLI, MONICA TRUSTEE & ETFIRSTASSEMBLYOF GOD OF GILROYMCDERMOTI MICHAEL ETALMORzuSSEY CHARLES PCACACACACACACACACACACACACACACACACACACACACACACA95 138-00009s037-s90495020-942795127-431r9s04695020-s723950209502095020-650894304950769s076950769507695076950769507695076950t495021950209s02195020-4778141000l0769892 records of 146Santa Clara County Weed Abatement ProgramPage 46.C.bPacket Pg. 31Attachment: 2020 Gilroy Commencement report (2574 : Resolution to Declare Weeds and Refuse a Public 2O2O WEED ABATEMENT PROGRAMCOMMENCEMENT REPORTCITY OF GILROY61512740075188605THOMASNO SITUSHECKER PASSMESANO SITUSFERNIEMURRAYMURRAYLASANIMASLASANIMASTOMKINSMADISONSANYSIDROLASANIMASSANYSIDROSANYSIDROLASANIMASLASANIMASLASANIMASCOHANSEY(MURRAY)SV/ANSTONNO SITUSAPNRD 808-39-066810-20-021RD 810-20-033RD Bl0-30-032810-66-0'12cT 810-67-041AV 835-01-003AV 835-0'1-059AV 835-02-013AV 835-02-016cT 835-02-023cr 835-03-059835-04-078AV 835-04-082AV 835-04-085AV 835-04-086AV 835-05-005AV 835-05-006AV 835-05-007AV 835-05-016(AV)835-31-030LN 841-01-064841-02-04650 ENORTH TEMPLE FL2223 CORPORATEPL I5O1999 BASCOM AV S 7OO525 UNIVERSITYAV STE 2OO22020THAVW7518 FERNIE CT15I9I KARLAVPOBOX1772707 MONROE STN0PoBox177214010 COLUMBETAV985 MONTEBELLO DR 105 E0 P.o.Box 69913575 MAMMINI CT13575 MAMMINI CT13575 MAMMINI CT296 DELIA STPOBO){1772707 MONROE STN19565 GLEN UNADR84 W SANTA CLARA ST LINIT18640 SUTTERBL STE IOOIOO3I FOOTHILLS BLVDCITY/STATESALT LAKE CITYNEWPORTBEACHCAMPBELLPALOALTOSAN MAIEOGILROYMONTE SERENOGILROYSAN JOSEGILROYSAN MARTINGILROYDANVILLESAN MARTINSAN MARTINSAN MARTINSAN JOSEGILROYSAN JOSESARATOGASAN JOSEMORGAN HILLROSEVILLECORP PRESI BISH CHURCH CHRISTHPAG LAND LLCHECKER PASS COMMERCIAL LLCCASTRO VALLEY PROPERTIES LLCVILLAGE GREEN CUSTOM HOME LLCRADOSEVICH, ERIC J TRUSTEEMONTANO, ALHOPE FOREST LLCGLANDER, CARMELLA R TRUSTEEATLANTIC CONCRETE INCMARTIN,INEZ M TRUSTEEZEPEDA,ALFREDO ANDGILROY SELF STORAGEPARTNERSGRËEN, GEORGE EAND LYNDAMGREEN, GEORGE EAND LYNDAMGREEN, GEORGE EAND LYNDAMDO HUONG MINHAND TRAN HUELAS ANIMAS DEVEL CO LLCGLANDE& CARMELLA R TRUSTEEGERANICHOLAS TRUSTEE & ETALFA2OI7 LLCSWANSTON LANE LLCUNION PACIFIC CORPORATIONUTCACACACACACACACACACACACACACACACACACACACACACA841s0-3620926259500894301944039s020-000095030-2229950219s128-134395021-177295046-97109s020945269s0469s0469504695127-22059502195128-134395070-641r95113950379s7472r0037040290806009096909003151354100ll5 records oÍ 146Santa Clara County \ileed Abatement ProgramPage 56.C.bPacket Pg. 32Attachment: 2020 Gilroy Commencement report (2574 : Resolution to Declare Weeds and Refuse a Public 2O2O WEED ABATEMENT PROGRAMCOMMENCEMENT REPORTCITY OF GILROY81 5539531176101112227472749807tOt0s87069006503SWANSTON LNNO SITUSLEWIS STLEWIS STFOREST STLEWIS STMARTIN STCHESTNUT STCHESTNUT STSOUTH FYALEXANDER STSOUTH FYNO SITUSNO SITUSMONTEREY RDCAMERON BLCAMERON BLNO SITUSNO SITUSNO SITUSNO SITUSNO SITUSPACHECO PASS HYCHARRON, STEVEN A TRUSTEEDRL PROPERTIES LLCNGUYEN, HUNG QAND LE, HONG TRODRIGUEZ, QUIRINO V ANDOLIVERI, SALVATOREAGILROY LEWIS STREETL PLIU, DENG AND CHEN, SASHAFERNANDEZ, FABIAN ETALMOREY, EDWARD J AND MEGAN DPACIFIC GASAND ELECTRIC COUNION PACIFIC CORPORATIONUNION PACIFIC CORPORATIONLINION PACIFIC CORPORATIONUNION PACIFIC CORPORATIONGARLIC FARM TRUCK CENTERLLCMCCARTHY GILROY LLCMCCARTHY GILROY LLCUNITED NATURAL FOODS WEST INCUNITED NAIURAL FOODS V/EST INCSOUTH COUNTYVENS LLCSOUTH COLTNTYVENS LLCNGUYEN, THU TAMCAPRARA, DENNIS TRUSTEE & ETAL841-02-054841-02-055841-03-062841 -03-070841-03-071841-04-029841-06-040841-07-043841-07-049841 -1 0-039841-13-021841-14-059841 -1 4-060841-14-072841-14-080841-17-100841-17-107841-17-119841-17-121841 -1 8-086841-18-087841 -53-066841-70-0141225 EMORY ST2545 MUIRFIELD WYI1485 NEWAV3II LEWIS ST7610 FOREST STI5I KALMUS DR STE J525855 CONARD LN S7472 CHESTNUT ST7498 CHESTNUT STIII ALMADEN BLVDIOO3I FOOTHILLS BLVDIOO3l FOOTHILLS BLVDIOO3I FOOTHILLS BLVDIOO3I FOOTHILLS BLVD5OOO 2ND ST E G2IOALMENDRAAV2IOALMENDRAAVIOO OLIVER ST FLR ISTHIOO OLIVER ST FLR I8TH7960 BSOQUEL DRIVE #371635 CAMPBELL TECH PY IOO26T3MCLAUGHLINAV31958 GLORIARDCITY/STATESAN JOSEGILROYGILROYGILROYGILROYCOSTAMESALOS MOLINOSGILROYGILROYSAN JOSEROSEVILLEROSEVILLEROSEVILLEROSEVILLEBENECIALOS GATOSLOS GATOSBOSTONBOSTONAPTOSCAMPBELLSAN JOSEGONZALESCACACACACACACACACACACACACACACACACAMAMACACACACA95126-170695020-000095020-90279s020-522095020-s2029262695055-959095020-580695020-5806951 l5-00059574795747957479574795030-721195030-72112tt02tt095003950089s12r-275293926-94010138 records of 146Santa Clara County Weed Abatement ProgramPage 66.C.bPacket Pg. 33Attachment: 2020 Gilroy Commencement report (2574 : Resolution to Declare Weeds and Refuse a Public 2O2O WEED ABATETI'IENT PROGRAMCOMMENCEMENT REPORTCITY OF GILROYSitusHOLLOWAYHOLLOV/AYCAMINOROSSILUCHESSATRAVELPARKOBATACAMERONAPN841-70-026841-70-037841-70-049841-72-001841 -73-005841-75-011841-79-006841 -84-009CITY/STATF],SAN JOSEGILROYMILPITASLOS GATOSWEST PALM BEACHLINCOLNSARATOGALOS GATOS95127-2433950209s03s-472395030-2933334069564895070-430495030-721185055569705885059803006601RDRDLNAVCLCTBLLOUGHRAN,ALEXANDERROCHA, JOE AAND VICTORIA MTEMPLE GILROY LLCFORTUNADEL TIEMPO LLCLONESTAR CALIFORNIA INCHOANG, VINCEAN TRISEALAKE CORPORATIONMCCARTHY GILROY LLC237 LAUMERAV575 SOUTHSIDE DR527 SIMAS DR19910 SUNSET DRI5OI BELVEDERE RD5240 MONTEVERDE LN2O3lOARGONAUT DR2IOALMENDRAAVCACACACAFLCACACA146 records ol 146Santa Clara County Weed Abatement ProgramPage 76.C.bPacket Pg. 34Attachment: 2020 Gilroy Commencement report (2574 : Resolution to Declare Weeds and Refuse a Public Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Pedro Jaime Rosso this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Man of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 35 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Elaine Bonino this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Woman of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 36 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Cresco Equipment Rentals this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Large Business of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 37 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Straw Hat Pizza this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Small Business of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 38 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Lisa Blagof this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Volunteer of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 39 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Donna Kline this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Educator of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 40 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to South County Tail Waggers this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Nonprofit of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 41 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Jane Tovar this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Youth Leadership Awardee During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 42 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Majesta Patterson this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Young Professional of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 43 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Gianfranco Filice this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Young Professional of the Year During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 44 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Gilroy Fire Department this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Special Recognition Awardee During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 45 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Gilroy Police Department this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Special Recognition Awardee During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 46 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL Certificate of Commendation The Mayor and City Council of the City of Gilroy Issues to Gilroy Foundation this Certificate in Recognition of your Distinction as the Gilroy Chamber of Commerce 2020 Special Recognition Awardee During the 67th Annual Spice of Life Awards Celebration _________________ Mayor Roland Velasco 6.D Packet Pg. 47 Communication: Certificates in Recognition of the 2020 Chamber of Commerce Spice of Life Awardees (CONSENT CALENDAR (ROLL CALL City of Gilroy STAFF REPORT Agenda Item Title: Approval of a Letter of Opposition to Senate Bill 50 (Wiener) That if Signed into Law Would Greatly Undermine Gilroy's Local General Planning Efforts by Allowing Developers to Make Local Planning and Zoning Decisions Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Administration Submitted By: Gabriel Gonzalez Prepared By: Trevin Barber Trevin Barber Strategic Plan Goals  Fiscal Stability  Downtown Revitalization  Economic Development ☐ Neighborhood Services  Enhanced Public Safety ☐ Workforce Stability  Public Engagement RECOMMENDATION Approve letter in opposition to Senate Bill 50. EXECUTIVE SUMMARY Senate Bill 50 would override local building and zoning codes and provide developers with significant discretion. In this report the City Council is presented with a brief analysis on SB 50. The League of California Cities is asking Cities to consider taking a position of “oppose-unless further amended.” A draft letter of opposition is attached. BACKGROUND 6.E Packet Pg. 48 California is a geographically and demographically diverse state, and that is reflected in its 482 cities and 58 counties. Local elected officials are charged by the California Constitution with protecting their citizens’ welfare. One chief way local governments do this is by exercising control over what gets built in their community. Local officials weigh the need for additional housing against the concerns and desires of their constituents. Where appropriate, those officials enact ordinances to shape their communities based on local conditions and desires. Moreover, these planning actions and decisions take place within the confines of state laws that require local governments to plan and zone for new housing, subject to approval by the California Department of Housing and Community Development (HCD), and under threat of fines for improper denial as a result of recent legislation. Senate Bill 50 was introduced by Senator Wiener at the beginning of the current legislative session on December 8, 2018. The intention of the bill is to support the Governor’s plan to enable the construction of 3.5 million new units of housing in California by 2025. ANALYSIS Senate Bill 50 would override local building codes, letting developers create more housing and denser housing. It would force cities to permit the construction of apartment buildings and fourplexes regardless of zoning. Key points regarding Senate Bill 50:  Recent amendments attempt to create an alternative planning process for jurisdictions to develop a “local flexibility plan” that, if approved by HCD, would exempt cities from nearly all aspects of SB 50 with the exception of requiring fourplexes in single-family zones. Unfortunately given the lack of clarity and legislative direction, staff cannot evaluate whether the “local flexibility plan” is a viable alternative.  Wastes time and money. SB 50 would greatly undermine locally adopted General Plans, Housing Elements (which are certified by HCD, and Sustainable Community Strategies (SCS). By allowing developers to override state approved housing plans, SB 50 seriously calls to question the need for cities to develop these community based plans and the justification for spending millions of state and local funds on the planning process. 6.E Packet Pg. 49  Gives away planning and zoning decisions to developers and transit agencies, who are unaccountable to local voters. Housing developers and transit agencies would have the power to determine hou sing densities, heights up to 55 feet, parking requirements, and design review standards for “transit -rich housing projects” within one-half mile of a major transit stop. For those “transit- rich housing projects” within one-quarter mile radius of a stop on a high-quality bus corridor, developers would be able to determine housing density, and parking requirements above .5 spots per unit.  Creates difficult to define terms. As presently drafted, it is very difficult to determine what constitutes a “jobs-rich area” since the HCD and the Office of Planning and Research (OPR) are largely tasked with making that determination.  Provides greater density and no transportation solutions. SB 50 would require cities to allow greater density in communities that are high opportunity and jobs rich, but may lack access to public transit. This seems at odds with many state policies that encourage and incentivize more dense housing near transit so that individuals may become less dependent on automobiles.  Creates arbitrary and unfair exemptions. SB 50 allows small cities in small counties to be exempt from the most extreme provisions. Shouldn’t all jurisdictions have the ability to have a community-led planning process that takes into account local needs and input as long as state objectives are still met? Instead of arbitrarily establishing a population metric, wouldn’t it be much more appropriate to consider the full range of community characteristics when determining which areas of the state SB 50 should apply. CONCLUSION Senate Bill 50 was drafted to take control away from locally elected councils and committees. While the pursuit of trying to lower the cost of housing is noble, removing local control and community input on neighborhood development is contrary to the well- established democratic principles of home-rule. The City Council may to choose to formalize their opposition via a letter from the Mayor to Senator Wiener. Such a letter has been drafted and is attached for reference. Attachments: 6.E Packet Pg. 50 1. SB 50 Opposition 2020-01-27 - Draft.v3 6.E Packet Pg. 51 City of Gilroy Mayor’s Office City Hall 7351 Rosanna Street Gilroy, California 95020-6197 Roland Velasco, Mayor roland.velasco@cityofgilroy.org City Hall Office (408) 846-0227 Cell Phone (408)710-8508 www.cityofgilroy.org January 27, 2020 The Honorable Scott Wiener State Senator California State Senate State Capitol Building, Room 5100 Sacromento, CA 95814 RE: SB 50 (Wiener) Planning and Zoning. Housing Development Incentives: Oppose Unless Amended (as amended 01/06/2020) Dear Senator Wiener, We regret to inform you that the City of Gilroy must oppose SB 50 unless the measure is further amended to address our community’s key concerns. The amendments taken on January 6, 2020 do not take into account our primary objections to SB 50. The City of Gilroy is pleased to see that recent amendments attempt to create an alternative planning process for jurisdictions to develop a “local flexibility plan” that, if approved by the California Department of Housing and Community Development (HCD), would exempt cities from nearly all aspects of SB 50 with the exception of requiring fourplexes in single-family zones. Unfortunately we can’t evaluate whether the “local flexibility plan” is a viable alternative because the amendments do not clearly identify the elements of the plan.  Specific Concerns with the January 6, 2020 Amendments: It appears that the intent of the amendments are to provide local governments with an opportunity to develop their own plan to meet the goals and objectives of SB 50. Although the goal of increased density around transit is clear; the goal of the bill regarding a jobs-rich housing project is not. The amendments, as drafted, raise the following concerns: o Without clearly identified criteria, we are unable to evaluate whether the “local flexibility plan” is a viable alternative planning option. 6.E.a Packet Pg. 52 Attachment: SB 50 Opposition 2020-01-27 - Draft.v3 (2620 : SB50 Opposition) o OPR and HCD are tasked with developing “rules, regulations, or guidelines” for the submission and approval of a local flexibility plan” without sufficient direction from the Legislature. This rulemaking process is exempt from the Administrative Procedures Act, thus allowing the Office of Planning and Research (OPR) and HCD to craft rules, regulations, or guidelines with little to no public input or oversight.  The elements of the plan are not clear: Further Legislative direction is required. o “Achieve a standard of transportation efficiency as great or greater than if the local government were to grant equitable communities incentives.” SB 50 does not contain any language regarding “transportation efficiency.” Therefore, it is not possible to determine how HCD, OPR or a local government will determine how to meet this standard or how a “local flexibility plan” is expected to comply with this standard. o “Increase overall feasible housing capacity for households of lower, moderate, and above moderate incomes, considering economic factors such as cost of likely construction types, affordable housing requirements, and the impact of local development fees.” The override provisions of SB 50 do not contain any language regarding “feasible housing capacity for households of lower, moderate, and above moderate incomes,” nor does it address “economic factors such as cost of likely construction types, affordable housing requirements, and the impact of local development fees.” Therefore, it is not possible to determine how HCD, OPR or a local government will determine how to meet this standard or how a “local flexibility plan” is expected to comply with this standard. o SB 50’s “community plan” for sensitive communities provides a much clearer alternative and should be considered as a possible alternative planning process for all jurisdictions.  The plan may intrude upon Gilroy’s Historic Downtown: Much of the parking and traffic needs of our downtown core are fulfilled by City funds. By removing adequate jurisdiction over downtown development near passenger-rail, SB 50 could interfere with the improvement and revitalization of our downtown core. Stripping local representatives of oversight of key municipal areas only to place it in the hands of a profit motivated party runs contrary to preserving and sustaining a vibrant and culturally diverse downtown core. The City of Gilroy has spent substantial resources on ensuring sustainable growth and would like to ensure this continues in the years to come.  The plan disrupts long term city planning meant to dovetail with State High Speed Rail: The City has spent considerable planning funds and grant monies developing a 2040 general plan that coincides with a State high speed transit stop. Our 2040 General Plan, through the extensive input of the community and understanding of the housing challenges we face, plans to zone over 7,290 dwelling units over the next 20 years. That will be a substantial contribution to the housing stock in our region, and we hope the state will work with us to meet these 6.E.a Packet Pg. 53 Attachment: SB 50 Opposition 2020-01-27 - Draft.v3 (2620 : SB50 Opposition) goals and expectations set in our General Plan. Facing SB 50, our (and the State’s) time, effort, and funding may be for naught. Additionally, the City may lose say in developing a sound plan for the planned stop in Gilroy. It is vital we ensure this milestone project is integrated into our community in the best way possible, and SB 50 directly interferes with Cities ability to do so. The City of Gilroy appreciates your individual attention and work effort in bringing about change in the area of housing development. The City of Gilroy looks forward to working with you and your staff to better support cities in solving local issues. If you have any questions regarding our stance on this matter please contact our City Administrator Gabriel Gonzalez. Mr. Gonzalez can be reached at his office phone number of 408-846- 0202 or by his work e-mail address at gabe.gonzalez@cityofgilroy.org. Sincerely, Roland Velasco Mayor, City of Gilroy cc: Senator Bill Monning, California State Senate District 17 Assemblyman Robert Rivas, California State Assembly District 30 Gilroy City Council Members: Mayor Pro Tempore Cat Tucker Council Member Dion Bracco Council Member Fred Tovar Council Member Peter Leroe-Muñoz Council Member Marie Blankley Council Member Carol Marques League of California Cities Regional Public Affairs Manager Seth Miller 6.E.a Packet Pg. 54 Attachment: SB 50 Opposition 2020-01-27 - Draft.v3 (2620 : SB50 Opposition) City of Gilroy STAFF REPORT Agenda Item Title: Consideration of an Urban Service Area Request to Incorporate Approximately 55.66 Acres Located West of Wren Avenue, South of Vickery Avenue, and North and South of Tatum Avenue; and Just Outside the Northern City Limits Northeast of the Intersection of Vickery Lane and Kern Avenue, APNs 790-09-006, 008, 009, 010, 011; 790-17-001, 004, 005, 006, 007, 008, 009, 010; 790-06- 017 and 790-06-018 into the Urban Service Area of the City of Gilroy; Applicants Wren Investors, LLC c/o Dick Oliver and Mark Hewell and David Sheedy (USA 12-01 and USA 14-02) Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Community Development Department Submitted By: Karen Garner Prepared By: Karen Garner Melissa Durkin Strategic Plan Goals ☐ Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services ☐ Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION Adopt a resolution of the City Council of the City of Gilroy approving the Wren Investors and Hewell Urban Service Area Amendment mitigated negative declaration and mitigation monitoring and reporting program and approving urban service area applications USA 12-01 and USA 14-02, incorporating approximately 56 acres into Gilroy’s urban service area, Assessor Parcel 790-09-006, 008, 009, 010, 011; 790-17- 001, 004, 005, 006, 007, 008, 009, 010; 790-06-017 and 790-06-018, filed by Wren 8.A Packet Pg. 55 Investors, LLC and Mark Hewell and David Sheedy. EXECUTIVE SUMMARY The proposed urban service area (USA) request would incorporate +/-55.66 acres into Gilroy’s USA. Although the city currently has more than a five-year supply of vacant residential land, the Wren Investors/Hewell property will have a lengthy entitlement process, one that could span several years. Staff anticipates that most of Gilroy’s vacant residential land would develop before the Wren Investors/Hewell property has completed its entitlement process. Approval of the proposed USA amendment request would allow the city to replenish the diminishing supply of residential land to meet foreseeable residential development needs. Incorporating the Wren Investors/Hewell property into Gilroy’s USA boundary would allow the property to potentially be annexed and developed. According to the fiscal impact analysis for this project, prepared by Applied Development Economics, annexing and developing the property would cause the City to incur future general fund net expenditures1. After ten years, the annual general fund net expenditures would be $166,681. These net expenditures could be offset by requiring the property developers to establish a community facilities district (CFD) and/or other funding mechanisms to provide services to this property. The CFD would require future property owners to bear the cost of providing ongoing City services to their properties. POLICY DISCUSSION Policy Question Should the City Council approve an urban service area (USA) amendment? Con Given the City Council’s strategic goal to ensure financial stability, this USA amendment would increase City net expenses and add to the operational capacity deficit, if not carefully mitigated. 1 Net expenditures are the increased per capita expenditures associated with the project minus increased revenues resulting from the project. 8.A Packet Pg. 56 Pro The USA would increase the City’s ability to meet the Regional Housing Needs Allocation (RHNA) requirements. BACKGROUND Urban Service Area Amendment Requests Gilroy’s USA is a planning boundary that the City uses to identify property suitable for annexation and development within a five-year horizon. City staff processes USA amendment requests and sends them to the Planning Commission for review and to the City Council for approval. However, the City Council’s approval of a USA request only allows an application to be filed with the Santa Clara County Local Agency Formation Commission (LAFCO) for consideration of the request. LAFCO has the ultimate authority to approve or deny all USA amendment requests, such that amendment requests that are approved by the Gilroy City Council are not effective unless and until they are also approved by LAFCO. In reviewing USA requests, the City considers (1) whether there is currently an adequate supply of land to meet development needs within the next five years , (2) whether services can be provided to the site within the next five years, and (3) the fiscal impacts of allowing the property to annex and develop. In addition, the City considers the application’s consistency with LAFCO’s USA amendment policies. These issues are discussed below in the analysis section of this staff report. Project Background Wren Investors began processing a USA request for a portion of this site in 2000 [Ref: USA 00-02]; that request encompassed all of the property included in the current Wren Investors request plus one additional parcel. USA 00-02 proceeded to the Gilroy Planning Commission and City Council as part of the 2008 USA request. USA 00-02 was ultimately not approved by the City Council and, therefore, not forwarded to LAFCO for consideration. The Council expressed the following concerns about USA 00-02: 8.A Packet Pg. 57  Negative fiscal impacts on the Gilroy Unified School District;  Negative fiscal impacts on the City;  Inadequate police and fire response times to the site;  Undesired environmental impacts resulting from the project; and  That no project design details were submitted as part of the CEQA analysis. The Hewell portion of this site has not been the subject of a prior independent USA request. Wren Investors submitted the USA 12-01 amendment request in 2012, and Mark Hewell and David Sheedy submitted USA 14-02 in 2014. Before either of these applications could be processed, a third USA application, USA 14-01, was submitted by Jeffrey Martin c/o Martin Limited Partnership. USA 14-01 encompassed 721 acres north of Gilroy City limits, and included both the Wren Investors and Hewell properties. The Wren Investors and Hewell properties had to be included in USA 14 -01 to avoid creating an unincorporated island. Since both the Wren Investors and Hewell properties were included in USA 14-01, the applicants agreed to place processing of USA 12-01 and USA 14-02 on hold while the City Council considered USA 14-01. The Gilroy City Council ultimately denied USA 14- 01, so it was not submitted to LAFCO for consideration. Since the Wren Investors and Hewell properties were not incorporated into the urban service area via USA 14 -01, both applicants request to continue processing their USA applications at this time. Measure H On November 8, 2016, Gilroy voters approved Measure H, a ballot measure that added an urban growth boundary to Gilroy’s general plan area. The urban growth boundary prevents development of land outside the boundary’s limits, unless voters specifically approve the development. The Wren Investors and Hewell properties are located inside the urban growth boundary, and therefore could be annexed and developed, if the USA amendment request is approved. Planning Commission Action 8.A Packet Pg. 58 The Planning Commission recommended approval of Urban Service Area Amendment applications USA 12-01 and USA 14-02 by a vote of 6-0-1 at their October 17, 2019 meeting. The Commission’s primary concerns related to potential fiscal impacts to the City if the sites ultimately annex and develop. There was no public comment related to these applications. Initial Study/Mitigated Negative Declaration Comments Staff received comments from the Gilroy Bicycle Pedestrian Commission (BPC), Santa Clara County LAFCO and Valley Water. The BPC comments related to future development of the site that is not contemplated as part of this application. This letter did not raise any environmental issues; therefore no response was needed. However, the BPC’s comments will be incorporated into future project design. LAFCO staff’s comments related to the project’s consistency with LAFCO policies and clarification of other issues addressed in the initial study/mitigated negative declaration. The response letter addresses each of LAFCO staff’s comments. Valley Water staff’s comments related to the need for access to a Valley Water channel and mitigating storm water runoff. These issues would be addressed as part of future development entitlements. The comment letters and staff’s responses to them are included as an attachment to this staff report. None of the comments would change the conclusions of the MND. As such, no significant adverse effects are expected to result from the proposed project, and the City Council can make findings to adopt the MND. ANALYSIS Conceptual Site Plan The developers have submitted conceptual site plans for this property that show a possible development scenario (see initial study/MND figures 5 and 6). The conceptual site plans show the following development within the USA amendment boundary: Land Use Acreage Residential Lots Low Density Residential 26.86 185 Medium Density Residential Duets 2.2 20 High Density Residential (Townhomes/Apartments) 9.9 102 Subtotal Residential 33.6 307 Streets 12.9 Drainage 3.4 Neighborhood Commercial 0.4 Total 55.66 307 8.A Packet Pg. 59 At this time, no development is proposed for this site and no development applications have been submitted. The conceptual site plan has not been vetted or endorsed by staff; it is simply a plan that shows a potential development scenario for purposes of environmental analysis. The conceptual design does not vest the developer or neighboring properties with any design approvals. Fiscal Impact Analysis A fiscal impact analysis has been prepared for the proposed USA request by Applied Development Economics in accordance with state law and LAFCO polici es [see attachment]. The fiscal impact analysis estimates the project will create an initial deficit of $107,122 per year. This cost/revenue gap will continue to widen over time. Pages 13 and 14 of the fiscal impact analysis, summarized here, show the ten -year cost/revenue projections for this project, which grows to $166,681 by Year 10: Year Year 1 Year 2 Year 3 Year 4 Year 5 Annual Deficit ($107,222) ($113,683) ($120,508) ($127,606) ($134,985) Year Year 6 Year 7 Year 8 Year 9 Year 10 Annual Deficit ($139,984) ($146,972) ($153,303) ($159,870) ($166,681) The fiscal impact analysis proposes some potential alternative funding methods that could defray some of the costs of providing services to this site. These alternatives include a community facilities district (CFD), which would fund maintenance of facilities and operation costs for public services such as police and fire protection. The City currently uses CFDs to fund maintenance and operation costs related to landscaping and sound walls. Using CFDs, or any of the other potential funding mechanisms, to fund other operations and/or staffing would need to be fully vetted to determine whether these are viable sources of long-term revenue that could be used to offset project costs. Vacant Land Inventory Residential and commercial vacant land inventories have been prepared for the proposed USA request by EMC Planning Group in accordance with LAFCO policies [see attachment]. The residential vacant land inventory determined the total number of potential units outside of the Downtown is 2,394 units; the total number of remaining units that could be built Downtown, based upon the of approved “Downtown Gilroy Specific plan,” is 909 units. Over the next 10 years, the City of Gilroy projects to issue 3,045 residential building permits for projects outside of the Downtown. This is an average of 305 permits per year. Based on the average development of 305 units per year, excluding development in the Downtown, and an approximate current availability of vacant l and adequate to 8.A Packet Pg. 60 build 2,394 units, the city has adequate land to serve future residential growth for approximately eight years (2,394/305 = 7.85). If the 909 Downtown units are added to this total, Gilroy has the land capacity to build up to 3,303 units (2,394 + 909), or about 11 years of residential development (3,303/305 = 10.83). Expanding the USA boundary to include the Wren Investors and Hewell properties would add 307 units to the vacant land inventory, resulting in land that could produce 3,610 residential units. Using a development rate of 305 units per year, the proposed USA expansion would increase the city’s supply of undeveloped residential land to about 12 years (3,610/305=11.8), if Downtown development is included. Although the city currently has more than a five-year supply of residential land, the Wren Investors/Hewell property would have a lengthy entitlement process, one that could span several years. Staff anticipates that most of the vacant residential land would develop before the Wren Investors/Hewell property has completed its entitlement process. Approval of the proposed USA amendment request would allow the city to replenish the diminishing supply of residential land to meet foreseeable residential development needs and Regional Housing Needs Allocation (RHNA) requirements. Plan for Services A plan for services has been prepared for the proposed USA request by EMC Planning Group in accordance with LAFCO policies [see attachment]. The plan addresses how the City would provide services to the project site upon annexation, and how other agencies would provide services upon development of the site. If Gilroy does not expand its USA boundary, the City might have to re-zone job-producing lands to residential zones to meet RHNA requirements. School District Impacts: Future development of the amendment areas consistent with the existing general plan would result in additional students and increase the demand for school services. The cumulative student generation estimates include a total of 103 new students, of which 54 would be Kindergarten–5th grade students, 20 would be 6th–8th grade students, and 29 would be high school students. New students would attend schools within the Gilroy Unified School District (GUSD). GUSD assesses its own development impact fee to address facility and infrastructure needs. It is anticipated that GUSD has adequate capacity to accommodate students that would be generated by development of th e property involved in this application. City Facilities and Services: The City’s ability to provide public services and facilities required by new growth is a fundamental policy consideration for all USA amendments. Future development of this site, consistent with the existing General Plan land use designation of Neighborhood District, would be expected to generate cumulative incremental increases in demand for City services and facilities. Overall, the future development within the amendment area is consistent with existing General Plan land use designations. Facility and infrastructure master plans have been prepared by the City to support the adopted General Plan. The development 8.A Packet Pg. 61 anticipated would not require major infrastructure beyond that identified in the General Plan and subsequent implementing master plans. The develop er will fund all infrastructure needed to serve this site and pay required development impact fees. However, funding for emergency response and public safety resources is provided by the general fund, and is not supported by development impact fees. Funding for necessary staff to support future growth in the amendment area will be a continuing challenge for the City. This funding issue could be offset by the use of a CFD to pay for services provided to this area. General Plan Update: The City of Gilroy is in the process of creating the Gilroy 2040 General Plan. The General Plan expresses the community’s long-term vision of city growth and development. The plan establishes public policy for the distribution of future land uses, both public and private, and addresses a wide range of policies, including economic development, transportation, safety, infrastructure, housing, parks, recreation and open space, historic preservation, and the environment. The property involved in this application is located within the Gilroy 2040 General Plan Focus Area 1. Four potential land use concepts are identified for consideration in this area. Concepts 1 and 2 reflect two different mixes of residential density (Neighborhood District Low and Neighborhood District High). Concepts 3 and 4 comprise these two alternate residential densities, together with an Employment Center designation applied to the eastern portion of the area. Employment Center provides a wide range of employment land uses, including manufacturing, light indu strial, research and development, office and regional retail commercial, and allows more intense development, resulting in greater potential employment capacity. The General Plan Advisory Committee and the Planning Commission selected Neighborhood District High and Employment Center for Focus Area 1. On November 18, 2019, the City Council affirmed this land use alternative. The General Plan will reflect the Neighborhood District High and Employment Center land use and the General Plan EIR will analyze impacts of that land use. The conceptual development plan contained in the Wren Investors & Hewell initial study/MND reflects the current General Plan Neighborhood District land use densities. The Neighborhood District High designation requires a higher density than the current land use designation. This new designation will not take effect until adoption of the General Plan, expected in winter 2021. The developer will design a new land use plan that reflects the land use densities in effect at the time the property obtains entitlements. 8.A Packet Pg. 62 ALTERNATIVES 1. The proposed USA request complies with City goals and policies, and generally complies with LAFCO policies. Therefore, the City Council could adopt a resolution approving urban service area applications USA 12-01 and USA 14-02. STAFF RECOMMENDS THIS OPTION because it would allow Gilroy to continue meeting its RHNA obligations. If the City Council elects this option, staff recommends that appropriate funding mechanisms be vetted, and that the developer be required to contractually agree to implement appropriate funding mechanisms prior to annexation, via a pre-annexation agreement. 2. The City Council could deny this urban service area request if the Council determines that incorporating the subject property is not in Gilroy’s best interest. A denial would leave this property in the County without the ability to annex into Gilroy City limits. STAFF DOES NOT RECOMMEND THIS OPTION because Gilroy’s supply of available residential land is rapidly diminishing. FISCAL IMPACT/FUNDING SOURCE The applicants paid all costs associated with processing these USA amendment requests. The future costs of the LAFCO process and annexation and entitlement applications will also be paid by the applicants. If this USA amendment request is approved, staff recommends that the City explore avenues to ensure that projects will be at least General Fund neutral prior to annexation, to ensure the City can adequately provide services to future residents. This is very important given the City’s existing operational capacity deficit. CONCLUSION Due to the need to prepare a Specific Plan for this property, it is likely that it will be several years before the applicants have entitlements to develop this site. By the time the developers have land entitlements, it is likely that the city will have only a few years of vacant residential land. Further, the subject property is located within Gilroy’s urban growth boundary, and is therefore eligible for development. If this USA amendment is approved, staff recommends that appropriate funding mechanisms be vetted, and that the developer be required to contractually agree to 8.A Packet Pg. 63 implement appropriate funding mechanisms prior to annexation, via a pre-annexation agreement. In accordance with the City’s Neighborhood District Policy, a Specific plan will be required for this property and other properties within this Neighborhood District area. Staff recommends approval of this USA request because (1) there is a diminishing availability of land to satisfy State RHNA requirements, (2)the property is within Gilroy’s urban growth boundary, (3) the City has the ability to mitigate the negative fiscal impact with a CFD or alternative funding mechanism on this site, and (4) it is consistent with current General Plan policies and goals. NEXT STEPS If the City Council approves the request, the City will submit a USA amendment application to LAFCO for consideration. It is expected that the application would be submitted to LAFCO by spring of 2020. PUBLIC OUTREACH Property owner information (i.e. list, labels, and map) within 500 feet of the subject site were generated by First American Title Company using current ownership data. On January 15, 2020 notices of this meeting were mailed to the property owners alo ng with other interested parties. In addition, the property has been posted with on -site signage notifying passersby of pending development, and the City Council public hearing packets are available through the City's webpage. Attachments: 1. Vicinity Map 2. Planning Commission Staff Report 3. Fiscal Impact Analysis 4. Wren Investors and Hewell Vacant Land Survey October 2019 5. Wren Hewell_Plan for Services 6. Letters and Response to Comments 7. Resolution USA 12-01 and 14-02 8. Resolution Exhibit A Mitigated Negative Declaration 9. Resolution Exhibit B Mitigation Monitoring and Reporting Program 10. Public Comments USA 12-01 - USA 14-02 8.A Packet Pg. 64 Tatum Ave.Kern Ave. Vickery Ave.Wren Ave. Mantelli Dr. Aerial Photograph 0 650 feet Figure 2 Source: ESRI 2016Project Site Existing Urban Service Area Boundary Proposed Urban Service Area Boundary Wren Investors and Hewell USA Amendment Initial Study 8.A.a Packet Pg. 65 Attachment: Vicinity Map (2563 : USA 12-01 and USA 14-02) Greg Larson INTERIM DIRECTOR Community Development Department 7351 Rosanna Street, Gilroy, California 95020-61197 Telephone: (408) 846-0451 Fax (408) 846-0429 http://www.cityofgilroy.org DATE: October 17, 2019 TO: Planning Commission FROM: Julie Wyrick, Planning Manager SUBJECT: USA 12-01 (#12070023) and USA 14-02 (#14070058): an urban service area amendment to include Assessor Parcel Numbers 790 - 09-006, 008, 009, 010, 011; 790-17-001, 004, 005, 006, 007, 008, 009, 010; 790-06-017 and 790-06-018 into the urban service area of the City of Gilroy. The 50.3-acre Wren Investors project site is generally located west of Wren Avenue, south of Vickery Avenue, and north and south of Tatum Avenue. The 5.36 -acre Hewell site is located just outside the northern city limits northeast of the intersection of Vickery Lane and Kern Avenue. This request is commonly known as the Wren Investors and Hewell Urban Service Area Amendment. The property is mostly undeveloped, although some single-family homes and the Gilroy Unified School District Farm Site are included within the subject site. This request proposes a change to the urban service area boundary to include approximately 56 acres, comprising the subject parcels, and does not include any development at this time. Applications filed by Wren Investors, LLC c/o Dick Oliver, 385 Woodview Avenue, #100, Morgan Hill, CA 95037; and Mark Hewell and David Sheedy, P.O. Box 1901, Gilroy, CA 95021. Request: Staff has analyzed the proposed project and reco mmends that the Planning Commission (Roll Call Vote): a) Consider and recommend that the City Council adopt the mitigated negative declaration prepared for the project, based on findings required by the California Environmental Quality Act (CEQA); and b) Adopt a resolution recommending that the City Council approve the Wren Investors and Mark Hewell and David Sheedy Urban Service Area Amendments (USA 12-01 and USA 14-02). 8.A.b Packet Pg. 66 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 2 EXECUTIVE SUMMARY: Wren Investors and Mark Hewell request inclusion of 55.66+/- acres into Gilroy’s Urban Service Area (USA). City staff has prepared a vacant land survey (attached) that determined there is currently at least an eight-year supply of vacant residential land within the city’s USA; there would be at least a nine-year supply of vacant residential land if the USA amendment request were approved. The local agency formation commission (LAFCO) has ultimate approval authority over USA amendment requests, and generally will not approve a USA amendment if a city has more than a five-year supply of vacant land. Although the city currently has more than a five-year supply of vacant residential land, the Wren Investors/Hewell property will have a lengthy entitlement process, one that could span several years. Staff anticipates that most of Gilroy’s vacant residential land would develop before the Wren Investors/Hewell property has completed its entitlement process. Approval of the proposed USA amendment request would allow the city to replenish the diminishing supply of residential land to meet foreseeable residential development needs. Incorporating the Wren Investors/Hewell property into Gilroy’s USA boundary would allow the property to potentially be annexed and developed. According to the fiscal impact analysis prepared for this project (attached), annexing and developing the property would cause the city to incur a loss of general fund revenue. After ten years, the general fund revenue loss would be $166,681 per year. The loss of revenue could be offset by requiring the property developers to establish a community facilities district (CFD) and/or other funding mechanisms to provide services to this property. The CFD would require future property owners to bear the cost of providing City services to their properties. If this Urban Service Area amendment is approved, staff recommends that appropriate funding mechanisms be vetted, and that the developer be required to contractually agree to implement appropriate funding mechanisms prior to annexation, via a pre - annexation agreement. In accordance with the City’s Neighborhood District Policy, a Specific plan will be required for this property and other properties within this Neighborhood District area. BACKGROUND: Urban Service Area Amendment Requests Gilroy’s USA is a five-year planning boundary that the city uses to identify property suitable for annexation and development within a five -year horizon. City staff processes USA amendment requests and sends them to the Planning Commission for review and City Council for approval. However, the City Council’s approval of a USA request allows an application only to be filed with the Santa Clara County Local Agency Formation Commission (LAFCO) for consideration of the request. LAFCO has the ultimate authority to approve or deny all USA amendment requests, such that amendment requests that are approved by the Gilroy City Council are not effective unless and until also approved by LAFCO. 8.A.b Packet Pg. 67 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 3 In considering USA requests, the city considers whether there is currently an adequate supply of land to meet development needs within the next five years; whether services can be proved to the site within the next five years; and the fiscal impacts of allowing the property to annex and develop. In addition, the city considers the application’s consistency with LAFCO’s USA amendment policies. These issues are discussed below in the analysis section of this staff report. Wren Investors began processing an USA request for this site in 2000 [Ref: USA 00 - 02]; that request included all of the property included in the current request plus one additional parcel. USA 00-02 proceeded to the Gilroy Planning Commission and City Council as part of the 2008 USA request. USA 00-02 was ultimately not approved by the City Council and, therefore, not forwarded to LAFCO for consideration. The Council expressed the following concerns about USA 00-02: That there would be:  Negative fiscal impacts on the Gilroy Unified School District;  Negative fiscal impacts on the city;  Inadequate police and fire response times to th e site;  Undesired environmental impacts resulting from the project; and  That no project design details were submitted as part of the CEQA analysis. The Hewell site has not been the subject of a prior independent USA request. Wren Investors submitted the USA 12-01 amendment request in 2012, and Mark Hewell and David Sheedy submitted USA 14-02 in 2014. Both applicants agreed to place application processing on hold while the City Council considered the proposed 721 -acre Rancho 101 Urban Service Area (USA 14-01; Project # 14070057). The Wren Investors and Hewell USA requests were contained within the Rancho 101 USA request. The Gilroy City Council ultimately denied the Rancho 101 USA request, so it was not submitted to LAFCO for consideration. At this time, Wren Investors, Mark Hewell and David Sheedy request to continue processing their USA requests. Measure H On November 8, 2016, Gilroy voters approved Measure H, a ballot measure that added an urban growth boundary to Gilroy’s general plan area. The urban growth boundary prevents development of land outside its limits, unless voters specifically approve the development. The Wren Investors and Hewell properties are located inside the urban growth boundary, and therefore could be annexed and develop ed, if the USA amendment request is approved. Subject Property and Surrounding Land Uses: The subject site is mostly undeveloped, although some parcels contain rural single-family homes and associated accessory structures, as well as small-scale agricultural operations. Surrounding Properties and Land Uses: 8.A.b Packet Pg. 68 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 4 LOCATION EXISTING LAND USE GENERAL PLAN ZONING Project Site Undeveloped; Single- Family Homes; Drainage Channel; Small-scale Agricultural uses; GUSD Farm Site Neighborhood District; Park/Recreation Facility N/A North Single-Family Home; agricultural land Neighborhood District ND/PUD; N/A South Single-Family Homes Low Density Residential R1 East Undeveloped park land; Antonio del Buono School; Apartments; Single-Family Homes Park/Recreation Facility; Educational Facility; High Density Res.; Low Density Res.; Neighborhood District PF; R3; R1; ND/PUD West Rural Residential; Agricultural uses; and single-family homes Neighborhood District; Low Density Residential; Medium Density Residential N/A; R1/PUD; and R3/PUD Environmental Assessment: In accordance with the California Environmental Quality Act (CEQA), an initial study was prepared to evaluate any potentially significant adverse effects of the proposed project on the environment. The initial study identified potentially significant impacts in four separate areas, summarized below. The entire MND/initial study document is available at the following link: http://www.cityofgilroy.org/298/Development-Activity-Projects Air Quality The adjacent residences could be exposed to dust and equipment exhaust during construction of any future development of the Wren and Hewell sites, which would be a significant impact. However, compliance with the City’s standard conditions of approval for the control of dust during construction would reduce exposures to construction dust to a less-than-significant level. Biological Resources Construction activities, including tree/shrub removal and ground disturbance, have the potential to impact nesting birds protected under the federal Migratory Bird Treaty Act and California Fish and Game Code, should nesting birds be present during construction. If protected bird species are nesting in or adjacent to the project site during the bird nesting season (February 1 through August 31), then noise-generating construction activities and/or vegetation removal could result in the loss of fertile eggs or nestlings, or otherwise lead to the abandonment of nests. 8.A.b Packet Pg. 69 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 5 Trees may exist on the Wren Investors site that may qualify as P rotected Trees based on Section 30.38.270 of the City Code. The Hewell project site contains one 12-inch diameter native northern California black walnut tree located behind the rural residence. Removal of any protected tree(s) is subject to the approval o f the Planning Division Manager, consistent with the Protected Trees section of the City Code, Section 30.38.270. The City relies on the site -specific recommendations of a certified arborist to mitigate impacts to individual significant trees. Cultural Resources Future development of the project site has the potential to affect surviving historic- era structures on the project site, either through modification or demolition in preparation of new residential development. Noise The increase in noise associated with future development of the project site could result in significant noise impacts to vicinity sensitive receptors; however, until a development project is designed and an application submitted to the City for processing, actual noise impacts cannot be adequately evaluated. The initial study identifies eight mitigation measures that would reduce the potentially significant impacts to a less-than-significant level. These mitigation measures are proposed for adoption through the mitigated negative de claration (MND), attached to this staff report. On August 29, 2019 (Wren Investors) and September 2, 2019 (Hewell), the applicants agreed to the recommended mitigation measures to address the identified adverse effects. The initial study/MND was circulated and made available for public review at the Gilroy Public Library, the Planning Division public counter, and on the Planning Division webpage (www.cityofgilroy.org/planning) for the requisite comment period, from September 6, 2019 through October 7, 2019. As of this report’s date, staff received comments from the Gilroy Bicycle Pedestrian Commission (BPC), Santa Clara County LAFCO and Valley Water. The BPC comments related to future development of the site that is not contemplated as part of this application; LAFCO’s comments related to consistency with LAFCO policy issues and other clarifying information; Valley Water comments related to the need for access to the channel that is within the boundaries of the site and mitigating runoff. None of the comments would change the conclusions of the MND. As such, no significant adverse effects are expected to result from the proposed project, and the Planning Commission can make findings to recommend adoption of the MND. ANALYSIS: General Plan Consistency: The City's General Plan designates the subject site for Neighborhood District uses, but the proposed USA amendment request does not include any development at this time. Thus, the following analysis reviews the project’s conformance with General Plan policies related to Urban Service Area expansions, rather than the potential future development of this property. Key goals and policies, 8.A.b Packet Pg. 70 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 6 which pertain to the proposed project, are discussed below: POLICY # TITLE AND SUMMARY ANALYSIS 1.01 Pattern of Development. Ensure orderly, contiguous pattern of development that prioritizes infill development, phases new development, encourages compactness and efficiency, preserves surrounding open space and agricultural resources, and avoids land use incompatibilities. The proposed Urban Service Area amendment would provide a contiguous pattern of development because it logically extends Gilroy’s Urban Service Area boundary along Tatum Avenue, Vickery Avenue, and Wren Avenue. Future development on this site would need to comply with the “Neighborhood District Policy,” which encourages compact and efficient development. As part of a larger future Specific Plan that would be developed for this area, this site would be developed to preserve open spaces and avoid land use incompatibilities. Like all Urban Service Area requests, this property is on the fringe of Gilroy, such that future development on this site would result in greenfield development (i.e. development of previously undeveloped land), rather than infill development. However, the Specific Plan and entitlement process required prior to development of this site is expected to take several years. Gilroy currently has an approximate eight-year supply of undeveloped residential land, so Gilroy’s existing vacant land inventory would be largely depleted by the time the Wren Investors/Hewell property is poised for development. Furthermore, this property is located within Gilroy’s Urban Growth Boundary, so development of this site would not negatively impact open space lands. Staff Determination of Consistency: Consistent 2.01 Location of Growth. Maximize existing infrastructure and service investments by directing new growth to vacant and under- utilized lands within the The city currently has an approximate eight- year supply of undeveloped residential land (11 years, if properties Downtown are included). The commercial component of the USA request is minor and has little impact on the city’s supply of vacant 8.A.b Packet Pg. 71 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 7 POLICY # TITLE AND SUMMARY ANALYSIS Urban Service Area. As a second-tier priority, direct new development to areas that border on existing urban development or are immediately adjacent to the Urban Service Area. commercial land. Much of the vacant land within the city is entitled as part of the Glen Loma Ranch Specific Plan development, and would develop before the Wren Investors/Hewell property has completed its entitlement process. The proposed USA amendment area does border on existing urban development and the existing USA boundary, such that approval of this USA amendment would not create “leap frog” development. Greenfield development is significantly easier and cost effective for developers than infill sites. With a limited investment pool and limited market absorption rates for new housing in Gilroy, facilitation of greenfield development (such as that proposed with the subject USA amendment) dis- incentivizes infill development in the downtown, on 1st Street, 10th Street, Leavesley Road, and other infill areas. Infill development offers more positive fiscal, environmental, and quality of life outcomes than greenfield development for the community. Gilroy’s Urban Growth boundary significantly limits Gilroy’s expansion potential. Coupled with the requirement to build housing in compliance with the state’s Regional Housing Needs Allocation (RHNA), staff expects that much of Gilroy’s developable infill property will have developed before the Wren Investors/Hewell property has completed its entitlement process. Therefore, staff believes that bringing the Wren Investors/Hewell property into Gilroy’s urban service area now will allow Gilroy to have adequate residential land to meet future 8.A.b Packet Pg. 72 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 8 POLICY # TITLE AND SUMMARY ANALYSIS residential growth requirements. Staff Determination of Consistency: Consistent 2.02 Rate and Timing of Growth. Ensure that the rate of growth is controlled such that resource and system capacity constraints are not exceeded and necessary urban services are funded, implemented and completed prior to occupation of new buildings. While infrastructure would be in place prior to occupancy of buildings within this development, according to this project’s fiscal impact analysis, development of this site would result in an initial net negative fiscal impact of $107,122. This deficit would grow each year, as property tax revenue does not increase commensurately with the costs of providing services. After ten years, the annual revenue loss would be $166,681. Similarly, Santa Clara County would incur lost revenue with development of this project. The result of the proposed USA would be increased service needs with reduced funding for the provision of services. For example, the Police Department has expressed concerns about the need for additional officers as the city boundaries expand; however, the $107,122 annual deficit could mean the city would need to reduce service levels in the larger organization. If this USA amendment request is approved, staff recommends that the developer be required to place these properties in a community facilities District (CFD) which would pay for the city’s cost to serve this site. Staff Determination of Consistency: Consistent, with the requirement to enter into a CFD 2.04 Growth Management Tools and Process. Utilize the RDO, Urban Service Area, 20-Year The subject property is within the 20-Year Planning Boundary; adequate sewer treatment and disposal capacities exist to serve this site; and development of the site would be subject to obtaining USA 8.A.b Packet Pg. 73 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 9 POLICY # TITLE AND SUMMARY ANALYSIS Planning Boundary, sewer treatment and disposal capacities, and natural resource management policies as tools for managing the rate, location and extent of growth. amendment approval and RDO allocations (If applicable). A Specific Plan for the larger area would need to evaluate how the proposed development will achieve the city’s natural resource management objectives; however, the proposal would result in the reduction of agricultural and open space lands surrounding the city. Staff Determination of Consistency: Consistent 2.07 Urban Service Area. Establish and maintain an Urban Service Area that indicates the area of land that could potentially be developed in the next 5 years and to which the City is committed to providing basic infrastructure and services. The city currently has an approximate eight- year supply of undeveloped residential land at this time (11 years, if properties Downtown are included). Expanding the USA boundary to include this property would result in the city having an approximate nine-year supply of undeveloped residential land (12 years, if properties Downtown are included), assuming the property would create 307 residential units. Although the city currently has more than a five-year supply of residential land, staff anticipates that most of that land would develop before the Wren Investors/Hewell property has completed its entitlement process. Approval of the proposed USA amendment request would allow the city to replenish the diminishing supply of residential land to meet foreseeable residential development needs. Staff Determination of Consistency: Consistent 4.03 Urban Containment. Contain urbanization within an area large enough to meet foreseeable need but The proposed USA amendment request would expand the city’s Urban Service Area to meet foreseeable residential development needs. 8.A.b Packet Pg. 74 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 10 POLICY # TITLE AND SUMMARY ANALYSIS which will not intrude unnecessarily on, cause premature conversion of, or impair the productivity of agricultural lands. Staff Determination of Consistency: Consistent 17.02 New Residential Development. Control the timing and location of new residential development in a way that allows the Gilroy Unified School District to plan and finance facilities in an orderly fashion. New residential development within this area will be required to pay impacts fees to the GUSD to build new schools for the students generated by such development. Staff Determination of Consistency: Consistent 17.03 Development Approvals and School Capacity. Verify the remaining capacity in local schools as part of the review process for residential subdivisions, with adequate school capacity being a condition for development approval. When capacity is limited, coordinate development approvals with the scheduling of capital funds for school expansion and/or improvements. Students within this subdivision will be assigned to schools once the residential units are constructed. Given the recent decline in school populations, it is likely that adequate school capacity will exist to serve future students. Staff Determination of Consistency: Consistent The City of Gilroy is in the process of creating the Gilroy 2040 General Plan. The General Plan expresses the community’s long-term vision of city growth and development. The plan establishes public policy for the distribution of future land uses, both public and private, and addresses a wide range of policies, including economic development, transportation, safety, infrastructure, housing, parks, recreation and open space, historic preservation and the environment. The City Council is expected to select a preferred land use alternative for analysis in the General Plan Environmental Impact Report before the end of this year. Staff expects to present the General Plan Environmental Impact Report and 2040 General Plan to the Planning Commission and City Council for adoption by late 2020. 8.A.b Packet Pg. 75 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 11 Analysis of Urban Service Area Request: Wren Investors, LLC and Mark Hewell request inclusion of 55.66+/- acres into Gilroy’s Urban Service Area. The developers have included thirteen parcels not under their ownership. This is necessary to create a logical city boundary and to prevent the creation of unincorporated (county) islands within city limits. All thirteen of the other property owners are in agreement with the proposed USA application. The following analysis examines the issues pertinent to this USA amendment request. Conceptual Site Plan: The developers have submitted conceptual site plans for this property that show a possible development scenario (see initial study/MND figures 5 and 6). The environmental analysis relies on these conceptual plans to determine the maximum development potential for this site. However, this property is a component of the “North Central, South of Buena Vista Avenue Extension” neighborhood district area. This neighborhood district area consists of 366 acres and 136 parcels, all of which will be included in a future comprehensive specific plan. In accordance with the “Neighborhood District Policy,” the specific plan would be developed with input from an advisory committee selected by the City Council. The specific plan will be required to meet all tenets of the “Neighborhood District Policy,” including the provision of residential units at a mix of densities; reservation of land at prominent intersections for commercial uses; provision of open space for passive and active recreational uses; and provision of affordab le housing. The actual land development plan site will be determined through that process. The conceptual site plans show the following development within the USA amendment boundary: Land Use Acreage Residential Lots Low Density Residential 26.86 185 Medium Density Residential Duets 2.2 20 High Density Residential (Townhomes/Apartments) 9.9 102 Subtotal Residential 33.6 307 Streets 12.9 Drainage 3.4 Neighborhood Commercial 0.4 Totals 55.66 307 The site plan also shows a possible development scenario for property surrounding the project site for the purpose of comprehensive planning. At this time, no development is proposed for this site and no development applications have been submitted. The conceptual site plan has not been vetted o r endorsed by staff; it is simply a plan that shows a potential development scenario for purposes of 8.A.b Packet Pg. 76 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 12 environmental analysis. The conceptual design does not vest the developer or neighboring properties with any design approvals. Fiscal Impact Analysis: A fiscal impact analysis has been prepared for the proposed USA request by Applied Development Economics in accordance with state law and LAFCO policies [see attachment]. The purpose of this analysis is to determine the economic impact that development of the 55.66+/- acres included in the Wren Investors application will have on both the city of Gilroy and the county of Santa Clara. This analysis is required at the USA amendment level to provide decision makers with the information needed to determine wheth er the city and county can provide urban services to the site without detracting from current service levels, and to identify the fiscal impacts inherent in expanding the USA boundary to include the subject site. The fiscal impact analysis estimates the project will create an initial deficit of $107,122 per year. This cost/revenue gap will continue to widen over time. Pages 13 and 14 of the fiscal impact analysis, summarized here, show the ten -year cost/revenue projections for this project, which grows to $166,681 by Year 10: Year Year 1 Year 2 Year 3 Year 4 Year 5 Annual Deficit ($107,222) ($113,683) ($120,508) ($127,606) ($134,985) Year Year 6 Year 7 Year 8 Year 9 Year 10 Annual Deficit ($139,984) ($146,972) ($153,303) ($159,870) ($166,681) The fiscal impact analysis proposes some potential alternative funding methods that could defray some of the costs of providing services to this site. These alternatives include a community facilities district (CFD), which would fund construction costs for infrastructure and facilities, maintenance of facilities, and operation costs for public services such as police and fire protection; a landscaping and lighting district (LLD), which could fund acquisition, construction, and maintenance of public landscaping and lighting, typically along streets; a maintenance assessment district (MAD), which can fund maintenance of storm drain facilities, water and sewer facilities and other public facilities and infrastructure not covered by LLDs; a homeowners’ associatio n (HOA), which can fund maintenance of internal amenities and property within subdivisions or planned unit developments; and developer exactions, which may be able to be used to fund police and fire service. Staff would need to evaluate each of these poss ible funding methods to determine their legal and financial feasibility. The city currently uses CFDs to fund maintenance and operation costs related to landscaping and soundwalls. Using CFDs, or any of the other potential funding 8.A.b Packet Pg. 77 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 13 mechanisms, to fund other operations and/or staffing would need to be fully vetted to determine whether these are viable sources of long-term revenue that could be used to offset project costs. As the fiscal impact analysis notes, general tax revenues are insufficient to fund the full costs of services to this site. If the city approves development on this site and is unable to use an alternative method of funding the ongoing provision of services, the city would need to either reduce services to the residents of Gilroy or use General Fund revenues earmarked for other purposes to serve this site, which could have the net effect of reducing services elsewhere. The fiscal impact analysis also projects that Santa Clara County will incur a revenue deficit if this property is incorporated into the city’s USA and is developed. If this Urban Service Area amendment is approved, staff recommends that appropriate funding mechanisms be vetted, and that the developer be required to contractually agree to implement appropriate funding mechanisms prior to annexation, via a pre-annexation agreement. Vacant Land Inventory: Residential and commercial vacant land inventories have been prepared for the proposed USA request by EMC Planning Group in accordance with LAFCO policies [see attachment]. These surveys inventoried all of the undeveloped residential and commercial land within city limits, including land approved for development, such as the Glen Loma Ranch and Hecker Pass specific plan areas. The surveys next determined the number of un its that could be built on each lot, based on either actual project plans or maximum potential buildout determined by dividing land area by permitted densities. The commercial component of this project is only 0.4 acres, and is incidental to the development. The addition of this property to Gilroy’s commercial inventory has an insignificant impact on the amount of commercial land available, but has been included in the analysis to meet LAFCO requirements. This analysis, therefore, focuses on the residential portion of the vacant land inventory. The residential vacant land inventory determined the total number of potential units outside of the Downtown is 2,394 units; the total number of remaining units that could be built Downtown, based upon the of approved “Downtown Gilroy Specific plan,” is 909 units. The survey next determined how long it would take to develop available land based on the city’s buildout projections. Over the next 10 years, the city of Gilroy projects to issue 3,045 residential building permits for projects outside of the Downtown. This is an average of 305 permits per year. Based on the average development of 305 units per year, excluding development in the Downtown, and an approximate current availability of vacant land adequate to build 2,394 units, the city has adequate land to serve future residential growth for approximately eight years (2,394/305 = 7.85). If the 909 Downtown units are added to this total, Gilroy has the land capacity to build up to 3,303 units (2,394 + 909). Applying the same average build out for units 8.A.b Packet Pg. 78 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 14 located in and out of Downtown, this allows for about 11 years of residential development (3,303/305 = 10.83). Expanding the USA boundary to include the Wren Investors and Hewell properties would add 307 u nits to the vacant land inventory, resulting in land that could produce 3,610 residential units. Using a development rate of 305 units per year, the proposed USA expansion would increase the city’s supply of undeveloped residential land to about 12 years (3,610/305=11.8), if Downtown development is included. Although the city currently has more than a five-year supply of residential land, the Wren Investors/Hewell property will have a lengthy entitlement process, one that could span several years. Staff anticipates that most of the vacant residential land would develop before the Wren Investors/Hewell property has completed its entitlement process. The city also has more than a five-year supply of commercial land, but the commercial component of the Wren Investors/Hewell property, proposed as 0.4 acres, is incidental to the residential component, and would be developed to support residents living in the area. Further, the commercial component of the Wren Investors/Hewell property has a negligible impact on the availability of commercial land in the city, and therefore should not be a determining factor in this USA amendment request. Approval of the proposed USA amendment request would allow the city to replenish the diminishing supply of residential land to meet foreseeable residential development needs. Plan for Services: A plan for services has been prepared for the proposed USA request by EMC Planning Group in accordance with LAFCO policies [see attachment]. The plan addresses how the city would provide services to the project site upon annexation, and how other agencies would provide services upon development of the site. School District Impacts: Future development of the amendment areas consistent with the existing general plan would result in additional students and increase the demand for school services. The cumulative student generation estimates include a total of 103 new students (54 Kindergarten - grade five; 20 grade six-eight; and 29 high school students). New students would attend schools within the Gilroy Unified School District, which assesses its own development impact fee to address facility and infrastructure needs. General Plan Educational Policy 17.02 directs the timing and location of new residential development to occur in a way that allows the Gilroy Unified School District (GUSD) to plan and finance facilities in an orderly fashion. Policy 17.03 states that development approvals and school capacity should be coordinated with the GUSD, with adequate capacity being a condition of approval. 8.A.b Packet Pg. 79 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 15 City Facilities and Services: The City’s ability to provide public services and facilities required by new growth is a fundamental policy consideration for all USA amendments. Future development of this site consistent with the existing Neighborhood District General Plan land use designation would be expected to generate cumulative incremental increases in demand for City services and facilities. General Plan Policy 2.02, “Rate and Timing of Growth” states that the city should “ensure that the rate of growth is controlled such that resource and system capacity constraints are not exceeded (e.g., water supply, police, and schools), are funded, implemented and completed prior to occupation of new buildings.” Overall, the future development within the amendment area is consistent with existing General Plan land use designations. Facility and infrastructure master plans have been prepared by the City to support the adopted General Plan. The development anticipated would not require major infrastructure beyond that identified in the General Plan and subsequent implementing master plans. The developer will fund all infrastructure needed to serve this site and pay required development impact fees. However, funding for emergency response and public safety resources is provided by the general fund, and is not supported by development impact fees. As discussed above, the fiscal impact analysis projects that the future residential development will result in an overall negative fiscal impact after buildout, with the deficit increasing over time. The fiscal impact analysis only projects the deficit out for a ten-year period. However, this deficit will continue to increase every year because the increases in tax revenue are not expected to increase as fast as the cost to serve this site. Funding for necessary staff to support future growth in the amendment area will be a continuing challenge for the City. This funding issue could be offset by the use of a CFD to pay for services provided to this area. Timing of Urban Service area Requests: The Local Agency Formation Commission (LAFCO) will consider Urban Service Area requests one time each year from each city in Santa Clara County. A city may not submit additional Urban Service Area amendment applications until LAFCO has heard and acted upon any pending applications from that city. LAFCO may make an exception to the once-a-year limitation when an amendment is needed to carry out a special institutional development or activity that is in the public interest. Such exceptions do not normally apply to proposed residential, commercial, or industrial development. Gilroy currently has no other USA requests in process. Conclusions: Due to the need to prepare a Specific plan for this property, it is likely that it will be several years before the applicants have entitlements to develop this site. By the time the developer has land entitlements, it is likely that the city will have only a few years of vacant residential land. Further, the subject property is located within Gilroy’s urban growth boundary, and is therefore eligible for development. 8.A.b Packet Pg. 80 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 16 Furthermore, staff recommends that the city explore avenues to ensure that projects will be at least revenue neutral prior to expanding the USA boundary, such that the city, county, and school district can ensure that it can adequately provide services to future residents. Due to the diminishing availability of land to satisfy RHNA requirements, inclusion with Gilroy’s urban growth boundary, the ability to require a CFD on this site, and consistency with current General Plan policies and goals, staff recommends approval of this USA request. Technical Advisory Committee (TAC): Project plans were routed to Engineering, Building, Police, Finance and Fire representatives for internal review and comment. The TAC considered the project on February 8, 2018. Recommendations of the TAC members have been incorporated into the project plans and/or are included as recommended conditions in attached resolution(s). Bicycle Pedestrian Committee (BPC): This USA amendment request was not presented to the Bicycle Pedestrian Committee (BPC) as no development is currently proposed. Plans will be forwarded to the BPC for review when city staff receives a development proposal. However, the BPC provided staff with comments via the initial study/MND review process. These comments will be incorporated into future development plans. Gilroy Unified School District (GUSD): The GUSD farm site is one of the properties included in this Urban Service Area request, and the GUSD supports the USA amendment. However, the farm site hosts the GUSD’s Future Farmers of America (FFA) program, and is very important to the district. The GUSD opposes development of the school farm site unless the farm operation is relocated to another site acceptable to the GUSD. As no development is currently proposed, there are no plans to develop the farm site. The GUSD would be signatory to any future development of its property. In addition, if the GUSD elects not to develop its farm site, staff would recommend that future residential developments surrounding the site disclose to buyers that the GUSD has the right to continue the farming operation. Noticing: Property owner information (i.e. list, labels, and map) within 500 feet of the subject site were generated by First American Title Company using current ownership data. Prior to October 6, notices of this Planning Commission meeting were mailed to the property owners along within other interest ed parties. In addition, the property has been posted with on-site signage notifying passersby of pending development, and the Planning Commission public hearing packets are available through the City's webpage. Appeal Procedure: The Planning Commission's action is not final, but rather a recommendation. As such, the matter will be considered by the City Council at a later date. 8.A.b Packet Pg. 81 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) 17 Next Steps: Should the Planning Commission make a recommendation to the City Council, the next step in this process would be to present the proposed Urban Service Area amendment request to the City Council. If the City Council approves the request, the City will submit a USA amendment application to LAFCO for consideration. It is expected that the application would be submitted to LAFCO by spring of 2020. Attachments: 1. Vicinity Map 2. Initial Study MND Link 3. Fiscal Impact Analysis 4. Wren Investors and Hewell Vacant Land Survey October 2019 5. USA 1201_1402_PC_ Reso 6. Wren Hewell_Plan for Services 8.A.b Packet Pg. 82 Attachment: Planning Commission Staff Report (2563 : USA 12-01 and USA 14-02) FISCAL IMPACT ANALYSIS OF THE WREN INVESTORS AND HEWELL URBAN SERVICE AREA AMENDMENT TO THE CITY OF GILROY AND THE COUNTY OF SANTA CLARA Prepared for the City of Gilroy Prepared by APPLIED DEVELOPMENT ECONOMICS, INC. 3527 Mt. Diablo Blvd. #248  Lafayette, CA 94549 925.934.8712  www.adeusa.com September 30, 2019 8.A.c Packet Pg. 83 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s TABLE OF CONTENTS Executive Summary ................................................................................ 1 City and County Existing Fiscal Conditions ................................................. 3 Fiscal Impact Analysis: Hewell Annexation ................................................. 6 Appendix: Household Retail Spending……………………………………………………………..…20 8.A.c Packet Pg. 84 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 1 EXECUTIVE SUMMARY The City of Gilroy has an application from Wren Investors and the Hewell project sponsors to amend the City’s Urban Service Area (USA). No development is proposed at this time; however, conceptual development plans have been submitted for purposes of showing how the property could be developed, consistent with the City General Plan land use designation of Neighborhood District. This report analyzes and describes the fiscal impacts to both the City of Gilroy and the County of Santa Clara of future development of the properties. LAFCO REQUIREMENTS California law governs the process for land annexation and government reorganizations for local governments in the state. Each California County maintains their own Local Agency Formation Commission (LAFCO) and, as such, the Santa Clara County LAFCO will oversee the Wren Investors and Hewell Annexation USA amendment process. Under state law and Santa Clara County LAFCO regulations is a requirement that during the application process a detailed fiscal impact analysis be completed in order to determine the fiscal and service impacts to the City and the County as a result of a proposed annexation. Specifically, LAFCO requires that the proposed amendments be evaluated to determine;  the ability of the City to provide urban services to the growth areas without detracting from current service levels,  the impacts of the proposed City expansion upon the County as a provider of services, and  the fiscal impacts of the proposed projects to the City and County. The Santa Clara County LAFCO also takes into consideration impacts to school district and special district service provision, regional housing needs, environmental impacts, and water availability. The Santa Clara County LAFCO also further defines the precise estimates to be included in the fiscal impacts to County government services, which are: projecting resident and employee generation, projecting revenue and expenditure estimates for the base year after development completion, then at five and ten years thereafter, and projecting the net County General Fund impact for the new service population. This analysis adheres to LAFCO requirements for the completion of the fiscal impacts of the proposed USA amendment. In particular, this analysis provides a description of the existing fiscal conditions of the City and County, an estimate of the fiscal impacts of the proposed USA amendment area at buildout and in a subsequent 10 year time frame from development completion. The Public Services Plan prepared by EMC Planning Group, Inc. has estimated the public service impacts resulting from the proposed project, and is used in this analysis to determine whether service cost deficiencies exist for the proposed project. In addition to impacts to the City of Gilroy, the Public Service Plan addresses impacts to the school district and the Santa Clara Valley Medical Center. Taken together, these two reports address the analyses required under LAFCO USA amendment guidelines. 8.A.c Packet Pg. 85 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 2 At anticipated build-out, future development of the two project areas would create an additional 307 residential units, with an estimated 1,036 new City of Gilroy residents. The projects would have a negative fiscal impact for both the City of Gilroy and the County of Santa Clara (Table 1). Much of this result is dependent on the home values eventually attained for the project, as the property tax for both the City and the County represents the largest single revenue source from the project. Based on current market data, ADE estimates the units to sell within a range of $521,800 for multi-family units to $882,300 for the low density single family units. The analysis is conservative in that it uses an average cost methodology which assumes the projects would require the same level of service and cost expenditure as existing development in the City and the County. The City impact can be mitigated through imposition of a Community Facilities District or other similar financing mechanism. TABLE: 1 SUMMARY OF ANNUAL FISCAL IMPACTS OF WREN INVESTORS AND HEWELL USA AMENDMENT Fiscal Effects Total at Buildout CITY OF GILROY Wren Investors Revenues 500,163 Expenditures 598,929 Net Fiscal Impact ($98,766) Hewell Revenues $102,248 Expenditures $110,604 Net Fiscal Impact ($8,356) SANTA CLARA COUNTY Revenues $824,052 Expenditures $858,120 Net Fiscal Impact ($34,068) Source: ADE, Inc. 8.A.c Packet Pg. 86 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 3 CITY AND COUNTY EXISTING FISCAL CONDITIONS The operating budgets of the City of Gilroy and the County of Santa Clara reflect the current fiscal condition of the respective agencies, including existing fiscal constraints, the prioritization of service objectives by management and elected officials, and the allocation of public resources. The historical nature of physical development within a City and County’s boundaries is one significant factor contributing to a local government’s fiscal condition. The imposition of statewide tax and service delivery policies also constrains local communities’ abilities to generate revenue necessary to pay for basic services. In addition, as was recently the case, external economic factors like the regional and national economy greatly impact revenue generation, which in turn affects funding of existing public services. This section provides a description of the operating budgets for the City of Gilroy and the County of Santa Clara. CITY OF GILROY BUDGET1 California local governments are financed through a complex variety of revenue sources such as property and sales taxes, state and federal intergovernmental transfers, and fees. The total City budget consists of the general fund, enterprise funds (water and sewer), debt service funds, capital projects funds, internal service funds, special revenue funds, and select trust and agency funds. The general fund is the focus of analysis in this report, since it must provide services that are dependent on general tax revenues, while most other funds have dedicated revenue sources for specific services. The City, like nearly every other local government in the nation, experienced significant negative impacts during the recent economic downturn. The impacts included unprecedented numbers of foreclosures, plummeting real estate values and, as a result, reduced property tax revenues. The downturn in the U.S. economy also impacted the City through the decrease in sales tax revenue as consumers spent less on taxable discretionary retail goods. The City reduced staffing levels and service levels during this time. However, for the past eight years, the City has had a balanced budget and has met or exceeded its General Fund Reserve policies. The City has also increased staffing levels over the past few years. For this analysis, certain adjustments have been made to both revenues and expenditures in order to focus the analysis on the net cost of providing services with local revenues. On the revenue side, the adjustments are in part state and federal grant funds that are not based on development or population in the City. Additional adjustments are made for one-time building permit or entitlement fees that are only paid at the time a building project is approved and do not fund ongoing operation of City services. On the expenditure side, these revenue adjustments are subtracted from the respective departmental service costs to calculate the net cost of providing ongoing services supported by annual local revenue sources. Expenditure adjustments also include capital expenditures, since the focus of this part of the analysis is on annual operating costs for City services. 1 City of Gilroy budget figures and analysis are derived from the City’s FY 2019-2020 Budget. 8.A.c Packet Pg. 87 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 4 TABLE: 2 CITY OF GILROY GENERAL FUND BUDGET 2016-2017 Budget REVENUES Property Tax $14,977,689 Doc Transfer tax $496,287 Sales Tax $20,558,683 Transient Occupancy Tax $1,402,699 Utility Users Tax $4,643,909 Franchise Tax $1,724,598 Motor Vehicle Tax $32,462 Business Licenses $710,435 Building Permits $2,889,783 Other Licenses & Permits $54,000 Fines & Forfeitures $262,730 Intergovernmental $141,500 Charges for Services $5,669,485 Use of Money & Property $475,334 Other Revenues $1,463,849 Other Financing Sources $142,000 Use of Fund Balance $2,178,141 Total General Fund Revenues $ 57,823,584 EXPENDITURES General Administration $7,495,023 Police $23,935,803 Fire $11,859,279 Public Works $5,524,790 Recreation $3,835,082 Community Development $4,881,988 Total General Fund Expenditures $57,531,965 NET SURPLUS/(DEFICIT) GENERALFUNDS $291,619 Source: City of Gilroy FY 2020 and FY 2022 Biennial Budget COUNTY OF SANTA CLARA FY 2019-20 BUDGET Counties face many challenges in providing services to local residents. As an administrative arm of the state, the county is mandated to provide certain services and receives both state and federal funding for this purpose. However, these funding sources often times are unpredictable and subject to fluctuations during difficult economic periods. Some county services such as criminal justice, public health, and the assessor benefit the entire unincorporated and incorporated community. Other services such as plan check and sheriff’s patrol are provided only to the unincorporated population. The County must use its locally- generated discretionary revenues to meet local service priorities. The total County of Santa Clara Proposed FY 19-20 Budget is $8.1 billion2, of which the General Fund budget is approximately $3.7 billion (Table 3). The General Fund budget excludes those funding categories that are 2 All fund categories including the County general fund. 8.A.c Packet Pg. 88 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 5 used for enterprise funds, special revenue, capital programs, and internal service funds. The County’s estimated $353 million General Fund deficit will be funded from prior year revenues. TABLE: 3 COUNTY OF SANTA CLARA GENERAL FUND BUDGET FY 19-20 REVENUES Taxes-Current Property $1,108,200,000 Sales Tax $114,585,335 Licenses, Permits, & Franchises $9,946,613 Fines, Forfeitures, & Penalties $10,077,500 Use of Money & Property $43,001,871 Aid from Govt. Agencies-State $753,726,944 Aid from Govt. Agencies-Federal $560,545,908 Revenue from Other Govt. Agencies $3,783,498 Charges for Services $116,412,667 Other Financing Sources $680,903,309 Revenue Total $ 3,401,183,645 EXPENDITURES Finance and Government $1,049,078,736 Public Safety and Justice $887,811,965 Children, Seniors, and Families $1,006,343,634 Santa Clara Valley Health/Hospital $773,999,964 Housing, Land Use, Environ., and Transportation $36,725,215 Expenditures Total $ 3,753,959,514 NET SURPLUS/(DEFICIT) ($352,775,869) Source: County of Santa Clara, FY 2019-20 Recommended Budget 8.A.c Packet Pg. 89 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 6 FISCAL IMPACT ANALYSIS PROJECT DESCRIPTION The project sites are located northeast of the intersection of Vickery Lane and Kern Avenue. The total project sites include 16 parcels totaling approximately 55.66 acres, with a land use designation of Neighborhood District. The sites will be developed in a combination of low, medium and high density residential housing, with a small retail building in the Wren Investors project. The State Department of Finance indicates that Gilroy has an average household size of 3.5 persons and a 3.6 percent vacancy rate. Using these factors, the projects will house an estimated additional 1,036 residents when fully developed (Table 4). The projects will have a total estimated assessed value of $228.7 million when fully developed ($2019). The basis for the estimated real estate values is discussed in the section below. TABLE: 4 WREN INVESTORS AND HEWELL SOI AMENDMENT: PROJECT CHARACTERISTICS LAND USE Units Population Assessed Value Per Unit Total Wren Investors Low Density (8 Du/AC) 137 462 $882,300 $120,875,100 Medium Density 20 67 $663,500 $13,270,000 High Density 102 344 $521,800 $53,226,200 Retail 3,485 Sq. Ft. 6 jobs $260.00 $906,100 Hewell Low Density (11 Du/AC) 48 162 $842,700 $40,449,600 Total 307 1,036 $228,727,000 Source: ADE, Inc. REAL ESTATE VALUES The two projects would include single family houses at 8 DU/AC and 11 DU/AC as well as medium density and high density units. The two single family densities translate to approximately 4,000 and 5,400 sq. ft. lots. Using assessor data records accessed from CoreLogic, ADE has compiled residential sales transactions over the past two years in these lot size and unit type categories, as shown in Table 5. The single family prices have fluctuated over this time frame but not appreciably increased. We have used the two-year average for each density level to project property taxes in the fiscal analysis. For the high density units, we have averaged the per sq. ft. of building space figures for the condos and the apartments, and assumed an average size of 1,300 sq. ft. per unit. This results in an average value of $521,800 per high density unit. 8.A.c Packet Pg. 90 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 7 TABLE 5: SELECTED HOME SALES PRICES IN GILROY, 2018-2019 Units Single Family High Density 5,400 4,000 2,200 Condos Apts Per Unit $882,300 $842,700 $663,500 $477,700 Per Sq. Ft. Bldg. $330.62 $332.84 $384.12 $372.51 $430.29 Per Sq. Ft. Lot $172.50 $228.71 $305.20 $373.90 $162.41 Source: ADE, Inc., based on data obtained from CoreLogic. PROJECT IMPACTS: CITY OF GILROY Annexation and development of the Wren Investors and Hewell sites will generate a number of revenues for the City of Gilroy, including property taxes, indirect sales taxes, and a variety of other taxes and fees. With the exception of the property tax, most of the revenues included in the analysis have been projected using a per capita basis, which reflects the average revenue generation by households in Gilroy. The development of the sites will also increase demand for City services as discussed further below. PROPERTY TAX SHIFT AND PROPERTY TAX REVENUE The base property tax paid by property owners, equal to one percent of assessed value under Proposition 13, is allocated to a wide range of local taxing agencies, including City and County government, special service districts, school districts, and other agencies. The parcels in the proposed USA amendment had an assessed value of $4,961,579 in 2017 and generated $49,616 in base property tax. Property tax from the existing parcels is distributed based on the percentages shown for the Tax Rate Area (TRA) 67-007 shown in Table 6. The initial fiscal effect after annexation of the land in the plan would be a shift in property tax distribution from the County General Fund and the South County Fire Protection District (SSCCFPD) to the City. It is not known currently what the new distribution would be, but staff in the Property Tax Division of the County of Santa Clara Controller-Treasurer’s Department indicated that it would be similar to TRA 02-001 due to the mix of taxing agencies that would serve the site after annexation. The SSCCFPD currently gets $4,900 in annual property tax from the site, which would shift to the City along with fi re protection jurisdiction. 8.A.c Packet Pg. 91 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 8 At full buildout, the City would receive about $215,400 per year in base property taxes. In addition, local jurisdictions receive property tax in lieu of motor vehicle license fees as part of the Proposition 1A legislation from the Schwarzenegger administration. These revenues are allocated based on the increase in assessed value annually for the jurisdiction and are estimated at about $117,800 per year at buildout of the proposed projects. SALES TAX Residents in the project would purchase retail items at Gilroy stores and thereby generate sales taxes. Based on the income levels anticipated for the proposed project, the residents are projected to spend about $9.1 million per year on taxable sales. Detailed estimates of household expenditures for each unit type may be found in the Appendix. It is estimated that 20 percent of this spending does not occur in Gilroy, either from out-commuters making purchases at their place of employment, through comparison shopping for major items at competing retail centers, or spending on business and leisure trips. This leaves $7.3 million for spending at Gilroy stores, a small amount of which would be spent at the new retail store in the Wren Investors project. The City receives one percent of these sales in the form of sales taxes. OTHER REVENUES The City collects a number of other revenues listed in Tables 7 and 8 either in the form of local taxes or as fees or charges for service. The utility users taxes and franchise taxes are collected on utility bills. The motor vehicle tax is the current City share of vehicle registration fees. As discussed above under property taxes, cities used to receive a higher share but that has been replaced by additional property taxes as p art of a previous state budget agreement. TABLE: 6 CURRENT AND ESTIMATED FUTURE PROPERTY TAX DISTRIBUTION Taxing Agency Current Distribution (TRA 67-007) Estimated Future Distribution (TRA 02-001) City of Gilroy 0.00% 9.63% County General Fund 14.20% 13.60% County Library 2.59% 2.48% Gilroy Unified 49.26% 47.80% Gavilan Community College 5.63% 5.46% County School Service 3.34% 3.24% South S.C. County Fire Dist. 9.88% 0.00% S.C. Valley Water Dist-South Zone 1 1.59% 1.53% S.C. Valley Water Dist-General 0.74% 0.71% South S.C. Valley Memorial Dist. 0.14% 0.13% Bay Area Air Quality Mgmt. Dist. 0.19% 0.18% Loma Prieta Resource Conserv. 0.05% 0.05% S.C. Co. Importation Water-Misc. Dist. 0.50% 0.47% ERAF 11.91% 14.72% Total 100.00% 100.00% Source: ADE, based on data provided by the Santa Clara County Office of the Controller-Treasurer. 8.A.c Packet Pg. 92 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 9 A small amount of business license revenue is shown for residences to account for home based businesses that often occur in residential neighborhoods. The other licenses and permits mainly cover things like animal and bicycle licenses. Building permits and plan check fees are not included, since those are only paid once when the development is constructed. The planning and engineering services supported by those fees have also been deducted from the cost analysis below. Fines and forfeitures are mainly the City share of traffic fines and parking fines that are levied in Gilroy. Charges for service include recreation program fees as well as miscellaneous charges for direct customer services provided at City Hall. Overall, the two projects combined are projected to generate about $602,400 per year in operating revenue for Gilroy. CITY COSTS City service costs have generally been allocated on a per capita basis. The cost factors take into account both the resident population in Gilroy and also service demands generated by the business base, as represented by the number of workers with jobs in Gilroy. As mentioned above, service costs for the fire department, the public works departments and the community development departments have been adjusted to remove the revenue received from plan check and building permit fees, since the analysis is focused on the annual impact of the project after it is built. The cost factors for all departments have been adjusted to remove department head expenses, in order to better reflect the direct impact of the project on City service needs. Similarly City Council costs are not included in the calculations. The General Administration costs are calculated as an overhead percentage of the other direct service costs. With the adjustments mentioned above, the General Administration departments, which include the City Administrator, the Finance and Human Resource Departments, Information Technology and the City Clerk, represent 2.2 percent of General Fund expenditures. Aside from these adjustments, the cost factors represent the full average cost of the project to the City. In the case of fire protection, the City is already incurring expenses for the fire station that would serve this project, so the incremental cost of the project would possibly be less than shown in Tables 7 and 8. In total, the projects are projected to generate about $709,500 in annual costs for the City at buildout. 8.A.c Packet Pg. 93 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 13 TABLE: 7 WREN INVESTORS USA AMENDMENT CITY IMPACTS-10 YEAR ANNUAL PROJECTION Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Property Tax $177,374 $180,921 $184,540 $188,231 $191,995 $196,987 $202,109 $207,364 $212,755 $218,287 VLF Property Tax $98,191 $100,155 $102,158 $104,201 $106,285 $109,049 $111,884 $114,793 $117,777 $120,840 Sales Tax $60,304 $62,114 $63,977 $65,896 $67,873 $69,909 $72,007 $74,167 $76,392 $78,684 Utility Users Tax $58,453 $60,207 $62,013 $63,874 $65,790 $67,763 $69,796 $71,890 $74,047 $76,268 Franchise Tax $22,327 $22,996 $23,686 $24,397 $25,129 $25,883 $26,659 $27,459 $28,283 $29,131 Motor Vehicle Tax $420 $433 $446 $459 $473 $487 $502 $517 $532 $548 Business Licenses $1,281 $1,320 $1,359 $1,400 $1,442 $1,486 $1,530 $1,576 $1,623 $1,672 Other Lic. & Permits $699 $720 $742 $764 $787 $810 $835 $860 $886 $912 Fines and Forfeitures $3,401 $3,503 $3,608 $3,717 $3,828 $3,943 $4,061 $4,183 $4,309 $4,438 Charges for Services $73,397 $75,599 $77,867 $80,203 $82,609 $85,087 $87,640 $90,269 $92,977 $95,766 Use of Money & Prop. $4,314 $4,444 $4,577 $4,714 $4,856 $5,002 $5,152 $5,306 $5,465 $5,629 Total Revenue $500,163 $512,412 $524,974 $537,856 $551,067 $566,406 $582,174 $598,383 $615,046 $632,176 General Administration $55,162 $56,816 $58,521 $60,276 $62,085 $63,947 $65,866 $67,842 $69,877 $71,973 Police $294,581 $303,419 $312,521 $321,897 $331,554 $341,501 $351,746 $362,298 $373,167 $384,362 Fire $147,454 $151,877 $156,434 $161,127 $165,961 $170,939 $176,068 $181,350 $186,790 $192,394 Public Works $51,353 $52,894 $54,481 $56,115 $57,799 $59,533 $61,319 $63,158 $65,053 $67,005 Recreation $45,847 $47,222 $48,639 $50,098 $51,601 $53,149 $54,743 $56,386 $58,077 $59,820 Community Dev. $4,532 $4,667 $4,808 $4,952 $5,100 $5,253 $5,411 $5,573 $5,740 $5,913 Total Expenditures $598,929 $616,896 $635,403 $654,465 $674,099 $694,322 $715,152 $736,607 $758,705 $781,466 NET SURPLUS/ (DEF) ($98,766) ($104,484) ($110,430) ($116,610) ($123,032) ($127,916) ($132,978) ($138,223) ($143,658) ($149,290) Source: ADE, Inc. 8.A.c Packet Pg. 94 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 14 TABLE: 8 HEWELL USA AMENDMENT CITY IMPACTS-10 YEAR ANNUAL PROJECTION Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Property Tax $38,079 $38,840 $39,617 $40,410 $41,218 $42,042 $42,883 $43,741 $44,615 $45,508 VLF Property Tax $21,076 $21,498 $21,928 $22,366 $22,813 $23,270 $23,735 $24,210 $24,694 $25,188 Sales Tax $12,700 $13,081 $13,474 $13,878 $14,294 $14,723 $15,165 $15,620 $16,089 $16,571 Utility Users Tax $10,794 $11,118 $11,451 $11,795 $12,149 $12,513 $12,889 $13,275 $13,673 $14,084 Franchise Tax $4,123 $4,246 $4,374 $4,505 $4,640 $4,779 $4,923 $5,071 $5,223 $5,379 Motor Vehicle Tax $78 $80 $82 $85 $87 $90 $93 $95 $98 $101 Business Licenses $206 $212 $218 $225 $232 $238 $246 $253 $261 $268 Other Lic. & Permits $129 $133 $137 $141 $145 $150 $154 $159 $164 $168 Fines and Forfeitures $628 $647 $666 $686 $707 $728 $750 $772 $796 $820 Charges for Services $13,553 $13,960 $14,379 $14,810 $15,254 $15,712 $16,183 $16,669 $17,169 $17,684 Use of Money & Prop. $882 $908 $936 $964 $993 $1,022 $1,053 $1,085 $1,117 $1,151 Total Revenue $102,248 $104,724 $107,262 $109,865 $112,533 $115,269 $118,074 $120,950 $123,899 $126,922 General Administration $10,187 $10,492 $10,807 $11,131 $11,465 $11,809 $12,163 $12,528 $12,904 $13,291 Police $54,397 $56,029 $57,710 $59,441 $61,224 $63,061 $64,953 $66,901 $68,909 $70,976 Fire $27,229 $28,046 $28,887 $29,753 $30,646 $31,565 $32,512 $33,488 $34,492 $35,527 Public Works $9,489 $9,774 $10,067 $10,369 $10,680 $11,001 $11,331 $11,671 $12,021 $12,381 Recreation $8,466 $8,720 $8,982 $9,251 $9,529 $9,814 $10,109 $10,412 $10,724 $11,046 Community Development $837 $862 $888 $914 $942 $970 $999 $1,029 $1,060 $1,092 Total Expenditures $110,604 $113,923 $117,340 $120,860 $124,486 $128,221 $132,067 $136,029 $140,110 $144,314 NET SURPLUS/ (DEF) ($8,356) ($9,199) ($10,078) ($10,996) ($11,953) ($12,952) ($13,994) ($15,080) ($16,212) ($17,391) Source: ADE, Inc. 8.A.c Packet Pg. 95 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 15 NET FISCAL IMPACT The net impact of the project is estimated to be an annual deficit of $98,766 for the Wren Investors project and $8,356 for the Hewell project. This is not necessarily unexpected, given the fiscal structure under which cities operate in California. As shown in Tables 7 and 8, the cost/revenue gap widens over time, assuming costs and revenues escalate at about the same rate, estimated here to be three percent per year, except for property taxes which escalate at two percent per year. This is somewhat conservative, because re-sales of the houses will tend to increase property taxes at a faster rate, but not enough to address the overall project deficit. There are a number of potential mitigation measures that could reduce or eliminate this fiscal impact, as discussed below. POTENTIAL MITIGATION OF PROJECTS IMPACTS Various potential options would be available to mitigate these impacts on the City of Gilroy, including establishment of Community Facilities Districts or other assessment districts to supplement the cost of providing certain services to the projects; increased service levels provided by Homeowners Associations or similar organizational mechanisms; or reductions in service levels. Each of these options is described briefly below. COMMUNITY FACILITIES DISTRICT (CFD). Authorized by the Mello Roos Act of 1982, these districts permit the imposition of “special taxes” to fund construction costs for infrastructure and facilities, maintenance of facilities and operation costs for public services such as police and fire protection. Gilroy has adopted a CFD ordinance and has existing CFDs in place in the City. Establishment of the CFD may be done by the owners of a majority of the property within the proposed district, while the approval of special taxes requires a two-thirds vote. Because of the two-thirds vote requirement for funding, these districts are typically formed by developers in coordination with the city or county prior to development of the subdivisions. Once established, they are made irrevocable through a lien on the property. They have most often been used to fund infrastructure construction, but a number of cities and counties have also required special taxes to help pay for services as well. This could help defray costs for police, fire, and recreation services. The fiscal deficit would be $381 per unit for the Wren Investors project. If the entire deficit were recouped through CFD special taxes, it would increase the tax burden on the units by about 0.055 percent of assessed value. The existing total tax rate for the 02-001 TRA is 1.26706 percent.3 At most, the Wren special tax would raise the total tax rate to 1.32206 percent. Effective tax rates below 2 percent are generally considered feasible and acceptable for most homeowners. LANDSCAPE AND LIGHTING DISTRICT (LLD). The Landscape and Lighting Act of 1972 permits the establishment of assessment districts to fund acquisition, construction, and maintenance of public landscaping and lighting, typically along streets. It also permitted similar activities related to parks and open space and recreation facilities and equipment, but Proposition 218 in 1996 imposed a condition on all assessment districts that the assessment must relate to a special benefit provided to each parcel in the district. The rule is that, “General enhancement of property value does not constitute a special benefit”. 3 County of Santa Clara Compilation of Tax Rates and Information, Fiscal Year 2017-2018. Santa Clara County Controller-Treasurer. 8.A.c Packet Pg. 96 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 16 This makes LLDs harder to apply to parks and recreation facilities but they are still used for maintenance of streets, lighting, and landscaping within subdivisions. In accordance with provisions of Proposition 218, the duration of the assessment is specified at the time the District is initially established, along with an annual escalation clause, to reduce the possibility of rescissions by property owner votes at the required annual hearing. There are no examples in California of a successful majority property owner protest of an LLD once it has been established. This funding mechanism, along with the MAD & HOA discussed below, could help pay for some of the Public Works costs shown in Tables 7 and 8. MAINTENANCE ASSESSMENT DISTRICT (MAD). This is a broader form of assessment district (authorized under a variety of Acts) that allows for maintenance of storm drain facilities, water and sewer facilities and other public facilities and infrastructure not covered by LLDs. All such assessment districts must follow Proposition 218 information and election procedures. An engineer’s report is required to establish the special benefit to all parcels in the district and the establishment of the district can b e defeated by majority protest of the property owners. Once the district is established and operating, an annual engineer's report is prepared to verify that the assessments continue to meet the special benefit provision of Proposition 218. As mentioned above for the LLDs, the duration of the assessment should be specified at the outset, as well as the index to be used for annual inflationary escalations, to reduce the likelihood of property owner protests at the annual public hearing. HOMEOWNERS ASSOCIATIONS (HOA). These associations are often formed to pay for maintenance of internal amenities within subdivisions or planned unit developments. Cities sometimes require HOAs to fund maintenance of streets and related public infrastructure as well. One difficulty with HOAs is that they are self governing and cities have had some difficulty enforcing proper maintenance of public facilities if the HOA fails to vote sufficient funds to do an adequate job. For this reason, this approach is not widely used currently. DEVELOPER EXACTIONS. Cities may require developers to pay for mitigation of fiscal impacts. One approach has been to calculate the dollar cost impact to certain services, such as police or fire protection, and create a capitalized fee amount that reflects the present value of projected deficits the project would create for those services, for example over a five year period. This is different than a development impact fee, which can only be used to fund capital improvements. This approach can help to augment regular City revenues for help pay for services when it is clear that development projects will create unfunded services impacts. However, compared to the CFDs or other assessment districts described above, this type of developer exaction usually only covers the fiscal costs of a project for a limited time and it must be calculated and imposed on each development project individually, although the City may adopt an ordinance describing the general basis and formula for the fee. Further discussion with City staff is necessary to determine what mitigation measures are most appropriate for this annexation. PROJECT IMPACTS: COUNTY OF SANTA CLARA Since this project involves an annexation process, LAFCO requires an analysis of the impact of the development on the County of Santa Clara. The recommended methodology for the analysis involves an average cost approach similar to that used for the City analysis in the previous section, including similar 8.A.c Packet Pg. 97 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 17 assumptions about the relative impact of residential vs. non-residential development. The revenues and service costs relate to countywide services provided to all residents of Santa Clara County. PROPERTY TAX The property tax shift was discussed earlier in terms of the change in jurisdiction. The County would lose less than one percent in property tax share. However, with development of the propert ies, the County would experience a substantial gain in property tax revenues from the sites, estimated at about $426,000 per year. About 40 percent of this is due to the vehicle license in lieu property tax. SALES TAX REVENUE This analysis focuses on the County’s General Fund budget, of which sales tax is a revenue component. This project is estimated to generate about $45,200 per year in sales tax revenues for the County General Fund. The County receives a 0.50 percent portion of the 8.75 percent sales tax rate in Santa Clara County. This represents an “incremental return” of a portion of the State’s Local Public Safety Fund (Public Safety Sales Tax-PSST) to the County. The 0.50 percent PSST is not distributed based on the location where the sales transaction was completed (i.e., not situs-based). Rather, it is taken at the state level, then after an analysis of sales tax revenue generation by county is completed by the State of California Controller’s Office, a distribution to the County is made as an “incremental return” of sales tax revenue. In addition, voters of the County approved Measure A in 2012, from which the County gets 0.125 percent of taxable sales. OTHER REVENUES In addition to the major property and sales tax revenues, County residents pay a variety of user fees and charges for service to the County. In this analysis, estimates of these fees and user charges are limited to services provided to all County residents and not those provided in the unincorporated area only. City residents also help to form the population base by which the County receives a variety of revenues from Federal, State and other local government agencies. However, due to the uncertain nature of these grant formulas, these funds are not estimated directly, but rather are deducted from the service costs to which they apply. COUNTY COSTS The County provides certain services to all County residents, regardless of the jurisdiction of their residence. These include the County jail system, health care, social services, and a variety of general government functions such as the Assessor, County Auditor and others. The analysis also factors in the Fund Balance Allocation, which reduces current effective cost levels nearly 19 percent. With this adjustment, the costs for County services are estimated on a per capita basis in Table 9 and total about $824,000 for the Wren Investors and Hewell USA Amendment. PROJECTED NET FISCAL IMPACT The property tax and other revenues generated by the project would not be sufficient to fund service costs expected to be incurred by Santa Clara County, unless project residents’ demand for County social and health services is substantially below average. The project would generate a net loss of about $34,100 in the first year, about 4.0 percent over costs. However, County costs are likely to escalate more rapidly than revenues due to limitations on the increases in property tax revenues and the project’s net deficit is projected to increase to 8.1 percent of costs in ten years (Table 9). 8.A.c Packet Pg. 98 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 18 TABLE: 9 COMBINED WREN INVESTORS AND HEWELL USA AMENDMENTS COUNTY IMPACTS-10 YEAR ANNUAL PROJECTION Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 REVENUES Taxes-Current Property $425,957 $434,476 $443,166 $452,029 $461,070 $470,291 $479,697 $489,291 $499,077 $509,058 Sales Tax $45,213 $46,570 $47,967 $49,406 $50,888 $52,414 $53,987 $55,606 $57,275 $58,993 Fines, Forfeitures, & Penalties $4,192 $4,317 $4,447 $4,580 $4,718 $4,859 $5,005 $5,155 $5,310 $5,469 Use of Money & Property $17,053 $17,564 $18,091 $18,634 $19,193 $19,769 $20,362 $20,972 $21,602 $22,250 Charges for Services $48,421 $49,874 $51,370 $52,911 $54,498 $56,133 $57,817 $59,552 $61,338 $63,178 Other Financing Sources $283,216 $291,713 $300,464 $309,478 $318,763 $328,325 $338,175 $348,320 $358,770 $369,533 Total Revenue $824,052 $844,514 $865,504 $887,038 $909,129 $931,792 $955,043 $978,897 $1,003,371 $1,028,481 EXPENDITURES Finance and Government $325,277 $335,036 $345,087 $355,439 $366,102 $377,085 $388,398 $400,050 $412,051 $424,413 Public Safety and Justice $287,548 $296,175 $305,060 $314,212 $323,638 $333,347 $343,347 $353,648 $364,257 $375,185 Children, Seniors, and Families $202,586 $208,663 $214,923 $221,371 $228,012 $234,853 $241,898 $249,155 $256,630 $264,329 Santa Clara Valley Health/Hospital $178,968 $184,337 $189,867 $195,563 $201,430 $207,473 $213,697 $220,108 $226,712 $233,513 Housing, Land Use, Environ. & Transp. $10,475 $10,789 $11,113 $11,446 $11,790 $12,143 $12,508 $12,883 $13,269 $13,667 Fund Balance Allocation ($146,734) ($151,136) ($155,670) ($160,341) ($165,151) ($170,105) ($175,209) ($180,465) ($185,879) ($191,455) Total Expenditures $858,120 $883,864 $910,379 $937,691 $965,822 $994,796 $1,024,640 $1,055,379 $1,087,041 $1,119,652 NET SURPLUS/ (DEFICIT) GENERAL FUND ($34,068) ($39,350) ($44,875) ($50,653) ($56,693) ($63,004) ($69,597) ($76,482) ($83,670) ($91,170) Source: ADE, Inc. 8.A.c Packet Pg. 99 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 19 APPENDIX TAXABLE SALES ESTIMATES The following tables show the estimates of retail/services spending and taxable sales for each of the four income levels modeled for the project. The figures reflect the aggregate total spending from the number of households in each density category, not per household values. Table A-1: Taxable Household Spending, Lower Density Single Family Units 137 HOUSEHOLDS WITH AVERAGE INCOME OF $183,000 TOTAL HOUSEHOLD SPENDING TAXABLE SALES TAXABLE PERCENT TOTAL SALES AS PERCENT OF INCOME TAXABLE SALES AS PERCENT OF INCOME STORE CATEGORY RETAIL Apparel Store Group $328,132 $328,132 100.0% 1.3% 1.3% General Merchandise Group $982,347 $661,086 67.3% 3.9% 2.6% Department Stores/Other General Merch. $230,280 $208,749 90.7% 0.9% 0.8% Other General Merchandise $615,897 $397,869 64.6% 2.5% 1.6% Drug & Proprietary Stores $136,170 $54,468 40.0% 0.5% 0.2% Specialty Retail Group $274,499 $274,499 100.0% 1.1% 1.1% Food, Eating and Drinking Group $1,894,983 $1,255,961 66.3% 7.6% 5.0% Grocery Stores $822,612 $205,653 25.0% 3.3% 0.8% Specialty Food Stores $27,039 $6,760 25.0% 0.1% 0.0% Liquor Stores $42,450 $40,668 95.8% 0.2% 0.2% Eating Places $1,002,880 $1,002,880 100.0% 4.0% 4.0% Building Materials And $0 $0 0.0% 0.0% 0.0% Homefurnishings Group $387,304 $387,304 100.0% 1.5% 1.5% Automotive Group $1,684,333 $1,633,356 93.3% 6.7% 6.5% Sub-Total Retail $5,551,597 $4,540,338 81.8% 22.1% 18.1% SERVICES Rental Services $46,107 $0 0.0% 0.2% 0.0% Professional Services $15,502 $0 0.0% 0.1% 0.0% Medical Services Eyecare $143,763 $71,882 50.0% 0.6% 0.3% Other Medical $428,652 $0 0.0% 1.7% 0.0% Repair Services Auto Repair $105,294 $42,118 40.0% 0.4% 0.2% Other Repair $49,830 $0 0.0% 0.2% 0.0% Personal Services Personal Care Services $99,400 $9,940 10.0% 0.4% 0.0% Other Personal $62,828 $0 0.0% 0.3% 0.0% Entertainment/Recreation Movie, Theater, Opera, Ballet $96,211 $9,621 10.0% 0.4% 0.0% Sporting Events $29,447 $2,945 10.0% 0.1% 0.0% Other Entertainment $204,168 $0 0.0% 0.8% 0.0% Sub-Total Services $1,281,202 $136,505 10.7% 5.1% 0.5% GRAND TOTAL $6,832,799 $4,676,843 68.4% 27.3% 18.7% Source: ADE, Inc.; retail demand model derived from U.S. Economic Census, Bureau of Labor Statistics Consumer Expenditure Sur vey and PUMS database. 8.A.c Packet Pg. 100 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 20 Table A-2: Taxable Household Spending, Higher Density Single Family Units 48 HOUSEHOLDS WITH AVERAGE INCOME OF $175,300 TOTAL HOUSEHOLD SPENDING TAXABLE SALES TAXABLE PERCENT TOTAL SALES AS PERCENT OF INCOME TAXABLE SALES AS PERCENT OF INCOME STORE CATEGORY RETAIL Apparel Store Group $111,625 $111,625 100.0% 1.3% 1.3% General Merchandise Group $334,275 $224,998 67.3% 4.0% 2.7% Department Stores/Other General Merch. $78,339 $71,014 90.7% 0.9% 0.8% Other General Merchandise $209,793 $135,526 64.6% 2.5% 1.6% Drug & Proprietary Stores $46,144 $18,458 40.0% 0.5% 0.2% Specialty Retail Group $93,453 $93,453 100.0% 1.1% 1.1% Food, Eating and Drinking Group $645,141 $427,318 66.2% 7.7% 5.1% Grocery Stores $280,400 $70,100 25.0% 3.3% 0.8% Specialty Food Stores $9,222 $2,306 25.0% 0.1% 0.0% Liquor Stores $14,440 $13,833 95.8% 0.2% 0.2% Eating Places $341,079 $341,079 100.0% 4.1% 4.1% Building Materials And $0 $0 0.0% 0.0% 0.0% Homefurnishings Group $131,956 $131,956 100.0% 1.6% 1.6% Automotive Group $569,734 $552,392 93.3% 6.8% 6.6% Sub-Total Retail $1,886,184 $1,541,741 81.7% 22.4% 18.3% SERVICES Rental Services $15,475 $0 0.0% 0.2% 0.0% Professional Services $5,203 $0 0.0% 0.1% 0.0% Medical Services Eyecare $48,250 $24,125 50.0% 0.6% 0.3% Other Medical $143,865 $0 0.0% 1.7% 0.0% Repair Services Auto Repair $35,339 $14,136 40.0% 0.4% 0.2% Other Repair $16,724 $0 0.0% 0.2% 0.0% Personal Services Personal Care Services $33,361 $3,336 10.0% 0.4% 0.0% Other Personal $21,086 $0 0.0% 0.3% 0.0% Entertainment/Recreation Movie, Theater, Opera, Ballet $32,291 $3,229 10.0% 0.4% 0.0% Sporting Events $9,883 $988 10.0% 0.1% 0.0% Other Entertainment $68,523 $0 0.0% 0.8% 0.0% Sub-Total Services $430,001 $45,814 10.7% 5.1% 0.5% GRAND TOTAL $2,316,184 $1,587,555 68.5% 27.5% 18.9% Source: ADE, Inc.; retail demand model derived from U.S. Economic Census, Bureau of Labor Statistics Consumer Expenditure Sur vey and PUMS database. 8.A.c Packet Pg. 101 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 21 Table A-3: Taxable Household Spending, Medium Density Units 20 HOUSEHOLDS WITH AVERAGE INCOME OF $140,800 TOTAL HOUSEHOLD SPENDING TAXABLE SALES TAXABLE PERCENT TOTAL SALES AS PERCENT OF INCOME TAXABLE SALES AS PERCENT OF INCOME STORE CATEGORY RETAIL Apparel Store Group $31,606 $31,606 100.0% 1.1% 1.1% General Merchandise Group $112,516 $74,634 66.3% 4.0% 2.7% Department Stores/Other General Merch. $24,279 $22,008 90.7% 0.9% 0.8% Other General Merchandise $70,449 $45,510 64.6% 2.5% 1.6% Drug & Proprietary Stores $17,789 $7,115 40.0% 0.6% 0.3% Specialty Retail Group $32,155 $32,155 100.0% 1.1% 1.1% Food, Eating and Drinking Group $223,224 $148,028 66.3% 7.9% 5.3% Grocery Stores $96,818 $24,205 25.0% 3.4% 0.9% Specialty Food Stores $3,164 $791 25.0% 0.1% 0.0% Liquor Stores $4,964 $4,755 95.8% 0.2% 0.2% Eating Places $118,277 $118,277 100.0% 4.2% 4.2% Building Materials And $0 $0 0.0% 0.0% 0.0% Homefurnishings Group $44,181 $44,181 100.0% 1.6% 1.6% Automotive Group $217,812 $211,828 93.3% 7.7% 7.5% Sub-Total Retail $661,493 $542,432 82.0% 23.5% 19.3% SERVICES Rental Services $5,181 $0 0.0% 0.2% 0.0% Professional Services $1,741 $0 0.0% 0.1% 0.0% Medical Services Eyecare $16,148 $8,074 50.0% 0.6% 0.3% Other Medical $48,147 $0 0.0% 1.7% 0.0% Repair Services Auto Repair $11,827 $4,731 40.0% 0.4% 0.2% Other Repair $5,597 $0 0.0% 0.2% 0.0% Personal Services Personal Care Services $11,165 $1,116 10.0% 0.4% 0.0% Other Personal $7,057 $0 0.0% 0.3% 0.0% Entertainment/Recreation Movie, Theater, Opera, Ballet $10,806 $1,081 10.0% 0.4% 0.0% Sporting Events $3,308 $331 10.0% 0.1% 0.0% Other Entertainment $22,932 $0 0.0% 0.8% 0.0% Sub-Total Services $143,908 $15,332 10.7% 5.1% 0.5% GRAND TOTAL $805,402 $557,765 69.3% 28.6% 19.8% Source: ADE, Inc.; retail demand model derived from U.S. Economic Census, Bureau of Labor Statistics Consumer Expenditure Sur vey and PUMS database. 8.A.c Packet Pg. 102 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) A p p l i e d D e v e l o p m e n t E c o n o m i c s | P a g e 22 Table A-4: Taxable Household Spending, High Density Units 102 HOUSEHOLDS WITH AVERAGE INCOME OF $113,500 TOTAL HOUSEHOLD SPENDING TAXABLE SALES TAXABLE PERCENT TOTAL SALES AS PERCENT OF INCOME TAXABLE SALES AS PERCENT OF INCOME STORE CATEGORY RETAIL Apparel Store Group $130,316 $130,316 100.0% 1.1% 1.1% General Merchandise Group $464,850 $308,318 66.3% 4.0% 2.7% Department Stores/Other General Merch. $100,208 $90,839 90.7% 0.9% 0.8% Other General Merchandise $291,150 $188,083 64.6% 2.5% 1.6% Drug & Proprietary Stores $73,493 $29,397 40.0% 0.6% 0.3% Specialty Retail Group $132,896 $132,896 100.0% 1.1% 1.1% Food, Eating and Drinking Group $922,633 $611,710 66.3% 8.0% 5.3% Grocery Stores $400,331 $100,083 25.0% 3.5% 0.9% Specialty Food Stores $13,085 $3,271 25.0% 0.1% 0.0% Liquor Stores $20,509 $19,648 95.8% 0.2% 0.2% Eating Places $488,709 $488,709 100.0% 4.2% 4.2% Building Materials And $0 $0 0.0% 0.0% 0.0% Homefurnishings Group $182,602 $182,602 100.0% 1.6% 1.6% Automotive Group $899,299 $874,575 93.3% 7.8% 7.6% Sub-Total Retail $2,732,596 $2,240,417 82.0% 23.6% 19.4% SERVICES Rental Services $21,280 $0 0.0% 0.2% 0.0% Professional Services $7,158 $0 0.0% 0.1% 0.0% Medical Services Eyecare $66,385 $33,193 50.0% 0.6% 0.3% Other Medical $197,938 $0 0.0% 1.7% 0.0% Repair Services Auto Repair $48,622 $19,449 40.0% 0.4% 0.2% Other Repair $23,010 $0 0.0% 0.2% 0.0% Personal Services Personal Care Services $45,900 $4,590 10.0% 0.4% 0.0% Other Personal $29,012 $0 0.0% 0.3% 0.0% Entertainment/Recreation Movie, Theater, Opera, Ballet $44,427 $4,443 10.0% 0.4% 0.0% Sporting Events $13,598 $1,360 10.0% 0.1% 0.0% Other Entertainment $94,278 $0 0.0% 0.8% 0.0% Sub-Total Services $591,608 $63,034 10.7% 5.1% 0.5% GRAND TOTAL $3,324,204 $2,303,450 69.3% 28.7% 19.9% Source: ADE, Inc.; retail demand model derived from U.S. Economic Census, Bureau of Labor Statistics Consumer Expenditure Sur vey and PUMS database. 8.A.c Packet Pg. 103 Attachment: Fiscal Impact Analysis (2563 : USA 12-01 and USA 14-02) Residential and Commercial Vacant Land Inventory Wren Investors & Hewell Urban Service Area Amendment USA 12-01 & USA 14-02 October 3, 2019 Prepared by EMC Planning Group 8.A.d Packet Pg. 104 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) 8.A.d Packet Pg. 105 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) This document was produced on recycled paper. R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY W REN I NVESTORS & H EWELL URBAN S ERVICE AREA AMENDMENT USA 12-01 & USA 14-02 PREPARED FOR City of Gilroy Community Development Department Melissa Durkin, Planner II 7351 Rosanna Street Gilroy, CA 95020 Tel 408.846.0253 PREPARED BY EMC Planning Group Inc. 301 Lighthouse Avenue, Suite C Monterey, CA 93940 Tel 831.649.1799 Fax 831.649.8399 Stuart Poulter, AICP, MCRP, Associate Planner poulter@emcplanning.com www.emcplanning.com October 3, 2019 8.A.d Packet Pg. 106 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) 8.A.d Packet Pg. 107 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) EMC PLANNING GROUP INC. TABLE OF CONTENTS 1.0 B ACKGROUND ..................................................................................... 1 2.0 R ESIDENTIAL V ACANT L AND S UPPLY ................................................. 1 3.0 R ESIDENTIAL G ROWTH P ROJECTIONS .............................................. 10 4.0 C OMMERCIAL V ACANT L AND S UPPLY ............................................... 10 5.0 R EFERENCES ..................................................................................... 18 Figures Figure 1 Northern Area Vacant Residential Land............................................ 3 Figure 2 Southern Area Vacant Residential Land ............................................ 5 Figure 3 Northern Area Vacant Commercial Land ........................................ 15 Figure 4 Southern Area Vacant Commercial Land......................................... 16 Tables Table 1 Building Density Targets for Quantifying Residential Capacity .................. 2 Table 2 Vacant Residential Land Inventory ........................................................................... 7 Table 3 Recently-Built or Under Construction Downtown Residential Projects .................................................................................................................................... 9 Table 4 Commercial Approvals 2009-2019......................................................................... 11 Table 5 Vacant Commercial Land Inventory ....................................................................... 12 Attachments Attachment A City of Gilroy Impact Fee and Mapping Revenue Projections 8.A.d Packet Pg. 108 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) 8.A.d Packet Pg. 109 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY EMC PLANNING GROUP INC. 1 1.0 B ACKGROUND In Santa Clara County, jurisdictional boundary changes, including urban service area (USA) amendments, are reviewed and acted upon by the Santa Clara County Local Agency Formation Commission (LAFCO). A city’s urban service area (USA) is defined by LAFCO as that area to which the city provides urban services such as water and sewer, or expects to provide these services within five years of inclusion within the Urban Service Area boundary. Therefore, the USA is expected to accommodate approximately five years of urban development. The City of Gilroy is considering an amendment to its existing USA for the addition of the 50.3-acre Wren Investors project site, located north and west of the Gilroy city limit and USA and the 5.36-acre Hewell site, located just outside the northern city limits northeast of the intersection of Vickery Lane and Kern Avenue. In acting upon a USA amendment request, LAFCO requires the preparation of an appropriate environmental review document, a fiscal analysis, and an analysis of the remaining vacant land within the existing USA. LAFCO utilizes the vacant land analysis in assessing the need for expansion of the USA, based on a goal of maintaining an approximate five-year supply of developable land within the USA. This vacant land analysis has been prepared to provide this information to the City and LAFCO for use in their decisions on this proposed USA amendment. This vacant land analysis focuses on the current supply of vacant land with a residential General Plan land use designation of Rural Residential, Hillside Residential, Low Density Residential, Medium Density Residential, High Density Residential, and Neighborhood District. The vacant land analysis also focuses on lands with specific plan designations, including the Hecker Pass Special Use District, and the Glen Loma Ranch Specific Plan, and takes into account residential development opportunities in the downtown. 2.0 R ESIDENTIAL V ACANT L AND S UPPLY Defining Vacant Land For purposes of this report, residential land is considered vacant if it is substantially underutilized and has a residential General Plan land use designation. The survey identifies land as vacant (or not vacant) as of September 2019. Physically vacant land may have approved 8.A.d Packet Pg. 110 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY 2 EMC PLANNING GROUP INC. entitlements that make the land more readily developable. In many cases, the City approves concurrent residential subdivision maps and architectural and site approvals. However, where subdivided residential land is expected to be sold as individual lots for later development, land is considered vacant until a building permit is granted for development of the lot. Currently Vacant Residential Land Quantifying the existing supply of residentially-designated vacant land within the Gilroy USA involved mapping land thought to be potentially vacant, and then eliminating those parcels for which building permits had been obtained. For areas with an approved final subdivision map, potential for development is based on the number of subdivided lots, equating to one dwelling unit per lot. In areas without an approved final subdivision map, including land in the Medium and High Density and Neighborhood District General Plan designations, the build-out is assumed to follow the density provided as a development target in the General Plan, as indicated in Table 1, Building Density Targets for Quantifying Residential Capacity, below: Table 1 Building Density Targets for Quantifying Residential Capacity General Plan designation Density Target Rural Residential 0.4 units/acre Hillside Residential 2.0 units/acre Low Density Residential 5.0 units/acre Medium Density Residential 16.0 units/acre High Density Residential – 20.0 units/acre Source: City of Gilroy 2019 Figure 1, Northern Area Vacant Land, and Figure 2, Southern Area Vacant Land, show the location of residential parcels determined to be vacant. Table 2, Vacant Residential Land Inventory, provides a list of estimated developable lots within each land use designation. As the table shows, approximately 2,394 residential units could be developed on vacant land. 8.A.d Packet Pg. 111 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) 0 1,600 feet Source: City o f Gilroy 2014, ESRI 2019 Figure 1Northern Area Vacant Residential Land Wren Investors and Hewell USA Amendment Urban Sevices Area (USA)Rural Reside ntial (RR) Neighborhood District/Specific Plan (N D) Hillside (H) Low Density Residentia l (L) Medium Density Residential (M) High D ensity Resid ential (HD ) Downtown (D) 8.A.d Packet Pg. 112 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) CITY OF GILROY RESIDENTIAL AND COMMERCIAL VACANT LAND INVENTORY 4 EMC PLANNING GROUP INC. This side intentionally left blank. 8.A.dPacket Pg. 113Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) 0 1,600 feet Source: City o f Gilroy 2014, ESRI 2019 Figure 2Southern Area Vacant Residential Land Wren Investors and Hewell USA Amendment Downtown (D)Urban Services Area (USA)Rural Reside ntial (RR) Hillside (H) Low Density Residentia l (L) Medium Density Residential (M) High D ensity Resid ential (HD ) Neighborhood District/Specific Plan (N D) 8.A.d Packet Pg. 114 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) CITY OF GILROY RESIDENTIAL AND COMMERCIAL VACANT LAND INVENTORY 6 EMC PLANNING GROUP INC. This side intentionally left blank. 8.A.dPacket Pg. 115Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY EMC PLANNING GROUP INC. 7 Table 2 Vacant Residential Land Inventory Location Lots/Units Rural Residential - (1.0 dwelling unit/2.5 ac.) (RR) RR-1 Miller Pond 14 Rural Residential Subtotal 14 Hillside Residential - 0.5 – 4.0 dwelling units/acre (H) H-1 Eagle Ridge Subdivision – Berwick Lane 12 H-3 Eagle Ridge Subdivision - Portmarnock Way 14 H-4 Eagle Ridge Subdivision – Eagle Ridge Court 24 H-5 Portrush Lane, Southerland Court, Walton Heath Court West of Miller Avenue 19 H-6 6385, 6389, 6395 Miller 3 H-7 Eagle Ridge Kroeger 6 H-8 Country Estates Subdivision (Phase II) [9120 and 9121 Gunnera; 2333, 2363, 2373 and 2393 Banyan; 2391 Mantelli; 2311, 2331 and 2361 Hoya] 10 H-9 Country Estates Subdivision (Phase III) [8951, 8962, 8970, 8971, 8981, 9010, 9025, 9030, 9035, 9045, 9050, 9145, 9175 Tea Tree; 8950, 8955, 8983, 9005 Mimosa; 2161, 2201, 2202, 2241, 2242, 2262 Columbine; 2203, 2204, 2224, 2244, 2243, 2273, 2281, 2283, 2291 Banyan; 9210, 9211, 9250 Mahogany; 1810, 1820, 1830, 1870, 1881 Carob] 40 H-8 Country Estates Subdivision (Phase IV) 95 H-9 Schaal Subdivision 1 H-10 Cambridge at Carriage Hills Subdivision [1955, 1975 Saffron; 1920, 1950, 1980, 1981, 1986 Lavender; 8735, 8745, 8755, 8760, 8775 Wild Iris; 8762, 8772 Foxglove] 14 H-11 Hollyhock Hills Subdivision [8530 Shooting Star; 2140, 2150, 2160, 2170, 2185 Hollyhock) 6 H-12 Miscellaneous lots South of Mantelli Drive (2225 Country Drive; 2320 Wildrose; 2 H-13 Rancho Hills/Deer Park Phase II [1681 Longmeadow] 1 8.A.d Packet Pg. 116 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY 8 EMC PLANNING GROUP INC. Location Lots/Units H-14 The Forest [8340, 8341, 8350, 8351, 8361 Wintergreen Court; 8325 Pepper Grass] 6 Hillside Residential Subtotal 253 Low Density Residential - 3.0 – 7.5 dwelling units/acre (L) L-1 Santa Teresa Boulevard South of Sunrise Drive 19 L-2 Miller Avenue at Thomas Road (Chappel/Sargenti Subdivision) 14 L-3 Miller Avenue at Thomas Road (Christopher Subdivision) 12 L-4 West of Thomas Road 31 L-5 Greenfield Drive Subdivision 14 Low Density Residential Subtotal 90 Medium Density Residential – 8.0 – 16.0 dwelling units/ac. (M) M-1 East of Kern Avenue/South of Tatum Avenue 56 M-3 Gurries Drive 8 M-4 Royal Way 65 M-5 North of Village Green 40 Medium Density Residential Subtotal 169 High Density Residential – 16.0 – 30.0 dwelling units/ac. (HD) HD-1 East of Santa Teresa Boulevard 140 HD-2 Southeast Corner of Santa Teresa Boulevard/Hecker Pass 202 HD-3 Northeast Corner of Hecker Pass/Kern Avenue 120 HD-4 West Church Street/Howson Street 87 HD-5 Northwest of Monterey Road/Ronan Avenue 119 High Density Residential Subtotal 668 Neighborhood District/Specific Plan Areas (ND) ND-1 Glen Loma Ranch Specific Plan (Santa Teresa Boulevard) 1,095 ND-2 Hecker Pass Specific Plan 105 Neighborhood District/Specific Plan Subtotal 1,200 TOTAL 2,394 Source: Google Earth 2018, Property information provided by the City of Gilroy 2019 8.A.d Packet Pg. 117 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY EMC PLANNING GROUP INC. 9 Residential Units in Downtown One thousand five hundred seventy-six (1,576) units were projected to develop in Gilroy’s Downtown as part of the revitalization identified in the Downtown Gilroy Specific Plan. As shown in Table 3, Recently Built or Under Construction Downtown Residential Projects, of the 1,576 units available, 667 have been constructed or have been issued permits, leaving a balance of 909 units remaining for entitlement. Table 3 Recently-Built or Under Construction Downtown Residential Projects Location Lots/Units Downtown (D) Prior Projects that have been Constructed 225 D-1 Alexander Station 263 D-2 Alexis Gevorgian/ Gateway Apartments (Monterey Street) 75 D-3 The Cannery at Lewis Street Apartments 104 Total Granted 667 Remaining Downtown Specific Plan RDO Exemption Units 909 Source: Google Earth 2018; Property information provided by the City of Gilroy 2019 It is anticipated that some of the residential units would be built as part of mixed-use (commercial/retail/residential) projects, and/or on land that is currently, or has previously, been developed (i.e. land that is not vacant). The Gilroy General Plan contains direction regarding residential redevelopment of the downtown. A key strategy for managing growth and minimizing costs is to focus new development in areas that are already serviced by roads, sewers, and other infrastructure. The General Plan supports development on these lands before extending the City outward. It also supports intensification of development in the Downtown area to discourage sprawl and strengthen the Downtown core. However, redevelopment in the Downtown on parcels that require demolition of existing structures presents additional cost constraints as it can be expensive to demolish old buildings. Coupled with the demise of redevelopment agencies in California, financing redevelopment projects is more complicated. Furthermore, residential development in the Downtown differs from the housing types developed in the rest of the city, as Downtown units are likely to be constructed as part of mixed-use buildings. Residential units in mixed-use buildings have a less-predictable market than traditional housing types, such that the timing of development Downtown is correspondingly unpredictable and expected to occur over the course of decades. Because of 8.A.d Packet Pg. 118 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY 10 EMC PLANNING GROUP INC. this, the city cannot apply an annual rate of development Downtown. Therefore, the Vacant Land Inventory considers residential development Downtown separately from residential development elsewhere in the city. 3 .0 R ESIDENTIAL G ROWTH P ROJECTIONS Over the next 10 years (20/21 to 29/30), the City of Gilroy expects to issue 3,045 residential building permits for projects outside of the Downtown. This is an average of 305 permits per year. This is based upon the City of Gilroy Impact Fee and Mapping Revenue Projections, included as Attachment A. Note that these projections exclude development in the Downtown, except for projects that are already in the entitlement process. The reason is that the 909 remaining Downtown units are expected to build out over the course of decades, such that the amount of development in any given year is not easily predictable. Based on the average development of 305 units per year, excluding development in the Downtown, and an approximate current availability of vacant land outside of the Downtown to build 2,394 units (see Table 2), Gilroy has adequate land for approximately 7.8 years of residential development (2,394/ 305= 7.85). If the 909 units of residential development opportunity in the downtown (see Table 3) are added to this total, Gilroy has the land capacity to build up to 3,303 units (2,394 + 909). Applying the same average build out for units located in and out of Downtown, this allows for about 10.8 years of residential development (3,303/ 305 = 10.83). 4.0 C OMMERCIAL V ACANT L AND S UPPLY Defining Commercial Land For purposes of this report, land is considered vacant if it is substantially underutilized and has a commercial zoning designation. The survey identifies land as vacant (or not vacant) as of September 30, 2019. Physically vacant land may have approved entitlements that make the land more readily developable. The commercial districts and commercial zoning designations analyzed for purposes of this report include: Downtown Historic District (DHD); Downtown Expansion District (DED); Highway Commercial District (HC); Shopping Center Commercial District (C3); Planned Unit Development Combining District (PUD); Cannery District (CD); Commercial Industrial District (CM); Gateway District (GD); and General Industrial District (M2). 8.A.d Packet Pg. 119 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY EMC PLANNING GROUP INC. 11 Inclusion of commercial land in the Wren/Hewell Urban Service Amendment project is intended to satisfy the 2020 General Plan and zoning ordinance requirements for Neighborhood Districts to include a mix of service uses within close proximity to residential areas. As noted in the City’s zoning ordinance, the Neighborhood Commercial designation encourages “areas in the city suitable for commercial uses of a low intensity and of a neighborhood character, which cater directly to residents of the immediate neighborhood only, rather than to the entire city. The uses in this district are intended to be of low intensity in order to be compatible with residential living” (City of Gilroy Zoning Ordinance Article X, 30.13.10). Commercial Absorption Rate An average annual absorption rate was determined based on approvals granted for the commercial zoning designations during the prior 10 years (2009-2019). During this period, a total of 8.73 acres of commercial uses was approved, or an average of 0.87 acres per year. Table 4, Commercial Approvals 2009-2019, summarizes commercial approvals during the 10-year period. Table 4 Commercial Approvals 2009-2019 Project Name/Location Year Zoning Acres 770 First Street 2019 C-3 0.87 6807 Automall Parkway 2019 CM 3.04 8050 Santa Teresa Boulevard 2019 C-3 1.42 6901 Cameron Boulevard Gas Station 2017 HC-M2/PUD (a portion of McCarthy Business Park) 0.65 800 1st Street CVS Pharmacy 2015 C-3 1.58 De La Torre Mixed-Use – Monterey Street and Tenth Street 2011 Expansion District (Downtown Gilroy Specific Plan) 1.17 Total 8.73 Average per Year 0.87 Source: City of Gilroy 2019; Google Earth 2018 8.A.d Packet Pg. 120 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY 12 EMC PLANNING GROUP INC. Currently Vacant Commercial Land Table 5, Vacant Commercial Land Inventory, provides a list of vacant commercial lots within each zoning designation. As the table shows, approximately 136.02 acres of commercial land is vacant. Figure 3, Northern Area Vacant Commercial Land, and Figure 4, Southern Area Vacant Commercial Land, show the location of commercial parcels that are vacant. Table 5 Vacant Commercial Land Inventory Location APN Zoning Acres C-1 North of First Street east of Kelton Dr. 790-39-019 C-3 0.97 C-2 Forest Street at Leavesley Road 835-01-050 835-01-064 C-3 5.64 C-3 San Ysidro Road north of Outlets 835-04-064 C-3 11.05 C-4 Renz Lane east of WalMart Supercenter 841-18-080 841-18-081 C3-M2/PUD 12.63 C-5 Holloway Road west of Camino Arroyo 841-70-037 Regency/Newman Center PUD 2.16 C-6 Monterey Street at West Tenth Street 799-34-036 C-3 0.87 C-7 East side of Monterey Street south of West Tenth Street 841-14-011 Gateway District (Downtown Gilroy Specific Plan) 1.89 C-8 Automall Parkway south of East Tenth Street 841-16-117 CM 9.11 C-9 Travel Park Circle 841-75-011 CM 1.73 C-10 Railroad Street & 6th Street 841-08-044 Cannery District 0.25 C-11 Alexander Street & 7th Street 841-13-022 Cannery District 3.62 C-12 Eigleberry Street, North of 4th Street 799-04-016 DED 0.18 8.A.d Packet Pg. 121 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY EMC PLANNING GROUP INC. 13 Location APN Zoning Acres C-13 Swanston Lane & Wheeler Street 841-02-055 CM 0.75 C-14 Monterey Street, South of Howson Street 790-37-003 Gateway District 1.95 C-15 Chestnut Street & 9th Street 841-12-047 841-12-057 CM 1.96 C-16 Monterey Street & 9th Street 841-14-001 DED 0.55 C-17 McCarthy Commercial 841-84-005 841-84-007 841-84-008 841-84-009 841-17-100 HC-M2/PUD (a portion of McCarthy Business Park) 4.35 C-18 Machado Commercial 841-18-082 (portion) C3-M2/PUD 28.2 C-19 Land Capital Group 841-70-049 C3-H2-M2/PUD (Gilroy Crossing Shopping Center) 10.18 C-20 7840 Monterey Street 841-02-058 DED 0.41 C-21 7634 Monterey Street 841-04-008 DHD 0.16 C-22 Monterey Street 799-09-056 DHD 0.16 C-23 2740 Hecker Pass Highway 810-20-006 Hecker Pass Special District (Hecker Pass Specific Plan) 6.00 C-24 Northeast of Bolsa Road 841-31-003 841-31-019 841-31-022 CM 103 Total 207.77 Source: City of Gilroy 2019; Google Earth 2018 Note: C-23: APN: 810-20-006 (Hecker Pass Specific Plan) was approved for an agricultural commercial development in 2018 but the Arch & Site approval has since expired C-24: APNs 841-31-003, 019, and 022 (totaling approximately 103 acres) were recently rezoned to Commercial Industrial (CM) 8.A.d Packet Pg. 122 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY 14 EMC PLANNING GROUP INC. Available Commercial Land Supply There are currently 207.77 acres of vacant commercial land within the city. Based on an annual absorption rate of about 0.87 acres per year, the city has adequate commercial land to serve future growth for about 239 years. The City estimates that the territory currently proposed for inclusion in the USA will not be available for development for at least four to five years, at which time the supply of vacant commercial land would be about 234 years. The 0.4 acres of commercial uses within the USA proposal are intended to serve the residential uses within the residential uses also included in the USA proposal. Most of the City’s vacant commercial land does not serve this purpose. The USA amendment area is estimated to build out over a 15 to 20 year period, which would result in an average commercial development rate within the USA amendment area of about to 1.9 to 2.5 acres per year. 8.A.d Packet Pg. 123 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C-20 C-21 C-23 C-1 C-2C-2 C-3 C-13 C-14 C-12UV152 UV152 UV152 £¤101 £¤101 Leavesley Rd.1St St.Santa Teresa Blvd.Day Rd.Mo n t e r e y S t.Mo n t e r e y H wy. N e w A v e .Mo n t e r e y R d . 0 1,600 feet Source: City o f Gilroy 2008, ESRI 2019 Figure 3 Wren Investors and Hewell USA AmendmentNorthern Area Vacant Commercial Land Vacan t Comme rcial Land C-1 C-2 C-3 CM PU D DHD DED GD Urb an Se vices Area (U SA) Hecke r Pa ss Spe cial D istrict 8.A.d Packet Pg. 124 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) CITY OF GILROY RESIDENTIAL AND COMMERCIAL VACANT LAND INVENTORY 16 EMC PLANNING GROUP INC. This side intentionally left blank. 8.A.dPacket Pg. 125Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C-23 C-15C-15 --C-24 C-7 C-9 C-8C-6 C-10 C-11 C-5 C-4C-4 C-17 C-18(Portion) C-19 C-17 C-17C-17C-17UV152 UV152 £¤101 £¤101 El Camino Real .Mo n t e r e y Rd .Mo n t e r e y Hwy . 0 1,600 feet Source: City o f Gilroy 2008, ESRI 2019 Figure 4 Wren Investors and Hewell USA Amendment Souther n Area Vacant Commercial LandDHD DED GD Vacan t Comme rcial Land C-1 C-2 C-3 CM PU D Urb an Se vices Area (U SA) CD 8.A.d Packet Pg. 126 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) CITY OF GILROY RESIDENTIAL AND COMMERCIAL VACANT LAND INVENTORY 18 EMC PLANNING GROUP INC. This side intentionally left blank. 8.A.dPacket Pg. 127Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY EMC PLANNING GROUP INC. 19 5 .0 R EFERENCES City of Gilroy. 2002 - 2020 General Plan. June 2002 (a). City of Gilroy. Hecker Pass Specific Plan. January 18, 2005. Revised August 18, 2009. Revised May 18, 2015. Revised August 6, 2018 (b). City of Gilroy. Downtown Gilroy Specific Plan. November 21, 2005 (c). City of Gilroy. Email Correspondence with Melissa Durkin. July 6, 2018; September 12, 2019; September 30, 2019; October 1, 2019 (d). City of Gilroy. Email Correspondence with Jorge Duran. August 7, 2018 (e). City of Gilroy. Gilroy City Code, Chapter 30 Zoning Ordinance. September 12, 2019 (f). City of Gilroy. Impact Fee and Mapping Revenue Projections. October 26, 2014 (g). Google Earth. Imagery Date, May 9, 2018. Santa Clara Local Agency Formation Commission (LAFCO) website. Accessed October 23, 2017 at: http://santaclaralafco.org/about-lafco/faq 8.A.d Packet Pg. 128 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) C ITY OF G ILROY R ESIDENTIAL AND C OMMERCIAL V ACANT L AND I NVENTORY 20 EMC PLANNING GROUP INC. This side intentionally left blank. 8.A.d Packet Pg. 129 Attachment: Wren Investors and Hewell Vacant Land Survey October 2019 (2563 : USA 12-01 and USA 14-02) P LAN FOR S ERVICES W REN I NVESTORS & H EWELL URBAN S ERVICE AREA AMENDMENT USA 12-01 and USA 14-02 PREPARED FOR City of Gilroy October 4, 2019 8.A.e Packet Pg. 130 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 8.A.e Packet Pg. 131 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) This document was produced on recycled paper. P LAN FOR S ERVICES W REN I NVESTORS & H EWELL URBAN S ERVICE AREA AMENDMENT USA 12-01 and USA 14-02 PREPARED FOR City of Gilroy Community Development Department Melissa Durkin, Planner II 7351 Rosanna Street Gilroy, CA 95020 Tel 408.846.0451 PREPARED BY EMC Planning Group Inc. 301 Lighthouse Avenue, Suite C Monterey, CA 93940 Tel 831.649.1799 Fax 831.649.8399 Stuart Poulter, AICP, MCRP, Associate Planner poulter@emcplanning.com www.emcplanning.com October 4, 2019 8.A.e Packet Pg. 132 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 8.A.e Packet Pg. 133 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. TABLE OF CONTENTS 1.0 INTRODUCTION ......................................................................................... 1-1 Executive Summary .............................................................................................................. 1-1 Cortese Knox Act Requirements ......................................................................................... 1-1 Primary Information Sources .............................................................................................. 1-3 2.0 PROPOSED USA AMENDMENT ................................................................ 2-1 Summary ................................................................................................................................ 2-1 Background ............................................................................................................................ 2-1 Project Location and Setting ................................................................................................ 2-2 Project Description ................................................................................................................ 2-2 Anticipated Approvals ......................................................................................................... 2-4 Anticipated Time Frame for Service Delivery .................................................................. 2-4 3.0 WATER ...................................................................................................... 3-1 Information Sources ............................................................................................................. 3-1 Existing Conditions .............................................................................................................. 3-2 Project Demand and Infrastructure Expansion ................................................................ 3-4 Financing ................................................................................................................................ 3-6 Conclusion ............................................................................................................................. 3-7 4.0 WASTEWATER ........................................................................................... 4-1 Information Sources ............................................................................................................. 4-1 Existing Conditions .............................................................................................................. 4-1 Project Wastewater Generation and Infrastructure Expansion ...................................... 4-2 Financing ................................................................................................................................ 4-3 Conclusion ............................................................................................................................. 4-4 8.A.e Packet Pg. 134 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 5.0 STORM DRAINAGE ................................................................................... 5-1 Information Sources .............................................................................................................. 5-1 Capacity and Infrastructure................................................................................................. 5-2 Financing ................................................................................................................................ 5-2 Conclusion ............................................................................................................................. 5-3 6.0 SOLID WASTE ........................................................................................... 6-1 Existing Conditions .............................................................................................................. 6-1 Waste Generation .................................................................................................................. 6-1 Conclusion ............................................................................................................................. 6-2 7.0 FIRE SERVICES .......................................................................................... 7-1 Information Sources .............................................................................................................. 7-1 Existing Conditions .............................................................................................................. 7-1 Financing ................................................................................................................................ 7-4 Conclusion ............................................................................................................................. 7-5 8.0 POLICE SERVICES ..................................................................................... 8-1 Information Sources .............................................................................................................. 8-1 Existing Conditions .............................................................................................................. 8-1 Project Impact Analysis ........................................................................................................ 8-3 Financing ................................................................................................................................ 8-3 Conclusion ............................................................................................................................. 8-4 9.0 LIGHTING ................................................................................................. 9-1 Information Sources .............................................................................................................. 9-1 Lighting .................................................................................................................................. 9-1 Financing ................................................................................................................................ 9-1 8.A.e Packet Pg. 135 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 10.0 LIBRARIES ................................................................................................ 10-1 Information Sources ........................................................................................................... 10-1 Existing Conditions ............................................................................................................ 10-1 Demand and Infrastructure ............................................................................................... 10-2 Financing .............................................................................................................................. 10-2 Conclusion ........................................................................................................................... 10-3 11.0 ROADS ..................................................................................................... 11-1 Information Sources ........................................................................................................... 11-1 Existing Conditions ............................................................................................................ 11-1 Infrastructure Expansion ................................................................................................... 11-2 12.0 SCHOOL FACILITIES ................................................................................ 12-1 Information Source ............................................................................................................. 12-1 Existing Conditions ............................................................................................................ 12-1 Capacity................................................................................................................................ 12-2 Financing .............................................................................................................................. 12-2 Conclusion ........................................................................................................................... 12-3 13.0 HOSPITALS .............................................................................................. 13-1 Information Sources ........................................................................................................... 13-1 Existing Conditions ............................................................................................................ 13-1 Capacity................................................................................................................................ 13-1 Conclusion ........................................................................................................................... 13-2 14.0 PARK AND RECREATION FACILITIES ...................................................... 14-1 Information Sources ........................................................................................................... 14-1 Existing Conditions ............................................................................................................ 14-1 Demand and Infrastructure ............................................................................................... 14-2 Financing .............................................................................................................................. 14-2 8.A.e Packet Pg. 136 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. Conclusion ........................................................................................................................... 14-2 15.0 COMMUNITY FACILITIES DISTRICT ........................................................ 15-1 Information Sources ............................................................................................................ 15-1 Overview of CFDs ............................................................................................................... 15-1 Formation and Financing of CFD ..................................................................................... 15-2 16.0 SOURCES ................................................................................................ 16-1 Persons Contacted ............................................................................................................... 16-1 Documents Referenced ...................................................................................................... 16-1 Report Preparers ................................................................................................................. 16-5 Figures Figure 1 Existing and Proposed USA Boundaries ............................................ 2-5 Tables Table 2-1 Public Facilities and Utilities Fees ....................................................... 2-3 Table 2-2 Wren Investors and Hewell USA Amendment Anticipated Development .......................................................................................... 2-4 Table 3-1 Water Demand ....................................................................................... 3-5 Table 8-1 Police Response Times .......................................................................... 8-2 Table 12-1 Estimated Student Generation ........................................................... 12-2 8.A.e Packet Pg. 137 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 1-1 1.0 Introduction EXECUTIVE SUMMARY The City of Gilroy (hereinafter “City”) has prepared this plan for providing services (hereinafter “plan”) as part of the City’s application to the Local Agency Formation Commission of Santa Clara County (hereinafter “LAFCO”). The plan is required by LAFCO for urban service area (USA) amendments as an enumeration and description of how services will be provided and which entities would provide the services to the affected territory (project site). This plan addresses how the City and other agencies would provide services to the project site upon annexation and development of the site including water, wastewater, storm drainage, solid waste, fire, police, lighting, library services, roads, schools, and hospitals. CORTESE KNOX ACT REQUIREMENTS As a mandatory component of a USA Amendment application, LAFCO requires the submittal of a plan for providing services prepared in compliance with Government Code Section 56653 that describes how services will be provided and the level and range of those services, including detailed information on the extent, size, location and capacity of existing infrastructure. The Cortese Knox Act requires the preparation of a plan for providing services when an annexation or similar boundary change is requested. Government Code Section 56653 sets forth the requirements as follows: 56653 (a) If a proposal for a change of organization or reorganization is submitted pursuant to this part, the applicant shall submit a plan for providing services within the affected territory. (b) The plan for providing services shall include all of the following information and any additional information required by the commission or the executive officer: (1) An enumeration and description of the services to be extended to the affected territory. (2) The level and range of those services. 8.A.e Packet Pg. 138 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 1.0 Introduction 1-2 EMC Planning Group Inc. (3) An indication of when those services can feasibly be extended to the affected territory. (4) An indication of any improvement or upgrading of structures, roads, sewer or water facilities, or other conditions the local agency would impose or require within the affected territory if the change of organization or reorganization is completed. (5) Information with respect to how those services will be financed. (d) This section shall not preclude a local agency formation commission from considering any other options or exercising its powers under Section 56375. (e) This section shall remain in effect only until January 1, 2025, and as of that date is repealed (California State Assembly 2016). Pursuant to the Cortese-Knox Act, LAFCO has issued guidance for the preparation of plans for services that expand on the requirements listed above (LAFCO 2013). The plan for services must address the following: (a) The capacity of existing infrastructure including:  The total capacity / service units of the system  Number of service units already allocated  Number of service units within current boundaries anticipating future service  Number of service units within the system available after providing service to areas within current boundaries that anticipate future service  Number of service units required to serve the proposed project  Number of service units proposed to be added to meet the demand (b) In the event there are not enough service units available to serve the proposed project, the applicant shall provide a plan for obtaining the capacity necessary to provide service which must include the following information:  A description of any required facility or infrastructure expansions or other necessary capital improvements.  The likely schedule for completion of the expanded capacity project, the viability of the needed project, and the relation of the subject project to the overall project and project time line. 8.A.e Packet Pg. 139 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 1-3  A list of required administrative and legislated processes, such as CEQA review or State Water Resources Board allocation permits, including assessment of likelihood of approval of any permits and existence of pending or threatened legal or administrative challenges if known.  The planned total additional capacity.  The size and location of needed capital improvements.  The proposed project cost, financing plan and financing mechanisms including a description of the persons or properties expected to bear project costs.  Any proposed alternative projects if the preferred project cannot be completed. (c) The estimated time frame for service delivery. (e) A statement indicating any capital improvements, or upgrading of structures, roads, sewer or water facilities or other conditions the agency would impose or require within the affected territory prior to providing service if proposal is approved. (f) A description of how the services will be financed. (g) Agency’s general statement of intent to provide services to the affected territory, indicating the agency’s capability of providing the necessary services in a timely manner to the affected territory while being able to serve all areas within its current boundaries and without lowering the level of service provided to areas currently being served by the agency. In accordance with the Cortese-Knox Act and LAFCO’s guidance on preparing plans for services, this plan addresses water, wastewater, storm drainage, solid waste, fire, police, lighting, library services, roads, schools, and hospitals. This plan identifies the City’s planned capital improvements for the project area, notes the adequacy or deficiency of the City’s planned capital improvements and policy goals based upon the project description, and identifies the responsibilities and funding mechanisms for the provision of services to the site, based upon the level of future development anticipated by the conceptual development plan. PRIMARY INFORMATION SOURCES The following documents were the primary sources of information for this plan for services.  The Fiscal Impact Analysis of the Wren Investors-Hewell USA to the City of Gilroy and the County of Santa Clara provides a description of the existing fiscal conditions of the 8.A.e Packet Pg. 140 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 1.0 Introduction 1-4 EMC Planning Group Inc. City and County, an estimate of the fiscal impacts of the proposed USA amendment area at buildout and in a subsequent 10 year time frame from development completion (Applied Development Economics 2015).  The Cities Service Review Final Report is a municipal service review which is a comprehensive study of services within designated geographic areas that are completed to obtain information about service delivery, evaluate the provision of services, and recommend actions to promote the provisions of those services (Management Partners 2015).  Gilroy 2040 General Plan Background Report- Public Review Draft Chapter 9: Public Facilities, Services, and Infrastructure presents an overview of public and community services provided by the City of Gilroy and other agencies including water supply and delivery, wastewater collection and disposal, storm water drainage and flood control, solid and hazardous waste, utilities, law enforcement, fire protection, emergency medical services, and schools (Mintier Harnish 2014).  Gilroy 2040 General Plan Background Report- Public Review Draft Chapter 4: Economics and Demographics, describes the economic and demographic characteristics of the City of Gilroy to identify trends and changes in the make-up and composition and demands of Gilroy’s future population (Mintier Harnish 2014). 8.A.e Packet Pg. 141 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 2-1 2.0 Proposed USA Amendment SUMMARY The City received and is processing an application for an approximately 55-acre Urban Service Area (USA) amendment in the northern portion of its 20-year Growth Boundary. Most of the proposed USA amendment is designated Neighborhood District, with a small portion designated Park/Recreation Facility in the general plan. BACKGROUND The USA Amendment request is consistent with general plan land uses and densities, and is included within the planned services areas of the City’s master utility plans. The City has indicated its intent to eventually provide services to the project site, and elsewhere within the 20-year Growth Boundary, in a timely manner without lowering the level of services provided within the existing USA. The City has adopted a number of programs and infrastructure master plans to implement its general plan policies for the provision of public services. Master plans have been adopted for police and fire protection, water, recycled water, wastewater, storm drainage, parks and recreation services. Adopted programs and policies include cooperative agreements with other agencies to provide services including fire protection, recreation programs, library services, recycled water, and wastewater treatment. The City must weigh the extension of services to new areas of development against the cost of those extensions, and consider general plan policy guidance regarding services extensions. The City assesses development impact fees for water, sewer, traffic, and storm drainage, as well as for public facilities such as police, fire, library, and parks and recreation. The Gilroy Unified School District also assesses Level I development impact fees for school facilities. These fees assist in funding extensions to services to accommodate new development and population increases. General plan action 18.B states that an impact fee schedule shall be updated on a regular basis to ensure that public safety facilities and services required by new development are paid for by those developments (page 7-20). Gilroy City Code Section 21.162 states that approval of any development project by the City shall be conditioned upon the payment of public facilities impact fees in amounts in effect at the time of payment of the fees. All fees collected pursuant to this provision shall be placed in a separate public facilities impact fee fund in a manner to avoid any commingling of the fees with other revenues and funds. The fees collected, and any earnings thereon, shall be 8.A.e Packet Pg. 142 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 2.0 Proposed USA Amendment 2-2 EMC Planning Group Inc. expended solely for the acquisition and development of public facilities and the repayment of any indebtedness incurred by the City. Table 2-1, Public Facilities and Utilities Fees, lists the development impact fees for various facilities. PROJECT LOCATION AND SETTING The project includes two adjacent sites the Wren Investors site and the Hewell site. The 50.3-acre Wren Investors site is located north and west of the Gilroy city limit and USA, but within the City of Gilroy 2020 General Plan 20-year planning boundary. The existing USA boundary borders nearly the entire site along Vickery Avenue to the north, Wren Avenue to the east, and along the southern boundary of the site and along the west boundary of the site to Tatum Avenue. The site is comprised of 14 parcels total. Six parcels are developed with low‐density residential uses, one parcel that is occupied by the Gilroy High School Future Farmers of America Club farm laboratory, vacant land (grassland) and two vacant Santa Clara Valley Water District parcels through which run the Lions Creek channel and a paved community bike path. The 5.46-acre Hewell project site consists of two adjacent parcels: assessor’s parcel numbers 790-06-017 and 790-06-018 located just outside the northern city limits northeast of the intersection of Vickery Lane and Kern Avenue. Assessor’s parcel number 790-06-017, which makes up the southeast portion of the site, is developed with one home, associated outbuildings, and landscaping; however, the remainder of the project site is a vacant field. Land uses surrounding the project site are agricultural to the north, and rural residential with some small-scale agricultural uses to the south, and west. A residential subdivision (Harvest Park) is located to the east, within the City limits. The City of Gilroy 2020 General Plan designates the two project sites, with the exception of the SCVWD facility, for Neighborhood District uses which allows a variety of residential densities. The County of Santa Clara (“County”) land use designation of the project sites and the lands to the north, south, and west is Open Space Reserve. Figure 1, Existing and Proposed USA Boundaries, presents the general plan land use designation, as well as the City limits and existing and proposed USA boundaries. PROJECT DESCRIPTION The proposed project is a single urban service area amendment that includes both the previously separate Wren Investors project site and the Hewell project site (hereinafter referred to as “the proposed project”). Table 2-2, Wren Investors and Hewell USA Amendment Anticipated Development, presents the anticipated buildout for these two sites comprising 55.66 acres and presents proposed land uses, acreage, and number of residential lots. 8.A.e Packet Pg. 143 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment  EMC Planning Group Inc.  2‐3 Table 2‐1 Public Facilities and Utilities Fees    8.A.ePacket Pg. 144Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 2.0 Proposed USA Amendment 2-4 EMC Planning Group Inc. Table 2-2 Wren Investors and Hewell USA Amendment Anticipated Development Land Use Acreage Residential Lots Low Density Residential 26.86 185 Medium Density Residential Duets 2.2 20 High Density Residential (Townhomes/Apartments) 9.9 102 Subtotal Residential 33.6 307 Streets 12.9 Drainage 3.4 Neighborhood Commercial 0.4 Totals 55.66 307 SOURCE: Wren Investors (USA 12-01) & Hewell (USA 14-02) USA Amendment Applications ANTICIPATED APPROVALS Approval of the USA amendment by LAFCO would lead to annexation into the City of Gilroy and future development of the site. Future development of the site would require preparation of a master plan or specific plan and, dependent upon project-specific characteristics, may require supplemental environmental review once specific development plans are proposed and submitted to the City. Future actions are expected to include, but may not be limited to, the following: annexation, pre-zoning/zoning, residential development ordinance (RDO) allocation, specific or master plan approval, tentative and final subdivision map approval, architectural and site review approval, development agreements, Community Facilities District initiation, habitat permits, right-of-way abandonments and dedication acceptances, and encroachment permits for work within City rights-of-way. ANTICIPATED TIME FRAME FOR SERVICE DELIVERY An accurate estimate of the time frame for delivery of services cannot be made until specific development of the site is proposed; however, a general estimate can be made based upon City of Gilroy staff experience with similar projects. Assuming the USA amendment is approved, the entitlement process is expected to take about five years from the date a specific plan application is submitted. The City anticipates that a community task force would be assembled to assist with guiding future development plans. Assembling a task force and preparation of a specific plan as well as project-specific CEQA review, would likely take the City a minimum of two years to process. Subdivision maps and architectural and site review would follow. A more accurate time frame for the delivery of services could be developed once specific development of the site is proposed. 8.A.e Packet Pg. 145 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Ronan A ve. Monticelli Dr. Bosque St.Wren Ave. Eden S t . Vickery Ave. Fa rrell A v e. Bazos St.KernAve.La Primavera Way.ArborSt.S o rre n to D r.Churc hSt . Saint Cl ar Ave. Tatum A v e . Mantelli Dr. Martiri Dr . M o ro Dr.F e s ta AglioDr.P a d o v a D r .AvezanWay.Birdsong St.ElVeranoWay.WrenInvestors ProposedUSA Hewell USA AmendmentPrezone andAnnexation Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community Source: Esri 2016 Figure 1 Existing and Proposed USA Boundaries Wren Investors and Hewell USA Amendment Plan for Services Project Boundary Existing City Limit and Urban Service Area Boundary Proposed City Limit and Urban Service Area Boundary 0 500 feet 8.A.e Packet Pg. 146 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 2.0 Proposed USA Amendment 2-6 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 147 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 3-1 3.0 Water INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following sources were used for this section:  The City of Gilroy Water System Master Plan (hereinafter “Water Master Plan”) analyzes the water system for build out conditions with the 20-year Growth Boundary and provides recommendations for capital improvements (Carollo Engineers 2004).  The City of Gilroy 2015 Urban Water Management Plan (hereinafter “Urban Water Management Plan”) implements and maintains the reliability of urban water supplies, ensures that future beneficial use can be complemented by sufficient water supply, continues to promote policies and programs that benefit water conservation, and provides a means for response during water supply shortages and drought conditions. The Urban Water Management Plan is required in accordance with the California Water Code requirements, and updates are typically submitted to the Department of Water Resources every five years (AKEL Engineering Group 2016).  The Santa Clara Valley Water District/South County Regional Wastewater Authority’s South County Recycled Water Master Plan identifies opportunities to expand the use of tertiary treated recycled water within areas served by the plan, including the City (Carollo Engineering 2004d).  Santa Clara Valley Water District’s Stream Maintenance Program Update 2012-2022 Final Subsequent Impact Report addresses potential environmental impacts to the proposed Stream Maintenance Program Update and describes flood management goals to maintain appropriate conveyance capacity and functional integrity of Santa Clara Valley Water District facilities (Horizon Water and Environment 2011).  The Santa Clara Valley Water District’s Water Supply and Infrastructure Master Plan discusses the District’s plan to ensure a sustainable water supply for Santa Clara County’s future needs through 2035 (2012). 8.A.e Packet Pg. 148 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 3.0 Water 3-2 EMC Planning Group Inc.  The Santa Clara Valley Water District’s Groundwater Management Plan characterizes the District’s groundwater activities in terms of basin management objectives, strategies, and outcome measures so that the District may respond to risks and uncertainties that may impact the quality and quantity of groundwater supplies such as increased demand, regulatory changes, constituents of emerging concern, recharge limitations due to dam restrictions, reduced availability of imported water or other supplies, climate change, and intensified land development (2016).  The Santa Clara Valley Water District’s Annual Groundwater Report for Calendar Year 2016 describes the groundwater use, storage, land subsidence, and groundwater quality in the Llagas Subbasin for the 2016 year.  The Central Coast Hydrologic Region; Gilroy-Hollister Groundwater Basin, California’s Groundwater Bulletin 118 Interim Update 2016 Data explains the hydrology and basin boundaries of the Gilroy-Hollister Basin (California Department of Water Resources 2016).  The CASEGM Groundwater Basin Prioritization Results Groundwater Reliance Sorted by Basin Name illustrates the basin prioritization which is used to align resources in the implementation of the California Statewide Groundwater Elevation Monitoring (CASGEM) Program (California Department of Water Resource’s 2014). EXISTING CONDITIONS Groundwater Source The City utilizes local groundwater as its main source of supply and uses recycled water as a supplemental supply. The City’s municipal water system extracts its water supply from underground aquifers through nine active groundwater wells, which vary in depth and are located throughout the City (City of Gilroy 2016a). The City pays a groundwater extraction fee to the Santa Clara Valley Water District, which is the principal groundwater management agency in the Santa Clara Valley. The groundwater basin underlying Gilroy is the Santa Clara Valley groundwater basin, which is divided into three interconnected subbasins that transmit, filter, and store water. These basins consist of the Santa Clara Valley and Coyote Subbasins to the north of Gilroy, and the Llagas Subbasin, which is the southernmost subbasin. Gilroy is located within the Llagas Subbasin. Recharge to the Llagas Subbasin comes from a variety of sources including natural recharge from streams; percolations of precipitation and surplus irrigation waters; seepage along canals; subsurface inflow; and artificial recharge, including imported water from the Central Valley Project. The amount of water recharged to the basin varies widely from year to year dependent upon the amount of precipitation and imported water deliveries. Natural 8.A.e Packet Pg. 149 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 3-3 recharge to the basin occurs from a variety of sources including Uvas Creek and Llagas Creek as well as percolation of precipitation. Further, a number of artificial recharge facilities enhance natural recharge to the Llagas Subbasin and have successfully offset historic water- level declines including the Madrone Channel, Main Avenue Percolation Ponds, and a number of percolation ponds along Uvas Creek and Llagas Creek (AKEL Engineering Group 2011 and 2016). Demand for groundwater from the Llagas Subbasin is comprised of pumping for the City of Gilroy, the City of Morgan Hill, and agricultural uses. In 2016, groundwater pumping from the Llagas Subbasin was estimated at about 41,820 acre-feet with 16,560 acre-feet used for residential and industrial uses, 2,010 acre-feet for domestic uses, and 23,250 acre-feet for agricultural uses (Santa Clara Valley Water District 2017). The Santa Clara Valley Water District has an annual average pumping value of approximately 8,300 acre-feet and a 2015 value of 6,968 acre-feet. The District monitors groundwater conditions and adjusts its management to maintain adequate reserves. District-wide short- term water use reductions of up to 50 percent would be required to maintain aquifer balance during an extended drought. Water Treatment and Delivery Infrastructure In addition to the nine active groundwater wells, the City’s water system facilities include 10 potable water storage tanks, six active booster stations, and over 120 miles of pressurized pipes ranging from four inches through 30 inches in diameter. The wells have a total pumping capacity of approximately 18.8 million gallons per day (mgd). The City provides service to three separate pressure zones, defined by the elevation ranges they serve. Zone 1 has a pressure zone hydraulic grade line elevation of 374 feet and a service elevation range of 140 to 280 feet, and serves most of Gilroy. Zones 2 and 3 serve higher elevation in the hills at the western edge of the City (AKEL Engineering Group 2011; Carollo Engineers 2004d). The City has been constructing water transmission main facilities and storage reservoirs in accordance with the 2004 Water Supply Master Plan and 2015 South County Recycled Water Master Plan Update. For enhanced City-wide reliability to the water supply, the City added a storage reservoir with three million gallon (MG) capacity. Recycled Water In addition to using groundwater, the City also participates in an agreement with the City of Morgan Hill and the Santa Clara Valley Water District to reclaim and purify wastewater at the South County Recycled Water System operated by the South County Regional Wastewater Authority. The use of recycled water offsets use of potable water for agricultural, industrial, municipal and fire suppression uses. Specifically, recycled water is currently being used for landscape irrigation at Christmas Hill Ranch Site, Christmas Hill Park, Gilroy Golf Course, Gilroy Sports Park, Gilroy Shooting Range, McCarthy Business Park, Eagle Ridge Development and Golf Course, and for agricultural irrigation on Obata 8.A.e Packet Pg. 150 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 3.0 Water 3-4 EMC Planning Group Inc. Farms and South County Regional Wastewater Authority-owned agricultural buffer lands. The Calpine-Gilroy Energy Center Peaker Plant and Cogeneration Plant use recycled water for cooling. Additionally, two customers will be online and receiving recycled water in the near-term – C&E Farms and Obata Farms (new turnout). The wastewater treatment plant has a recycled water production capacity of 6.5 million gallons per day (mgd) or 19.9 acre feet per day and a demand of 5.2 mgd or 15.9 acre feet per day. According to the 2017 Urban Water Management Plan, the Gilroy’s annual recycled water demand is approximately 2,000 acre-feet per year. Several alternatives to expand the recycled water system are being considered to accelerate and optimize recycled water supplies. The existing recycled water distribution system consists of approximately 14.6 miles of 8- to 36-inch diameter pipelines extending from the South County Regional Water Authority wastewater treatment plant to the western edge of Gilroy along Hecker Pass Highway. The system is comprised of two primary distribution systems, the North System and South System, which operate independently of each other. The Urban Water Management Plan estimated future recycled water supply availability to increase by 555 million gallons (MG) by 2030. With this increased use of recycled water, total supply within the Llagas Subbasin is estimated at 18,800 MG/Y (per year) by 2040 (AKEL Engineering Group 2016 a). Per the Santa Clara Valley Water District, groundwater pumping within the Llagas Subbasin is approximately 44,000 acre-feet (based on average groundwater pumping between 2003 and 2012). In addition to groundwater, approximately 2,000 acre-feet of recycled water is used in areas overlying the Llagas Subbasin (based on 2018 use data). Recycled water use within the Llagas Subbasin projected to increase to 3,700 acre-feet by year 2040 (Santa Clara Valley Water District 2019).which is approximately 6000 acre-feet less than the estimate of 18,800 million gallons (57695 acre-feet) used by the City. Existing Site Water Service The City of Gilroy provides potable water service to customers within the City limits. The existing water system near the project site includes a 24-inch line in Santa Teresa Boulevard south of Sunrise Drive, a 16-inch line in Santa Teresa Boulevard north of Sunrise Drive to Day Road, a 16-inch lines in Wren Avenue, Cohansey Avenue, and Monterey Road south of Cohansey Avenue, a 12-inch lines in Hirasaki Avenue, Kern Avenue, Vickery Avenue Farrell Avenue, and eight-inch lines in Church Street, Tatum Avenue, and Ronan Avenue. There are existing City of Gilroy water mains adjacent to the site on Wren Avenue and Monterey Road. PROJECT DEMAND AND INFRASTRUCTURE EXPANSION Project Water Demand Future development of the project site would increase the demand for potable water on the project site, and would contribute to increased City-wide and subbasin-wide groundwater 8.A.e Packet Pg. 151 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 3-5 demand. Using the water demand coefficient identified in the City’s Water System Master Plan for Neighborhood Districts of 2,100 gallons per day per acre (gpd/ac) or 2.35 acre feet per year (afy), future water demand of the proposed project would be 116,886 gdp or 130.81 acre-feet. Table 3-1, Water Demand presents the projects projected water demand. Table 3-1 Water Demand Site and General Plan Designation Site Acreage Water Demand Coefficient (2,100 (Gallons Per Day Per Acre) Water Demand Coefficient (2.35 Acre Feet Per Year) Wren Investors (Neighborhood District) 50.30 105,630 gpd/acre 118.21 afy Hewell (Neighborhood District) 5.36 11,256 gpd/acre 12.60 afy Total: 55.66 116,886 gpd/acre 130.81 afy SOURCE: City of Gilroy 2004 The projected water supply available through 2040 during normal years, including recycled water sources, is 18,800 MG/Y. While the projected City-wide demand is only 5,822 MG/Y, the City of Morgan Hill and other uses are projected to have a demand of 13,658 MG/Y for a total demand of 18,478 MG/Y. This leaves 322 MG/Y projected excess water supply. In order to meet water supply goals for normal, single dry and multiple dry years, the Urban Water Management Plan recommends enhanced conservation to the maximum extent possible. In the event of an emergency supply shortfall, the City will rely on the contingency plan to reduce the rate of consumption and limit overdraft of the groundwater aquifer. A mitigation measure was included in the initial study that will require new development to include storm water capture for outdoor watering to help meet the 130 acre-feet additional supply needed for the new development. Water Infrastructure The project site is within an area that can be served by Zone 1, since the highest proposed service elevation is approximately 246 feet. Future development on the site would connect directly to existing City of Gilroy water infrastructure adjacent to the project site. According to Figure 4-2 of the Water System Master Plan, existing water system infrastructure adjacent to the project site includes 12-inch water mains that run along portions of the western project boundary along Kern Avenue, and to the south and the east of the project site along Cohansey Avenue and Wren Avenue. Water mains are also present in the residential neighborhood located directly south of the site between Mantelli Drive and the southern site boundary. Figure 5-2 of the Water Supply Master Plan presents proposed improvements to 8.A.e Packet Pg. 152 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 3.0 Water 3-6 EMC Planning Group Inc. the City’s system including 12-inch mains to the west of the project site along Kern Avenue and along the northern and eastern project site boundaries along Vickery Avenue and Wren Avenue, respectively. Future water supply infrastructure within the project site would be connected to existing City of Gilroy water mains adjacent to the site on Wren Avenue and Cohansey Avenue. On-site water infrastructure would be constructed by the applicant and dedicated to the City upon inspection and confirmation of conformance to City standards. New development is subject to compliance with the design requirements and standard conditions of approval of the City’s Urban Water Management Plan and Water System Master Plan. FINANCING The Water Supply Master Plan includes a Capital Improvement Program to assist the City in planning and constructing the proposed improvements to the water system through the build out of the general plan. The Capital Improvement Plan includes cost estimates for the proposed improvements and a Capital Improvement Budget that outlines funding and financing options. Future developers would be responsible for constructing all on-site water pipelines and off- site connecting pipelines. The City will reimburse the developer for construction of oversized mains (that will serve other future development) according to City reimbursement policy and comprehensive fee schedule in effect at the time of reimbursement. Additional improvements that are included in the Capital Improvement Plan would also be subject to reimbursement. The construction and financing of on-site infrastructure serving the project site would be the responsibility of the applicant. Future developers of the site would participate in the water development impact fee program, which provides a mechanism to offset the project’s share of existing and proposed City-wide infrastructure improvements that enable delivery to the site, such as the new wells required to serve the project. According to the fee program, future low density residential development would pay City development fees at the low-density level. Medium-density (duets) and high-density (townhome/ apartment) residential development would pay City development fees at the high-density level. Refer back to Table 2-1, Public Facilities and Utilities Fees. On-site water infrastructure would be constructed by the applicant and dedicated to the City. As owner of the water infrastructure, the City will be responsible for costs associated with future maintenance of the water infrastructure unless a Community Facilities District is established. This financing approach could help defray costs for associated with the new water infrastructure (see Section 15.0 for further discussion). 8.A.e Packet Pg. 153 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 3-7 CONCLUSION Future development of the site consistent with the existing general plan land use designation would result in an increased demand for water and required treatment. The existing and planned City infrastructure is sufficient to accommodate this increased demand for water service. Developers would be responsible for paying a proportionate share of impact fees for the necessary off-site infrastructure improvements and would be responsible for financing on-site improvements. Future development of the site would also expand the City’s tax base and correspondingly, increase available opportunities to provide funding for additional staffing if required. However, the increased tax base would not offset the costs of the financial impacts (see Fiscal Impact Analysis prepared by ADE) and the City will require formation of a Community Facilities District for the proposed project. As outlined in the Water System Master Plan and the Urban Water Management Plan, the City is able to deliver water to all customers within the city limits, and the City’s water supply and water system planning documents provide for expansion of water production and delivery infrastructure to supply all areas within the USA and 20-year Growth Boundary. Water demand associated with development of the project site is within the City’s water supplies and the planned water system infrastructure beyond that already identified in the City of Gilroy Water System Master Plan and Urban Water Management Plan. 8.A.e Packet Pg. 154 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 3.0 Water 3-8 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 155 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 4-1 4.0 Wastewater INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following sources were used for this section:  The City of Gilroy Sewer System Master Plan (hereinafter “Sewer System Master Plan”) analyzes the sewer system for build out conditions with the 20-year Growth Boundary, and provides recommendations for capital improvements (Carollo Engineers 2004b). EXISTING CONDITIONS The project site is within the 20-year Growth Boundary and therefore was accounted for in the Sewer System Master Plan. However, at the time the Sewer System Master Plan was prepared, the project site was designated Low-Density Residential in the general plan. As previously discussed, the general plan land use designation for the site was changed to Neighborhood District in 2002 as part of a general plan amendment process. The amount of wastewater generated by build out of the site with Neighborhood District uses remains consistent with the Sewer System Master Plan. The City operates and maintains its own sewer infrastructure and serves customers within the City limits. The City’s existing sewer collection system consists of a network of pipes ranging in size from six to 33 inches in diameter. The wastewater is directed to the South County wastewater treatment plant operated by the South County Regional Wastewater Authority, a joint agency consisting of the City of Gilroy and the City of Morgan Hill. Wastewater is conveyed through main trunk lines generally 10 inches or greater in size (Carollo 2004b, page 4-1). The wastewater treatment plant treats wastewater from the City of Gilroy and the City of Morgan Hill, with plant capacity and finances split at 58 percent and 42 percent respectively. The wastewater treatment plant has an average dry weather treatment capacity of approximately 8.5 million gallons per day (mgd), with approximately 4.9 mgd available for Gilroy and 3.6 mgd available for Morgan Hill. The wastewater treatment plant processed an average dry weather flow of 6.5 mgd in 2010 (AKEL Engineering Group 2015). The City’s share of the average 2010 wastewater flow was measured at 3.58 mgd (Ruggeri Jensen Azar 2015b). A portion of the wastewater is dispersed 8.A.e Packet Pg. 156 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 4.0 Wastewater 4-2 EMC Planning Group Inc. to percolation ponds and a portion is recycled. The water recycling facilities were upgraded to increase output capacity from 3 mgd to 9 mgd (Gilroy 2040 General Plan Background Report - Public Review Draft Chapter 9: Public Facilities, Services, and Infrastructure 2014). Existing Site Sewer Service The Morgan Hill Trunk conveys wastewater from Morgan Hill to Gilroy. The line passes through the project site as a combination of 27- to 30-inch pipes and continues southward on Wren Avenue to a merger with the Mantelli Sub-trunk at Mantelli Drive. The Morgan Hill Trunk also collects wastewater flows from within Gilroy. Wastewater flow is then conveyed in a 33-inch main east and south to the wastewater treatment plant. Sewer system modeling conducted for the Sewer Master Plan shows that during wet weather flow conditions, the Morgan Hill Trunk becomes deficient through the City (Carollo Engineers 2004b). PROJECT WASTEWATER GENERATION AND INFRASTRUCTURE EXPANSION Estimated Wastewater Generation The proposed project would result in increased wastewater flows and the development of new wastewater collection lines within the project site. The City would apply the Sewer Development Impact Fees to the construction of the sewer system upon annexation and development of the site. According to the sewer generation estimates outlined for each land use in the Sewer System Master Plan, future development of the site consistent with the Neighborhood District land use designation may result in 72,000 gpd. At the time the Sewer System Master Plan was prepared, the site was designated Low-Density Residential; which is a lower intensity residential use and would generate less wastewater than Neighborhood District uses. However, as discussed previously, the land use designation for the site was changed to Neighborhood District in 2005 as part of a general plan amendment process that modified the distribution of residential land uses city-wide, but did not substantial change the overall amount of lands designated for low to high density residential uses. As such, the wastewater that would be generated by build out of the site consistent with existing general plan land use designations has been evaluated in the Sewer System Master Plan, which concluded that there is adequate capacity to serve the 20-year planning area, including the project site. Collection Infrastructure Future development on the site would connect directly to existing City of Gilroy sewer infrastructure immediately adjacent to the project site. As depicted in the Sewer System Master Plan, Figure 4.2, the closest sewer main to the site is the Joint Morgan Hill-Gilroy 8.A.e Packet Pg. 157 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 4-3 Trunk, which runs along the eastern boundary of the project site. The Joint Morgan Hill- Gilroy Trunk conveys flows from the City of Morgan Hill as well as flows from the northwest and northeast portions of Gilroy. Along Wren Avenue, east of the project site, the Joint Morgan Hill-Gilroy Trunk consists of a 30-inch main, which decreases in size to a 27-inch main along the south-eastern project boundary between Tatum Avenue to Mantelli Drive, where it merges with the Mantelli Subtrunk at the intersection of Wren Avenue and Mantelli Drive. Wastewater flow is then conveyed in a 33-inch main east and south of Gilroy to the wastewater treatment plant. A 18- inch main is also located on Santa Teresa Boulevard, west of the site. According to the Sewer System Master Plan, modeling of the system shows that during wet weather flow conditions, the Joint Morgan Hill-Gilroy Trunk becomes deficient when Morgan Hill flows are introduced. Treatment Plant Expansion A relief line along Monterey Road is included in the City of Morgan Hill’s and the wastewater authority’s capital improvement plan, and is partially constructed. The City of Morgan Hill is the responsible entity for funding the new relief trunk from the intersection of California Avenue and Monterey Road in Morgan Hill to the intersection of Pacheco Pass Road and Renz Lane in the City of Gilroy. The City will maintain 50 percent capacity allocation in the new relief trunk that continues from Pacheco Pass Road to the waste water treatment plant outfall, and as a result, will be responsible for half of the funding for this reach of new sewer pipe (Carollo Engineers 2004b). According to the City of Morgan Hill, completion of the relief line is based on funding and it is unknown when adequate funds will be available to complete the construction of the relief line (Gittleson 2018). On-site wastewater infrastructure would be constructed by the applicant and dedicated to the City upon inspection and confirmation of conformance to City standards. FINANCING General plan action 19.A requires developers to pay fees to offset the costs of expanding the sewer system to accommodate their development. These fees will be paid in relation to the capacity demanded, and will reflect the total fees for improvements. The Sewer System Master Plan estimates average day sewer flows based on the land uses specified in the general plan. According to the Sewer System Master Plan, sewer flows are estimated to be 770 and 1,500 gallons per day per acre (gpda) for Low Density Residential and Medium Density Residential land uses respectively (page ES-9). Low -density residential development would pay City development fees at the low-density level. Development in the medium-density and high-density land uses would pay City development fees at the high- 8.A.e Packet Pg. 158 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 4.0 Wastewater 4-4 EMC Planning Group Inc. density level. The City would apply the sewer development impact fees to the construction of the sewer system upon annexation and development of the site. Refer to Table 2-1, Public Facilities and Utilities Fees to see the fees required by the City. The Sewer System Management Plan includes a capital improvement plan to assist the City in planning and constructing the proposed improvements to the sewer system through the build out of the general plan. The capital improvement plan includes cost estimates for the proposed improvements and a capital improvement budget that outlines funding and financing options. Future developers would be responsible for constructing all sewer pipelines. The City will reimburse the developer for construction of oversized mains according to the City reimbursement policy and comprehensive fee schedule in effect at the time of reimbursement. The construction and financing of onsite infrastructure for the project site would be the responsibility of the applicant. As discussed in Section 15.0, Community Facilities District, with the establishment of Mello Roos Community Facilities Districts, Gilroy permits the imposition of “special taxes” to fund maintenance of facilities which may help offset costs associated with wastewater infrastructure. CONCLUSION Future development of the site consistent with existing general plan land use designations would result in an increase in sewer generation and required treatment. The existing and planned City and South County Regional Wastewater Authority infrastructure is sufficient to accommodate this increase in sewer generation and required treatment. Sewer generation associated with development of the project site would not exceed the capacity of the City’s or South County Regional Wastewater Authority sewer system infrastructure beyond that already identified in the City of Gilroy Sewer System Master Plan. Improvements that are included in the Capital Improvement Plan would also be subject to reimbursement. 8.A.e Packet Pg. 159 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 5-1 5.0 Storm Drainage INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following sources were used for this section:  The City of Gilroy Storm Drainage System Master Plan (hereinafter “Storm Drainage Master Plan”) analyzes the storm drain system for build out conditions with the 20- year Growth Boundary, and provides recommendations for capital improvements (Carollo Engineers 2004a).  The Technical Support Document for Post Construction Stormwater Management Requirements for Development Projects in the Central Coast Region provides background, explanation, and justification for the Post-Construction requirements that establish performance criteria and implementation measures that municipalities utilize to implement post-construction storm management actions. (Central Coast Water Quality Control Board 2013).  The Revised Regional Storm Water Management Plan includes the efforts of Gilroy, Morgan Hill, and unincorporated Santa Clara County in meeting the Phase II Storm Water Permit requirements for “small municipal separate storm sewer systems (MS4s)” (City of Gilroy, City of Morgan Hill, and County of Santa Clara (2010). Existing Conditions The City storm drainage system consists of a combination of curb and gutter facilities, curb inlets, and underground pipelines draining to the nearest creek (Llagas Creek or Uvas Creek) or to a manmade channel. The City’s system discharges to existing channels and creeks owned or overseen by the Santa Clara Valley Water District. The City lies within two major watersheds: the Uvas Creek Watershed and the Llagas Watershed. These watersheds are divided into several hydrologically distinct drainage areas. Several major flood control projects have been completed that have improved drainage in the City The City requires new development to pay storm development impact fees. Low density residential development would pay City development fees at the low-density level. Medium and high-density residential development would pay City development fees at the high- density level. 8.A.e Packet Pg. 160 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 5.0 Storm Drainage 5-2 EMC Planning Group Inc. The project site is located in the Llagas Watershed (SDSMP, Figure 4.1) and the Ronan Channel Drainage Basin (SDSMP, Figure 4.3). Lions Creek or flows through the Wren USA area. CAPACITY AND INFRASTRUCTURE Expanded Infrastructure and Capacity The Storm Drain Master Plan (Carollo Engineers 2004a), provides a blueprint for expansion and maintenance of the City’s storm drainage infrastructure. The Storm Drain Master Plan establishes storm drainage system design and planning criteria, presents the results of a watershed model hydrologic analysis, evaluates the existing storm drainage system using computer hydraulic modeling, proposes system improvements, and is the basis for capital improvement programming (Carollo Engineers 2004a). Other than the Ronan Channel, the SDSMP identifies only one storm drain facility in the vicinity of the project site: a 30-inch storm pipe that drains to the Llagas Creek from Wren Avenue east of the site (SDSMP Figure 4.4). The SDSMP does not identify any deficiencies for the storm drain infrastructure that abuts the project site, nor does the SDSMP Figure 5.1, Proposed Improvements, identify any new storm drain infrastructure needed to serve future development within the 20-year planning area in the vicinity of the project site. The storm drainage flows that would result from build out of this site consistent with the Neighborhood District land use designation have already been evaluated in the SDSMP and necessary improvements to the existing system have been identified in the SDSMP. On-site and adjacent off-site storm water infrastructure would be constructed by the applicant and dedicated to the City or Santa Clara Valley Water District upon inspection and confirmation of conformance to City or Santa Clara Valley Water District standards. It is anticipated that at least the low-flow channel in West Branch Llagas Creek would be dedicated to the Santa Clara Valley Water District which would also maintain floodway portions of the channel. FINANCING The Storm Drain Master Plan includes a Capital Improvement Plan to assist the City in planning and constructing the proposed improvements to the storm drain system through the build out of the general plan. The Capital Improvement Plan includes cost estimates for the proposed improvements and a Capital Improvement Budget that outlines funding and financing options. Future developers would be responsible for constructing all storm water pipelines). The City will reimburse the developer for construction of oversized mains according to the City reimbursement policy and comprehensive fee schedule in effect at the time of reimbursement. The construction and financing of onsite infrastructure for the project site would be the responsibility of the applicant. 8.A.e Packet Pg. 161 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 5-3 Future developers of the site would participate in the storm drain system development impact fee program. Project-level impact on the existing storm drain system in the vicinity of the project site would be evaluated when specific development proposals are submitted. According to the fee program, future low density residential development would pay City development fees at the low-density level. Medium-density and high-density residential development would pay City development fees at the high-density level. Refer to Table 2-1, Public Facilities and Utilities Fees to see the fees required by the City. CONCLUSION Future development of the site consistent with existing general plan land use designation would result in an increase in storm water runoff. The existing and planned City infrastructure is sufficient to accommodate this increase in storm water; and the proposed on-site drainage improvements will accommodate 100-year storm flows. Developers would be responsible for paying impact fees for the necessary off-site infrastructure improvements and would be responsible for financing on-site improvements. Increases in storm water runoff associated with development of the project site would not exceed the capacity of the City’s or storm drain system infrastructure beyond that already identified in the Storm Drain Master Plan 8.A.e Packet Pg. 162 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 5.0 Storm Drainage 5-4 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 163 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 6-1 6.0 Solid Waste EXISTING CONDITIONS Recology South Valley provides solid waste pick up service to the cities of Gilroy and Morgan Hill (Recology South Valley 2017). Recology provides solid waste, recycling, composting, and street sweeping programs for residential customers and solid waste and recycling programs for commercial customers. They also provide special collection and debris box services. Recology implements resource recovery practices by collecting organic and recyclable materials and diverting them from disposal at area landfills. According the CalRecycle website, beginning with reporting year 2007 jurisdiction annual reports, diversion rates are no longer determined. With the passage of Senate Bill 1016, the Per Capita Disposal Measurement System, only per capita disposal rates are measured. For 2007 and subsequent years, CalRecycle compares reported disposal tons to population to calculate per capita disposal expressed in pounds/person/day (CalRecycle 2017). In 2006, the last year that diversion rates were determined, the City diverted 52 percent of solid waste generated within the City limit (CalRecycle 2017). The most recent estimate of per capita or per unit waste generation (per capita disposal expressed in pounds/person/day) approved by CalRecycle for the City is from 2015 in which solid waste disposal generation factors for the City are listed as 5.8 pounds per resident per day and 14.8 pounds per employee per day for commercial uses. The most recent approved annual disposal information was from 2015, when the County disposed of 48,324 tons of solid waste (CalRecycle 2017). WASTE GENERATION Development of the site will result in 307 new residential units and is anticipated to generate a new population of 1,081 persons. According to the waste generation rate of 5.8 pounds per day, future residential development of the site would result in an increased solid waste generation of 6,270 pounds of solid waste per day. 8.A.e Packet Pg. 164 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 6.0 Solid Waste 6-2 EMC Planning Group Inc. CONCLUSION Recology South Valley would continue to provide solid waste pick up upon development of the project site. Future development of the site consistent with existing general plan land use designations would result in an increase in solid waste, but not beyond that identified and planned for in the general plan. 8.A.e Packet Pg. 165 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 7-1 7.0 Fire Services INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following sources were used for this section:  E-mail correspondence with Interim Fire Chief, Jeff Clet, dated September 10, 2019.  The Update of the Fire Services Master Plan of August 2000 for the City of Gilroy Fire Department Final Report assesses the Gilroy Fire Department’s needs for build out conditions with the 20-year Growth Boundary and provides recommendations for improvements (City of Gilroy 2004).  The 2016 South Santa Clara County Annual Report discusses the budget and finances, operations, training programs, equipment and apparatus available, and a description and location of all fire stations of the South Santa Clara County Fire District (South Santa Clara County Fire District 2017).  The City of Gilroy’s online website consists of a Fire Department webpage that was used for the descriptions of the staff on duty, apparatus available, statistics from recent years, and the locations of the three existing fire stations within the City limits (City of Gilroy 2017a and City of Gilroy 2017b).  The Fire Chiefs Online website is a free service for Fire Officials with information and features that can help a city improve their Insurance Service Office rating (Fire Chiefs Online 2017). EXISTING CONDITIONS The City of Gilroy Fire Department serves the residents of Gilroy from three strategically located fire stations within the current City limits and is anticipating the construction of a fourth developer-funded fire station within the Glen Loma Ranch, Santa Teresa residential development area. The Las Animas Station located on 8383 Wren Avenue is located less than one mile from the project site. This station is equipped with a Type I fire engine and staffed daily by a minimum three-person crew. It also houses an additional reserve Type I fire engine and a reserve Type III fire engine. The Sunrise Station at 880 Sunrise Drive is located 8.A.e Packet Pg. 166 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 7.0 Fire Services 7-2 EMC Planning Group Inc. approximately two miles from the project site. The Sunrise Station is equipped with a Type I fire engine staffed daily with a three-person crew, an additional reserve Type I fire engine, and a Type VI reserve fire engine. The Sunrise Station is the newest of the City’s three fire stations and was designed and constructed to essential facilities standards (Facilities Standards for the Public Buildings Service (P-100)). The Chestnut Station at 7070 Chestnut Street is located approximately two and a half miles from the project site. The offices of the Fire Chief are located here. The command staff consists of the Fire Chief and three Division Chiefs. Administrative support staff consists of one Administrative Captain, one Management Analyst, and a Management Assistant. The Chestnut Station is equipped with a Type I fire engine and staffed daily by a minimum three-person crew. It also houses a Truck with a 75-foot aerial ladder, a Type IV engine and a County-approved transport ambulance. The fire department has received approval to respond the ambulance and can performance patient transports when their condition meets specific conditions stipulated with a contract with Santa Clara County. The Gilroy Fire Department in its entirety has 35 personnel on staff, with a daily minimum of 10 field personnel. (Interim Chief Jeff Clet, email message, September 10, 2019). According to the Gilroy Interim Fire Chief, Jeff Clet, the City is under contract with the Santa Clara County Emergency Medical Service (EMS) Agency to respond to Code 3 (Lights and Sirens) EMS calls within 7:59 minutes 90% of the time. They must respond to Code 2 (non-life threatening emergency medical calls) within 11:59 minutes (Interim Chief Jeff Clet, e-mail message, September 10, 2019). In 2018, the Gilroy Fire Department responded to 5,137 calls for service (City of Gilroy 2017b) The unincorporated areas of Gilroy pay for and receive fire protection and emergency medical services from the South Santa Clara County Fire District (fire district). However, a “Boundary Drop” agreement with the City results in the response of the closest fire resource. The majority of fire district 9-1-1 requests in these areas were responded to by Gilroy Fire Department. The fire district has one fire station within the current City limits. However, the fire districts Masten Fire Station 2 at 10810 No Name Uno Avenue is approximately three miles northeast of the project site and is staffed by a minimum three‐person crew. Apparatus at the station include a Type I fire engine, water tender, Type I reserve engine, and an air support trailer. While owned by the City, the district’s Treehaven Station 3, located at 3050 Hecker Pass Highway, is also approximately three miles from the project site. The Treehaven Station is staffed by a minimum of a three‐person crew and apparatus at the station are similar to the Masten Station in that it includes one Type 1 fire engine, one reserve engine, one utility vehicle, and one technical rescue trailer. The fire district also utilizes other regional fire resources, via the County mutual-aid agreements, to respond to calls, which includes two other stations located in Morgan Hill. 8.A.e Packet Pg. 167 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 7-3 According to the 2016 South Santa Clara County Annual Report, the City of Gilroy provided 524 aid responses to the fire district and the fire district provided 359 aid responses to the City of Gilroy (South Santa Clara County Fire District 2017). Since the project site is not within the City limits, data can only be drawn from the surrounding areas of the site. The more common incidents occurring in bordering areas to the project area, according to the Update of the Fire Services Master Plan of August 2000 for the City of Gilroy Fire Department Final Report (fire master plan), included rescue and emergency medical services and fires. The response time for the incidents surrounding the project site ranged from four to eight minutes (City of Gilroy 2004). Every city is required to receive an Insurance Services Office (ISO) Report that evaluates a list of features that rate a community’s fire protection levels. The ISO Report rates a city by ten class categorizations, with Class One being the best. The three components investigated in the ISO’s grading are: the city’s fire department, the city’s water supply, and the city’s communications (City of Gilroy 2004). On September 29, 2014 the City of Gilroy received an ISO rating of 3 (Alan Anderson, email message, November 16, 2017). According to Alan Anderson, the development agreement between the City of Gilroy and the Glen Loma Corporation indicates that a new fire station on the South-west side of the City shall be ready for occupancy prior to the issuance of the 1,100th building permit. This agreement was signed in 2004 and appended on August 6, 2018.Project Impact Analysis In light of existing boundary agreement between the district and the City, the Gilroy Fire Department would continue to respond into the project site and potentially adjacent streets, depending on their proximity to the Treehaven station and the availability of Gilroy Fire Department resources, thereby increasing service demand for fire department resources. The increased service demand created by the project site would also likely result in service demand increases for district resource. When the Las Animas resource is committed to an incident in the project area and a service request occurs within Gilroy and the Treehaven resource is the closest fire resource, the boundary drop agreement would result in the dispatch of a district resource into Gilroy. Fire stations in urban settings are typically sited so that responding apparatus are within 2.0 to 2.5 road miles or have a four to five minute travel time (assuming an average travel speed of 30 mph) to the structures within the station’s “first due” station district. (Fire Chiefs Online 2017). However, since response time is dependent on travel speed it travel time can be affected by the circulation system layout, traffic calming devices, traffic conditions, temporary street routing during construction, calls in progress (including out‐of‐district calls), and similar factors. 8.A.e Packet Pg. 168 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 7.0 Fire Services 7-4 EMC Planning Group Inc. When call volume increases within the south Santa Clara County area, it will impact all regional departments as a result of the boundary drop agreement. In order to maintain service levels within a region, the existing staff and facilities must have the ability to accommodate or absorb the increase in service demand. The Gilroy fire master plan suggests that the project site would receive fire protection and emergency medical services through an eight-minute travel street network by four different fire stations (City of Gilroy 2004, p. V‐31). However, project access and street design elements that restrict emergency vehicle access into the project site, such as those found in the Heartlands Development, could significantly increase response times to addresses and facilities within the project site. With adequate surface street access into the project site and the inclusion of Emergency Vehicle Accesses (EVAs) where necessary, the project site would continue to be sufficiently served by the current staffing levels and facilities of the Gilroy Fire Department. In addition, incident volume and resource availability analysis recently completed for a Regional Standards of Coverage being performed by Citygate Associates and presented to the Gilroy City Council indicated that the current facilities could accommodate the increase incident volume created by the population increase of the proposed project (Gilroy Fire Department). Based on additional mapping within the Fire Master Plan, the project site would be within a three mile radius of the five Gilroy and fire district stations, mentioned previously, when project buildout is completed. The fire master plan also indicates that the project site is within a four minute travel time from the City’s Sunrise, Las Animas, and Chestnut Stations (City of Gilroy 2004, p.IV‐5) and within an eight minute travel time from the fire district Treehaven and Masten Stations (City of Gilroy 2004, p. V‐31). As reflected in the Cities Service Review Final Report, the city would likely have the capability to maintain current levels of service as well as meeting any infrastructure needs through 2020 as a result of population increase (LAFCO 2015). FINANCING According to the City’s impact fee program, future anticipated low density residential development would pay City development fees at the low-density level. Medium and high- density residential development would pay City development fees at the high-density level. Refer to Table 2-1, Public Facilities and Utilities Fees to see the fees required by the City. Future development of the site would increase the City’s tax base and general fund revenues, which the City may use at its discretion to fund programs and staffing. However, tax revenues from the proposed project would not be sufficient to fund additional staffing needs for services that the City would provide to the site. Funding for future staffing of the fire department would be derived from the General Fund or some other funding source. 8.A.e Packet Pg. 169 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 7-5 CONCLUSION Future development of the site, consistent with existing land use designations would result in an increase in service demand but would also expand the tax base and correspondingly, available funding opportunities for increased staffing levels. Future development would also be responsible for the payment of a proportionate share of impact fees for infrastructure improvements. The proposed project would not require a level of service beyond that identified in the general plan and Gilroy Fire Services Master Plan Master Plan Update. The developers would be required to notify new homeowners of Section 4291 of the California Public Resources Code requiring that property owners and/or occupants maintain a defensible space of 100 feet from each side of a structure to protect against a fire (California Legislative Information 2010). Additionally, the developers of the site would be required to pay all development impact fees applicable at the time of issuance of a building permit. 8.A.e Packet Pg. 170 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 7.0 Fire Services 7-6 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 171 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 8-1 8.0 Police Services INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following source was used for this section:  The Gilroy Police Department Strategic Plan Update 2016-2019 provides documentation of the department’s records, performance measures, budget and goals (City of Gilroy 2016b).  The Santa Clara County Sheriff website offers a page dedicated to the enforcement operations. All of the County’s headquarters, sub-stations, and patrol locations are listed with contact information (County of Santa Clara 2017).  The CrimeReports website is a compilation of data from a national coalition of police departments and sheriff’s offices which choose to share data with their communities (CrimeReports 2019). EXISTING CONDITIONS The City of Gilroy Police Department serves the residents within the City of Gilroy while the Santa Clara County Sheriff’s Office manages the incidents in the unincorporated areas surrounding the city (County of Santa Clara 2017). The City of Gilroy Police Department is located at 7301 Hanna Street, approximately two miles from the southeast corner of the Wren Investors Proposed USA boundary line. The Santa Clara County Sheriff’s Office consists of a South County enforcement division which is located in San Martin, approximately four miles from the northeast corner of the Hewell USA Amendment Prezone and Annexation. Police response is usually by officers on patrol in the field, so proximity to police office buildings is not critical. The Department is currently staffed with 105 sworn/non-sworn officers in total; the Department is authorized to have 69 sworn officers (Gilroy Human Resources Department, e-mail message, September 13, 2019). The need for officers is determined by the amount of available patrol time, which is based on the number of calls for service, processing evidence, report writing, and other administrative duties. Captain Joseph Deras of the Gilroy Police Department stated the patrol officers should have a minimum of 8.A.e Packet Pg. 172 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 8.0 Police Services 8-2 EMC Planning Group Inc. 33 percent of their time available to do proactive police work, but the department is not currently meeting this standard due to the needs of responding to community generated calls for service (Joseph Deras, email message, May 10, 2018). The Department currently collaborates with the Morgan Hill Police Department, as they have a regional Special Weapons and Tactics (SWAT) and negotiations team (Joseph Deras, email message, November 28, 2017). The response times of the Police Department ranges depending on the type of priority the call has. Table 8-1, Police Response Times, provides the breakdown of what the response times were for the 2017 fiscal year. Table 8-1 Police Response Times 2019 Fiscal Year Response Times (7/1/2018 – 6/30/2019) Priority 1 2 3 4 5 6 Seconds 307 552 1527 2186 2516 2359 Minutes 5:08 9:13 25:28 36:26 41:56 39:20 SOURCE: David Boles, email message, October 8, 2019 According to the Gilroy Police Department Policy Manual, Section 802.3.3, Priority 1 calls are defined as calls for service that are in-progress, life threatening or have threat to life; Priority 2 calls are for service where something has occurred or is occurring and it needs an immediate public safety response; Priority 3 calls are in-progress property calls where service is needed in a location that has threat to a property; Priority 4 calls are calls for service that involve people and/or property or both and that occurred within the last five to ten minutes; Priority 5 calls are calls that involve people and/or property or both and that occurred over 20 minutes ago; and Priority 6 calls are calls for service that are initiated by Public Safety Personnel in the field or could be in-progress or prior that do not need a Public Safety Response within a certain time or calls that are created for documentation purposes only (City of Gilroy 2017). During the fiscal year 2014/2015, the Gilroy Police Department received 37,720 calls for service, 7,293 of these calls were Priority One calls, which require immediate assistance. The Department responded to these Priority One calls in five minutes or less 27 percent of the time (City of Gilroy 2016b). Due to the proposed project not currently within the City limits, crime reports could only be found in the surrounding area. During the months of April to October 2019, there were a total of 14 incidents that involved police response; 12 of these responses were considered quality of life incidents, which include disturbances such as loud noises (CrimeReports 2019). 8.A.e Packet Pg. 173 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 8-3 According to the Police Dispatch Map, the officers patrol within four response areas. The project site is located within the Police Response Area 3, which covers the City limits that fall north of First Street and west of Monterey Road (Joseph Deras, email message, December 4, 2017). PROJECT IMPACT ANALYSIS Buildout of the project site consistent with the conceptual development plan would result in 307 new dwelling units, with a population of approximately 1,000 new residents. This increase in the population would increase the number of calls received by the department. As the number of residences and businesses increase, staff within the police department would need to increase proportionately to maintain adequate service levels (Joseph Deras, email message, May 10, 2018). The area of responsibility would expand to include the project site and potentially adjacent streets, thereby reducing the demand on the Santa Clara County Sheriff’s Office. While the project site would be served by the Gilroy Police Department, the Sherriff’s Office would respond if mutual aid is necessary. According to the Local Agency Formation Commission of Santa Clara County, Gilroy’s General Fund routinely operates at a surplus; therefore, the City of Gilroy would have the capability of meeting future service needs in the event of an economic downturn. Additionally, it was determined that the City contains adequate financial assets to aid in the expansion or replacement of infrastructure if recommended by capital improvement plans (LAFCO 2015). FINANCING Equipment and facility upgrades and needs brought about by the proposed project would be partially paid for by the collection of development impact fees, collected as a standard condition of approval, when specific development of the project site is approved in the future. Refer back to Table 2-1, Public Facilities and Utilities Fees, to see the fees required by the City. A Community Facilities District would be required within the project site, and could augment fire services funding (see Section 15.0 for further discussion). Future development of the site would increase the City’s tax base and General Fund revenues, which the City may use at its discretion to fund programs and staffing. However, tax revenues from the proposed project would not be sufficient to fund additional staffing needs for all services that the City would provide to the site and revenues attributable to the project would result in a net decrease in the General fund. Funding for future staffing of the police department would be derived from the General Fund. 8.A.e Packet Pg. 174 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 8.0 Police Services 8-4 EMC Planning Group Inc. CONCLUSION Upon annexation, the City would become the primary provider of police protection services for the project site, while the current mutual aid agreements remain in place. Future development of the project site, consistent with the conceptual development plans, would result in an increase in service demand with the addition of approximately 1,000 people. Mr. Deras states a concern that the increased demand for police services would not be fully offset by revenue generated for residential development (Joseph Deras, email message, May 10, 2018). The developers of the project site would be required to pay all development impact fees applicable at the time of issuance of a building permit. 8.A.e Packet Pg. 175 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 9-1 9.0 Lighting INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following source was used for this section:  The 2014 City of Gilroy General Guidelines present design criteria and minimum standards for the City of Gilroy. LIGHTING Most of the proposed project would have lighting typical of residential and neighborhood- serving commercial uses. The City requires that new development include light emitting diode (LED) street lighting luminaires. Eectrolier ownership is dedicated to the City of Gilroy (City of Gilroy General Guidelines 2014). The streets would have standard lighting per the City’s street lighting standards and the commercial areas would have parking lot and exterior building light. Lighting will be provided and maintained by the City. FINANCING The Landscape and Lighting Act of 1972 permits the establishment of assessment districts to fund acquisition, construction, and maintenance of public landscaping and lighting, typically along streets. Proposition 218 in 1996 imposed a condition on all assessment districts that the assessment must relate to a special benefit provided to each parcel in the district. The rule is that “general enhancement of property value does not constitute a special benefit”. In accordance with provisions of Proposition 218, the duration of the assessment is specified at the time the District is initially established, along with an annual escalation clause, to reduce the possibility of rescissions by property owner votes at the required annual hearing. There are no examples in California of a successful majority property owner protest of a lighting and landscaping district once it has been established. 8.A.e Packet Pg. 176 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 9.0 Lighting 9-2 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 177 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 10-1 10.0 Libraries INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following source was used for this section:  The Santa Clara County Library District provides a webpage with the entire history of the District from 1914 when it was first established to present day (Santa Clara County Library District 2017a).  The Santa Clara County Library District offers a timeline specific to the history of the Gilroy Branch, beginning in 1878 when book services were first established in Gilroy and ending with a description in regards to the present day Gilroy Library Branch (Santa Clara County Library District 2017b). EXISTING CONDITIONS The City is an affiliate of a Joint Powers Authority with the Santa Clara County Library District where the City manages a Gilroy Library Branch (Gilroy Library) that is overseen by the Santa Clara County Public Library District. The Gilroy Library is a special district meaning that it is not funded by Santa Clara County. One source of funding comes from the residents within the Santa Clara County Library District service area who pay a special tax to support and help maintain library hours and services. This special tax retains qualified staff, supports the continuance of available programs, funds the purchases of essential books and present-day research materials (Santa Clara County Library District 2013). Additional funding, approximately 40 percent, comes from a parcel tax within the City (Lani Yoshimura, telephone interview, November 17, 2017). The Gilroy Library primarily serves the residents within the City limits, but is also available to the unincorporated areas surrounding the City as well as the residents of San Martin, San Benito, Salinas, and Santa Cruz (Lani Yoshimura, telephone interview, November 17, 2017). The Gilroy Library was originally established in 1910 within City Hall and was opened into the building recognized today at 350 W. Sixth Street in 2012 (Santa Clara County Library District 2017a); this location is approximately a mile and a half from the project site. The 8.A.e Packet Pg. 178 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 10.0 Libraries 10-2 EMC Planning Group Inc. Gilroy library has expanded to 150,000 volumes including 400 periodicals and the largest Spanish Language collection in the Santa Clara Public Library District. A unique 200 phonographic record collection from the former KFAT radio station is also stored at the Gilroy Library. Services include internet access, electronic databases, and word processors as well as bookmobiles, free delivery services to residences, museum passes, reading programs, braille and talking book devices, and countless other services (Santa Clara County Library District 2017b). The Gilroy Library has a total of approximately 30 staff, which includes full-time, part-time, and grant employees. The grant employees are not employees of the Gilroy Library because they are the employees of the English Speaking and Listening (ESL) and Literacy programs that are funded by grants (Lani Yoshimura, telephone interview, November 17, 2017). DEMAND AND INFRASTRUCTURE The demand of the current library facility would increase with the development buildout of the project site as a result of the population increase of approximately 1,000 people. However, the Gilroy Community Librarian, Lani Yoshimura, indicated that the existing facility has the potential to expand within its own building footprint to accommodate the increase in demand of the facility. The librarian also stated that with the increase in use of technology, the Gilroy Library is currently underused in comparison to past years because one does not need to physically visit the facility to be able to use its resources. As aforementioned, the Gilroy Library allows access to its resources through the bookmobile program and the home delivery program; an additional feature such as the mobile app allows its users to search and explore electronic resources, music, and magazines (Santa Clara County Library District 2017c). FINANCING The development impact fee for new and upgraded library facilities is included in a public facilities impact fee. According to the fee program, future anticipated low density residential development would pay City development fees at the low-density level. Medium-density (duets) and high-density (townhome/apartment) residential development would pay City development fees at the high-density level. Refer back to Table 2-1, Public Facilities and Utilities Fees to see the fees required by the City. 8.A.e Packet Pg. 179 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 10-3 CONCLUSION Upon annexation of the project site to the City, consistent with the conceptual development plans, the project site would result in an increase in service demand with the growth in population. Future development of the site would also result in the increase in property tax revenues, some of which are allocated to the Santa Clara County Public Library District. The City will be required to provide support for the library services in the form of development impact fees paid by the project developers and perhaps other funding mechanisms to provide additional capital facilities, on-going operations, and maintenance. All development impact fees applicable at the time of issuance of a building permit are also required by the project developers. 8.A.e Packet Pg. 180 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 10.0 Libraries 10-4 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 181 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 11-1 11.0 Roads INFORMATION SOURCES This section includes information from the Traffic Impact Analysis for the Wren Investors and Hewell Urban Service Area Amendment, Gilroy, California, prepared by Hexagon Transportation Consultants dated December 14, 2017. EXISTING CONDITIONS The proposed project is generally located south of Vickery Lane between Kern Avenue and Wren Avenue, and north of the existing residential units located north of Mantelli Drive. US 101 is a six-lane freeway north of the Monterey Road interchange and transitions to a four-lane freeway south of that point. US 101 extends northward through San Jose and southward into Salinas. This freeway serves as the primary roadway connection between Gilroy and Morgan Hill and other Santa Clara County communities to the north and between Gilroy and Salinas to the south. Access to the project site to and from US 101 is provided via full-access interchanges at Masten Avenue and Leavesley Road. Monterey Road is a four-lane north-south roadway in the vicinity of the project site. It begins at its interchange with US 101 in the southern part of Gilroy and extends northward to San Jose. Monterey Road currently provides access to the project site via Farrell Avenue and Cohansey Avenue. Church Street is a two-lane north-south roadway that begins in the southern part of Gilroy at Luchessa Avenue and extends northward just beyond Farrell Avenue where it currently terminates at Sturia Way. Wren Avenue is a two- to four-lane, north-south roadway that begins in the southern part of Gilroy at Uvas Park Drive and extends northward to north of Cohansey Avenue, where it currently terminates. Wren Avenue provides direct access to the project site. Kern Avenue is a two-lane, north-south roadway. It begins at its intersection with First Street/Hecker Pass Highway (SR 152) and extends northward to north of Vickery Avenue where it currently terminates. Kern Avenue would provide direct access to the project site. 8.A.e Packet Pg. 182 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 11.0 Roads 11-2 EMC Planning Group Inc. Masten Avenue/Fitzgerald Avenue is a two-lane, east-west roadway that begins at Center Avenue as Masten Avenue and extends westward to Monterey Street where it changes designation to Fitzgerald Avenue and continues to Santa Teresa Boulevard. Masten Avenue provides direct access to US 101 via a full interchange. Cohansey Avenue is a two-lane, east-west undivided roadway that extends from Monterey Road eastward terminating west of US 101. East of US 101, Cohansey Avenue continues eastward from No Name Uno for approximately 2,000 feet, providing access to residences and undeveloped parcels. Cohansey Avenue extends westward from Monterey Road to the Hewell property. Additionally, with the development of the proposed project, Cohansey Avenue would be extended through the Hewell Property site to Kern Avenue, providing direct access to the project site. The Cohansey Avenue extension would provide an alternative access route to the project site and surrounding land uses (both existing and future) to/from the north. Vickery Avenue is a two-lane, east-west roadway that extends from Kern Avenue to east of Wren Avenue. Vickery Avenue would provide direct access to the project site. Farrell Avenue is a two-lane east-west roadway that extends between Wren Avenue and Monterey Road. Farrell Avenue currently provides the main access route to the project site and surrounding land uses to/from the north. Farrell Avenue is proposed to be extended into the Wren Investors site and provide direct access to the northern portion of the site. Mantelli Drive is an east-west roadway that begins east of Church Street and extends westward into the west foothills of Gilroy. Mantelli Drive is a four-lane facility between Church Street and Santa Teresa Boulevard. Welburn Avenue/Leavesley Road is a two-lane east-west roadway that begins at Monterey Road as a transition from Leavesley Road and extends westward beyond Santa Teresa Boulevard, where it terminates at Mantelli Drive. Leavesley Road provides direct access to US 101 via a full interchange. INFRASTRUCTURE EXPANSION New streets, additional lanes on existing streets, and new signal lights would be necessary to accommodate the new traffic that would be generated by development on the site. The project proposes approximately 12.9 acres of new roads. Farrell Avenue would be extended westward into the project site, providing direct access to the northern portion of the Wren Investors site and forming a four-legged intersection with Wren Avenue. Two additional access points would provide access to the northern portion of the Wren Investors site, one along Wren Avenue, north of Farrell Avenue, and one along Vickery Avenue. St. Clair Avenue would be extended eastward into the project site, forming a four-legged intersection 8.A.e Packet Pg. 183 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 11-3 at Kern Avenue, and connecting to Ronan Avenue, just west of Wren Avenue. This new roadway extension, in addition to Tatum Avenue, would provide direct access to the southern portion of the project site and as well as an alternate connection between Wren and Kern Avenues. The following intersections will need to be signalized: Monterey Road and Day Road, Wren Avenue and Welburn Avenue, Monterey Road and Buena Vista Avenue, and US 101 Southbound Ramps and Masten Avenue. Additionally, a second westbound turn lane will be added at Monterey Road and Masten Avenue/Fitzgerald Avenue. These improvements are planned for in the City’s Traffic Circulation Master Plan (TCMP) and are included in the City’s Traffic Impact Fee (TIF) Program. Thus, the developer will be required to pay the applicable TIF fee as a fair-share contribution toward improvements at these intersections. Various bicycle facilities exist in the vicinity of the project site (existing bike lanes are available along segments of Cohansey Avenue, Wren Avenue, Farrell Avenue, Church Street, Welburn Avenue, and Mantelli Drive). In addition, the Bicycle Transportation Plan contained in the City of Gilroy General Plan, the City of Gilroy Bicycle/Pedestrian Transportation Plan, and the City of Gilroy Trails Master Plan indicate that a variety of bicycle facilities are planned in the study area, some of which would benefit the project. . Bicycle paths are planned for the Llagas Creek Corridor and the remainder of the Lions Creek Corridor. Bike lanes are planned for Monterey Road and for Cohansey Avenue and Wren Avenue, north of Mantelli Drive. Bicycle routes also are planned for Wren Avenue between Mantelli Drive and Lawrence Drive and on Welburn Avenue between Wren Avenue and Monterey Road. 8.A.e Packet Pg. 184 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 11.0 Roads 11-4 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 185 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 12-1 12.0 School Facilities INFORMATION SOURCE In addition to the primary sources listed in Section 1.0 Introduction, the following source was used for this section:  Gilroy Unified School District Developer Fee Justification Study, Gilroy Unified School District 2014.  Gilroy Unified School District website: https://www.gilroyunified.org/ EXISTING CONDITIONS The project site is located within service boundaries of the Gilroy Unified School District (school district). The school district provides service to over 11,000 students in the Gilroy area. There are currently eight elementary schools, three middle schools, and four high schools including a continuation school and one early college academy school in the District. The school district also provides early childhood/pre-school services. The schools nearest the project site are Antonio Del Buono Elementary School, located directly across Wren Avenue from the project site, Christopher High School, located directly across Santa Teresa Boulevard from the project site, Brownell Middle School, located at 7800 Carmel Street, south of First Street, and Rucker Elementary School, to the east of Monterey Road. In September 2019, the school district announced the closure of Antonio Del Buono Elementary School due to declining enrollment. The elementary school is set to close in the summer of 2020 (Gilroy Unified School District 2019). The main school district office is located in the City at 7810 Arroyo Circle (Gilroy Unified School District 2017). The general plan contains several policies regarding schools. General plan policy 17.03 states that the verifications of the remaining capacities in local schools shall be part of the review process for residential subdivisions, with adequate school capacity being a condition for development approval. When capacity is limited, development approvals shall be coordinated with the scheduling of capital funds for school expansion and/or improvements. General plan policy 17.04 requires developers of new residential subdivisions to dedicate land and/or pay a fee to offset the costs of providing new elementary and secondary schools resulting from their developments. Policy 17.06 states that in areas of new residential 8.A.e Packet Pg. 186 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 12.0 School Facilities 12-2 EMC Planning Group Inc. development, as a condition of development approval, sites shall be identified and dedicated. Action 17.B of the general plan states that school facility impacts shall be included in the review of development proposals to ensure that adequate school facility capacity is a condition for development approval. Action 17.C states the representatives of the GUSD be included in discussions regarding the implementation of the new Neighborhood Districts to ensure that new school facilities are successfully integrated as a visual and functional focal point in new neighborhoods. CAPACITY Estimated Demand Table 12-1, Estimated Student Generation, presents the anticipated number of students generated by the proposed project. Table 12-1 Estimated Student Generation Housing Type (Units) K-5 students (SF 0.20/MF 0.14) 6-8 students (SF 0.07/MF 0.06) 9-12 students (SF 0.09/MF 0.10) Total Students Generated Single-Family (185) 37 13 17 67 Multi-Family (122) 17 7 12 36 TOTAL 54 20 29 103 SOURCE: Alvaro Meza, Gilroy Unified School District, email message August 27, 2019 NOTE: Amounts may vary due to rounding. Development of the site based on these student generation factors would be as follows: the single-family residences would result in 67 K-12 students and multi-family residences would result in 36 K-12 students. FINANCING Senate Bill 50 (1998) established standard fees for mitigation of schools impacts. The payment of the development fees authorized by Education Code section 17620 is full and complete mitigation of the impacts on the provision of adequate school facilities resulting from any legislative or adjudicative act. California Education Code section 17620 et seq. authorizes the collection of developer fees; California Government Code section 65995 et seq. establishes the types of fees and rates; California Government Code section 66000 sets the process for justifying fees and appealing or challenging fees. The school district collects Level I fees in accordance with the legislatively set fees and the school district’s fee justification study (Gilroy Unified School District 2018). The State 8.A.e Packet Pg. 187 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 12-3 Allocation Board determines the amount of maximum statutory school fees. The justification report justifies residential fees per square foot which are higher than the state in order to fund the cost of providing school facilities to students from new residential development. The fees are $3.36 per square foot for single-family residential units and multi-family residential units. Fees are assessed when building permit are approved. CONCLUSION Future development of the site consistent with existing general plan land use designations would increase the number of students within the District and as such, developers of the project site would be responsible for the payment of facility impact fees to accommodate the increased number of students. 8.A.e Packet Pg. 188 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 12.0 School Facilities 12-4 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 189 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 13-1 13.0 Hospitals INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following source was used for this section:  “The Effects of the Proposed Changed in Governance and Control of Ownership & Operation of the Daughters of Charity Healthcare System to Prime Healthcare Services Inc.”, prepared for the Attorney General, analyzes financial, utilization, and service information of the St. Louise Regional Hospital.  St. Louise Regional Hospital website. EXISTING CONDITIONS Gilroy is served by the Saint Louise Regional Hospital which has been purchased by the County of Santa Clara in March 2019. Located at 9400 No Name Uno, the hospital opened in 1989 in Morgan Hill and relocated to Gilroy in 1999. The hospital is currently a 93 bed acute care hospital and 24-hour emergency care department offering a wide range of services to residents in both Santa Clara and San Benito counties. The hospital has eight licensed emergency treatment stations and five surgical operating rooms for inpatient and outpatient surgical procedures. The hospital has 93 licensed beds and 247 attending physicians. The current average occupancy rate of the hospital is approximately 33 percent. In 2018, the hospital had 3,021 inpatient admissions with 10,948 inpatient days and performed 2,294 surgeries. (St. Louise Regional Hospital website 2019). CAPACITY Future development of the site would result in an increased demand on services at the hospital. However, due to the low average occupancy rate of 33 percent, the hospital currently has excess capacity to sufficiently accommodate the increased demand created by a population increase of 10,000. The increased demand is not expected to exceed capacity rates such that expansion of its facilities would be required. 8.A.e Packet Pg. 190 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 13.0 Hospitals 13-2 EMC Planning Group Inc. CONCLUSION Future development of the site, consistent with existing general plan land use designations would increase the demand for acute care and emergency services; however, this increase can be accommodated by the existing capacity of the hospital. 8.A.e Packet Pg. 191 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 14-1 14.0 Park and Recreation Facilities INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following source was used for this section:  The City of Gilroy Parks and Recreation System Master Plan (park master plan) was developed by the City concurrently with the general plan update in 2002 and the two documents are consistent. In 2004, the park master plan was updated to be consistent with new general plan build out projections, new park standards, updated facilities inventories, updated implementation plans for infrastructure and programs, and new recommendations. The park master plan timeframe extends through general plan build out (Bellinger Foster Steinmetz Landscape Architecture 2004). EXISTING CONDITIONS The City requires that for every thousand in population, there shall be five acres of developed open parkland. This includes mini-parks, neighborhood/school parks, community and community/school parks, sports parks, trails/linear parkways, and special use facilities. Golf courses, non-accessible open spaces, and private recreational facilities are not included in this standard. Policy 16.06 of the City’s general plan states that park facilities shall be offered within walking distance of all residents. “Walking distance” is defined as the distance of half of a mile (City of Gilroy 2002). The project site is within the “walking distance” and geographical service area standard of one half of a mile to a park, as reflected in the parks master plan (Bellinger Foster Steinmetz Landscape Architecture 2004, p. 33). The nearest parks to the project site are Las Animas Community Park located less than one quarter of a mile to the southeast. The primary purpose of a community park is to provide a recreational area that meets the needs of the community-at-large and usually includes special facilities such as lit sports fields, amphitheaters, and gymnasiums that serve the entire community. Restrooms, off-street parking, night lighting of facilities and other active recreation facilities are typical community park elements (City of Gilroy 2002, page 7-24). 8.A.e Packet Pg. 192 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 14.0 Park and Recreation Facilities 14-2 EMC Planning Group Inc. DEMAND AND INFRASTRUCTURE Future development of the site consistent with existing general plan land use designations could result in approximately 1,000 new residents in the City, which according to City standards, would require approximately five acres of parkland. The park master plan proposes capital improvements to meet the City’s parks service area and acreage standards. Planned infrastructure improvements include, but are not limited to, renovations and improvements at existing parks, completion of the Gilroy Sports Park, design and completion of underdeveloped park sites, and identification, design and acquisition of new public parklands to meet the City’s demand for parks. FINANCING Future development of the site would increase the City’s tax base and General Fund revenues, which the City may use at its discretion to provide financing for additional programs and staffing. The parks master plan includes a capital improvement plan that assists the City in planning and financing the proposed capital improvements. The capital improvement plan includes a capital improvement budget that outlines existing and alternative funding sources. New and/or upgraded equipment and facilities brought about by an increase in demand from new development would be paid for by a public facilities impact fee. Land dedication can be used as a partial alternative to, or in combination with, impact fees for the acquisition and development of recreation facilities. Refer back to Table 2- 1, Public Facilities and Utilities Fees to see the fees required by the City. CONCLUSION Future development of the site consistent with existing general plan land use designations would increase the service demand but also would expand the tax base and correspondingly, available funding opportunities for increased programming and staffing levels. Future development would also be responsible for the payment of a proportionate share of impact fees for new facilities and equipment. The proposed project would not require a level of service beyond that identified in the general plan and park master plan. 8.A.e Packet Pg. 193 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 15-1 15.0 Community Facilities District INFORMATION SOURCES In addition to the primary sources listed in Section 1.0 Introduction, the following sources were used for this section:  NBS. Special Financing Districts: An Introduction to Special Assessments and Special Taxes. July 2015.  NBS. Community Facilities Districts: A Robust Funding and Financing Tool for Local Governments in California. 2018. OVERVIEW OF CFDS Community Facilities Districts (CFD), sometimes known as “Mello-Roos Districts” (State Senators Henry Mello and Assemblyman Mike Roos were the original authors of the legislation – see California Government Code, Section 53311 et seq., entitled “Mello-Roos Community Facilities Act of 1982”), can fund certain large infrastructure capital projects as well as public services on an annual basis. Capital projects with a useful life of at least five years that may be funded with a CFD include:  Park, recreation, and open space facilities;  School facilities;  Libraries;  Child care facilities; and  Infrastructure needs including streets, water systems, library facilities, purchasing of open space, and economic development investments including parking garages. The services that may be funded include:  Police protection;  Fire protection and suppression, and ambulance and paramedic services; 8.A.e Packet Pg. 194 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 15.0 Community Facilities District 15-2 EMC Planning Group Inc.  Recreation program services, library services, and maintenance services for elementary and secondary school sites and structures, and the operation and maintenance of museums and cultural facilities;  Maintenance and lighting of parks, parkways, streets, roads and open space;  Flood and storm protection services;  Services with respect to removal or remedial action for the cleanup of any hazardous substance; and  Maintenance and operation of any real property or other tangible property with an estimated useful life of five or more years that is owned by the local agency or by another local agency. Any public agency with the authority to provide the types of services and facilities may form a CFD. Cities, counties, school districts, and special districts are common users of this tool. A formation process is required, including appropriate financial analysis and planning. A Special Tax Consultant will develop a Special Tax Formula and Report. There will be public hearings and either a mailed ballot process to property owners or a regular election if there are 12 or more voters in the proposed district. The City of Gilroy has adopted a citywide Community Facilities District to fund landscape maintenance, primarily for streetscapes and drainage basins. The Community Facilities District has four zones, to account for differences in maintenance costs for different neighborhoods in the City. FORMATION AND FINANCING OF CFD The proposed project will be required by the City to form a CFD as a means to finance all applicable services (noted above). Future developers would be responsible for paying a proportionate share of impact fees for the necessary off-site infrastructure improvements and would be responsible for financing on-site improvements. Future development of the site would also expand the City’s tax base and correspondingly, increase available opportunities to provide funding for additional staffing if required. However, the expanded tax base created by the proposed project is not anticipated to generate adequate funds to cover the costs of necessary services. Through CFDs, the City is permitted to impose “special taxes” to fund maintenance of facilities. Establishment of the CFD may be done by the owners of a majority of the property within the proposed CFD, while the approval of special taxes requires a two-thirds vote. Because of the two-thirds vote requirement for funding, these districts are typically formed 8.A.e Packet Pg. 195 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 15-3 by developers in coordination with the city or county prior to development of the subdivisions. Once established, a CFD is made irrevocable through a lien on the property. The general timeline for the successful implementation of a new CFD is six to 12 months, but often the process can take more than a year. Bringing all the interested parties into accord can take a very long time, and this part of the process must be taken into consideration. A well-managed and orderly process involves various meetings, forms of analysis, and consensus building. 8.A.e Packet Pg. 196 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 15.0 Community Facilities District 15-4 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 197 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) EMC Planning Group Inc. 16-1 16.0 Sources PERSONS CONTACTED Anderson, Alan, Fire Chief, City of Gilroy Fire Department. Email message to consultant, 14 and 16 November 2017. Boles, David, Crime Analysis, Records, and Property & Evidence Manager, Gilroy Police Department. Email message to consultant, 8 October 2019. Deras, Joseph, Captain, Gilroy Police Department. Email message to consultant, 28 November 2017 and December 4, 2017. Gittleson, David. City of Morgan Hill Associate Engineer. Telephone interview with consultant, 4 January 2018.Meza, Alvaro, Assistant Superintendent, Gilroy Unified School District. Email message to consultant, 27 August 2019. Wu, Pamela, City of Gilroy Senior Planner. Email message to consultant, 10 May 2018. Yoshimura, Lani, Gilroy Community Librarian, City of Gilroy. Telephone interview with consultant, 17 November 2017; e-mail correspondence with consultant, 27 September 2019. DOCUMENTS REFERENCED Applied Development Economics, Inc. Fiscal Impact Analysis of the Wren Investors-Hewell Urban Service Amendment to the City of Gilroy and the County of Santa Clara. DATE. AKEL Engineering Group, Inc. City of Gilroy 2010 Urban Water Management Plan. June 2011. http://www.cityofgilroy.org/cityofgilroy_files/city_hall/community_ development/engineering/water_management_plan/2010UWMP_Gilroy_Final_HC_ 061511.pdf. June 2011. AKEL Engineering Group, Inc., North Central Gilroy Urban Service Area Amendment Water Supply Assessment. November 2015. AKEL Engineering Group, Inc. City of Gilroy 2015 Urban Water Management Plan. May 2016. http://www.ci.gilroy.ca.us/DocumentCenter/View/5908, (2016 a) 8.A.e Packet Pg. 198 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 16.0 Sources 16-2 EMC Planning Group Inc. AKEL Engineering Group, Inc. 2015 South County Recycled Water Plan Master Plan Update. May 2016. http://www.ci.gilroy.ca.us/DocumentCenter/Home/View/6127 (2016 b) American Fact Finder. 2016. “Annual Estimates of the Resident Population: April 1, 2010 to July 1, 2016.” https://factfinder.census.gov/faces/tableservices/jsf/pages/productview.xhtml?src=CF. Bellinger Foster Steinmetz Landscape Architecture. September 2004. City of Gilroy Parks and Recreation System Master Plan. Monterey, CA. Bellinger Foster Steinmetz. City of Gilroy Parks and Recreation System Master Plan (PRSMP). June 13, 2002, updated September 2004. http://www.cityofgilroy.org/cityofgilroy_files/city_hall/community_development/ engineering/master_plans/pr_master_plan.pdf Bellinger Foster Steinmetz. City of Gilroy Trails Master Plan. 2005. California Department of Resources Recycling and Recovery (CalRecycle). Jurisdiction Diversion/Disposal Rate Summary Webpage. http://www.calrecycle.ca.gov/LGCentral/DataTools/Reports/DivDispRtSum.htm. Accessed November 30, 2017. California Department of Water Resources. The CASEGM Groundwater Basin Prioritization Results Groundwater Reliance Sorted by Basin Name. 2014. California Department of Water Resources. Central Coast Hydrologic Region; Gilroy- Hollister Groundwater Basin, California’s Groundwater Bulletin 118 Interim Update 2016 Data, December 2016. https://gis.water.ca.gov/app/bbat/reports/BasinBoundaryDescription/BasinBoundary Description__3_003_01.pdfCalifornia Legislative Information. 2010. Public Resources Code, Section 4291; Accessed November 15, 2017. http://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PRC& sectionNum=4291. California State Assembly. Guide to the Cortese-Knox-Hertberg Local Government Reorganization Act of 2000. December 2016. California State Water Resources Control Board. Urban Water Supplier Conservation Tiers. 2015. Carollo Engineers. City of Gilroy Storm Drainage System Master Plan. May 2004 (a). Carollo Engineers. City of Gilroy Sewer System Master Plan. May 2004 (b). Carollo Engineers. City of Gilroy Water System Master Plan. May 2004 (c). Carollo Engineers. South County Recycled Water Master Plan. October 2004 (d). City of Gilroy (City). 8.A.e Packet Pg. 199 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 16-3 ―――.City of Gilroy Municipal Code. November 20, 2017. http://www.codepublishing.com/ca/gilroy/ ―――. September 2001. Draft Environmental Impact Report for the City of Gilroy revised Draft General Plan. Gilroy, CA. ―――. 2002. “2020 General Plan.” http://www.cityofgilroy.org/274/2020-General-Plan ―――. October 2004. Update of the Fire Services Master Plan of August 2000 for the City of Gilroy Fire Department Final Report – Volume 1, The Master Plan Update Report October 2004. Gilroy, CA. ―――. City of Gilroy Annual Water Quality Report 2016. 2016a. http://www.cityofgilroy.org/ArchiveCenter/ViewFile/Item/574 ―――. April 2016b. Gilroy Police Department Strategic Plan Update 2016-2019. Gilroy, CA. ―――. July 2017. Gilroy Police Department Policy Manual. Gilroy, CA. ―――. “Fire Stations.” Accessed on November 14, 2017a. http://www.cityofgilroy.org/754/Fire-Stations. ―――. “Fire Department.” Accessed on November 16, 2017b. http://www.cityofgilroy.org/165/Fire-Department. ___. 2014 City of Gilroy Guidelines. 2014 (e). City of Gilroy Community Development Department Engineering Division Fees to Build. As revised July 1, 2014. http://www.cityofgilroy.org/DocumentCenter/Home/View/1310 ___. Gilroy General Plan. June 13, 2002a. http://www.cityofgilroy.org/cityofgilroy/city_hall/community_development/ planning/general_plan/ ___. City of Gilroy General Plan Final Environmental Impact Report. June 13, 2002b. http://www.cityofgilroy.org/cityofgilroy_files/city_hall/community_development/ Gilroy Unified School District (GUSD). ___. GUSD website. http://www.gusd.k12.ca.us/. Accessed September 24, 2019. ___. Gilroy Unified School District Developer Fee Justification Study. Prepared by Spectrum Management Solutions. 2014. http://gusd-ca.schoolloop.com/file/ 1216320361781/1389424725424/7824640379605770695.pdf. Accessed January 4, 2018. City of Morgan Hill. For our San Martin Neighbors. https://www.morgan-hill.ca.gov /1608/San-Martin-Neighbors-Information. Accessed November 28, 2017. City of Morgan Hill. Capital Improvement Program FY 2016-17 and 2017-18. (2016) 8.A.e Packet Pg. 200 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 16.0 Sources 16-4 EMC Planning Group Inc. County of Santa Clara. “Enforcement Operations.” Published on August 9, 2017. https://www.sccgov.org/sites/sheriff/Pages/eo.aspx CrimeReports. 2019. Gilroy, California, United States; Accessed October 3, 2019. https://www.crimereports.com/home/#!/dashboard?incident_types=Assault%252CAs sault%2520with%2520Deadly%2520Weapon%252CBreaking%2520%2526%2520Enteri ng%252CDisorder%252CDrugs%252CHomicide%252CKidnapping%252CLiquor%25 2COther%2520Sexual%2520Offense%252CProperty%2520Crime%252CProperty%252 0Crime%2520Commercial%252CProperty%2520Crime%2520Residential%252CQualit y%2520of%2520Life%252CRobbery%252CSexual%2520Assault%252CSexual%2520Of fense%252CTheft%252CTheft%2520from%2520Vehicle%252CTheft%2520of%2520Veh icle&start_date=2017-05-13&end_date=2017-11-13&days=sunday%252Cmonday%252 Ctuesday%252Cwednesday%252Cthursday%252Cfriday%252Csaturday&start_time= 0&end_time=23&include_sex_offenders=false&lat=37.02702469999416&lng=-121. 58930629491805&zoom=19&current_tab=list&shapeIds=&shape_id=false&position_id =6xdn-ybp4-row-gdrp__89ag-i3rc. EMC Planning Group. North Gilroy Neighborhood District Urban Service Area Amendment Draft Environmental Impact Report. 2015. Fire Chiefs Online. “Response-Time Considerations.” Accessed November 14, 2017. https://firechief.iso.com/FCWWeb/mitigation/ppc/3000/ppc3015.jsp Horizon Water and Environment. Santa Clara County Stream Maintenance Program Update 2012-2022 Final Subsequent Impact Report. December 2011. Local Agency Formation Commission of Santa Clara County (LAFCO). December 2015. Cities Service Review Final Report. San Jose, CA. Management Partners. Cities Service Review Final Report. October 2015. Mintier Harnish. City of Gilroy 2040 General Plan Background Report Public Review Draft. April 2014. NBS. Special Financing Districts: An Introduction to Special Assessments and Special Taxes. July 2015. NBS. Community Facilities Districts: A Robust Funding and Financing Tool for Local Governments in California. 2018. Recology South Valley. http://www.recologysouthvalley.com. Accessed November 21, 2017. Ruggeri Jensen Azar. North Gilroy Neighborhood Districts Urban Service Area Modification Narrative (2015A). Ruggeri Jensen Azar. Preliminary Engineers Report for North Gilroy Neighborhood Districts (2015b). 8.A.e Packet Pg. 201 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) Wren Investors and Hewell Urban Service Area Amendment Plan for Services EMC Planning Group Inc. 16-5 Santa Clara County Library District. “Library Measure A Special Tax Passes.” Published on August 28, 2013. https://www.sccl.org/About/Library-News/Press-Releases/Library- Measure-A-Special-Tax-Passes ―――. “Santa Clara County Library District 1914-2014.” Accessed on November 15, 2017a. https://www.sccl.org/Events/100-Year-Anniversary/Timeline#2004 ―――. “Library History.” Accessed on November 15, 2017b. https://www.sccl.org/Locations/Gilroy/About-Us/Library-History ―――. “Mobile App.” Accessed November 17, 2017c. https://www.sccl.org/Services/Mobile- App. Santa Clara Valley Water District. Annual Groundwater Report for Calendar Year 2016. http://www.valleywater.org/services/WaterQualityReports.aspx. Santa Clara Valley Water District. 2016 Groundwater Management Plan. November 2016. Santa Clara Valley Water District. 2012 Water Supply and Infrastructure Master Plan. October 2012. Santa Clara Valley Water District. Personal Communication with Yvonne Arroyo, Associate Engineer. October 3, 2019. South Santa Clara County Fire District. “2016 Annual Report.” Accessed on November 14, 2017. http://www.ssccfd.com/wp-content/uploads/2014/02/2016- SSCCFD-Annual-Report-FINAL.pdf. St. Louise Regional Hospital website. Accessed on October 3, 2019. https://slrh.sccgov.org/About-Us/Pages/Quick-Facts.aspx REPORT PREPARERS EMC Planning Group Teri Wissler Adam, Senior Principal Principal-in-charge Richard James, AICP, MUP, Principal Editing Stuart Poulter, AICP, MCRP, Associate Planner Project Manager Rachel Hawkins, JD, Associate Planner Report Preparation Shoshana Wangerin, Assistant Planner Report Preparation 8.A.e Packet Pg. 202 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) 16.0 Sources 16-6 EMC Planning Group Inc. This side intentionally left blank. 8.A.e Packet Pg. 203 Attachment: Wren Hewell_Plan for Services (2563 : USA 12-01 and USA 14-02) October 16, 2019 Melissa Durkin Planner II City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 Re: Wren Investors and Hewell Urban Service Area Amendment (USA 12-01 & USA 14-02) Initial Study/Mitigated Negative Declaration, Response to Public Comments Dear Melissa, The public comment period for the above reference mitigated negative declaration (MND) ended on October 7, 2019. The following three (3) comment letters were received: Gilroy Bicycle Pedestrian Commission; Local Agency Formation Commission (LAFCO) of Santa Clara County; and the Santa Clara Valley Water District (Valley Water). Copies of the three comment letters are attached to this response letter. Responses to comments are as follows: Zachary Hilton, Chair, Gilroy Bicycle Pedestrian Commission, September 25, 2019 Based on the analysis contained in the traffic impact analysis prepared by Hexagon Transportation Consultants, the Gilroy Bicycle Pedestrian Commission recommends a total of 34 Class I and 7 Class II bicycle parking spaces for the 102 residential units proposed. The letter further recommends the proposed project contribute to the completion of planned bicycle facilities that would serve the project site directly as well as continuous sidewalk connections throughout the project area that connect to existing pedestrian and bicycle facilities. 8.A.f Packet Pg. 204 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) Melissa Durkin City of Gilroy October 16, 2019, Page 2 No environmental issues were raised. Neelima Palacherla, LAFCO Executive Officer, Santa Clara LAFCO, October 7, 2019 Response to comments to LAFCO staff comments are presented below using the issue sub-headings found in LAFCO’s comment letter: Project Description Concerns & Resulting Analysis Concerns CEQA defines a project as “the whole of an action, which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment.” The City has received an application for an Urban Service Area (USA) amendment only. The application did not include any development plans (e.g. tentative subdivision map, use permit etc.). Therefore, the only action before the City of Gilroy, and subsequently, LAFCO as a responsible agency, is consideration of the Urban Service Area amendment. The USA amendment by itself would result in no direct physical change in the environment. However, with approval of the proposed USA amendment, development of the project site with residential and commercial uses is a reasonably foreseeable indirect physical change in the environment and therefore, must be evaluated in the CEQA documentation for the USA amendment. Therefore, the project description provided in the IS/MND is based on conceptual-level development anticipated when the USA amendment application was received by the City, and is consistent with the City’s General Plan land use designation of Neighborhood District. It appears that the commenter is expecting a specific development project with the USA amendment application (e.g. tentative subdivision map, use permit etc.). However, for purposes of CEQA review, the project description in the IS/MND accurately describes the requested action and the reasonably foreseeable indirect physical changes in the environment (i.e., development consistent with the City‘s General Plan land use designation of Neighborhood District), and is adequate and detailed enough to identify and evaluate potential environmental impacts. The IS/MND fully discloses and analyzes the anticipated development consistent with the City’s General Plan land use 8.A.f Packet Pg. 205 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) Melissa Durkin City of Gilroy October 16, 2019, Page 3 designation of Neighborhood District, as well as the public services necessary to serve the anticipated development. The timing of future development is unknown as no development application has been submitted; however, it is reasonably foreseeable that an application for development could be submitted upon approval of the USA amendment. This was the assumption in the IS/MND. Further, the commenter states that they need more detailed and specific information on the proposed development; however, they do not indicate what additional information is needed. Proposed MND’s Relationship to Prior Uncertified Wren Investors EIR The commenter is referring to a background section of a Greenhouse Gas Emissions analysis prepared for the proposed project. This section presented the history of the project site’s USA amendment applications. The commenter asks why an MND was prepared for the proposed project and not an EIR. CEQA requires preparation of an EIR if a proposed project would result in a significant, adverse, unavoidable environmental impact. Otherwise, if all significant impacts can be mitigated to a less than significant level, or if no significant impacts are identified, then an MND is the appropriate CEQA document. When preparation of the EIR for the Wren Investors site commenced several years ago, 7.5 acres of the project site was designated “Farmland of Statewide Importance,” on the 2010 California Department of Conservation Important Farmland Map. The loss of Farmland of Statewide Importance is generally considered significant and unavoidable. However, when the CEQA process restarted several years later, the California Department of Conservation had updated the map (2014) and changed the designation on the 7.5 acres to Grazing Land, which is not considered important farmland. Therefore, the loss of farmland on either site is no longer considered significant and unavoidable. The loss of farmland would be considered less than significant. According to the 2014 farmland map, the Hewell site did contain Prime Farmland and Farmland of Statewide Importance but the loss of this farmland was determined to be less than significant (see additional discussion below under “Project’s Consistency with LAFCO’s Policies”). Therefore, preparation of an EIR was not necessary. 8.A.f Packet Pg. 206 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) Melissa Durkin City of Gilroy October 16, 2019, Page 4 Proposed Project’s Relationship to General Plan Update Which is Underway The commenter implies that the City cannot make any land use decisions based upon the existing General Plan because the City is in the process of preparing a new General Plan. The City of Gilroy is currently in the process of preparing a new General Plan and selecting a “Preferred Land Use Alternative.” However, until the new General Plan is adopted, the existing land use designation of Neighborhood District is the applicable land use designation for the project site. Project’s Consistency with LAFCO’s Policies The commenter requested that a full consistency analysis of the project with applicable City, County, and LAFCO policies be provided as part of the IS/MND. The City’s initial study evaluates whether the proposed project would conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to, the general plan, specific plan, zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect. The initial study evaluates all of the potential environmental effects associated with the development of the project site. The commenter specifically asks if the project is consistent with LAFCO goals to preserve agricultural land and open space resources; discourage urban sprawl; and encourage the efficient provision of services. The following is provided. Agricultural Land and Open Space Resources The IS/MND provides an evaluation (see Section D.2 “Agriculture” starting on page 26 of the initial study) that evaluates potential environmental impacts on lands found within the Hewell site designated as Prime Farmland and Farmland of Statewide Importance by the California Department of Conversation Farmland Map. The Wren Investors site includes no land designated as either. As noted in the initial study, this determination was based on a Land Evaluation and Site Assessment (LESA) model score of 49.9 with a land evaluation subscore of 31.9 and the site assessment score of 18.0. The loss of agricultural land with a LESA score of between 40 and 59 is considered significant if both the land evaluation and the site assessment subcategories have scores of 20 or better. Since the site assessment subcategory is less than 20, future urban development of the parcel would not be considered a significant impact in accordance 8.A.f Packet Pg. 207 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) Melissa Durkin City of Gilroy October 16, 2019, Page 5 with the City of Gilroy significance criteria. The LESA worksheets and supporting graphics included in the 2015 LESA modelling for the Hewell site are included as Appendix A of the initial study. Additionally, and as presented in the attached maps, the California Department of Conservation’s Important Farmland Map was updated again in 2016 and the Hewell site is no longer designated as Prime Farmland and Farmland of Statewide Importance. The map has not been updated since 2016. Therefore, the proposed project would not result in the conversion of Prime Farmland, Farmland of Statewide Importance, or Unique Farmland. Impacts to agricultural resources remain less than significant. Finally, the project site is designated as Neighborhood District and therefore, is not planned for agricultural use or open space uses. Discourage Urban Sprawl The Wren Investors project site is surrounded by urban development to the north, south, east, and southwest, and by low density rural development on the northwest. The Hewell site is surrounded by urban development to the east, low density rural development on the south and west, and open space to the north. Both sites are immediately adjacent to the existing city limits and Urban Service Area boundary. Surrounding land uses are discussed in the initial study and depicted on Figure 2 of the initial study. Therefore, approval of the USA amendment and the reasonably foreseeable development of the project site would not be considered urban sprawl. Encourage the Efficient Provision of Services The initial study evaluates the provision of public services (fire protection, police protection, schools, recreation, libraries, water, wastewater, and storm drainage) and the environmental impacts associated with the provision of these services. The project site is immediately adjacent to the existing city limits and the existing Urban Service Area boundary and therefore, services can be provided efficiently. Additionally, no significant environmental impacts were identified associated with providing these public services. 8.A.f Packet Pg. 208 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) Melissa Durkin City of Gilroy October 16, 2019, Page 6 Yvonne Arroyo, Associate Engineer, Community Project Reviews Unit, Valley Water, October 7, 2019 The commenter notes that any future development within the proposed urban service area should not propose any development within Valley Water lands. Valley Water requests the City provide public street access to Valley Water-owned parcels so that a secondary means of ingress/egress can be provided. The commenter also notes that increased storm water runoff due to proposed high density residential development (which was not previously accounted for in the water district’s hydrology analysis for the Lions Creek and West Branch Llagas Creek) will need to be mitigated so as not to exceed the design capacity of either creek. Future development proposals for the project site will be evaluated for increased runoff and will be required to mitigate for any increase for the 100-year event due to increase in land use density. Future development review will also ensure no development is proposed on Valley Water land. Please let me know if you have any questions or need additional clarification on any of the responses provided. Sincerely, Stuart Poulter, AICP, MCRP Associate Planner Attachment A California Department of Conservation Important Farmland Maps (2010, 2014, and 2016) Attachment B Comment Letters Received during Public Review Period: 1. Gilroy Bicycle Pedestrian Commission, September 25, 2019 2. Santa Clara LAFCO, October 7, 2019 3. Valley Water, October 7, 2019 8.A.f Packet Pg. 209 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) ATTACHMENT A C ALIFORNIA D EPARTMENT OF C ONSERVATION IMPORTANT F ARMLAND M APS (2010, 2014, AND 2016) 8.A.f Packet Pg. 210 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) Important Farmland 2010 Wren Investors and Hewell USA 0 700 feet Figure 1 Source: ESRI 2018, California Department of Conservation 2010 Project Site Tatum Ave.Kern Ave.Vickery Ave.Wren Ave.Mantelli Dr. Farmland TypeLegend Prime Farmland Farmland of Statewide Importance Unique Farmland Grazing Land Farmland of Local ImportanceUrban and Built-Up-Land Other Land 8.A.f Packet Pg. 211 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) Important Farmland 2014 Wren Investors and Hewell USA 0 700 feet Figure 2 Source: ESRI 2018, California Department of Conservation 2014 Project Site Tatum Ave.Kern Ave.Vickery Ave.Wren Ave.Mantelli Dr. Farmland TypeLegend Prime Farmland Farmland of Statewide Importance Unique Farmland Grazing Land Farmland of Local ImportanceUrban and Built-Up-Land Other Land 8.A.f Packet Pg. 212 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) Important Farmland 2016 Wren Investors and Hewell USA 0 700 feet Figure 3 Source: ESRI 2018, California Department of Conservation 2016 Project Site Tatum Ave.Kern Ave.Vickery Ave.Wren Ave.Mantelli Dr. Farmland TypeLegend Prime Farmland Farmland of Statewide Importance Unique Farmland Grazing Land Farmland of Local ImportanceUrban and Built-Up-Land Other Land 8.A.f Packet Pg. 213 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) ATTACHMENT B P UBLIC C OMMENT L ETTERS R ECEIVED DURING P UBLIC R EVIEW P ERIOD 1. G ILROY B ICYCLE P EDESTRIAN C OMMISSION , SEPTEMBER 25, 2019 2. S ANTA C LARA LAFCO, O CTOBER 7, 2019 3. V ALLEY W ATER , O CTOBER 7, 2019 8.A.f Packet Pg. 214 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) 1 Melissa Durkin Melissa.Durkin@cityofgilroy.org Planner II City of Gilroy September 24, 2019 Re: Notice of Intent to Adopt Mitigated Negative Declaration Project Title: Wren Investors & Hewell Urban Service Area Amendment (USA 12-01 & USA 14-02) Melissa, This project will have a direct impact in the City of Gilroy by achieving our goal to reduce air emissions from on-road motor vehicles, improve air quality by encouraging our residents and commuters to mode shift from vehicles to cycling, and increase walking as alternatives to driving for short and first/last mile trips. By providing visible bicycle parking for residents and visitors, you are encouraging vehicle passerby’s to consider walking/biking to this project. This enhances the security of bicycle parking at the project too. This project demonstrates how we can reduce the amount of parking for vehicles while providing the necessary bicycle parking to make the site functional for all users. This creates equity to all modes of transportation. We are actively embracing, advancing ideas, and projects that promote the concept of free- range people in the City of Gilroy. Providing an incentive that rewards the effort of biking is important. Free secured front row parking accomplishes this. We advocate for building and planning for the future generations as well as current residents who don’t own cars. This reflects what we are teaching the youth in our community through Safe Routes To School and Safe Routes for All. We have the following recommendations from the Hexacon Traffic Impact Analysis. The multi- family residential component of the proposed project (102 units) should provide a total of 34 Class I and 7 Class II bicycle parking spaces. We would support a bike room to be located inside the multi-family residential component, as opposed to the Class I bicycle lockers. There are examples of those at Alexander Station, Cannery Apartments, and Monterey Rd Apartments. Here’s a link to our Bicycle Parking Guidelines https://www.cityofgilroy.org/DocumentCenter/View/6938/Bicycle-Parking-Guideline-Sheet The retail component (8,000 square feet) should provide 1 Class I and 1-2 Class II bicycle parking spaces. For the employees I’m a big fan of bike lockers. Inside these lockers are hooks to hang helmets, and coats. Some lockers can even fit two bikes utilizing both sides. Many service workers do not have cars. Providing incentives such as secured bike lockers to their employees would keep unwanted cars out of the parking spaces when they work a shift or double shifts. This will also free up current bicycle parking for the customers. Contribute to Planned Bicycle 8.A.f Packet Pg. 215 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) 2 Facilities in the Project Area. It is recommended that the proposed project contrib ute to the completion of planned bicycle facilities that would serve the project site directly, in particular those along Kern, Cohansey, and Wren Avenues. The contribution should include striped bike facilities, to the extent practical, along Kern Avenue, and extending the existing bike lane along Cohansey Avenue from the Harvest Park site to Kern Avenue. Additionally, it is recommended that the missing bike lanes along Wren Avenue, approximately 1,000 feet between Farrell Avenue and Vickery Avenue, be installed to provide a continuous bike lane along Wren Avenue. Some streets within the project area have sidewalks missing along one or both sides of the street, including segments of Wren Avenue, Kern Avenue, Tatum Avenue, Vickery Avenue, and Farrell Avenue. This results in a discontinuous pedestrian facility network in the project area. It is recommended that with the development of the project area, sidewalks along both sides of all new streets on the project site and along existing project frontage stree ts with missing sidewalks be built. This would provide a continuous sidewalk connection from every proposed residential unit within the project site to existing and planned pedestrian facilities within the study area. On the mentioning of developing a Safe Routes to School program, there is already an established Safe Routes to School Task Force comprised of all stakeholders. Our Commission will work with the developer and City of Gilroy to establish a SRTS Report with suggested walking and biking routes to the assigned schools in the project area. Thank you. Zachary Hilton Chair, Gilroy Bicycle Pedestrian Commission Zachary.Hilton@cityofgilroy.org #GilroyBPAC 8.A.f Packet Pg. 216 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) PAGE 1 OF 4 VIA E-MAIL [melissa.durkin@cityofgilroy.org] Melissa Durkin, Planner II Community Development Department City of Gilroy 7351 Rosanna Street Gilroy, CA 95020 RE: CITY OF GILROY’S NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION FOR WREN INVESTORS AND HEWELL URBAN SERVICE AREA AMENDMENT Dear Ms. Durkin: Thank you for providing the Santa Clara LAFCO, a Responsible Agency, the opportunity to review and comment on the City of Gilroy’s Initial Study (IS) and proposed adoption of a Mitigated Negative Declaration (MND) for the proposed Wren Investors and Hewell Urban Service Area Amendment. Project Description Concerns & Resulting Analysis Concerns As indicated in these documents, the proposed project is a “single urban service area amendment to the City of Gilroy’s urban service area (USA) that includes both the previously separate Wren Investors project site and the Hewell project site. The 50.3-acres Wren Investors project site is located north and west of the Gilroy city limits and USA and the 5.36-acre Hewell site is located just outside the northern city limits and outside the USA. Both sites are within the City of Gilroy 2020 General Plan 20-year planning boundary.” According to the City’s Notice of Intent, the proposed project “does not include any development at this time.” However, in Table 1 of the IS, anticipated buildout for the two sites is presented, including proposed land uses, acreage, and number of residential lots; and a conceptual lot layout for each site is presented in Figure 5 and Figure 6 of the IS. It is unclear what the exact project description is for the proposal and it appears that the project description as written, is not comprehensive enough and would not allow for an adequate environmental analysis to be conducted that meets LAFCO’s needs as a Responsible Agency. In general, the only purpose of including an area within a city’s USA is to allow the city to annex and provide urban services to the area because the anticipated 8.A.f Packet Pg. 217 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) PAGE 2 OF 4 development is imminent, and these lands are pre-zoned for a specific development project. Therefore, the City’s environmental analysis must fully disclose and analyze the anticipated development, the timing of that development and the services that the City will provide to the area to support that development. In order to properly conduct such an analysis, more detailed and specific information on the proposed development must be included. This will allow for a more detailed evaluation of the project’s anticipate impacts on existing services, utilities, and facilities and how those impacts will be addressed by the City. Without such information, it is premature for LAFCO to consider an USA amendment proposal or its associated environmental impacts. Proposed Mitigated Negative Declaration’s Relationship to Prior Uncertified Wren Investors EIR As was noted on Page 14 of Appendix B of the City’s IS & MND, “EMC Planning Group previously completed CEQA and LAFCO documentation for Wren Investors project in 2014. A portion of the environmental analysis for Hewell/Sheedy Urban Service Area Amendment, Pre-zoning, and Annexation project (“Hewell project”) was prepared in 2015. However, the environmental impact report (EIR) for the Wren Investors project was never certified and the Hewell project was put on hold before the CEQA documentation could be completed.” It is unclear why the City has prepared only a MND for the proposed project at this time, when the City prepared an EIR for substantially the same proposed project in 2014/2015. Proposed Project’s Relationship to General Plan Update Which is Underway As noted in the City’s MND, “both sites are within the City of Gilroy 2020 General Plan 20-year planning boundary” which was adopted June 2002. We understand that the city is in the process of preparing a new General Plan, which will articulate the vision of the community through the year 2040. As you know, one of the main purposes of any comprehensive general plan update is for a city to analyze future growth scenarios and their associated impacts (e.g. environmental and financial), before approving a specific scenario through the city’s adoption of a new General Plan. We also understand that the City Council will soon be considering a Preferred Land Use Alternative for the 2040 General Plan, including a preferred land use alternative for the project area; and that Preferred Land Use Alternative will be analyzed in an upcoming Environmental Impact Report for the 2040 General Plan. Given that the outcome of the update is currently undetermined, it is premature to propose such a USA amendment. Project’s Consistency with LAFCO’s Policies In the Land Use section (p. 67) of the proposed IS, it is stated that the proposed project “would not…. conflict with any applicable land-use plan, policy or regulation adopted for the purpose of avoiding or mitigating an environmental effect.” However, it does not appear that an analysis was done to evaluate the proposed project for consistency with applicable City policies, County policies or Santa Clara 8.A.f Packet Pg. 218 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) PAGE 3 OF 4 LAFCO Policies. No specific policies and/or analysis is presented for review, just a summary conclusion. Furthermore, the Land Use section (p. 67) of the IS makes a vague reference to a policy consistency analysis that was prepared for the Wren Investors Draft EIR (2014) and Hewell USA Amendment, Prezone, and Annexation Administrative Draft Initial Study (2015) which was never certified or adopted by the City. The purpose of that reference is unclear. As part of the USA amendment review process, LAFCO staff will evaluate whether the project is consistent with LAFCO’s goals which are as follows: • Preserve agricultural land and open space resources, • Discourage urban sprawl, and • Encourage the efficient provision of services. LAFCO has adopted local policies based on the above goals. The IS & MND should include an analysis of the proposed project’s consistency with applicable LAFCO policies; applicable City policies and County policies. LAFCO Urban Service Area Policies discourage USA expansions that include agricultural and open space land. These Policies also address issues such as availability of adequate water supply, local and regional impacts, regional housing needs, ability of school districts to provide school facilities, ability of the city to provide urban services to the growth areas without detracting from current service levels, whether the conversion of agricultural and open space lands is premature and if there are other areas into which to channel growth, fiscal impact on other agencies, and consistency with city and county general plans and specific plans. The IS & MND should include an evaluation of whether the project is consistent with all of LAFCO’s Urban Service Area Policies. LAFCO also requires that the City provide information on the current supply of vacant land within its Urban Service Area for the land use categories that the City proposes for the lands within the Urban Service expansion area. If a city has a substantial supply of vacant land within its Urban Service Area and applies for an USA expansion, LAFCO will require an explanation of why the expansion is necessary; why infill development is not undertaken first; and how an orderly, efficient growth pattern, consistent with LAFCO’s mandate, will be maintained. The site of the proposed project includes prime farmlands. Therefore, the IS & MND should include an evaluation of the proposed project’s impacts on farmlands. Conclusion For the foregoing reasons, we urge the City Council to not approve the proposed Mitigated Negative Declaration at this time. As you know, LAFCO is a Responsible Agency for the proposed project and therefore has an independent obligation to review the IS and MND for legal adequacy under CEQA prior to issuing any approvals for the Project (CEQA Guidelines, §15096.) Therefore, we respectfully request that the City prepare revised documents that address the identified 8.A.f Packet Pg. 219 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) PAGE 4 OF 4 deficiencies and that the City then recirculate new documents to affected agencies and the public for their review and comment, as required by CEQA. Thank you. Sincerely, Neelima Palacherla LAFCO Executive Officer Cc: LAFCO Members Jacqueline Onciano, Director, Santa Clara County Dept. of Planning & Development 8.A.f Packet Pg. 220 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) 8.A.f Packet Pg. 221 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) 8.A.f Packet Pg. 222 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) 8.A.f Packet Pg. 223 Attachment: Letters and Response to Comments (2563 : USA 12-01 and USA 14-02) 1 RESOLUTION NO. 2020-XX RESOLUTION NO. 2020-XX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY APPROVING THE WREN INVESTORS/HEWELL USA AMENDMENT MITIGATED NEGATIVE DECLARATION AND APPROVAL OF URBAN SERVICE AREA APPLICATION USA 12-01 AND 14-02, INCLUSION OF ASSESSOR PARCEL NUMBERS 790-09-006, 008, 009, 010, 011; 790-17- 001, 004, 005, 006, 007, 008, 009, 010; 790-06-017 and 790-06-018, GERALLY LOCATED WEST OF WREN AVENUE, SOUTH OF VICKERY AVENUE, AND NORTH AND SOUTH OF TATUM AVENUE; AND OUTSIDE THE NORTHERN CITY LIMITS NORTHEAST OF THE INTERSECTION OF VICKERY LANE AND KERN AVENUE, INTO THE CITY OF GILROY URBAN SERVICE AREA WHEREAS, the Gilroy 2020 General Plan was adopted by the Gilroy City Council on June 13, 2002 and designates the subject property with a Neighborhood District land use designations; and WHEREAS, Dick Oliver, representing Wren Investors, LLC, submitted Urban Service Area Amendment application USA12-01 requesting that the City of Gilroy incorporate approximately 50.3 acres of land into its Urban Service Area; and Mark Hewell and David Sheedy submitted USA 14-02 requesting that the city of Gilroy incorporate approximately 5.36 acres of land into its Urban Service; and WHEREAS, the Wren Investors project site is generally located west of Wren Avenue, south of Vickery Avenue, and north and south of Tatum Avenue and the Hewell site is located just outside the northern city limits northeast of the intersection of Vickery Lane and Kern Avenue; and WHEREAS, Action 2.A of the 2020 General Plan requires USA applications to be reviewed based on the following criteria: A) The need for additional lands, if any, to accommodate projected growth for the next five years; B) Consistency of the proposed area of Urban Service Area expansion in light of General Plan policies regarding the pattern of development (1.01), the location of growth (2.01), and the rate and timing of growth (2.02); and C) Consistency with implementation strategies for the Neighborhood Districts, including phasing 8.A.g Packet Pg. 224 Attachment: Resolution USA 12-01 and 14-02 (2563 : USA 12-01 and USA 14-02) RESOLUTION NO. 2020-XX 4816-3222-8525v1 JH\04706089 strategies, if applicable (based on outcome of Action 1.C) ; and WHEREAS, the City Council of the City of Gilroy has considered Urban Service Area Amendment applications USA 12-01 and 14-02 in accordance with the Gilroy 2020 General Plan and other applicable standards and regulations; and WHEREAS, City staff referred Urban Service Area Amendment application USA 12-01 and 14-02 to various public agencies and City departments; and WHEREAS, the City Council of the City of Gilroy has considered the Vacant Land Inventory, Fiscal Impact Analysis, Local Agency Formation Commission policy analysis, and Plan for Services prepared for USA 12-01 and 14-02; and WHEREAS, the Planning Commission considered the Initial Study/Mitigated Negative Declaration (IS/MND) for USA 12-01 and 14-02 at a special meeting on October 17, 2019, and unanimously approved a motion to recommend adoption of the mitigated negative declaration; and WHEREAS, the Planning Commission of the City of Gilroy considered USA 12-01 and 14-02 at a special meeting on October 17, 2019, and unanimously approved a motion to recommend approval of the Urban Service Area amendment, and the City Council of the City of Gilroy has considered that recommendation; and WHEREAS, the City Council of the City of Gilroy held a duly noticed public hearing on January 27, 2020 and heard public testimony; and WHEREAS, the City Council of the City of Gilroy finds that the Mitigated Negative Declaration (MND) was completed for this project in compliance with the California Environmental Quality Act and reflects the independent judgment of the City, and therefore, adopted the Wren Investors & Hewell Urban Service Area Amendment Mitigated Negative 8.A.g Packet Pg. 225 Attachment: Resolution USA 12-01 and 14-02 (2563 : USA 12-01 and USA 14-02) RESOLUTION NO. 2020-XX 4816-3222-8525v1 JH\04706089 Declaration (attached as Exhibit A) and mitigation monitoring and reporting program (attached as Exhibit B) at a regular meeting on January 27, 2020. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Gilroy finds, after due study, deliberation, and public hearing, the following circumstances exist: A. The Urban Service Area request is for property located within the City’s 20-year Growth Boundary; B. The Urban Service Area request is on the whole consistent with Gilroy General Plan policies and goals regarding the pattern of development, the location of growth, the rate and timing of growth, and expansion of the City’s Urban Service Area; C. Annexation and adoption of a specific plan will be required prior to consideration of development entitlements; D. The Urban Service Area amendment will promote comprehensive planning for land use, storm water drainage, utilities, and circulation, and future development within the Urban Service Area request will be phased in accordance with 2020 General Plan Policies, Neighborhood District Policy, the Residential Development Ordinance and adopted Specific Plan; E. The City currently has an approximate 11-year supply of vacant residential land suitable for the types of housing envisioned in the Wren Investors and Hewell development area and, in light of the protracted process to prepare a specific plan and annex land, increasing the land supply at this time by expanding the City’s Urban Service Area boundary is needed to accommodate projected growth for the next five years; and F. Although the Urban Service Area request will create a negative fiscal impact on the city, the City will initiate financing district(s) to offset excess costs; G. The Wren Investors & Hewell Urban Service Area Amendment Mitigated Negative Declaration was completed in compliance with the California Environmental Quality Act, and contains adequate analysis to support approval of the project. BE IT FURTHER RESOLVED that the City Council of the City of Gilroy hereby approves the Wren Investors and Hewell Urban Service Area Amendment (USA 12-01 and 14- 02) adding 56 acres of land to the City’s Urban Service Area, and directs the City Administrator to submit an Urban Service Area Amendment application to the Local Agency Formation Commission. 8.A.g Packet Pg. 226 Attachment: Resolution USA 12-01 and 14-02 (2563 : USA 12-01 and USA 14-02) RESOLUTION NO. 2020-XX 4816-3222-8525v1 JH\04706089 PASSED AND ADOPTED this 27th day of January, 2020 by the following roll call vote: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: APPROVED: __________________________ Roland Velasco, Mayor ATTEST: _________________________________ Shawna Freels, City Clerk 8.A.g Packet Pg. 227 Attachment: Resolution USA 12-01 and 14-02 (2563 : USA 12-01 and USA 14-02) 8.A.h Packet Pg. 228 Attachment: Resolution Exhibit A Mitigated Negative Declaration (2563 : USA 12-01 and USA 14-02) 2 Entity or Person(s) Undertaking Project: Name: Wren Investors LLC & Mark Hewell Address: 385 Woodview Ave., Suite 100, Morgan Hill, CA 95037 (Wren Investors LLC) P.O. Box 1901, Gilroy, CA 95021 (Mark Hewell) Staff Planner: Julie Wyrick, Planning Division Manager Initial Study: An initial study of this project was undertaken and prepared for the purpose of ascertaining whether this project might have a significant effect on the environment. A copy of this study is attached. Findings & Reasons: The initial study identified potentially significant effects on the environment. However, this project has been mitigated (see Mitigation Measures below which avoid or mitigate the effects) to a point where no significant effects will occur. On the basis of the whole record, there is no substantial evidence the project will have a significant effect on the environment. The following reasons will support these findings: The proposal is a logical component of the existing land use of this area. Identified adverse impacts are proposed to be mitigated and a mitigation monitoring and reporting program have been prepared. The proposed project is consistent with the adopted goals and policies of the General Plan of the City of Gilroy. City staff independently reviewed the Initial Study, and this Negative Declaration reflects the independent judgment of the City of Gilroy. With the application of the following Mitigation Measures the proposed project will not have any significant impacts on the environment. The Gilroy Planning Division is the custodian of the documents and other material that constitute the record of proceedings upon which this decision is based. Air Quality AQ-1. The following construction equipment parameters shall be included on all grading and building plans, subject to review and approval by the Building Division: a.All mobile diesel-powered off-road equipment larger than 25 horsepower and operating on the site for more than two consecutive days shall meet, at a minimum, U.S. EPA particulate matter emissions standards for Tier 2 engines or equivalent that also includes CARB-certified Level 3 Verified Diesel Emission Control Strategies (VDECS) or Diesel Particulate Filters meeting these requirements. Note that U.S. EPA Tier 4 equipment is considered to meet this measure. Applicant and/or construction contractor shall be responsible for submitting an equipment data list and operations timeframes to the Building 8.A.h Packet Pg. 229 Attachment: Resolution Exhibit A Mitigated Negative Declaration (2563 : USA 12-01 and USA 14-02) 8.A.h Packet Pg. 230 Attachment: Resolution Exhibit A Mitigated Negative Declaration (2563 : USA 12-01 and USA 14-02) 8.A.h Packet Pg. 231 Attachment: Resolution Exhibit A Mitigated Negative Declaration (2563 : USA 12-01 and USA 14-02) 8.A.h Packet Pg. 232 Attachment: Resolution Exhibit A Mitigated Negative Declaration (2563 : USA 12-01 and USA 14-02) 8.A.h Packet Pg. 233 Attachment: Resolution Exhibit A Mitigated Negative Declaration (2563 : USA 12-01 and USA 14-02) EMC PLANNING GROUP INC. 1 -1 M ITIGATION M ONITORING AND R EPORTING P ROGRAM I NTRODUCTION CEQA Guidelines section 15097 requires public agencies to adopt reporting or monitoring programs when they approve projects subject to an environmental impact report or a negative declaration that includes mitigation measures to avoid significant adverse environmental effects. The reporting or monitoring program is to be designed to ensure compliance with conditions of project approval during project implementation in order to avoid significant adverse environmental effects. The law was passed in response to historic non-implementation of mitigation measures presented in environmental documents and subsequently adopted as conditions of project approval. In addition, monitoring ensures that mitigation measures are implemented and thereby provides a mechanism to evaluate the effectiveness of the mitigation measures. A definitive set of project conditions would include enough detailed information and enforcement procedures to ensure the measure's compliance. This monitoring program is designed to provide a mechanism to ensure that mitigation measures and subsequent conditions of project approval are implemented. M ONITORING P ROGRAM The basis for this monitoring program is the mitigation measures included in the project mitigated negative declaration. These mitigation measures are designed to eliminate or reduce 8.A.i Packet Pg. 234 Attachment: Resolution Exhibit B Mitigation Monitoring and Reporting Program (2563 : USA 12-01 and USA 14-02) M ITIGATION M ONITORING AND R EPORTING P ROGRAM 1 -2 EMC PLANNING GROUP INC. significant adverse environmental effects to less than significant levels. These mitigation measures become conditions of project approval, which the project proponent is required to complete during and after implementation of the proposed project. The attached checklist is proposed for monitoring the implementation of the mitigation measures. This monitoring checklist contains all appropriate mitigation measures in the mitigated negative declaration. M ONITORING P ROGRAM P ROCEDURES The City of Gilroy shall use the attached monitoring checklist for the proposed project. The monitoring program should be implemented as follows: 1. The Gilroy Planning Division should be responsible for coordination of the monitoring program, including the monitoring checklist. The Gilroy Planning Division should be responsible for completing the monitoring checklist and distributing the checklist to the responsible individuals or agencies for their use in monitoring the mitigation measures. 2. Each responsible individual or agency will then be responsible for determining whether the mitigation measures contained in the monitoring checklist have been complied with. Once all mitigation measures have been complied with, the responsible individual or agency should submit a copy of the monitoring checklist to the Gilroy Planning Division to be placed in the project file. If the mitigation measure has not been complied with, the monitoring checklist should not be returned to the Gilroy Planning Division. 3. The Gilroy Planning Division will review the checklist to ensure that appropriate mitigation measures and additional conditions of project approval included in the monitoring checklist have been complied with at the appropriate time, e.g. prior to issuance of a use permit, etc. Compliance with mitigation measures is required for project approvals. 4. If a responsible individual or agency determines that a non-compliance has occurred, a written notice should be delivered by certified mail to the project proponent within 10 days, with a copy to the Gilroy Planning Division, describing the non-compliance and requiring compliance within a specified period of time. If non-compliance still exists at the expiration of the specified period of time, construction may be halted and fines may be imposed at the discretion of the City of Gilroy. 8.A.i Packet Pg. 235 Attachment: Resolution Exhibit B Mitigation Monitoring and Reporting Program (2563 : USA 12-01 and USA 14-02) W REN I NVESTORS & H EWELL U RBAN S ERVICE A REA A MENDMENT (USA 12-01 & USA 14-02) EMC PLANNING GROUP INC. 1 -3 M ONITORING C HECKLIST Step 1 – Prior to Approval of Tentative Map and Architectural and Site Review The following mitigation measure shall be implemented: Mitigation Measure BIO-2. The project applicant shall identify protected trees, pursuant to Section 30.38.270 of the City’s City Code, on the Tentative Map for residential development and on the Architectural and Site Review plans for commercial development. Protected trees shall be incorporated to the extent feasible into development design. Party Responsible for Implementation: Project Applicant Party Responsible for Monitoring: Gilroy Planning Division Monitoring Notes: Mitigation Measure BIO-3. During preparation of site plans, the project applicant shall contract with a certified arborist to prepare a tree assessment report for the project site and submit the report to the City of Gilroy Planning Division for review and approval. The tree assessment report shall include, but not be limited to, the following items: a. identify all protected trees on the project site, pursuant to Section 30.38.270 of the City Code, including those that can be feasibly incorporated into the proposed development (retained), and those proposed for removal; 8.A.i Packet Pg. 236 Attachment: Resolution Exhibit B Mitigation Monitoring and Reporting Program (2563 : USA 12-01 and USA 14-02) M ITIGATION M ONITORING AND R EPORTING P ROGRAM 1 -4 EMC PLANNING GROUP INC. b. recommendations for the size, species, source, location, and number of replacement plantings to mitigate the loss of protected trees; and c. for all trees that are to be retained on the project site, provide tree protection measures necessary to minimize construction activity that could affect tree health, structure, or stability. All arborist recommendations, including the species and locations of all replacement trees, shall be listed on the final landscape plan, and the arborist shall sign the final landscape plan certifying that it is consistent with the tree assessment report recommendations. Party Responsible for Implementation: Project Applicant Party Responsible for Monitoring: Gilroy Planning Division Monitoring Notes: Mitigation Measure C-1. Prior to approval of any tentative map for the project site, a historic resource evaluation (HRE) shall be prepared by a qualified professional and at the applicant’s expense for the historic-era structures on the following Assessor’s Parcels: 790-09-006, 790-17-001, 790-17-004, 790-17-007 and 008, and 790-17-010. At minimum, the HRE shall survey and identify all structures on these parcels that are 50 years or greater at the time of the survey and shall evaluate the identified historic-era structures with NRHP and CRHR eligibility criteria. If the HRE determines that significant historic structures are present on the site, a mitigation plan shall be prepared and submitted to the City of Gilroy Planning Director for review and approval prior to any site disturbing activities. The mitigation plan shall be prepared and implemented by a qualified historic professional and at the applicant’s expense, and shall include a strategy for preservation of significant historic structures and a plan for adaptive re-use of the resource that utilizes either preservation in place or relocation to an appropriate receiver site elsewhere on the project site or within the City limit. Party Responsible for Implementation: Project Applicant Party Responsible for Monitoring: Gilroy Planning Division 8.A.i Packet Pg. 237 Attachment: Resolution Exhibit B Mitigation Monitoring and Reporting Program (2563 : USA 12-01 and USA 14-02) W REN I NVESTORS & H EWELL U RBAN S ERVICE A REA A MENDMENT (USA 12-01 & USA 14-02) EMC PLANNING GROUP INC. 1 -5 Monitoring Notes: Mitigation Measure N-1. Associated with CEQA compliance for subdivisions and commercial projects at the project site, an acoustical analysis shall be prepared by a qualified acoustical professional. The recommendations in the analysis shall include, but not be limited to, recommendations for building placement and acoustical design features for new construction adjacent to Wren Avenue in proximity to the Antonio Del Buono Elementary School. The report recommendations shall be incorporated into the plans as part of the Tentative Map and Architectural and Site Review applications for future development, and shall be subject to the review and approval of the Planning Division, prior to approval of the Tentative Map and Architectural and Site Review. Party Responsible for Implementation: Project Applicant Party Responsible for Monitoring: Gilroy Planning Division Monitoring Notes: Step 2 – Prior to Issuance of Grading and Building Permits The following mitigation measure shall be implemented: Mitigation Measure AQ-1. The following construction equipment parameters shall be included on all grading and building plans, subject to review and approval by the Building Division: 8.A.i Packet Pg. 238 Attachment: Resolution Exhibit B Mitigation Monitoring and Reporting Program (2563 : USA 12-01 and USA 14-02) M ITIGATION M ONITORING AND R EPORTING P ROGRAM 1 -6 EMC PLANNING GROUP INC. a. All mobile diesel-powered off-road equipment larger than 25 horsepower and operating on the site for more than two consecutive days shall meet, at a minimum, U.S. EPA particulate matter emissions standards for Tier 2 engines or equivalent that also includes CARB-certified Level 3 Verified Diesel Emission Control Strategies (VDECS) or Diesel Particulate Filters meeting these requirements. Note that U.S. EPA Tier 4 equipment is considered to meet this measure. Applicant and/or construction contractor shall be responsible for submitting an equipment data list and operations timeframes to the Building Division prior to commencement of grading operations, and updating the information each week that there is a change. For each piece of equipment, the list shall include: CARB identification number, type of equipment (grader, dozer, etc.), emissions classification of equipment (Tier 2, filter type, etc.), compliance or non-compliance with emissions requirements above, and proposed operation schedule. b. Include conspicuous signage at the construction site entry and on-site construction office reiterating idle time limits on all diesel-fueled off-road vehicles to five minutes, as required by Title 23, Section 2449, of the California Code of Regulations (“CARB Off-Road Diesel Regulations”). c. Eliminate the use of portable diesel equipment (e.g., generators) within 200 feet of project boundaries by providing electrical service at the site during the initial construction phase. Alternatively, use propane or natural gas powered equipment if electricity is not available. Weekly monitoring reports detailing compliance with the measures described above shall be submitted by the applicant to the Building Division during all phases of construction. The Building Division shall ensure this has occurred prior to issuance of an occupancy permit. Party Responsible for Implementation: Project Applicant Party Responsible for Monitoring: Gilroy Building Division Monitoring Notes: 8.A.i Packet Pg. 239 Attachment: Resolution Exhibit B Mitigation Monitoring and Reporting Program (2563 : USA 12-01 and USA 14-02) W REN I NVESTORS & H EWELL U RBAN S ERVICE A REA A MENDMENT (USA 12-01 & USA 14-02) EMC PLANNING GROUP INC. 1 -7 Mitigation Measure BIO-1. If noise generation, ground disturbance, vegetation removal, or other construction activities begin during the bird nesting season (February 1 to September 15), or if construction activities are suspended for at least two weeks and recommence during the bird nesting season, then the project applicant will retain a qualified biologist to conduct a pre-construction survey for nesting birds, including CDFW Fully Protected white-tailed kite. The survey will be performed within suitable nesting habitat areas on and adjacent to the site to ensure that no active nests would be disturbed during project implementation. This survey will be conducted no more than one week prior to the initiation of disturbance and/or construction activities. A report documenting survey results and plan for active bird nest avoidance (if needed) will be completed by the qualified biologist and submitted to the City of Gilroy Planning Division Manager for review and approval prior to disturbance and/or construction activities. If no active bird nests are detected during the survey, then project activities can proceed as scheduled. However, if an active bird nest of a protected species is detected during the survey, then a plan for active bird nest avoidance will determine and clearly delineate an appropriately sized, temporary protective buffer area around each active nest, depending on the nesting bird species, existing site conditions, and type of proposed disturbance and/or construction activities. The protective buffer area around an active bird nest is typically 75-250 feet, determined at the discretion of the qualified biologist. To ensure that no inadvertent impacts to an active bird nest will occur, no disturbance and/or construction activities will occur within the protective buffer area(s) until the juvenile birds have fledged (left the nest), and there is no evidence of a second attempt at nesting, as determined by the qualified biologist. Party Responsible for Implementation: Project Applicant Party Responsible for Monitoring: Gilroy Planning Division Monitoring Notes: 8.A.i Packet Pg. 240 Attachment: Resolution Exhibit B Mitigation Monitoring and Reporting Program (2563 : USA 12-01 and USA 14-02) M ITIGATION M ONITORING AND R EPORTING P ROGRAM 1 -8 EMC PLANNING GROUP INC. Mitigation Measure BIO-4. Prior to site disturbance, the project applicant shall fully comply with measures required by Section 30.38.270 of the Gilroy City Code. Pruning and/or removal of protected trees shall be undertaken only under the direction of a certified arborist hired at the applicants’ expense, and subject to the review and approval of the Community Development Director. An approved tree removal permit is required prior to removal of any protected tree(s); the project developer shall obtain a tree removal permit, and shall comply with any tree protection measures or replacement plantings stipulated by the city. Party Responsible for Implementation: Project Applicant Party Responsible for Monitoring: Gilroy Planning Division Monitoring Notes: Mitigation Measure BIO-5. Prior to and during construction, the project applicant shall implement all retained tree protection measures recommended for the site by the certified arborist’s tree assessment report and permit approvals. Party Responsible for Implementation: Project Applicant Party Responsible for Monitoring: Gilroy Planning Division Monitoring Notes: 8.A.i Packet Pg. 241 Attachment: Resolution Exhibit B Mitigation Monitoring and Reporting Program (2563 : USA 12-01 and USA 14-02) 8.A.j Packet Pg. 242 Attachment: Public Comments USA 12-01 - USA 14-02 [Revision 1] (2563 : USA 12-01 and USA 14-02) 8.A.j Packet Pg. 243 Attachment: Public Comments USA 12-01 - USA 14-02 [Revision 1] (2563 : USA 12-01 and USA 14-02) 8.A.j Packet Pg. 244 Attachment: Public Comments USA 12-01 - USA 14-02 [Revision 1] (2563 : USA 12-01 and USA 14-02) City of Gilroy STAFF REPORT Agenda Item Title: Amendment to the Fiscal Year 2019-2020 General Fund Budget by Appropriating $5.825 Million of Unassigned Fund Balance to Projects Identified by the City Council Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Finance Department Submitted By: Jimmy Forbis Prepared By: Jimmy Forbis Bryce Atkins Strategic Plan Goals  Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services  Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION Adopt a resolution of the City Council of the City of Gilroy amending the fiscal year 2019-2020 budget by $5,825,000 in the general fund and appropriating those funds to projects identified by the City Council. BACKGROUND At the November 18, 2019 regular City Council Meeting, Council provided direction to staff to bring back a resolution amending the City’s operating budget for Fiscal Year 2019-2020. The intent of the resolution is to appropriate unassigned fund balances to be used for projects that were identified by the City Council. The total unassigned fund 9.A Packet Pg. 245 balance presented was $7.6 million1. However, at the same meeting Council adopted Resolution No. 2019-78, appropriating $1.8 million for the IRS Section 115 Trust, leaving the unassigned fund balance at $5.825 million. ANALYSIS Below is a listing of the specific projects and programs that Council identified, excepting the retirement trust already appropriated, as well as the amounts of funding to be assigned. Purpose Amount Glen Loma Fire Station $2,900,000 Downtown Parking Lot 1,200,000 Land Acquisition for Future City Facilities 1,725,000 Total $5,825,000 ALTERNATIVES Council may approve, modify or reject the attached resolution, should it so desire. FISCAL IMPACT/FUNDING SOURCE Adopting the proposed resolution will impact $5.825 million of the General Fund’s unassigned fund balance. NEXT STEPS Funds will be transferred to the Capital Projects Fund to be held until these projects commence development/construction. Any balances unused upon completion or cessation of these purposes will be transferred back to the General Fund. Attachments: 1. Budget Amendment Resolution 2. Unassigned Fund Balance Staff Report 11-18-19 3. Revised Staff Report #2570 - Amendment to the Fiscal Year 2019-2020 General Fund Budget by Appropriating $4.625 Million of Unassigned Fund Balance (2)_1.27.2020 4. Revised Resolution - Unassigned Fund Balance (2) 1 See attached staff report from the November 18th regular Council Meeting 9.A Packet Pg. 246 RESOLUTION NO. 2020-XX RESOLUTION NO. 2020-XX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY AMENDING THE FISCAL YEAR 2019-2020 BUDGET BY $5,825,000 IN THE GENERAL FUND AND APPROPRIATING THOSE FUNDS TO PROJECTS IDENTIFIED BY THE CITY COUNCIL WHEREAS, the City Administrator prepared and submitted to the City Council a budget for the City of Gilroy for Fiscal Years 2019-2020 and 2020-2021, and the City Council carefully examined, considered and adopted the same on June 3, 2019; and WHEREAS, at the November 18, 2018 regular meeting of the Gilroy City Council, the Council directed that $7.6 million of unassigned fund balance in the General Fund shall be appropriated and utilized for specific purposes; and WHEREAS, at the above mentioned meeting, Council also amended the Fiscal Year 2019-2020 budget by $1.8 million for the IRS Section 115 Trust, part of the $7.6 million total specific purposes; and WHEREAS, City Staff has prepared and submitted to the City Council, in the staff report dated January 27, 2019, a proposed amendment to said budget for Fiscal Year 2019-2020. The purpose of such amendment is to appropriate the remaining $5.8 million unassigned fund balance for the proposed projects identified by the City Council; and WHEREAS, the City Council has carefully examined and considered the same and is satisfied with said budget amendments. NOW, THEREFORE, BE IT RESOLVED THAT appropriations for Fiscal Year 2019-20 are hereby increased in the various funds by the associated amounts described in Attachment A. PASSED AND ADOPTED this 27th day of January, 2020 by the following roll call vote: AYES: COUNCILMEMBERS: 9.A.a Packet Pg. 247 Attachment: Budget Amendment Resolution [Revision 1] (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) RESOLUTION NO. 2020-XX NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: APPROVED: ___________________________ ATTEST: Roland Velasco, Mayor _________________________ Shawna Freels, City Clerk 9.A.a Packet Pg. 248 Attachment: Budget Amendment Resolution [Revision 1] (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) RESOLUTION NO. 2020-XX ATTACHMENT A January 27, 2020 Budget Amendments Fund Number Fund Name Amount 100 Fire Station General Fund Transfer to Capital Projects Fund $2,900,000 100 Downtown Parking Lot General Fund Transfer to Capital Projects Fund 1,200,000 100 Future Land Acquisition for City Facilities General Fund Transfer to Capital Projects Fund 1,725,000 Total Amendments to the General Fund [Fund 100] 5,825,000 400 Fire Station Transfer-In and Appropriation 2,900,000 400 Downtown Parking Lot Transfer-In and Appropriation 1,200,000 400 Future Land Acquisition for City Facilities Transfer-In and Appropriation 1,725,000 Total Amendment to the Capital Projects Fund [Fund 400] $5,825,000 9.A.a Packet Pg. 249 Attachment: Budget Amendment Resolution [Revision 1] (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) City of Gilroy STAFF REPORT Agenda Item Title: Report on the General Fund Unassigned Fund Balance Meeting Date: November 18, 2019 From: Gabriel Gonzalez, City Administrator Department: Finance Department Submitted By: Jimmy Forbis Prepared By: Jimmy Forbis Rosemary Guerrero Strategic Plan Goals  Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services ☐ Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION Receive report and provide direction to staff. BACKGROUND Fund balance, in general, is classified according to the legislative restriction that is placed upon the funds. The categories include assigned, committed, nonspendable, restricted, and unassigned fund balances. These categories are described below.  Assigned. The assigned fund balance is comprised of amounts intended to be used by the government for specific purposes. The intended use is established by officials and designated for that purpose. Exam ple: Working capital; allocations to projects 9.A.b Packet Pg. 250 Attachment: Unassigned Fund Balance Staff Report 11-18-19 (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments)  Committed. A committed fund balance is comprised of self-imposed limit to funds to be utilized for a specific purpose. This limitation is typically imposed at the government’s highest level of decision making authority and requires formal action at the same level to remove. Example: Reserves  Nonspendable. A nonspendable fund balance includes amounts that are not in a spendable form. Example: Inventory  Restricted. Restricted fund balance are funds with an external limitation such as a limitation imposed by creditors, grantors, laws and regulations. Example: Bond proceeds, legal settlements.  Unassigned. Unassigned fund balance is a classification that represents a fund balance that has not been assigned to othe r funds, has not been restricted, committed or assigned to specific purposes within the general fund. The general fund is the only fund that reports a positive unassigned fund balance amount. In June 2017, the City of Gilroy adopted a new general fund reserve policy consisting of a minimum general fund reserve of 20% of annual general fund expenditures and a 10% economic stability reserve of annual general fund expenditures. The general fund reserve is intended to help the City when revenues temporarily fa ll short of expenditures. This would be to cover an unanticipated cost or fund a one -time unbudgeted necessary cost. These funds are only for a one -time use only and the reserve would have to be replenished if it goes under the 20%/10% required level. The City’s unaudited general fund balance at June 30, 2019 is $26.9M. Total unaudited actual expenditures for the general fund in FY19 were $53.6M. The City’s general fund reserve requirements of 20% and 10% of the $53.6M would require $10.7M in general reserves and $5.4M for the economic stability required reserves. ANALYSIS Once the audit is completed in December 2019, the City is expected to have a net unassigned fund balance of $10.9M. At this time, staff has no reason to believe that this figure will materially change. There have been several Council actions that have already or could impact remaining unassigned fund balance levels: 1. In June, 2019, the City Council adopted a budget in which expenditures exceeded revenues by $2.4M. That funding gap was filled by use of the City’s unassigned fund balance. 9.A.b Packet Pg. 251 Attachment: Unassigned Fund Balance Staff Report 11-18-19 (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) 2. At the November 4, 2019 City Council meeting, $842,000 of unassigned fund balance was assigned to the Sports Park conservation easement purchase. 3. Council will receive a presentation at their November 18, 2019 meeting requesting the consideration of allocating $1.8M in unassigned fund balance to establish the City’s IRS Section 115 trust for unfunded pension liabilities. 4. Council will receive a presentation at their November 25, 2019 study session concerning the use of unassigned fund balance of approximately $2.9M to bridge the gap between current funding and anticipated construction costs of the City’s new fire station. With the FY 19 adopted budget (#1) and recent amendments (#2), the general fund currently has an unaudited unassigned fund balance of $7.6M. Should Council approve a budget amendment for the IRS Section 115 Trust (#3) and the City’s new fire station (#4), that figure would be further reduced to $2.9M. 9.A.b Packet Pg. 252 Attachment: Unassigned Fund Balance Staff Report 11-18-19 (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) Unaudited Fund Balance at 6/30/19 $26,978,112 Actual Expenditures FY19 $53,569,600 Unrestricted Minimum - 20%$10,713,920 Economic Stability - 10%$5,356,960 Total Reserve Required Level $16,070,880 Net Fund Balance $10,907,232 Budget FY20 - General Fund Revenue $55,645,444 Expenditures $58,085,639 Net change in Fund Balance ($2,440,195) Budgetary Unassigned Fund Balance (6/30/19)$8,467,037 Assigned Fund Balance Sports Park Conservation Easement FY20 ($842,000) $7,625,037 Potential Fire Station Funding ($2,900,000) (11/25/19 Study Session) IRS Section 115 Trust ($1,800,000) (11/18/19 Council Meeting) Remaining Unassigned Fund Balance $2,925,037 Unaudited Unassigned Fund Balance (as of 11/18/19) Council has other unfunded projects that have been discussed in previous meetings or are the subject of future Council consideration including:  10th street bridge – up to $15M  Downtown parking lots (7th Street and Eigleberry) - $1.2M  Land acquisition for City facilities - $1.8M ALTERNATIVES Council may select to fund projects and/or liabilities as they see fit. Council can also decide to postpone the use of the unassigned fund balance at this time and discuss at a later date. 9.A.b Packet Pg. 253 Attachment: Unassigned Fund Balance Staff Report 11-18-19 (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) FISCAL IMPACT/FUNDING SOURCE There is no fiscal impact at this time. However the impact will vary depending on the decision Council makes - if they will fund a project or leave the unassigned balance for use at a later time. CONCLUSION The City has many needs that outnumber the amount of fund s available. Council has many options and can decide to invest in various projects and/or address unfunded liabilities. 9.A.b Packet Pg. 254 Attachment: Unassigned Fund Balance Staff Report 11-18-19 (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) City of Gilroy STAFF REPORT Revised Agenda Item Title: Amendment to the Fiscal Year 2019-2020 General Fund Budget by Appropriating $4.625 Million of Unassigned Fund Balance to Projects Identified by the City Council Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Finance Department Submitted By: Jimmy Forbis Prepared By: Jimmy Forbis Bryce Atkins Strategic Plan Goals  Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services  Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION Adopt a resolution of the City Council of the City of Gilroy amending the fiscal year 2019-2020 budget by $4,625,000 in the general fund and appropriating those funds to projects identified by the City Council. BACKGROUND At the November 18, 2019 regular City Council Meeting, Council provided direction to staff to bring back a resolution amending the City’s operating budget for Fiscal Year 2019-2020. The intent of the resolution is to appropriate unassigned fund balances to be used for projects that were identified by the City Council. The total unassigned fund Deleted: 5.8 Deleted: 5,8 9.A.c Packet Pg. 255 Attachment: Revised Staff Report #2570 - Amendment to the Fiscal Year 2019-2020 General Fund Budget by Appropriating $4.625 Million of balance presented was $7.6 million1. However, at the same meeting Council adopted Resolution No. 2019-78, appropriating $1.8 million for the IRS Section 115 Trust, leaving the unassigned fund balance at $5.825 million. Subsequently, at the December 2nd, 2019 Council Meeting, direction was provided to utilize the full remaining allocation under the Glen Loma Development Agreement for the Glen Loma Fire Station. This Council direction reduced the $2.9 million assignment of unassigned General Fund balance for the Glen Loma Fire Station to $1.7 million. ANALYSIS Below is a listing of the specific projects and programs that Council identified, excepting the retirement trust already appropriated, as well as the amounts of funding to be assigned. Purpose Amount Glen Loma Fire Station $1,700,000 Downtown Parking Lot 1,200,000 Land Acquisition for Future City Facilities 1,725,000 Total $4,625,000 ALTERNATIVES Council may approve, modify or reject the attached resolution, should it so desire. FISCAL IMPACT/FUNDING SOURCE Adopting the proposed resolution will impact $4.625 million of the General Fund’s unassigned fund balance. NEXT STEPS Funds will be transferred to the Capital Projects Fund to be held until these projects commence development/construction. Any balances unused upon completion or cessation of these purposes will be transferred back to the General Fund. Attachments: 1. Budget Amendment Resolution 2. Unassigned Fund Balance Staff Report 11-18-19 1 See attached staff report from the November 18 th regular Council Meeting Deleted: 2,9 Deleted: 5,8 Deleted: 5.8 9.A.c Packet Pg. 256 Attachment: Revised Staff Report #2570 - Amendment to the Fiscal Year 2019-2020 General Fund Budget by Appropriating $4.625 Million of RESOLUTION NO. 2020-XX RESOLUTION NO. 2020-XX A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GILROY AMENDING THE FISCAL YEAR 2019-2020 BUDGET BY $4,625,000 IN THE GENERAL FUND AND APPROPRIATING THOSE FUNDS TO PROJECTS IDENTIFIED BY THE CITY COUNCIL WHEREAS, the City Administrator prepared and submitted to the City Council a budget for the City of Gilroy for Fiscal Years 2019-2020 and 2020-2021, and the City Council carefully examined, considered and adopted the same on June 3, 2019; and WHEREAS, at the November 18, 2018 regular meeting of the Gilroy City Council, the Council directed that $7.6 million of unassigned fund balance in the General Fund shall be appropriated and utilized for specific purposes; and WHEREAS, at the above mentioned meeting, Council also amended the Fiscal Year 2019-2020 budget by $1.8 million for the IRS Section 115 Trust, part of the $7.6 million total specific purposes; and WHEREAS, at the December 2, 2019 Council Meeting, Council directed that the amount of unassigned General Fund balance to be assigned to the Glen Loma Fire Station was to be reduced to $1.7 million from $2.9 million; and WHEREAS, City Staff has prepared and submitted to the City Council, in the staff report dated January 27, 2019, a proposed amendment to said budget for Fiscal Year 2019-2020. The purpose of such amendment is to appropriate $4.6 million of unassigned fund balance for the proposed projects identified by the City Council; and WHEREAS, the City Council has carefully examined and considered the same and is satisfied with said budget amendments. NOW, THEREFORE, BE IT RESOLVED THAT appropriations for Fiscal Year 2019-20 are hereby increased in the various funds by the associated amounts described in Attachment A. Deleted: 5,8 Deleted: the remaining Deleted: 5.8 9.A.d Packet Pg. 257 Attachment: Revised Resolution - Unassigned Fund Balance (2) (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) RESOLUTION NO. 2020-XX PASSED AND ADOPTED this 27th day of January, 2020 by the following roll call vote: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: APPROVED: ___________________________ ATTEST: Roland Velasco, Mayor _________________________ Shawna Freels, City Clerk 9.A.d Packet Pg. 258 Attachment: Revised Resolution - Unassigned Fund Balance (2) (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) RESOLUTION NO. 2020-XX ATTACHMENT A January 27, 2020 Budget Amendments Fund Number Fund Name Amount 100 Fire Station General Fund Transfer to Capital Projects Fund $1,700,000 100 Downtown Parking Lot General Fund Transfer to Capital Projects Fund 1,200,000 100 Future Land Acquisition for City Facilities General Fund Transfer to Capital Projects Fund 1,725,000 Total Amendments to the General Fund [Fund 100] 4,625,000 400 Fire Station Transfer-In and Appropriation 1,700,000 400 Downtown Parking Lot Transfer-In and Appropriation 1,200,000 400 Future Land Acquisition for City Facilities Transfer-In and Appropriation 1,725,000 Total Amendment to the Capital Projects Fund [Fund 400] $4,625,000 Deleted: 2,9 Deleted: 5,8 Deleted: 2,9 Deleted: 5,8 9.A.d Packet Pg. 259 Attachment: Revised Resolution - Unassigned Fund Balance (2) (2570 : Fiscal Year 2019-2020 General Fund Budget Amendments) City of Gilroy STAFF REPORT Agenda Item Title: Introduction of an Ordinance of the City Council of the City of Gilroy Amending Chapter 16 of the Gilroy City Code Entitled “Offenses - Miscellaneous” Adding New Sections 16.24 and 16.25 Pertaining to Imitation Weapons Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Police Department Submitted By: Scot Smithee Prepared By: Scot Smithee Scot Smithee Strategic Plan Goals ☐ Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services  Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION a) Motion to read the ordinance by title only and waive further reading . b) Introduce an ordinance of the City Council of the City of Gilroy amending Chapter 16 of the Gilroy City Code entitled “Offenses - Miscellaneous” adding new sections 16.24 and 16.25 pertaining to imitation weapons. EXECUTIVE SUMMARY The consideration of an ordinance of the City Council of the City of Gilroy amending Gilroy City Code Chapter 16 to add new sections pertaining to imitation weapons was presented to Council at the September 9, 2019 meeting. Council directed staff to draft amendments to the ordinance. The ordinance is sched uled for introduction to Council at 10.A Packet Pg. 260 the January 27, 2020 Council meeting. The staff report presented to Council on September 9, 2019 is included for reference. BACKGROUND The Police Department is experiencing incidents of imitation weapons used during the course of criminal acts and subsequently located on individuals or in vehicles. Imitation weapons are devices such as air guns, pellet guns, and BB guns that resemble real firearms. Although manufacturers of imitation weapons distinguish their product from real firearms by inserting a bright orange plug in the tip of the barrel of each weapon, individuals can easily modify the weapons by removing the orange plug to resemble a real firearm. This instills fear in victims who cannot recognize a real firearm f rom an imitation firearm. Staff is asking Council to consider two additions to the Gilroy City Code Chapter 16 with an overall goal to add new sections defining imitation weapons and prohibit possession of imitation weapons. These additions to the Gilroy City Code would provide officers with a lawful enforcement foundation to confiscate these items and remove them from circulation. FISCAL IMPACT/FUNDING SOURCE Introduction of this ordinance would have no fiscal impact. Attachments: 1. Sept 9 Staff Report 2. Ordinance No. 2020-_Prohibition on Possession of Imitation Weapons in Public v2 (2) 10.A Packet Pg. 261 City of Gilroy STAFF REPORT Agenda Item Title: Consideration of Proposed Amendments to Chapter 16 of the Gilroy City Code Entitled "Offenses - Miscellaneous" to Include New Sections to the Definition of Deadly Weapons and to Prohibit Possession of Imitation Firearms with Specific Exceptions Meeting Date: September 9, 2019 From: Gabriel Gonzalez, City Administrator Department: Police Department Submitted By: Scot Smithee Prepared By: Scot Smithee Patricia Vigil Strategic Plan Goals ☐ Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services  Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION Direct staff to draft amendments the Gilroy City Code Chapter 16 entitled "Offenses - Miscellaneous" to include new sections to the definition of deadly weapons and to prohibit possession of imitation firearms with specific exceptions. EXECUTIVE SUMMARY Gilroy Police Officers are experiencing an increase in incidents involving the use of imitation firearms located on individuals or recovered in vehicles during the course of criminal activity. Imitation firearms are devices, such as air guns, pellet guns, and BB guns that resemble real firearms and are used during the commission of crimes. The Police Department is proposing to amend the Gilroy City Code to include defining 10.B Packet Pg. 171 10.A.a Packet Pg. 262 Attachment: Sept 9 Staff Report (2533 : Imitation Weapons Ordinance) imitation firearms and prohibit the possession of imitation firearms with specific exceptions. BACKGROUND The Police Department is experiencing incidents of imitation firearms used during the course of criminal acts and subsequently located on individuals or in vehicles. For example, during the first five months of 2019, there have been six incidents involving imitation firearms. The most recent involved a victim who sustained injuries to the head, face, and neck after being shot with a pellet gun. Further, in 2018, an officer attempted to detain a fleeing suspect who brandished an imitation firearm at a victim during a carjacking. In a second case, officers were investigating a suspicious vehicle call for service and the driver was located with a holstered imitation firearm visible on the passenger seat of the vehicle. In another case, officers were responding to a call for service of a suspicious person observed with a visible firearm in their waistband. A search of the subject revealed the firearm to be a realistic looking imitation firearm. These calls for service indicate the impact and severity imitation firearms are placing on officer resources due to the likelihood of more than one officer responding to the call. Police officers have to make decisions during rapidly evolving events. Subjects possessing these weapons create risks for the officers, themselves, and the public. . Due to the inherent threat of the incident, the officer’s focus is on the person holding the weapon and their actions. There are documented cases of officers who have been forced to use deadly force against a suspect who was later found to be in possession of an imitation firearm. Furthermore, many times individuals suffering a mental health crisis will use these imitation firearms to commit “suicide by cop”. ANALYSIS Imitation firearms manufactured today closely resemble and function like real firearms. Two types of imitation firearms include pneumatic and replica guns. Pneumatic guns, such as air-soft guns, use pneumatic pressure to propel a projectile. The propellant system may be either through an internal pump, hand operated by the person using the gun or one using a compressed C02 air cartridge. These weapons are readily available to purchase and are powerful enough to cause bodily injury. Replica guns are full size reproductions of firearms. Most of these weapons operate in the same manner as real firearms including a charging slide that moves back and forth and a magazine clip placed in the stock of the weapon identical to the way a real firearm is loaded. Imitation firearms have the ability to shoot projectiles at high rates of speed and cause great bodily injury to a person. Due to the realism of the shape and design of imitation firearms, they are difficult to identify as imitations unless closely examined. Manufacturers of pneumatic weapons distinguish their product from real firearms by inserting a bright orange plug in the tip of the barrel of each weapon. However, 10.B Packet Pg. 172 10.A.a Packet Pg. 263 Attachment: Sept 9 Staff Report (2533 : Imitation Weapons Ordinance) individuals can easily modify the weapons by either spray painting the orange tip black or wrapping the weapon in black tape to resemble a real firearm. Reasons offenders use imitation firearms in criminality is the belief they will avoid harsher punishments, such as a weapons possession charge, if caught with an imitation rather than real firearm. Therefore, criminals will brandish imitation firearms to threaten victims, commit armed robberies, and perpetrate other crimes. An imitation weapon is easier and cheaper to obtain than a real firearm, not subject to a background check, is almost indistinguishable from a real weapon, and will instill fear in victims who cannot recognize a real firearm from an imitation firearm. Lastly, psychological displacement by criminals is a factor for the use of an imitation firearm over a real firearm due to the realism of the weapon. Because the size of the gun is similar to a real weapon, the criminal assumes t he same feelings of power, manipulation, and control thereby building confidence to perpetrate crimes and victimize innocent people. Maintaining control of an incident and resolving the incident while providing public safety and self-protection are foundation of an officers training principles. Daily, officers face a multitude of scenarios that require split second decision -making. Possession of imitation firearms by individuals places additional officer safety risks as officers face life-or-death assessments during rapidly evolving events. Across the nation, we have seen incidents of great bodily injury inflicted to individuals who brandish or use imitation weapons during the commission of crimes. Review of other cities City codes reveal the inclusion of the definition of imitation firearms and prohibit the possession of imitation firearms with specific exceptions. The Gilroy Police Department is recommending Council consider changing two sections of the Gilroy City Code to include imitation firearms in the definition of deadly weapons and prohibit their possession with specific exceptions. These two changes will provide officers an added enforcement measure to confiscate and remove imitation weapons from circulation. Research conducted reveals there is no advisory government agency responsible for the overall compilation of law enforcement data on the use of imitation weapons used in criminal activity. Each agency retains its own individual records management on cases involving imitation weapons. The last research study conducted for Congress in 1990 by the Police Executive Research Forum on police involvement with imitation firearms was experiential, not empirical estimates. The research found that in a four-year period, 458 police departments reported 5,654 robberies and 8,128 assaults committed involved the use of imitation firearms during the course of crimes. The law enforcement agencies that were surveyed reported 31,650 imitation weapons seized in the same four -year period. 10.B Packet Pg. 173 10.A.a Packet Pg. 264 Attachment: Sept 9 Staff Report (2533 : Imitation Weapons Ordinance) If Council were to approve changes to the City Code the goal is to include imitation firearms, such as air guns, pellet guns and BB guns as part of the definition of deadly weapons and will make possession of imitation firearms illegal to possess with specific exceptions. These changes to the Gilroy City Code would provide officers with a lawful enforcement foundation to confiscate imitation firearms and remove them from the City streets of Gilroy. ALTERNATIVES: 1. Consider amending the Gilroy City Code to include imitation firearms in the definition of deadly weapons and prohibiting the possession of imitation firearms with specific exceptions. STAFF RECOMMENDS this option to promote public safety and reduce risks for officers and the public. 2. Do not amend the City of Gilroy City Code defining imitation firearms and prohibiting the possession imitation firearms. STAFF DOES NOT RECOMMEND the status quo option because it will not make progress in reducing risk to officers and the public. FISCAL IMPACT: City Attorney time to draft proposed ordinance. CONCLUSION: Crimes using imitation firearms are on the rise in Gilroy. Staff is initiating a proactive approach to consider amendments to the Gilroy City Code that would provide officer’s with a lawful foundation to cite, confiscate and remove dangerous imitation weapons from the hands of criminals in Gilroy. 10.B Packet Pg. 174 10.A.a Packet Pg. 265 Attachment: Sept 9 Staff Report (2533 : Imitation Weapons Ordinance) -1- ORDINANCE NO. 2020-XX__ 4838-4060-1261v2 CCHU\04706083 ORDINANCE NO. 2020-XX AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF GILROY AMENDING GILROY CITY CODE CHAPTER 16 TO ADD NEW SECTIONS 16.24 AND 16.25 PERTAINING TO IMITATION WEAPONS WHEREAS, pursuant to California Constitution article XI, section 7, and the City Charter, section 600, the City Council has the authority to enact ordinances which promote the public health, safety and general welfare of its residents; and WHEREAS, the City Council finds that the modification to Gilroy City Code, Chapter 16, pertaining to imitation weapons is necessary and in the interest of the health, safety and welfare of the residents of the City; and WHEREAS, the City Council finds that this Ordinance is not subject to the California Environmental Quality Act (“CEQA,” Public Resources Code sections 21000 et seq.), because it will not result in a direct or reasonably foreseeable indirect physical change in the environment, and it does not have the potential to result in a physical change to the environment, directly or indirectly (Title 14, Chapter 3 of the California Code of Regulations “CEQA Guidelines,” sections 15060(c)(2) and (3)). NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF GILROY DOES HEREBY ORDAIN AS FOLLOWS: SECTION I Chapter 16 of the Gilroy City Code entitled the “Offenses - Miscellaneous” is hereby amended by adding new Sections 16.24 and 16.25 to read as follows: “16.24 Imitation Weapons – Defined. For the purposes of this section, an imitation weapon means a replica of a firearm that is so substantially similar in visual characteristics to an existing firearm as to lead a reasonable person to believe that the replica is a firearm that could be operational. 16.25. Possession of Imitation Weapons. It shall be unlawful for any person to possess or display an imitation weapon on public property, in the public right of way, or in an area viewable from public property or the public right of way.” 10.A.b Packet Pg. 266 Attachment: Ordinance No. 2020-_Prohibition on Possession of Imitation Weapons in Public v2 (2) (2533 : Imitation Weapons Ordinance) -2- ORDINANCE NO. 2020-XX__ 4838-4060-1261v2 CCHU\04706083 SECTION II If any section, subsection, sentence, clause or phrase of this Ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council of the City of Gilroy hereby declares that it would have passed and adopted this ordinance, and each section, subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases may be declared invalid or unconstitutional. SECTION III Pursuant to section 608 of the Charter of the City of Gilroy, this ordinance shall be in full force and effect thirty (30) days from and after the date it is adopted. PASSED AND ADOPTED BY THE COUNCIL OF THE CITY OF GILROY this ___day of January, 2020, by the following vote: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: ATTEST: APPROVED: _______________________ ________________________ Shawna Freels, City Clerk Roland Velasco, Mayor 10.A.b Packet Pg. 267 Attachment: Ordinance No. 2020-_Prohibition on Possession of Imitation Weapons in Public v2 (2) (2533 : Imitation Weapons Ordinance) City of Gilroy STAFF REPORT Agenda Item Title: Request to Waive Permit and Service Fees by the Gilroy Memorial Day Events Committee and Determination that the Waiving of Fees for the 2020 Memorial Day Parade and Activities Constitutes a Public Purpose Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Administration Submitted By: Gabriel Gonzalez Prepared By: Gabriel Gonzalez Trevin Barber Strategic Plan Goals ☐ Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services ☐ Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION Declare that the Memorial Day parade and activities constitute a public purpose and approve an estimated $11,341 fee waiver request by the Gilroy Memorial Day Events Committee for the 2020 Memorial Day parade and activities BACKGROUND When it comes to parade management the main concern from the City’s perspective is traffic control, such as setting up barricades and securing the parade route. In years past the City was a major contributor to making parades a success by providing traffic control with volunteers. The Police Department used to have three groups of volunteers 10.B Packet Pg. 268 that were available to help manage traffic and monitor road closures for safety. Those groups included the Police Reserves, the Police Explorers, and the Volunteers in Policing. Due to a number of factors those volunteer groups have been decreasing in size over the years. Currently the number of volunteers available is a fraction of previous years. There are simply not enough volunteers to be able to manage a parade with multiple road closures. The City has not provided volunteers for special event applicants for some time. If an applicant does not have enough volunteers and the Police Department also does not have volunteers, then the applicant is required to agree to reimburse the City for staff costs in advance of issuing the permit. Last year, on Jun 3, 2019 the City Council directed the City Administrator to waive the fees of $1,300 assessed on the 2019 Gilroy Memorial Day Parade Special Event Permit for City services rendered during the event. The fee consisted of police services rendered. The difference in the fee waiver request from 2019 to this year is last year the Committee used volunteers to set up and remove traffic barriers. However, this year the Committee is requesting City workforces to provide labor to set up the traffic barriers. If volunteers are provided, like last year, then the final fee waived will be less. Another change to the cost estimate compared to 2019 is the rental fee for Christmas Hill Park. The Gilroy Memorial Day Events Committee is petitioning the City to preemptively waive fees to be assessed on the 2020 Gilroy Memorial Day Parade. These include special event permit processing fees, park rental fees, traffic services fees, and police services fees. ANALYSIS Scope of Parade The Gilroy Memorial Day Events Committee is planning for this year’s activities to include a Remembrance Celebration at the cemetery, a parade down 10th Street, and finishing with Family Fun Day at Christmas Hill Park. The activities will include a car show, food, information booths, and no-cost activities for children. City Estimate of Costs Given the scope of the parade’s activities the City would need to waive the park reservation fee for Christmas Hill Park, mobilize/demobilize traffic barriers, and provide traffic officers. The fee for 2020 is expected to be higher than in 2019 due to the change in scope. While staff has collaborated to provide a rough order of magnitude of City costs, it should be noted that the below cost estimates are speculative and based solely on known information gathered from meetings with the Gilroy Memoria l Day Events 10.B Packet Pg. 269 Committee and past events. Costs may increase or decrease after the fact based on several factors including (1) number of provided private volunteers, (2) actual length of the event, and (3) unforeseen changes to the event plan. Figure #1: Chart of Estimated City Costs Under Consideration to be Waived Compared to 2019 Actual Department 2019 Cost Actual 2020 Cost Estimate Recreation $0 $610 Police $1,300 $2,000 Public Works - Operations $0 $7,700 Subtotal $1,300 $10,310 Contingency - 10% $1,031 Total $1,300 $11,341 The Recreation Department estimates that renting the park side of Christmas Hill Park, not including the Amphitheater, would run approximately $610 with a $500 Damage Deposit. The Police Department estimates that providing Gilroy Police Officers for the event would be over $2,000. This figure uses the reduced average rate of $68 per hour, and depends heavily on the attendance, whether alcohol is served, and the final length of the event. The Police Department would use overtime to provide officers for this event. If the Public Works Department Street Section provides 100% of the traffic control, then it is estimated that about eleven total staff would be needed with a total cost of $7,700. This estimate is based on last year’s traffic control plan and would include one call out for traffic control setup and one call out for traffic control pick up. As plans for the parade become more firm over time, private event staff and/or volunteers may be available and as such would lower the amount of City staff needed. Consideration of Fee Waiver According to the California Constitution (Cal. Const., art. XVI, § 6) public agencies, including cities, are prohibited from making a gift of public funds. “Due to their unique operating environment, governments have a responsibility to be accountable for the use of resources that differs significantly from that of business enterprises. Although businesses receive revenues from a voluntary exchange between a willing buyer and seller, most governments obtain resources primarily from the involuntary payment of 10.B Packet Pg. 270 taxes.” (GASB White Paper: Why Governmental Accounting and Financial Reporting Is – And Should Be – Different (April 2013).) The restriction against gifts of public funds is in place to ensure accountability to constituents and to prevent misuse of this public money. The Constitution states, in relevant part: “The Legislature shall have no power . . . to make any gift or authorize the making of any gift, of any public money or thing of value to any individual, municipal or other corporation[.]” (Const., Art. XVI, § 6.) Courts have interpreted this provision to include all payments of public money for which there is no authority or enforceable claim, even if there is a moral or equitable obligation. Declaration of Public Purpose However, if the City Council makes an official determination that waiving the fees is for a public purpose than court precedent dictates that the fees may be waived without triggering a gift of public funds. Generally, in order to make that determination an event has to be open to the general public and must enhance the City. In this case the parade will be open to the public and improves goodwill by (1) remembering all of those who paid such a terrible price in service to our country and (2) honoring their families who must endure that loss. FISCAL IMPACT/FUNDING SOURCE Staff costs will draw down on the Overtime allocation from the budgets of the respective departments involved, including Recreation, Public Works-Operations, and Police for a total of approximately $11,341. Attachments: 1. Memorial Day Events Committee Letter 10.B Packet Pg. 271 10.B.a Packet Pg. 272 Attachment: Memorial Day Events Committee Letter (2601 : Memorial Day Committee Request) City of Gilroy STAFF REPORT Agenda Item Title: Presentation on Pavement Management and the Pavement Condition of City of Gilroy Streets Meeting Date: January 27, 2020 From: Gabriel Gonzalez, City Administrator Department: Public Works Department Submitted By: Girum Awoke Prepared By: Girum Awoke Nirorn Than Strategic Plan Goals ☐ Fiscal Stability ☐ Downtown Revitalization ☐ Economic Development ☐ Neighborhood Services ☐ Enhanced Public Safety ☐ Workforce Stability ☐ Public Engagement RECOMMENDATION Receive report. EXECUTIVE SUMMARY The City of Gilroy Pavement management process involves the assessment of existing conditions, as well as the planning and budgeting of funds for the maintenance and rehabilitation of the road network. The City has approximately 270 lane miles of paved roads with a total replacement value of more than $200 million. In summer 2019, the City conducted a citywide pavement condition survey through the Pavement Management Technical Assistance Program (P-TAP), partly funded by the Metropolitan Transportation Commission (MTC). As a result, the average PCI for the 11.A Packet Pg. 273 City was found to be 62 (on a scale of 0-100), which is a reduction of 7 points from the 2017 average PCI of 69. Most of Gilroy’s roads have received minimal to no treatment in a number of years. The older the pavement of a given roadway, the faster it deteriorates. As a result, the percentage of “Very Poor” streets (PCI 0-25) has increased by 5.6% from 2017 to 2019 while the percentage of “Poor” street (PCI 25-50) has increased by 10.5%, and the percentage of “Good” street (PCI 70-100) has decreased by 16.3%. Consequently, the City’s deferred maintenance cost has increased from $14.9 million in 2017 to $33.4 million in 2019. In order to address this pressing need, five different scenarios were investigated ranging from maintaining current investment in pavement maintenance (through Measure B, SB-1, General Fund and other transportation funding sources) to unconstrained levels of funding. In the worst case scenario, where the City does not provide any additional funding for pavement maintenance, the average Citywide PCI will drop to 59. On the other hand, to keep the City’s average PCI at a PCI level of 70 (which is considered good pavement condition, and allows some transportation funding to be used for transportation improvements other than just pavements), the city would need to invest approximately $34 million in the next five years. BACKGROUND Pavement management requires planning the maintenance and repair of a network of roads and/or other paved facilities in order to optimize pavement conditions over the entire network. Generally, Gilroy’s Pavement Condition assessment through the use of Pavement Condition Index (PCI) and maintenance ap proaches to improve pavement condition can be summarized as follows: Figure 1: Possible Treatment By Condition Category Condition Category PCI Possible Treatment* Condition Category I – Very Good 86-100 No Treatment (Do Nothing) Condition Category II – Good, Non-Load Related 66-85 Slurry Seal/Microsurfacing Condition Category III – Good, Load Related 66-85 Chip Seal/Cape seal/Thin overlay Condition Category IV – Poor 40-65 Grind and Overlay Condition Category V – Very Poor 0-39 Reconstruction * Actual treatment may be a combination of one or more of the above treatment methods based on pavement condition and available funding. 11.A Packet Pg. 274 The City has approximately 270 lane miles of paved roads, not including alleys, which the City is responsible for maintaining. The total replacement value for this asset is estimated at $219.4 million. Like many cities, the City of Gilroy has adopted a strategic approach to making informed decisions on street maintenance. To do so, the City conducts a pavement condition survey and prepares a Pavement Management Report every two years with assistance from the Metropolitan Transportation Commission (MTC), through the Pavement Management Technical Assistance Program (P-TAP). The P- TAP is a program developed by MTC to provide resources to cities to assess pavement condition and to make well informed decisions about pavement maintenance and rehabilitation investments including field reviews, data analysis and reporting. This survey evaluates road quality based on observable conditions such as cracks, potholes, patches, and loose rock to determine a Pavement Condition Index (PCI). PCI is the main measuring mechanism used to evaluate pavement quality. In general, a new road has a PCI of 100 and a road with a PCI of zero essentially has no remaining useful life left. The followings are some examples of PCI rating in relation to physical deterioration of the pavement: Figure 2: Example of PCI Rating 11.A Packet Pg. 275 In 2016, the City conducted a citywide pavement condition survey t hrough the Pavement Management Technical Assistance Program (P-TAP). As a result, in 2016, the average PCI for the City is 66. Although the PCI rating of 66 is considered “Good” condition, the survey results also show the continuing degradation of our pave ment system. For instance, in 2013 the average PCI for the City was 73. From 2013 to 2016, the PCI has dropped 7 points. As part of the PTAP project, the city has been assigned a consultant that conducted field survey and inspection of all city streets from May – September 2019. City staff received the draft report in mid-December 2019 which is currently being finalized. ANALYSIS 11.A Packet Pg. 276 In 2016, the City conducted a citywide pavement condition survey through MTC’s Pavement Management Technical Assistance Program (P-TAP). As a result, in 2017, the average PCI for the City was 69. Although the PCI rating of 69 is considered “Fair” condition, the survey results also showed the continuing degradation of the City’s pavement network without continuous investment. For instance, in 2013 the average PCI for the City was 73, and from 2013 to 2017, the PCI decreased by about 4 points. It is important to note that all pavement surfaces deteriorate overtime; however, the older the road surface, the faster it deteriorates. It has been well documented that deferred maintenance (the amount of maintenance and rehabilitation work that should have been completed to maintain the street in “Good” condition, but had to be deferred due to funding deficiencies), results in higher future costs to preserve and maintain a road pavement at the state of good repair. Studies have shown that every $2 spent on preventive maintenance on street that is in good condition will save $4-$8 on restoration cost later down the road. More importantly, streets that are beyond repair can cost up to $60 per square feet for reconstruction. This also reinforces the principle that it costs less to maintain streets in good condition. Below is a typical pavement deterioration curve. Figure 3: Typical Pavement Deterioration Curve For instance, Church Street from 10th Street to 6th Street was evaluated at the PCI of 73 in early 2019; this segment received the typical preventive maintenance which was completed in September 2019 as part of the 2019 Capital Pavement M aintenance project. This preventive maintenance increased the PCI of this segment from 73 to 87. It is estimated that this maintenance effort will last 5-8 years before needing another preventive maintenance. Using the Life Cycle Cost evaluation, the preve ntive maintenance effort on Church Street would save approximately $1.6 million in a 35 years life cycle. 11.A Packet Pg. 277 In general, once the pavement condition are optimized (PCI 82) the total annual cost for preventive maintenance will be substantially less and the tot al deferred maintenance cost will be zero. Based on the current survey, The City average PCI rating is 62. The table below breaks down the PCI rating by street functional classification. Figure 4: PCI by Functional Class in 2019 Functional Classification Total Sections Total Center Miles Total Lane Miles PCI Arterial 62 18.82 53.29 56 Collector 115 28.61 61.25 62 Residential/Local 562 76.85 153.69 64 739 124.28 268.23 In comparison, below is the breakdown of the PCI rating in 2017. Figure 5: PCI by Functional Class in 2017 Functional Classification Total Sections Total Center Miles Total Lane Miles PCI Arterial 65 18.82 54.89 68 Collector 113 28.36 60.75 68 Residential/Local 559 76.11 152.22 70 737 123.29 267.86 When maintenance activities are performed, there is an increase in PCI as shown in the Figure 2 with the blue curve. The deterioration still happens, but it will start over again from a higher point. For example, Church Street from 10th Street to 6th Street was evaluated at the PCI of 73 in early 2019, but this segment received the typical preventive maintenance and was completed in September 2019. This preventive maintenance increased the PCI of this segment from 73 to 87. It is estimated that this maintenance effort will last 5-8 years before needing another preventive maintenance. Using the Life Cycle Cost evaluation, the preventive maintenance program on Church Street from 10th Street to 7th Street would save approximately $1.6 million in a 35 years life cycle (see the analysis below). 11.A Packet Pg. 278 Figure 6: Life Cycle Cost Evaluation Between Conventional and Optimized Plans From 2017 to 2019, there is a 7 points drop in the average PCI. As mentioned above, all pavements deteriorate overtime; however, the older the road, the faster it deteriorates. As shown in the table 4 below, the percentage of “Very Poor” street (Category V) has increased 5.6% from 2017 to 2019. The percentage of “Poor” street (Category IV) has increased 10.5%. The percentage of “Fair” street (Category II/III) has increased 0.5%, while the percentage of “Good” street has decreased by 16.3%. Figure 7: Percentage of Condition of Streets by Year Surveyed Current Condition Categories 2017 Percent (%) 2019 Percent (%) Condition I - Good to Excellent (PCI 70 - 100) 58.6 42.3 Condition II/III - At Risk to Fair (PCI 50 - 70) 28.3 28.5 Condition IV - Poor (PCI 25 - 50) 11.8 22.3 Condition V - Failed to Very Poor (PCI 0 - 25) 1.3 6.9 Put in terms of costs, in 2017 the City had $14.9 million in deferred maintenance cost. This cost has increased to $33.4 million in 2019. This increase in deferred maintenance cost is a direct reflection of the increase in roads that have now fallen into categories IV and V (poor and very poor). Both categories have a total increase of 17.1%. FISCAL IMPACT/FUNDING SOURCES Currently the City has the following funding sources available for pavement maintenance: 1. SB1- Road Maintenance and Rehabilitation Act – estimated direct amount spent on pavement rehabilitation = $700,000 11.A Packet Pg. 279 2. VTA Measure B - Local Streets & Roads Program Category - estimated direct amount spent on pavement rehabilitation = $700,000 3. Highway User Revenue (Gas Tax and Vehicle Registration Fee ) = estimated direct amount spent on pavement rehabilitation = $300,000 4. Other (General Fund, Transportation Grants, Enterprise Fund etc.) including Local Street maintenance - estimated direct amount spent on pavement rehabilitation = $100,000 ALTERNATIVES Based on the principle that it costs less to maintain streets in good to fair condition, the MTC Pavement Management Program (PMP) advises to develop a maintenance strategy that will first improve the overall condition of the network to an optimal PCI (PCI 82), and then sustain it at that level. With the current PCI level, the City would need to spend approximately $68.4 million total in the next 5 years in order to bring the city pavement to its optimal level. Although, this level of funding may not be achievable due to funding deficiencies, this analysis demonstrates the amount and extent of pavement maintenance need and assists staff in developing a cost-effective maintenance and rehabilitation strategy through evaluating multiple “what -if” scenarios. In the draft Pavement Management Report, 5 scenarios were evaluated: 1. Unconstrained (zero “deferred maintenance”) — The annual amounts, as identified in the budget needs analysis totaling $68.4 million, were input into the scenarios module. This scenario shows the effects of implementing the ideal investment strategy (as recommended by the MTC PMP Needs module). 2. Current Investment Level — An average annual budget of $1.8 million was evaluated over five years, for a total of $9 million, to determine the effects of continuing pavement maintenance at the current budget level. The overall network PCI decreases by 3 points, to 59, under this funding level. 3. Maintain Current PCI (62) — A scenario to determine the funding required to maintain the overall network PCI of 62 over the next five years was analyzed. It was determined that $17.3 million would be required over the next five years to achieve this goal. 4. Increase Overall PCI by 5 points to 67 - A scenario to determine the funding required to increase the overall network PCI by 5 points over the next five years was analyzed. It was determined that $25 million would be required over the next five years to achieve this goal. This would result in an overall network PCI increases by five points, to 67 over the next five years. 5. Increase Overall PCI to 70 — A scenario to determine the funding required to increase the overall network PCI by 8 points over the next five years was analyzed. It was determined that $34.1 million would be required over the next 11.A Packet Pg. 280 five years to achieve this goal. This would result in an overall network PCI increases by eight points, to 70 over the next five years. SUMMARY/CONCLUSION The City of Gilroy assesses Street pavement condition through the use of Pavement Condition Index (PCI) and develops maintenance approaches to improve pavement condition in the long run. Through a citywide pavement condition survey through MTC’s Pavement Management Technical Assistance Program (P-TAP), the average PCI was found to be 73 in 2013, 69 in 2017, and 62 in 2019 according to the latest pavement condition survey and analysis. The analysis also included several target scenarios and associated cost implications ranging from maintaining current level of investment in pavement preservation to unconstrained level of investment in this important asset. The condition survey and subsequent analysis shows that the City needs to act quickly to address the deteriorating condition of our streets. Attachments: 1. Pavement Managemetn Report 2020 11.A Packet Pg. 281     Page | 1    Pavement Management Technical Assistance (P‐TAP) Round 20                                                                               Pavement Management Technical  Assistance Program (P‐TAP) Round 20  2018/19 Pavement Management Report  Final Report (1/23/2020)  Prepared By:  AMS Consulting  5627 Stoneridge Drive, Suite 320  Pleasanton, CA 94588  11.A.a Packet Pg. 282 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 2    Pavement Management Technical Assistance (P‐TAP) Round 20   TABLE OF CONTENTS  ACRONYMS ............................................................................................................................................ 4  EXECUTIVE SUMMARY ........................................................................................................................... 5  INTRODUCTION ...................................................................................................................................... 7  What is a Pavement Management System? ..................................................................................... 8  Why is a Pavement Management System important? ..................................................................... 9  Scope ................................................................................................................................................. 9  CURRENT STATE OF ROADS .................................................................................................................. 10  Road Network .................................................................................................................................. 10  Arterial ......................................................................................................................................... 10  Collector ....................................................................................................................................... 10  Residential/Local .......................................................................................................................... 10  Pavement Condition Assessment .................................................................................................... 11  Pavement Condition Index (PCI) ..................................................................................................... 13  Local PCI Comparison ...................................................................................................................... 14  Maintenance and Rehabilitation Strategies ................................................................................... 15  Types of Treatments for roads with a PCI between 70 ‐ 100 ...................................................... 16  Types of Treatments for roads with a PCI between 60 ‐ 90 ........................................................ 17  Types of Treatments for roads with a PCI between 55 ‐ 70 ........................................................ 18  Types of Treatments for roads with a PCI 70 or Less .................................................................. 19  Pavement Needs.............................................................................................................................. 20  BUDGET SCENARIOS ............................................................................................................................. 22  Scenario 1 – Current Funding Scenario ........................................................................................... 24  Scenario 2 – Constant PCI of 62 ....................................................................................................... 27  Scenario 3 – Plus 5 PCI Increase ...................................................................................................... 30  Scenario 4 – Increase PCI to 70 ........................................................................................................ 33  Scenario 5 – Optimal PCI/Needs ..................................................................................................... 36  CONCLUSIONS ...................................................................................................................................... 39  APPENDICIES ........................................................................................................................................ 44    EXECUTIVE SUMMARY FIGURES  Figure ES  1 – Overview of City’s Current Pavement Condition .............................................................. 5  EXECUTIVE SUMMARY TABLES  Table ES 1 – Summary of outcome of different funding levels (Scenarios) ............................................ 7    11.A.a Packet Pg. 283 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 3    Pavement Management Technical Assistance (P‐TAP) Round 20   FIGURES  Figure 1. Pavement Life Expectancy ..................................................................................................... 11  Figure 2. Sample of Pavement Distress Types ...................................................................................... 12  Figure 3. Sample of PCI Condition Categories ...................................................................................... 12  Figure 4. Street‐by‐Street Map of Pavement Condition Index (2019) .................................................. 13  Figure 5. Local Agency PCI Comparison ................................................................................................ 14  Figure 6. Standard Deterioration Curve ............................................................................................... 15  Figure 7. Needs Summary by Functional Class ..................................................................................... 21  Figure 8. Current Budget PCI and Backlog Breakdown ......................................................................... 24  Figure 9. 2024 Condition Category Summary ....................................................................................... 25  Figure 10. Year 2024 PCI Map using Current Budget of $1.8M/year .................................................... 26  Figure 11. Constant PCI and Backlog .................................................................................................... 27  Figure 12. 2024 Condition Category Summary ..................................................................................... 28  Figure 13. Year 2024 PCI Map using Constant PCI ................................................................................ 29  Figure 14. Plus 5 PCI Increase/Optimal PCI and Backlog ...................................................................... 30  Figure 15. 2024 Condition Category Summary ..................................................................................... 31  Figure 16. Year 2024 PCI Map using Plus 5 PCI Increase ...................................................................... 32  Figure 17. Increase PCI to 70 PCI and Backlog ...................................................................................... 33  Figure 18. 2024 Condition Category Summary ..................................................................................... 34  Figure 19. Year 2024 PCI Map by Increasing Network PCI to 70 ........................................................... 35  Figure 20. Optimal PCI and Backlog...................................................................................................... 36  Figure 21. 2024 Condition Category Summary ..................................................................................... 37  Figure 22. 2024 PCI Map of bringing network to optimal conditions ................................................... 38  Figure 23. 5‐Year Scenario PCI Summary ............................................................................................. 41  Figure 24. 5‐Year Scenario Backlog Summary ...................................................................................... 42  Figure 25. Pavement Condition Category Percentages in 2024 ............................................................ 43     TABLES   Table 1. City Network Summary Statistics ............................................................................................ 11  Table 2. Current Pavement Condition Categories ................................................................................ 14  Table 3. 5‐Year Needs Breakdown ....................................................................................................... 20  Table 4. Scenario Summary .................................................................................................................. 23  Table 5. Current Budget Cost and Network Summary .......................................................................... 25  Table 6. Constant PCI Cost and Network Summary .............................................................................. 28  Table 7. Plus 5 PCI Increase Cost and Network Summary .................................................................... 31  Table 8. Constant PCI Cost and Network Summary .............................................................................. 34  Table 9. Optimal PCI Cost and Network Summary ............................................................................... 37    11.A.a Packet Pg. 284 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 4    Pavement Management Technical Assistance (P‐TAP) Round 20   ACRONYMS  AC ‐ Asphalt Concrete  ADA – Americans with Disabilities Act  AMS – Asset Management Specialists  ASTM ‐ American Society of Testing Materials   ‐ Cold in Place Recycling  CLM ‐ Centerline Miles  FC ‐ Functional Classification  FDR ‐ Full Depth Reclamation  GIS ‐ Geographic Information Systems  LF ‐ Linear Foot  LM ‐ Lane Miles  M ‐ Million  MTC ‐ Metropolitan Transportation Commission  PCC ‐ Portland Cement Concrete  PCI ‐ Pavement Condition Index  PM ‐ Preventative Maintenance  P‐TAP ‐ Pavement Management Technical Assistance Program  SF ‐ Square Foot  ST ‐ Surface Treatment  SY ‐ Square Yard            CIR 11.A.a Packet Pg. 285 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 5    Pavement Management Technical Assistance (P‐TAP) Round 20   EXECUTIVE SUMMARY  The City of Gilroy’s street network is 124 centerline miles in length and covers approximately 27.1  million square feet of asphalt concrete.  This network is an essential asset and is among the most  valuable assets maintained by the City.  This asset is worth over $221 million to replace1. Through the  Metropolitan Transportation Commission (MTC) Pavement Management Technical Assistance  Program (P‐TAP), the City completed a comprehensive pavement management update that included  field inspections and an update of the City’s pavement management software.  With the most recent  inspection information and treatments, the City’s overall pavement condition index (PCI) is 62, which  is classified as “At‐risk to Fair” for MTC standards.  The PCI is a rating from 0 – 100, with 0 being a failed  street, and 100 being a brand new pavement.  Approximately 43.1% of the City’s roads have a PCI of  70 and above (Figure ES 1)  Figure ES  1 – Overview of City’s Current Pavement Condition        1 The valuation is assessed by the assumption of replacing the entire street network with a new street valued in today’s  dollar.    11.A.a Packet Pg. 286 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 6    Pavement Management Technical Assistance (P‐TAP) Round 20     An adequately designed asphalt street typically lasts twenty years without the need of total  reconstruction.  However, if conditions change, such as higher daily traffic usage, then reconstruction  of the pavement may be warranted sooner.  Extending the life of the pavement with pavement  preservation, as opposed to the replacement of pavement is the goal of a pavement management  program.      Five budget scenarios were evaluated as part of the P‐TAP update.  AMS used the MTC StreetSaver  pavement management software to run various budget scenarios.  Based on a series of assumptions,  StreetSaver allocates available funds across the street network, recommends improvements, and  forecasts future PCI if recommendations are implemented.      The five funding scenarios detailed below are five‐ year projections and provides useful “what‐if”  information on expected PCI and backlog values that may occur at different funding constraints.   Backlog is the cost of a project that is recommended for treatment in the first year but deferred to the  following years due to funding constraints.  The following scenarios were analyzed and detailed below.      Scenario 1 – Current Budget    Funding of $1.8 million per year on maintenance and rehabilitation.     PCI decreases to 59   Backlog increases to $53.6 million    45.5% of City streets will have a PCI equal to or greater than 70     Scenario 2 – Constant PCI (PCI 62)   Scenario requires $3.4 million per year for maintenance and rehabilitation   PCI is constant at 62   Backlog increases to $48.4 million   53% of City streets will have a PCI equal to or greater than 70    Scenario 3 – Plus 5 PCI Increase (PCI 67)   Scenario requires $3.9 million per year for maintenance and rehabilitation   PCI is constant at 67   Backlog increases to $46.3 million  11.A.a Packet Pg. 287 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 7    Pavement Management Technical Assistance (P‐TAP) Round 20    63.5% of City streets will have a PCI equal to or greater than 70    Scenario 4 – Increase PCI to 70    Scenario requires $6.8 million per year for maintenance and rehabilitation   PCI is constant at 70   Backlog increases to $36.6   73.7% of City streets will have a PCI equal to or greater than 70      Scenario 5 – Optimal PCI (PCI 79 to 82)   Scenario requires $13.6 million per year for maintenance and rehabilitation   PCI is optimal and ranges from 79‐82   Backlog decreases to $0   91.8% of City streets will have a PCI equal to or greater than 70      Table ES 1 – Summary of outcome of different funding levels (Scenarios)  Optimal PCI  Current  Budget  Plus  5 PCI  Increase  Increase PCI to  70  Average Yearly Budget  $13,694,814 $1,800,000 $3,460,014 $3,927,422 $6,830,491  Total Budget for 5 Years $68,474,070 $9,000,000 $17,300,072 $19,637,108 $34,152,457  Current PCI 62 62 62 62 62  Current % in 'Good'  condition 43.1% 43.1% 43.1% 43.1% 43.1%  PCI after 5 years (change) 82 (+20) 59 (‐3) 62 (0) 67 (+5) 70 (+8)  Backlog after 5 years $0 $53,686,017 $48,408,538 $46,312,665 $36,618,580  % 'Good' in 5 years 91.8% 45.5% 53.0% 63.5% 73.7%  % 'Fair' in 5 years 6.6% 20.4% 17.7% 15.8% 10.3%  % 'Poor' in 5 years 1.6% 17.3% 12.4% 4.2% 1.6%  % 'Very Poor' in 5 years 0.0% 16.8% 16.8% 16.6% 14.3%  Constant PCI (62)(67)(59) 11.A.a Packet Pg. 288 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 8    Pavement Management Technical Assistance (P‐TAP) Round 20   INTRODUCTION  Paved streets in the City of Gilroy are one of the many assets that are utilized by every resident, visitor,  and business.  A good street network enhances public safety, promotes mobility, and enables  economic activity.  The City is responsible for 124.28 centerline miles of roads or 268.23 lane miles2.   This asset comprises of over 27.1 million square feet of asphalt concrete and is estimated at $221  million to replace.      AMS Consulting (AMS) was selected as the City’s Pavement Management Consultant through the MTC  P‐TAP program.  The program helps local agencies in the San Francisco Bay Area update their pavement  management program through inspection surveys and reporting.  The program is designed to help  agencies stretch their pavement expenditures by:     Implementing, updating, and maintaining pavement management databases; and    Providing updated pavement condition data of the network and each street segment.    What is a Pavement Management System?  Pavement Management is the systematic process that is used to oversee the City’s paved surfaces by  measuring the condition, tracking the maintenance and rehabilitation of pavement sections.  These  pavement sections can be organized by area, zones, and functional classifications.  Effective pavement  management strategies include condition assessment, life‐cycle costs analysis, and budget projections  that can identify segments of pavement in need of maintenance or repair.      Please note, the pavement management software is a network support tool for planning and budgeting  purposes.  The City is not bound by the StreetSaver’s recommendation and is not a substitute for sound  engineering judgment.  Pavement management projects can be manually added or removed from the    2 Lane mile is equal to 5,280 linear feet multiplied by the number of lanes.  11.A.a Packet Pg. 289 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 9    Pavement Management Technical Assistance (P‐TAP) Round 20   StreetSaver’s recommended sections selected for treatment based on other special considerations  where the StreetSaver system does not recognize its prioritization method.      Why is a Pavement Management System important?   The City’s paved surfaces are a vital asset to the community.  It is essential that this asset is preserved  and maintained.  The pavement management program seeks balance between pavement maintenance  and rehabilitation of existing surfaces.  The most cost‐effective way to correct any paved surface  problem is to address issues when they first appear.  That is why funds are targeted to paved areas or  sections that are rated in fair or good condition for preventative maintenance.  Without preventative  maintenance, these paved asphalt concrete surfaces would quickly deteriorate and be more expensive  to fix in the future.      Scope  As part of the P‐TAP Round 20 grant, AMS was responsible for inspecting Arterial, Collector and  Residential streets.  For each pavement section, a Pavement Condition Index (PCI) score were assigned,  which gives a numerical indication of the current condition of the pavement.    The results of the condition assessment are used to determine the remaining useful life and develop  on‐going major maintenance strategies and to assess pavement criticality.  Cost analysis was also  performed to give the City an understanding of its short‐term pavement needs projection on which to  base its yearly budget needs for maintenance, rehabilitation, and replacement.        11.A.a Packet Pg. 290 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 10    Pavement Management Technical Assistance (P‐TAP) Round 20   CURRENT STATE OF ROADS  Road Network   The City’s road network is broken down into three functional classifications:    Arterial  These roadways provide a high degree of mobility while allowing direct access to abutting properties.  In an urban setting, these roadways serve major activity centers and have the highest volume and  longest trip demand within a city. They interconnect other major corridors to accommodate trips  entering and leaving the city. These roads also serve demand for “intra‐area” travel between the  business district and outlying residential areas. An example of an arterial in Gilroy is Monterey Street.  In addition, Arterials primarily serve intra‐urban or local travel, carrying traffic from Collector streets  to and from other parts of the City and to limited access roadways. Access to properties bordering  these streets is subordinate to the primary function of moving traffic. The typical design speed on an  arterial is 45 miles per hour and it has two or four lanes. Parking is generally not provided on arterials.    Collector  The primary function of Collector streets is a combination of access and mobility. These streets provide  links between Local streets and Arterials. They are designed to serve neighborhood traffic rather than  cross‐town traffic, though they may include trips between adjacent neighborhoods. The design speed  for collectors is typically 35 miles per hour. On‐street parking is usually provided.    Residential/Local  Unlike others categories, local roads are not intended for use in long distance travel except at the origin  or destination end of a trip. These roads are typically classified by default after arterial and collector  streets have been identified. Local roads provide the highest level of accessibility and carry no through  traffic movement. The primary function of local streets is access to adjacent land uses. Parking is  usually provided along local streets and speed limits are typically 25 miles per hour.  11.A.a Packet Pg. 291 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 11    Pavement Management Technical Assistance (P‐TAP) Round 20   Each street is not built the same and therefore does not share the same deterioration curves or have  the same life expectancy.  Figure 1 is an example of the City’s current life expectancy for pavement.   The useful life for an arterial is much shorter than a residential street and this is due to the amount of  traffic.    Figure 1. Pavement Life Expectancy    The City of Gilroy owns and manages 124.28 centerline miles of pavement.   This equates to 268.23  lane miles.  Table 1 is a summary of the City’s road network.    Table 1. City Network Summary Statistics  Functional  Classification  Total  Sections  Total  Center  Miles  Total  Lane  Miles  Total Area  (SF)  Arterial 62 18.82 53.29 5,532,071  Collector 118 28.61 61.25 6,869,283  Residential/Local 566 76.85 153.69 14,479,898   746 124.28 268.23 26,881,252    Pavement Condition Assessment  A pavement surface assessment is completed by identifying surface distresses within each pavement  management section.  Inspections entail the evaluation of a representative sample (10% of the area)  11.A.a Packet Pg. 292 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 12    Pavement Management Technical Assistance (P‐TAP) Round 20   and identifying eight different types of pavement surface distresses; three severities (low, medium,  and heavy) and quantifying them.  Figure 2 is an example of eight different surface types.  Inspectors  use StreetSaver as a tool to calculate the condition of each management section.  StreetSaver is an  industry‐standard (modified ASTM 6433) software that is used to generate a pavement rating also  known as a PCI (Pavement Condition Index).  A PCI rating index is a numerical value between 0 to 100,  with 0 being a failed road and 100 being a brand‐new street (Figure 3).  The PCI is calculated using  StreetSaver system algorithms that were developed by MTC.      Figure 2. Sample of Pavement Distress Types    Figure 3. Sample of PCI Condition Categories      11.A.a Packet Pg. 293 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 13    Pavement Management Technical Assistance (P‐TAP) Round 20   Pavement Condition Index (PCI)    After the 2019 pavement management update and recent pavement projects (slurry and resurfacing),  the City’s overall network PCI is 62 PCI.  The overall network condition is a weighted average PCI, which  is equal to each management section PCI multiplied by its area and divided by the total area of the  network.  Figure 4 is a street‐by‐street map of the pavement condition index.    Figure 4. Street‐by‐Street Map of Pavement Condition Index (2019)      11.A.a Packet Pg. 294 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 14    Pavement Management Technical Assistance (P‐TAP) Round 20   Local PCI Comparison    Figure 5 is a PCI comparison of local agencies in Santa Clara County.  Results were obtained from the  MTC Vital Signs website.  MTC results show that the City’s overall network PCI is 5 points below the  San Francisco Bay Area average PCI.  Figure 5. Local Agency PCI Comparison    Table 2 is a breakdown of the City’s current road network pavement condition categories.   Approximately 43.1% of the City’s road network has a PCI of 70 or better.  Table 2. Current Pavement Condition Categories  Current Condition Categories Percent  Condition I ‐ Good to Excellent (PCI 70 ‐ 100) 43.1  Condition II/III ‐ At Risk to Fair (PCI 50 ‐ 70) 27.9  Condition IV ‐ Poor (PCI 25 ‐ 50) 22.1  Condition V ‐ Failed to Very Poor (PCI 0 ‐ 25) 6.9  81 79 76 75 74 71 71 70 70 69 67 67 65 63 62 67 0 10 20 30 40 50 60 70 80 90 100 Pavement Condition Index (PCI)Local Agency Local Agency PCI Comparison 11.A.a Packet Pg. 295 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 15    Pavement Management Technical Assistance (P‐TAP) Round 20   Maintenance and Rehabilitation Strategies  The City’s current maintenance activities vary from project to project; each maintenance activity is  based upon the section’s functional classification (arterial, collector and local), surface type, and PCI.   Figure 6 illustrates a general pavement life cycle curve.  The curve shows that pavements deteriorate  only 40 percent in quality in the first 75 percent of their life; this deterioration subsequently accelerates  rapidly, resulting in another 40 percent drop in quality in the next 12 percent of life.  Therefore,  investing in preventative maintenance in the good streets (70 and above) can save the City a significant  amount of money in rehabilitation and reconstruction cost in the future.  MTC recommends that the  City continues its efforts in utilizing the recommended cost‐effective treatments such as crack seals,  slurry seals, and microsurfacing.  City staff has reviewed the maintenance strategies and AMS has  updated the StreetSaver pavement management system.  Part of the update was to review and revise  the system unit costs.  These unit costs are used to calculate total funding and budget need calculation.   These unit costs are “Total Project Costs” that include but are not limited to administration,  construction, design, etc.      Figure 6. Standard Deterioration Curve    $3.00/sy  $4.50/sy  $40.00/sy  $80.00/sy  11.A.a Packet Pg. 296 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 16    Pavement Management Technical Assistance (P‐TAP) Round 20   Types of Treatments for roads with a PCI between 70 ‐ 100  Crack Sealing3  Surface Crack is an inevitable distress and is one of the first signs of distress types that  occur at the pavement surface.  If this distress is neglected over time, it can grow to a  pothole and eventually sub‐base failure if left untreated.  Crack Sealing is a cost‐effective  treatment and can treat all types of cracks greater than 1/8”.   This treatment slows the  deterioration and can extend a pavement life three to five years.  Fog Seals4  Fog Seal is a single application, typically light, of emulsified asphalt to an existing asphalt  surface.  This maintenance treatment can be used to renew an oxidized road (weathered)  and improve the surface appearance, as well as seal minor cracks and surface voids, and  inhibit raveling.  This treatment extends the pavement life two to four years.    Slurry Seals5  Slurry seal is a surface treatment designed to extend the life of asphalt pavements in good  condition by providing skid resistance, restricting moisture intrusion, protecting the  structure from further oxidation and raveling, and restoring a uniform black appearance.  Slurry seal provides quick construction times and minimal disruption to the traveling  public. This treatment can extend the life of the pavement by five to seven years.  Microsurfacing6  Micro surfacing is a surface treatment designed to extend the life of asphalt pavements in  good condition by providing skid resistance, restricting moisture intrusion, protecting the  structure from further oxidation and raveling, and restoring a uniform black appearance.  It is the most economical choice when leveling is required. Micro surfacing boasts quick construction  times and minimal disruption to the traveling public.  This treatment extends the pavement life six to  eight years.      3 https://roadresource.org/treatment_resources/crack_seal  4 https://roadresource.org/treatment_resources/fog_seal  5 https://roadresource.org/treatment_resources/slurry_seal  6 https://roadresource.org/treatment_resources/micro_surfacing  11.A.a Packet Pg. 297 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 17    Pavement Management Technical Assistance (P‐TAP) Round 20   Ultra Thin Lift HMA7  An ultra thin lift HMA is a hot mix asphalt treatment consisting of paving grade asphalt and  aggregate.  Ultra thin lift asphalt treatments are generally applied at a compacted depth  of .75” to 1” on roads in good condition.   This pavement preservation application provides  a smooth surface, while addressing raveling, low‐severity top‐down cracking and  oxidation.  This treatment can extend the life of the pavement eight to ten years.    Types of Treatments for roads with a PCI between 60 ‐ 90  Chip Seal8  A chip seal is a roadway surface treatment that consists of a layer(s) of asphalt binder (hot  or emulsion) with a layer(s) of embedded aggregate. Chip seals provide a new skid resistant  wearing surface, stops raveling, seals minor cracks, and retards further deterioration of the  existing roadway.  Chip seal binders can be polymer modified as well to improve aggregate  retention and provide for a quicker return to traffic.  This treatment can be used on roads  with a PCI of 60 and above and can extend the pavement life five to seven years.  Cape Seals9  A cape seal is a roadway surface treatment designed to extend the life of pavements in fair  to good condition, consisting of a chip seal treatment, which is then covered by a slurry seal  or micro surfacing treatment. Cape seals provide the benefits of both the chip seal and the  slurry seal or micro surfacing treatment, namely sealing moderate cracks, providing skid  resistance, sealing the pavement against moisture intrusion, protecting the structure from  further oxidation and raveling, and restoring a uniform black appearance.    The chip seal can be polymer modified as well to improve aggregate retention and provide for a quicker  return to traffic.  Cape seals  public.  This treatment excels in urban areas where a stand alone chip seals are not but    7 https://roadresource.org/treatment_resources/ultra_thin_lift_hma  8 https://roadresource.org/treatment_resources/chip_seal  9 https://roadresource.org/treatment_resources/cape_seal  provide quick construction times and reasonable disruption to the traveling  de appropriate 11.A.a Packet Pg. 298 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 18    Pavement Management Technical Assistance (P‐TAP) Round 20   the need for sealing cracks is warranted.  This treatment can be used on roads with a PCI of 60 and  above and can extend the pavement life eight to ten years.  Hot In‐Place Recycling10  Hot In‐place Recycling (HIR) is an on‐site, in‐place pavement preservation and corrective  maintenance technique that when combined with an asphalt overlay can be classified as  structural rehabilitation. There are three sub‐disciplines of HIR; Surface Recycling,  Remixing and Repaving. All HIR sub‐disciplines consist of heating, softening, scarifying/hot  milling, mixing, placing and compacting the existing pavement. Rejuvenating agents and  additives can be integrated into HIR mixtures to improve the characteristics of the recycled  pavement. HIR should be considered whenever mill and fill or a leveling course is required prior to an  asphalt overlay.  This treatment can be used on pavements with a PCI of 60 or greater and extends the  life by seven to fifteen years.      Types of Treatments for roads with a PCI between 55 ‐ 70  Scrub Seal11  A scrub seal is an application that is very similar to a chip seal treatment.  The only  difference is that the asphalt distributor pulls a broom sled that houses a series of brooms  placed at different angles.  These brooms guide or "scrub" the emulsion into cracks that  ensure the road will be sealed.  This treatment can be used on a road with a PCI of 55‐70  and can extend the life of the pavement for six to seven years.      10 https://roadresource.org/treatment_resources/hot_in_place_recycling  11 https://roadresource.org/treatment_resources/scrub_seal  11.A.a Packet Pg. 299 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 19    Pavement Management Technical Assistance (P‐TAP) Round 20   Types of Treatments for roads with a PCI 70 or Less  Cold‐in‐Place Recycling12  A cost‐effective, long‐lasting, greener alternative to conventional maintenance and  rehabilitation techniques. Cold In‐place recycling (CIR) is a process that cold mills and  recycles the top 2‐5 inches of asphalt using a continuous train operation. Through the  complete reuse of existing material, CIR greatly reduces trucking, time and natural  resources to significantly lower project costs. Generally, any road that is a candidate for  mill & fill is a candidate for CIR.  This treatment adds fifteen‐twenty years with combined  appropriate wearing course.  This treatment is 20%‐50% less expensive than conventional  maintenance and reconstruction methods.    Cold Planing13  Cold Planing (CP), commonly referred to as milling or profiling, is the controlled removal of  the surface of an existing pavement to the desired depth or cross‐slope with specially  designed equipment capable of removing portions of the pavement surface to the specified  grade and/or cross‐slope. CP can be used in excavation, reconstruction, rehabilitation and  maintenance operations.  This treatment extends the life of the pavement structure by  correcting smoothness issues, drainage issues and removing some top down cracking and  raveling.  Full Depth Reclamation Reconstruction14  A cost‐effective, long‐lasting greener alternative to deep rehabilitation or removal and  replacement techniques. Full Depth Reclamation (FDR) is an engineered rehabilitation  technique in which the full thickness of the asphalt pavement and a predetermined portion  of the underlying materials (base, subbase and/or subgrade) is uniformly pulverized and  blended to provide an upgraded, homogeneous material. The reclaimed materials may be  improved and strengthened by using Mechanical, Chemical or Bituminous stabilization. FDR    12 https://roadresource.org/treatment_resources/cold_in_place_recycling  13 https://roadresource.org/treatment_resources/cold_planing_micro_milling  14 https://roadresource.org/treatment_resources/full_depth_reclamation  This treatment must be paired with typical treatment such as overlay. 11.A.a Packet Pg. 300 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 20    Pavement Management Technical Assistance (P‐TAP) Round 20   isn't only for roads in poor condition, it is also a viable design process for increasing the structural  capacity of pavement in good condition.  Pavement Needs  The pavement management program develops a maintenance strategy that will improve the overall  condition of the road network to an optimal PCI (79‐82 PCI range).  The overall weighted average PCI  is 62 which falls under the At‐Risk to Fair Category.  This scenario answers the most common  question, “if the City had all the money in the world, what would it cost to update the road network?”   Table 3 below represents the 5‐Year breakdown to get the road network into optimal conditions and  address the backlog.  Currently, the City’s backlog is approximately $33.3 million. The backlog is derived  from the work scheduled in prior years but deferred due to insufficient funding resources.  Please note  that the cost of the needs has been front‐loaded.  The reason for the front‐loaded costs are due to the  pavement management system needs  conditions  and maintain those conditions for the next five years.   To maintain the PCI at optimal levels,  the City would need to spend approximately $67.6 million by the end of year 2024.  Based on the  pavement management software it is more cost‐effective to repair the street in the first year rather  than waiting to repair them in the subsequent years.  Generally speaking, roads appear to be in good  condition for a long time; however, when roads fail, they fail quickly, and repair costs can increase if  the recommended maintenance treatments are deferred.  Should the City not invest in maintenance  or rehabilitation treatments on streets for the next five years, the overall network PCI will decrease to  52.    Table 3. 5‐Year Needs Breakdown  City Needs  Year PM Rehab Cost Total PCI  Treated  PCI  Untreated  2020 $2,867,653 $30,489,917 $33,357,570 79 62  2021 $83,935 $6,695,135 $6,779,070 78 59  2022 $325,251 $5,141,683 $5,466,934 79 57  2023 $413,981 $13,432,786 $13,846,767 82 54  2024 $880,050 $7,304,358 $8,184,408 82 52   $4,570,870 $63,063,879 $67,634,749     are designed to bring the entire pavement network to optimal  e , 11.A.a Packet Pg. 301 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 21    Pavement Management Technical Assistance (P‐TAP) Round 20       Figure 7. Needs Summary by Functional Class    $24,011,906,  36% $17,777,293,  26% $25,845,550,  38% Needs Summary by Functional Class Arterial Collector Residential/Local 11.A.a Packet Pg. 302 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 22    Pavement Management Technical Assistance (P‐TAP) Round 20   BUDGET SCENARIOS  Having determined the maintenance and rehabilitation needs of the City’s road network, the next step  in developing a cost‐effective maintenance and rehabilitation strategy is to run “what‐if” scenarios.   The advantages of a pavement management program such as StreetSaver, the ability to forecast the  treatments and conditions based on budget constraints or predict future costs based on targeted  network PCI goals.  The following scenarios have been analyzed:    1. Scenario 1 ‐ Current Funding Scenario   This budget scenario analyzes the impacts of using the City’s current budget of $1.8 million per  year for the next five years.      2. Scenario 2 – Constant PCI of 62  This budget scenario analyzes the impacts of sustaining the overall network PCI at 62 for the next  five years.    3. Scenario 3 – Plus 5 PCI Increase (67 PCI)  This budget scenario analyzes the impacts of improving the overall network PCI by 5 points and  sustaining it for the next five years.      4. Scenario 4 – Increase PCI to 70 PCI  This budget scenario analyzes the impacts of improving the overall network PCI to 70 and  sustaining if for the next five years.    5. Scenario 5 – Optimal PCI  This budget scenario analyzes the cost of bringing the City’s road network to optimal conditions  and sustaining it for the next five years.      11.A.a Packet Pg. 303 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 23    Pavement Management Technical Assistance (P‐TAP) Round 20     Table 4  is a breakdown of the five scenarios tested.    Table 4. Scenario Summary   Optimal PCI  Current  Budget  Constant  PCI  Plust 5 PCI  Increase  Increase PCI  to 70  Average Yearly Budget  $13,694,814 $1,800,000 $3,460,014 $3,927,422 $6,830,491  Total Budget for 5 Years $68,474,070 $9,000,000 $17,300,072 $19,637,108 $34,152,457  Current PCI 62 62 62 62 62  Current % in 'Good'  condition 43.1% 43.1% 43.1% 43.1% 43.1%  PCI after 5 years (change) 82 (+20) 59 (‐3) 62 (0) 67 (+5) 70 (+8)  Backlog after 5 years $0 $53,686,017 $48,408,538 $46,312,665 $36,618,580  % 'Good' in 5 years 91.8% 45.5% 53.0% 63.5% 73.7%  % 'Fair' in 5 years 6.6% 20.4% 17.7% 15.8% 10.3%  % 'Poor' in 5 years 1.6% 17.3% 12.4% 4.2% 1.6%  % 'Very Poor' in 5 years 0.0% 16.8% 16.8% 16.6% 14.3%                        11.A.a Packet Pg. 304 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 24    Pavement Management Technical Assistance (P‐TAP) Round 20   Scenario 1 – Current Funding Scenario  The City’s current budget is $1.8 million per year for the next five years.    Figure 8 shows a one‐point  PCI improvement (63) in the first year, however, the PCI slowly declines in the subsequent years.  By  the year 2024, the overall network PCI will be 59, while the backlog increases to $53.7 million.      Figure 8. Current Budget PCI and Backlog Breakdown      Figure 9 is a breakdown of what the City’s network would look like using the current budget of $1.8  million/year for the next five years.  System results show 45.5% of City streets will have a PCI equal to  or greater than 70 PCI (Condition Category I) by the end of year 2024.  Roads with a PCI of 25 and  below (Condition Category V) will have increased from 6.9% to 16.8%.      $31.6 $35.0 $35.9 $46.1 $53.7 63 62 61 60 59 0 10 20 30 40 50 60 70 80 90 100 $0 $20 $40 $60 $80 $100 $120 $140 2020 2021 2022 2023 2024 Pavement Condition Indexx (PCI)MillionsYear Current Budget ($1.8M/Year) 5‐Year  PCI and Backlog  Backlog 11.A.a Packet Pg. 305 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 25    Pavement Management Technical Assistance (P‐TAP) Round 20     Figure 9. 2024 Condition Category Summary         Table 5 is a breakdown of the City’s Current Budget for the next five years.  Current Budget    2020 2021 2022 2023 2024  Budget Total $1,800,000 $1,800,000 $1,800,000 $1,800,000 $1,800,000  Rehabilitation Budget $897,645 $896,953 $899,037 $896,025 $898,368  Preventative Maintenance Budget $901,085 $902,184 $899,914 $768,074 $727,929  Deferred Maintenance/Backlog $31,619,886 $35,036,401 $35,915,138 $46,144,002 $53,686,017  PCI 63 62 61 60 59                          % Change from 2019 +2.4%-7.5%-4.8%+9.9% 11.A.a Packet Pg. 306 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 26    Pavement Management Technical Assistance (P‐TAP) Round 20     Figure 10 is a PCI map of what the network will look at the end of year 2024 by using the current  budget of $1.8M/year for the next five years.     Figure 10. Year 2024 PCI Map using Current Budget of $1.8M/year     11.A.a Packet Pg. 307 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 27    Pavement Management Technical Assistance (P‐TAP) Round 20     Scenario 2 – Constant PCI of 62  This scenario analyzes the cost to maintain the overall network PCI at 62.  Implementing this scenario  would cost on average $3.4 million per year for the next five years.  Figure 11 results show that by the  end of year 2024 the overall backlog will increase to $48 million, while the PCI remains constant.    Figure 11. Constant PCI and Backlog                $32 $35 $35 $41 $48 63 62 62 62 62 0 10 20 30 40 50 60 70 80 90 100 $0 $20 $40 $60 $80 $100 $120 $140 2020 2021 2022 2023 2024 Pavement Condition Index (PCI)MillionsYear Constant PCI of 62 ($3.4M/year) 5‐Year  PCI and Backlog Backlog Pavement Condition Index (PCI) 11.A.a Packet Pg. 308 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 28    Pavement Management Technical Assistance (P‐TAP) Round 20   Figure 12 shows the 2024 road network condition category breakdown.  Approximately, 53.0% of  City streets will have a PCI equal to or greater than 70 PCI (Condition Category I).  Roads with a PCI of  25 and below (Condition Category V) will have increased from 6.9% to 16.8%.    Figure 12. 2024 Condition Category Summary       Table 6 is a breakdown of the Constant PCI for the next five years.    Table 6. Constant PCI Cost and Network Summary  Constant PCI    2020 2021 2022 2023 2024  Budget Total $1,276,131 $2,079,222 $2,897,677 $5,127,550 $5,395,623  Rehabilitation Budget $542,486 $930,742 $2,016,008 $4,727,925 $5,010,942  Preventative Maintenance Budget $733,645 $1,148,480 $881,669 $399,625 $384,681  Deferred Maintenance/Backlog $32,142,476 $35,042,170 $34,752,836 $41,484,624 $48,408,538  PCI 62 62 62 62 62                        +9.9% -10.2% -9.7% +9.9% % Change from 2019 11.A.a Packet Pg. 309 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 29    Pavement Management Technical Assistance (P‐TAP) Round 20   Figure 13 is a PCI map of what the network will look at the end of year 2024 by keeping the road  network constant at 62.    Figure 13. Year 2024 PCI Map using Constant PCI       11.A.a Packet Pg. 310 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 30    Pavement Management Technical Assistance (P‐TAP) Round 20     Scenario 3 – Plus 5 PCI Increase  Figure 14 represents the costs and impacts of increasing the overall network by 5 points to a PCI of 67.   Implementing this scenario would cost approximately $5.0M/year for the next five years.  System  results show that the overall backlog increases to $46 million by the end of the year 2024.       Figure 14. Plus 5 PCI Increase/Optimal PCI and Backlog      Figure 15 shows the 2024 road network condition category breakdown.  Approximately, 63.5% of  City streets will have a PCI equal to or greater than 70 PCI (Condition Category I).  Roads with a PCI of  25 and below (Condition Category V) will have increased from 6.9% to 16.6%.        $27 $28 $29 $39 $46 67 67 67 67 67 0 10 20 30 40 50 60 70 80 90 100 $0 $20 $40 $60 $80 $100 $120 2020 2021 2022 2023 2024 Pavement Condition Index (PCI)MillionsYear PCI Increase to 67 ($5.0M/year) 5‐Year  PCI and Backlog Backlog Pavement Condition Index (PCI) 11.A.a Packet Pg. 311 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 31    Pavement Management Technical Assistance (P‐TAP) Round 20     Figure 15. 2024 Condition Category Summary     Table 7 is a breakdown of the Plus 5 PCI Increase for the next five years.    Table 7. Plus 5 PCI Increase Cost and Network Summary  Plus 5 PCI    2020 2021 2022 2023 2024  Budget Total $1,800,000 $1,800,000 $1,800,000 $1,800,000 $1,800,000  Rehabilitation Budget 3458912 4772933 4375573 4833225 4092680  Preventative Maintenance Budget 2540550 340186 147583 90784 384682  Deferred Maintenance/Backlog 27358043 28323863 29254794 38765348 46312665  PCI 67 67 67 67 67                              +20.4% -12.1% -17.9% +9.7% % Change from 2019 11.A.a Packet Pg. 312 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 32    Pavement Management Technical Assistance (P‐TAP) Round 20   Figure 16 is a PCI map of what the network will look at the end of year 2024 by increasing the overall  network PCI by five points.     Figure 16. Year 2024 PCI Map using Plus 5 PCI Increase      11.A.a Packet Pg. 313 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 33    Pavement Management Technical Assistance (P‐TAP) Round 20   Scenario 4 – Increase PCI to 70  Figure 17 represents the costs and impacts of increasing the overall network to 70.  Implementing this  scenario would cost approximately $6.8M/year for the next five years.  System results show that the  overall backlog increases to $37 million by the end of year 2024..     Figure 17. Increase PCI to 70 PCI and Backlog      Figure 18 shows the 2024 road network condition category breakdown.  Approximately, 73.7% of  City streets will have a PCI equal to or greater than 70 PCI (Condition Category I).  Roads with a PCI of  25 and below (Condition Category V) will have increased from 6.9% to 14.3%.        $21 $23 $24 $34 $37 70 70 70 70 70 0 10 20 30 40 50 60 70 80 90 100 $0 $20 $40 $60 $80 $100 $120 2020 2021 2022 2023 2024 Pavement Condition Index (PCI)MillionsYear PCI Increase to 70 PCI ($6.8M/year) 5‐Year  PCI and Backlog Backlog Pavement Condition Index (PCI) 11.A.a Packet Pg. 314 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 34    Pavement Management Technical Assistance (P‐TAP) Round 20     Figure 18. 2024 Condition Category Summary      Table 8 is a breakdown of the Increase PCI to 70 for the next five years.    Table 8. Constant PCI Cost and Network Summary  Increase PCI to 70    2020 2021 2022 2023 2024  Budget Total $11,937,650 $5,879,490 $4,780,445 $5,126,614 $6,428,258  Rehabilitation Budget 9069997 5879490 4558416 5113253 6043577  Preventative Maintenance Budget 2867653 0 222029 13361 384681  Deferred Maintenance/Backlog 21481060 23070454 24322065 33617371 36618580  PCI 70 70 70 70 70                            +30.6% -17.6% -20.5% +7.4% % Change from 2019 11.A.a Packet Pg. 315 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 35    Pavement Management Technical Assistance (P‐TAP) Round 20   Figure 19 is a PCI map of what the network will look at the end of year 2024 by increasing the overall  network PCI to 70.     Figure 19. Year 2024 PCI Map by Increasing Network PCI to 70          11.A.a Packet Pg. 316 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 36    Pavement Management Technical Assistance (P‐TAP) Round 20     Scenario 5 – Optimal PCI/Needs   Figure 20 represents the costs and impacts bringing the City’s road network to optimal conditions.  Implementing this scenario would cost approximately $13.6M/year for the next five years.  System  results show that the City’s road network is sustained as optimal PCI and has no backlog.    Figure 20. Optimal PCI and Backlog      Figure 21 shows the 2024 road network condition category breakdown.  Approximately, 91.8% of  City streets will have a PCI equal to or greater than 70 PCI (Condition Category I).  Roads with a PCI of  25 and below (Condition Category V) will have decreased from 6.9% to 0%.        $0 $0 $0 $0 $0 79 78 79 82 82 0 10 20 30 40 50 60 70 80 90 100 $0 $20 $40 $60 $80 $100 $120 2020 2021 2022 2023 2024 Pavement Condition Index (PCI)MillionsYear Optimal PCI ($13.6M/year) 5‐Year  PCI and Backlog Backlog Pavement Condition Index (PCI) 11.A.a Packet Pg. 317 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 37    Pavement Management Technical Assistance (P‐TAP) Round 20     Figure 21. 2024 Condition Category Summary      Table 9 is a breakdown of the Plus 5 PCI Increase for the next five years.    Table 9. Optimal PCI Cost and Network Summary  Optimal PCI    2020 2021 2022 2023 2024  Budget Total $27,840,263 $12,517,069 $5,466,934 $13,846,767 $8,184,408  Rehabilitation Budget $24,972,610 $12,433,134 $5,141,683 $13,432,786 $7,304,358  Preventative Maintenance Budget $2,867,653 $83,935 $325,251 $413,981 $880,050  Deferred Maintenance/Backlog $5,517,298 $0 $0 $0 $0  PCI 77 78 79 82 82                            +48.7% -21.3% -5.3% % Change from 2019 11.A.a Packet Pg. 318 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 38    Pavement Management Technical Assistance (P‐TAP) Round 20   Figure 22 is a PCI map of what the network will look at the end of year 2024 by bringing the City’s  road network to optimal conditions.    Figure 22. 2024 PCI Map of bringing network to optimal conditions      11.A.a Packet Pg. 319 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 39    Pavement Management Technical Assistance (P‐TAP) Round 20   CONCLUSIONS  The City of Gilroy currently has 124.28 centerline miles of paved roads or 268.23 lane miles. After  updating the City’s pavement management system with inspections and recent maintenance and  rehabilitation treatments, the City’s overall network condition is 62 PCI.  Approximately 43.1% of the  City’s road network has a PCI of 70 or better.  The City’s current backlog is about $33.4 million.      The first recommended budget the City should consider is the Optimal PCI scenario.   This scenario  would cost on average of $13.6 million per year for the next five years.  Results show that the City  would have 91.8% of City streets greater than or equal to 70 PCI.  The overall network PCI would  achieve optimal levels and range from 79‐82 (Figure 23) and the City will not have a backlog                  (Figure 24).  Approximately 91.8% of the City’s road network will have a PCI of 70 and above                (Figure 25)    The second scenario is increasing the overall network PCI to 70 (Figure 23).  System results show that  it would cost on average of $6.8 million per year for the next five years.  The City’s backlog would  increase to $37 million (Figure 24) at the end of five years, while approximately 73.7% of the City’s  road network will have a PCI of 70 or greater (Figure 25).    The third scenario is increasing the overall network PCI by 5 points to 67 (Figure 23).  System results  show that it would cost on average of $5.0 million per year for the next five years.  The overall backlog  increases to $46 million (Figure 24), while approximately 63.5% of the City’s road network will have a  PCI equal to or better than 70 (Figure 25).    The fourth scenario is keeping the overall network constant at 62 (Figure 23) for the next five years.   System results show that it will cost approximately $3.4 million per year.  This scenario increases the  backlog to $48 million (Figure 24), while approximately 53% of the City’s road network will have a PCI  equal to or greater than 70 (Figure 25).    11.A.a Packet Pg. 320 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 40    Pavement Management Technical Assistance (P‐TAP) Round 20   The last scenario to consider and is least recommended in comparison to the other scenarios tested is  the City’s current budget of $1.8 million per year for the next five years.  System results show that the  PCI will decrease to 59 (Figure 23) at the end of year 2024, while the backlog will grow to $53.6 million  (Figure 24).  In addition, approximately 45.5% of city streets will have a PCI equal to or greater than 70  (Figure 25).                                                                        11.A.a Packet Pg. 321 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 41    Pavement Management Technical Assistance (P‐TAP) Round 20   Figure 23. 5‐Year Scenario PCI Summary      11.A.a Packet Pg. 322 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 42    Pavement Management Technical Assistance (P‐TAP) Round 20     Figure 24. 5‐Year Scenario Backlog Summary    11.A.a Packet Pg. 323 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 43    Pavement Management Technical Assistance (P‐TAP) Round 20   Figure 25. Pavement Condition Category Percentages in 2024    11.A.a Packet Pg. 324 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)     Page | 44    Pavement Management Technical Assistance (P‐TAP) Round 20   APPENDICIES    SECTION I – PCI REPORT   SECTION II – NEEDS AND NETWORK SUMMARY STATISTICS  SECTION II – NETWORK CONDITION AND COST SUMMARY  SECTION IV – SECTIONS SELECTED FOR TREATMENT  SECTION V – OTHER BACKUP DOCUMENTS                  11.A.a Packet Pg. 325 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) SECTION PCI The Section PCI contains a PCI reported sorted by Street Name (ascending) ST ID – Street Identification SEC ID – Street Section Identification STREET NAME – Street Name BEGIN LOCATION – Start of the management section END LOCATION – End of the management section LENGTH – Length of management section WIDTH – Width of management section AREA – Area of management section FC – This is a group of streets or roadway subsystems that are classified pending on the level of service and traffic. A – Arterial C – Collector R – Residential/Local O – Other (user defined) SURFACE TYPE – Type of pavement surface. A – Asphalt Concrete, O – Asphalt Concrete over Asphalt Concrete P-Portland Cement Concrete, PCI – Pavement Condition Index of the management section – Last Calculated PCI The Pavement Condition Index is a rating derived from the Pavement Management System (PMS). The rating is based from the visual distress inspection information that consists of the MTC inspection guidelines (Alligator Cracking, Block Cracking, Distortion, Longitudinal and Transverse Cracking, Rutting, and Weathering and Raveling) or any maintenance and rehabilitation information that was entered into the PMS. REMAINING SERVICE LIFE (RSL) – Number of years left of pavement life 11.A.a Packet Pg. 326 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       Below are images of what streets look like in the condition category: CONDITION CATEGORY RATING Condition Category I (PCI 70 – 100, Pavement is classified in Very good to excellent condition and has little distress). Condition Category II/III (PCI 51-69, Pavements are classified in the Good Category and have significant non-load and load related distresses). 11.A.a Packet Pg. 327 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       Condition Category Good IV (PCI 26-50, Pavement are classified in the Poor Category and have major distress). Condition Category V (PCI 0 – 25, Pavement is classified in the very poor to failed category and has extensive amounts of major distress) 11.A.a Packet Pg. 328 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) ACORN WY10 85121344,114 R - Residential/Local A - ACENDVALLEY OAKS DR 29.01ACORWY ADAMS CT10 763603313,575 R - Residential/Local A - ACMURRAY AVE END 23.88ADAMCT ALBANY PL10 69164337,527 R - Residential/Local A - ACPLYMOUTH DR END 19.56ALBAPL ALDER ST10 821,013 35 35,455 R - Residential/Local A - ACSTARLING DR THOMAS RD 27.67ALDEST ALEXANDER ST10 771,033 44 45,452 R - Residential/Local A - ACSIXTH ST LEWIS ST 24.52ALEXST ALEXANDER ST20 711,394 48 68,666 R - Residential/Local A - ACS END(CUL-DE-SAC)NINTH ST 20.74ALEXST ALEXANDER ST30 791,907 48 91,536 R - Residential/Local O - AC/ACNINTH ST SIXTH ST 33.06ALEXST ALTA OAK WY10 845923420,128 R - Residential/Local A - ACGREENFIELD DR VILLAGE PL 28.92ALTAWY AMANDA WY10 627353727,195 R - Residential/Local A - ACCARLA WY MANTELLI DR 15.68AMANAV AMBER CT10 80136356,553 R - Residential/Local A - ACENDSEQUOIA DR 26.41AMBECT ANDOVER PL10 68126374,662 R - Residential/Local A - ACENDYORKTOWN DR 18.98ANDOPL ANGELA CT10 55226339,234 R - Residential/Local A - ACENDPRINCEVALLE ST 11.99ANGECT ANSON CT10 724243416,201 R - Residential/Local A - ACLEARNARD WY END 20.84ANSOCT ANTONIO CT10 743333212,505 R - Residential/Local A - ACENDPRINCEVALLE ST 22.59ANTOCT APACHE CT10 833823515,081 R - Residential/Local A - ACENDRODEO DR 27.76APACCT ARAPAHO DR10 831,086 35 38,010 R - Residential/Local A - ACDURANGO LN BENBOW DR 27.76ARAPDR ARBOR ST10 944523515,820 R - Residential/Local A - ACMANTELLI DR EDEN ST 33.57ARBOST ARMAND CT10 75424356,469 R - Residential/Local A - ACWREN AVE END 23.23ARMACT ARNOLD DR10 421,484 37 56,715 R - Residential/Local A - ACWAYLAND LN END 6.23ARNODR ARROYO CIR10 695,053 41 207,173 A - Arterial A - ACCAMINO ARROYO CAMINO ARROYO 14.43ARROCR ARROYO CIR20 511,074 74 79,476 C - Collector A - ACCAMINO ARROYO LEAVESLEY RD 5.62ARROCR ASHBURY CT10 78154347,021 R - Residential/Local A - ACENDALDER ST 24.86ASHBCT AVEZAN WAY10 846333421,522 R - Residential/Local A - ACTATUM AVE ST CLAR AVE 28.39AVEZAN AYER DR10 631,685 35 60,936 R - Residential/Local A - ACSANTA BARBARA DR END 16.15AYERDR AZARA ST10 85427208,540 R - Residential/Local A - ACSTONECRESS ST MANTELLI DR 29.01AZARST BABBS CREEK DR10 841,362 35 47,670 R - Residential/Local A - ACENDTHOMAS RD 28.92BABCDR BABBS CREEK DR20 895503418,700 R - Residential/Local A - AC100FT WEST OF STARLING DR END WEST 40.06BABCDR BANES LN10 83240317,440 R - Residential/Local A - ACALEXANDER ST END 28.3BANELN BANYAN CT10 849522119,992 R - Residential/Local A - ACBANYAN ST END 35.03BANYCT BANYAN CT20 83200214,200 R - Residential/Local A - ACENDTEA TREE WAY 33.56BANYCT BANYAN ST10 849732019,460 R - Residential/Local A - ACLINARIA ST E END 28.39BANYST Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver1 SS1030 Criteria: 11.A.a Packet Pg. 329 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) BARRON PL10 745213520,196 R - Residential/Local A - ACENDVICTORIA DR 22.59BARRPL BAY TREE DR10 601,535 35 53,725 R - Residential/Local A - ACWEST END EAST END 15.13BAYTDR BENASSI DR10 827633425,942 R - Residential/Local A - ACTHIRD ST SEQUOIA DR 27.69BENADR BENBOW DR10 805813520,335 R - Residential/Local A - ACSAGE HILL DR ARAPAHO DR 25.85BENBDR BENNETT CT10 814913517,185 R - Residential/Local A - ACSEVERANCE ST END 26.49BENNCT BENNETT ST10 733003510,500 R - Residential/Local A - ACCHURCH ST SEVERANCE ST 24.21BENNST BERRYBUSH CT10 836033522,898 R - Residential/Local A - ACOAK BROOK WY END 28.3BERRYC BLACKBERRY CT10 715323520,413 R - Residential/Local A - ACOAK BROOK WY END 23.08BLACCT BLACKFOOT CT10 854003212,800 R - Residential/Local A - ACGERONIMO ST CUL DE SAC 33.82BLCKCT BLACKSMITH DR10 615743520,090 R - Residential/Local A - ACTRAILBLAZER WY SADDLER DR 15.48BLACDR BLACKWING WY10 625483519,180 R - Residential/Local A - ACRANCHO HILLS DR EAGLE HILLS WY 16.38BLACWY BLAKE CT10 695083519,741 R - Residential/Local A - ACENDSANTA THERESA DR 19.56BLAKCT BLOSSOM GLEN CT10 683092910,544 R - Residential/Local A - ACGLENVIEW DR END 18.97BLOGCT BLUE HERON CT10 75215349,095 R - Residential/Local A - ACENDPEREGRINE DR 26.08BLUHCT BLUEBELL DR10 831,364 20 27,280 R - Residential/Local A - ACBURCHELL RD COUNTRY DR 27.76BLUBDR BOGIALA WY10 937503627,000 R - Residential/Local A - ACMARSANNE LN DE ANZA PL 33.52BOGAWY BOLSA RD10 614,841 24 116,184 A - Arterial A - ACCARNADERO RD 1076' S/O TRAVEL PARK CIR 11.09BOLSRD BOLSA RD20 361,076 82 88,232 A - Arterial A - AC1076' S/O TR PRK CIR TRAVEL PARK CIR 2.77BOLSRD BOSQUE ST10 843093410,506 R - Residential/Local A - ACJARDIN WY TAOS WY 28.98BOSQST BRAZOS ST10 823633412,342 R - Residential/Local A - ACJARDIN WY TAOS WY 27.73BRAZST BREM LN10 66302817,640 C - Collector A - ACS END HOLLOWAY RD 0BREMLN BRIARBERRY LN10 851,690 34 57,460 R - Residential/Local A - ACRANCHO HILLS DR PHEASANT DR 29.02BRIALN BRISTLECONE CT10 843213513,028 R - Residential/Local A - ACPONDEROSA DR END 28.94BRISCT BRITTANY CT10 783583514,241 R - Residential/Local A - ACMANTELLI DR END 24.57BRITCT BROADWAY10 111,176 37 43,512 R - Residential/Local A - ACWAYLAND LN HANNA ST 0BROAWY BROOK WY10 827403425,160 R - Residential/Local A - ACGREENFIELD DR VILLAGE PL 27.67BROOWY BUNTING CT10 823013410,234 R - Residential/Local A - ACSUNRISE DR CUL DE SAC 27.13BUNTIN BURCHELL RD10 692,277 12 27,324 R - Residential/Local A - ACHWY 152 BLUEBELL DR 19.05BURCRD BURKE DR10 744233717,458 R - Residential/Local A - ACMURRAY AV END 22.62BURKDR BUTTERCUP LN10 806652113,965 R - Residential/Local A - ACKERN AVE WESTWOOD DR 26.06BUTTLN BYERS ST10 658683732,116 R - Residential/Local A - ACSANTA PAULA DR WREN AVE 17.25BYERST Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver2 SS1030 Criteria: 11.A.a Packet Pg. 330 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CALABRESE WY10 568903734,737 R - Residential/Local A - ACENDDELTA DR 12.57CALAWY CALLE DEL REY10 761,585 45 71,325 C - Collector A - ACMANTELLI DR LERMA LN 14.13CALDRY CALLE DEL REY20 671,167 45 52,515 C - Collector A - ACLERMA LN LONG MEADOW DR 10.61CALDRY CAMERON BLVD10 762,020 100 202,000 A - Arterial A - ACHWY 152 VENTURE WY 20.2CAMBL CAMINO ARROYO10 646514227,342 C - Collector A - ACGILMAN RD ARROYO CIR 9.51CAMARR CAMINO ARROYO20 731,248 42 58,396 C - Collector A - ACARROYO CIR END 12.82CAMARR CAMINO ARROYO90 742,150 82 176,300 C - Collector A - ACVENTURE WAY PACHECO PASS RD 14.53CAMARR CAMINO ARROYO95 642,820 82 231,240 C - Collector A - ACPACHECO PASS RD GILMAN RD 9.88CAMARR CANOPY CT10 853573514,906 R - Residential/Local A - ACARBOR ST END 29.58CANOCT CANYON CT10 85100343,400 R - Residential/Local A - ACCHEYENNE DR CUL DE SAC 29.01CANYCT CARIGNANE DR10 628533630,708 R - Residential/Local A - ACMICHELLE CT MESA RD 15.58CARIDR CARLA WY10 538633731,931 R - Residential/Local A - ACAMANDA AV WREN AVE 11.12CARLWY CARLYLE CT10 564193616,884 R - Residential/Local A - ACCHURCH ST END 12.54CARLCT CARMEL ST10 691,053 44 46,332 C - Collector A - ACFIRST ST EL CERRITO WY 11.3CARMST CARMEL ST20 581,181 44 51,964 C - Collector A - ACEL CERRITO WY SHERWOOD DR 7.63CARMST CARMEL ST30 391,336 48 64,128 R - Residential/Local A - ACEIGHTH ST SIXTH ST 4.99CARMST CARMEL ST40 541,865 48 89,520 C - Collector A - ACSIXTH ST THIRD ST 6.42CARMST CARMEL ST50 191,535 48 73,680 C - Collector A - ACTHIRD ST FIRST ST 0CARMST CAROB CT10 839302018,600 R - Residential/Local A - ACTEA TREE WAY END 33.56CAROCT CARR PL10 677353527,601 R - Residential/Local A - ACENDSIXTH ST 18.4CARRPL CARRIAGE DR10 736233422,967 R - Residential/Local A - ACENDRANCHO HILLS DR 24.21CARRDR CASEY ST10 215524725,944 R - Residential/Local A - ACENDSWANSTON LN 0CASEST CATALINA CT10 39147367,176 R - Residential/Local A - ACENDEL DORADO DR 5.07CATACT CATHERINE CT10 58169337,520 R - Residential/Local A - ACPRINCEVALLE ST END 13.49CATHCT CEDAR CT10 364683719,208 R - Residential/Local A - ACENDWESTWOOD DR 3.84CEDACT CHADWICK ST10 785823520,370 R - Residential/Local A - ACHOXETT ST WENTZ DR 25.13CHADST CHAPPELL CT10 822783511,523 R - Residential/Local A - ACENDCHURCH ST 27.73CHAPCT CHARLES LUX DR10 855903218,880 R - Residential/Local A - ACGREENFIELD DR CIMINO ST 34.14CHRLUX CHARLES LUX DR20 877503022,500 R - Residential/Local A - ACCIMINO ST TENTH ST/CHARLES LUX DR RAB 33.6CHRLUX CHERRYWOOD CT10 833003410,200 R - Residential/Local A - ACSPRIG WAY CUL DE SAC 33.81CHERCT CHESAPEAKE PL10 704663719,049 R - Residential/Local A - ACENDORCHARD DR 20.16CHESPL Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver3 SS1030 Criteria: 11.A.a Packet Pg. 331 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CHESBRO WY10 717683627,648 R - Residential/Local A - ACGAUNT AVE KELTON DR 20.23CHESWY CHESTNUT ST10 739214945,129 C - Collector A - ACSIXTH ST END 12.83CHESST CHESTNUT ST20 576935034,650 C - Collector A - ACLEWIS ST MURRAY ST 7.31CHESST CHESTNUT ST30 232,700 63 170,100 A - Arterial A - ACLUCHESSA AVE 505' N/O STUTZ WY 0CHESST CHESTNUT ST40 503574214,994 A - Arterial A - AC505' N/O STUTZ WY 689' S/O TENTH ST 7.09CHESST CHESTNUT ST50 286896242,718 A - Arterial A - AC689' S/O TENTHST TENTH ST 0.62CHESST CHESTNUT ST60 431,279 63 80,577 C - Collector O - AC/ACTENTH ST EIGHTH ST 5.2CHESST CHESTNUT ST70 741,243 49 60,907 C - Collector O - AC/ACEIGHTH ST SIXTH ST 19.79CHESST CHEYENNE DR10 834543314,982 R - Residential/Local A - ACSADDLER WY 100' W/O NAVAJO CT 27.76CHEYDR CHIESA DR10 304273715,799 R - Residential/Local A - ACENDLA PALOMA WY 1.7CHIEDR CHRISTINE CT10 62142285,626 R - Residential/Local A - ACCARIGNANE DR END 15.58CHRICT CHURCH ST10 651,036 53 54,908 C - Collector A - ACFIRST ST HOWSON ST 9.87CHURST CHURCH ST100 681,853 48 88,944 C - Collector A - ACSEVENTH ST FOURTH ST 10.89CHURST CHURCH ST110 701,827 48 87,696 C - Collector A - ACFOURTH ST FIRST ST 11.64CHURST CHURCH ST121 501,243 52 64,636 C - Collector A - ACLONDON DR TENTH ST 5.33CHURST CHURCH ST125 501,700 52 88,400 C - Collector A - ACLUCHESSA AVE LONDON DR 5.33CHURST CHURCH ST20 439705351,410 C - Collector A - ACHOWSON ST WELBURN AVE 3.63CHURST CHURCH ST30 531,701 63 107,163 C - Collector O - AC/ACWELBURN AVE MANTELLI DR 9.18CHURST CHURCH ST40 681,345 62 83,390 C - Collector O - AC/ACMANTELLI DR 98' S/O RONAN 16.36CHURST CHURCH ST50 764795626,824 C - Collector O - AC/AC98' S/O RONAN LIMAN AVE 20.24CHURST CHURCH ST60 559335046,650 C - Collector O - AC/ACLIMAN AVE LAS ANIMAS AV 10.02CHURST CHURCH ST70 624424921,658 C - Collector O - AC/ACLAS ANIMAS AV 100' N/O HENNESSEY WY 13.29CHURST CHURCH ST80 723764918,424 C - Collector O - AC/AC100' N/O HENNESSEY WY FARRELL AVE 17.17CHURST CHURCH ST85 748634538,835 C - Collector A - ACFARRELL AV N. END 14.63CHURST CHURCH ST91 931,108 48 53,184 C - Collector A - ACTENTH ST EIGHTH ST 22.23CHURST CHURCH ST95 937644836,672 C - Collector A - ACEIGHTH ST SEVENTH ST 22.23CHURST CHURCHILL PL10 804603516,100 R - Residential/Local A - ACWEST END CHURCH ST 26.4CHURPL CHURCHILL PL20 794723516,520 R - Residential/Local A - ACCHURCH ST EAST END 25.76CHURPL CIELO VISTA CT10 77176274,752 R - Residential/Local A - ACDANCING WIND WAY CUL DE SAC 26.55CIELCT CIELO VISTA LN10 781,308 27 35,316 R - Residential/Local A - ACDANCING WIND WAY DREAM CATCHER WAY 27.65CIELLN Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver4 SS1030 Criteria: 11.A.a Packet Pg. 332 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CIMINO ST10 836104728,670 R - Residential/Local A - ACLUCHESSA AVE CHARLES LUX DR 31.05CIMNO CINNAMON WY10 841,370 32 43,840 R - Residential/Local A - ACPEPPERMINT ST CULDESAC SOUTH 30.07CINNMN CLARK WY10 808823530,870 R - Residential/Local A - ACCRAWFORD DR WREN AVE 26.41CLARWY CLOVE PL10 84260328,320 R - Residential/Local A - ACCINNAMON ST COBBLESTONE CT 30.07CLOVPL CLUB DR10 271,050 60 63,000 R - Residential/Local A - ACSANTA TERESA BLVD GRENACHE WY 0.61CLUBDR COBBLESTONE CT10 911,400 28 39,200 R - Residential/Local A - ACTHIRD ST PEPPERMINT ST 42.62COBBSTN COBBLESTONE CT/THIRD ST RAB 75 89260164,160 R - Residential/Local A - ACTHIRD ST THIRD ST 40.24THIRST COHANSEY AVE05 4350175,950 R - Residential/Local A - ACNO NAME UNO AVE 350 E OF NONAME UNO AVE 0COHAAV COHANSEY AVE15 117181712,206 R - Residential/Local A - AC350 E OF NONAME UNO 360 E OF TERI CT 0COHAAV COHANSEY AVE25 909505451,300 R - Residential/Local A - ACNIGHTINGALE DR END EAST 32.31COHAV COLONY CT10 85121356,028 R - Residential/Local A - ACRANCHO HILLS DR END 29.01COLOCT COLONY WY10 745783421,437 R - Residential/Local A - ACENDRANCHO HILLS DR 25.13COLOWY COLUMBINE CT10 846182015,808 R - Residential/Local A - ACMANTELLI DR END 28.39COLUCR COMANCHE ST10 836703221,440 R - Residential/Local A - ACSUNRISE DR PUBELO 30.73COMAST CONCORD PL10 792733311,124 R - Residential/Local A - ACNINTH ST END 25.77CONCPL CONNELL CT10 822782910,673 R - Residential/Local A - ACLAS ANIMAS AV END 27.13CONNCT COOPER PL10 814763516,660 R - Residential/Local A - ACJICARRILLA PL SUNRISE DR 31.77COOPPL CORAL BELL CT10 84329209,211 R - Residential/Local A - ACENDPERIWINKLE DR 28.39CORACT COUNTRY DR10 841,113 20 22,260 R - Residential/Local A - ACENDSTRAWBERRY LN 28.39COUNDR COUNTRY DR20 841,400 20 28,000 R - Residential/Local A - ACSTRAWBERRY LN SUNFLOWER CIR 28.39COUNDR COUNTRY DR30 801,030 20 20,600 R - Residential/Local A - ACSUNFLOWER CIR MANTELLI DR 25.85COUNDR COYOTE MOON LN10 751,105 34 37,570 R - Residential/Local A - ACDREAM CATCHER WAY SUNRISE DR 24.49COYOLN CRAWFORD CT10 74131376,654 R - Residential/Local A - ACCRAWFORD DR END 22.6CRAWCT CRAWFORD DR10 781,221 35 42,735 R - Residential/Local A - ACSANTA PAULA DR END 25.14CRAWDR CREST HILL CT10 834563417,289 R - Residential/Local A - ACRANCHO HILLS DR END 27.77CREHCT CREST HILL WY10 831,713 34 58,242 R - Residential/Local A - ACENDRANCHO HILLS DR 27.77CREHWY CROCKER LN10 378962925,984 R - Residential/Local A - ACNINTH ST EIGHTH ST 3.94CROCLN CULP DR10 647763527,160 R - Residential/Local A - ACHOESCH WY KERN AVE 16.78CULPDR CUMBERLAND DR10 769343734,558 R - Residential/Local A - ACMILLER AVE ORCHARD DR 23.86CUMBDR CYPRESS CT10 451,600 34 54,400 R - Residential/Local A - ACWEST WOOD DR CUL DE SAC 7.19CYPRCT Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver5 SS1030 Criteria: 11.A.a Packet Pg. 333 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CYPRESS CT10 844083514,280 R - Residential/Local A - ACENDPONDEROSA DR 28.94CYPREC CYPRESS CT20 785323418,088 R - Residential/Local A - ACPONDEROSA DR LAUREL DR 24.86CYPREC CYPRESS CT30 47323626,352 R - Residential/Local A - ACLAUREL DR WESTWOOD DR 0CYPREC DAFODIL PL10 836643523,240 R - Residential/Local A - ACMANTELLI DR ZINNIA ST 27.76DAFOPL DANCING WIND WY10 745443418,496 R - Residential/Local A - ACRANCHO HILLS DRIVE CIELO VISTA LAND 23.52DANCWY DARTMOUTH PL10 583413313,368 R - Residential/Local A - ACENDPRINCEVALLE ST 13.51DARTPL DAVID CT10 372833712,278 R - Residential/Local A - ACENDSHERWOOD DR 4.26DAVICT DAWN WY10 521,132 31 37,272 R - Residential/Local A - ACENDMESA RD 10.55DAWNWY DE ANZA PL10 934903617,640 R - Residential/Local A - ACTENTH ST LOPEZ WY 33.52DEANZ DEARBORN PL10 733273312,906 R - Residential/Local A - ACENDORCHARD DR 21.98DEARPL DEL REY CT10 34230299,186 R - Residential/Local A - ACENDMANTELLI DR 3.17DELRCT DEL RIO CIR10 807222920,938 R - Residential/Local A - ACSANTA FE DR SANTA FE DR 26.06DELRIO DELTA CT10 45174378,245 R - Residential/Local A - ACENDDELTA DR 7.52DELTCT DELTA DR10 422,123 36 76,428 R - Residential/Local A - ACEL DORADO DR MANTELLI DR 6.27DELTDR DESERT BLOOM PL10 796673825,346 R - Residential/Local A - ACO'KEEFE LANE SUNRISE DRIVE 28.79DESEPL DEVILLE CT10 222963612,456 R - Residential/Local A - ACENDEL DORADO DR 0DEVICT DEVON PL10 613543514,351 R - Residential/Local A - ACENDLONDON DR 15.05DEVOPL DIANE CT10 383573715,016 R - Residential/Local A - ACWELBURN AVE END 4.64DIANCT DORIS CT10 365403621,324 R - Residential/Local A - ACWELBURN AVE END 3.88DORICT DOVE CT10 853023412,220 R - Residential/Local A - ACCREST HILL WY END 29.01DOVECT DOVETAIL WAY10 751,508 34 51,272 R - Residential/Local A - ACRANCHO HILLS DR END 25.82DOVETA DOWDY ST10 251,343 48 64,464 R - Residential/Local A - ACEIGHTH ST SIXTH ST 0DOWDST DOWDY ST20 691,857 48 89,136 R - Residential/Local A - ACSIXTH ST THIRD ST 19.56DOWDST DREAM CATCHER WY10 767363425,024 R - Residential/Local A - ACCIELO VISTA WAY SUNRISE DRIVE 25.5DREAWY DRIFTWOOD TER10 401,123 37 41,551 R - Residential/Local A - ACWESTWOOD DR JUNIPER DR 5.39DRIFTR DURANGO LN10 845623519,670 R - Residential/Local A - ACWAGON WY ARAPAHO DR 28.39DURALN EAGLE HILLS WY10 839363532,760 R - Residential/Local A - ACBLANKWING WY 300' S/O PEREGRINE DR 27.76EAGHWY EAGLE HILLS WY20 853003510,500 R - Residential/Local A - AC300' S/O PEREGRINE DR PEREGRINE DR 29.01EAGHWY EAGLE VIEW WY10 829153431,110 R - Residential/Local A - ACLONGMEADOW DR 241' N/O QUAILWALK DR 27.13EAGVWY EAGLE VIEW WY20 834883416,592 R - Residential/Local A - AC241' N/O QUAILWALK DR PEREGRINE DR 27.76EAGVWY EAGLE`S NEST LN10 803243411,016 R - Residential/Local A - ACEAGLE HILLS WY 324' N/O EAGLE HILLS WY 25.85EAGNLN Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver6 SS1030 Criteria: 11.A.a Packet Pg. 334 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) EAGLE`S NEST LN20 811,109 34 37,706 R - Residential/Local A - AC324' N/O EAGLE HILLS WY PEREGRINE DR 26.49EAGNLN EAST CT10 62145377,008 R - Residential/Local A - ACWELBURN AVE END 15.64EASTCT EAST HILLVIEW CT10 68130376,534 R - Residential/Local A - ACTARYN LN END 18.47EHILCT EAST ST10 276624529,790 R - Residential/Local A - ACEIGHTH ST SEVENTH ST 0.65EASTST EDEN ST10 801,324 35 46,340 R - Residential/Local A - ACWREN AV FLORAL ST 26.05EDENST EIGHTH ST20 461,931 47 90,757 C - Collector A - ACMILLER AVE PRINCEVALLE ST 4.31EIGHST EIGHTH ST30 671,856 38 70,528 C - Collector A - ACPRINCEVALLE ST CHURCH ST 10.54EIGHST EIGHTH ST40 536423824,396 C - Collector A - ACCHURCH ST MONTEREY RD 6.15EIGHST EIGHTH ST50 221,643 37 60,791 R - Residential/Local A - ACALEXANDER ST CROCKER LN 0EIGHST EIGLEBERRY ST10 911,092 48 52,416 R - Residential/Local O - AC/ACTENTH ST EIGHTH ST 42.04EIGLST EIGLEBERRY ST15 911,359 48 65,232 R - Residential/Local O - AC/ACEIGHTH ST SIXTH ST 42.04EIGLST EIGLEBERRY ST20 891,250 51 63,750 R - Residential/Local C - AC/PCCSIXTH ST FOURTH ST 39EIGLST EIGLEBERRY ST30 911,299 51 66,249 R - Residential/Local C - AC/PCCFOURTH ST SECOND ST 42.04EIGLST EIGLEBERRY ST40 915325127,132 R - Residential/Local O - AC/ACSECOND ST FIRST ST 42.04EIGLST EL CAMINITO10 451,050 35 36,750 R - Residential/Local A - ACLERMA LN LONG MEADOW DR 7.79ELCAMI EL CERRITO WY10 446263723,162 R - Residential/Local A - ACPARISH WY WREN AVE 7.1ELCEWY EL CERRITO WY20 441,127 37 41,699 R - Residential/Local A - ACWREN AVE WAYLAND LN 7.06ELCEWY EL CERRITO WY30 351,444 37 53,428 R - Residential/Local A - ACWAYLAND LN LA COCHE WY 3.5ELCEWY EL DORADO DR10 211,037 36 39,216 R - Residential/Local A - ACENDTERESA BLVD 0ELDODR EL INVIERNO DR10 842963410,064 R - Residential/Local A - ACWREN AVE EL VERANO WY 28.98ELINDR EL ROBLE CT10 264633717,131 R - Residential/Local A - ACSAN MIGUEL ST END 0.3ELROCT EL TORO WY10 554753717,575 R - Residential/Local A - ACWAYLAND LN CARMEL ST 12.05ELTOWY EL TORO WY20 492863710,582 R - Residential/Local A - ACHANNA ST LA COCHE WY 9.23ELTOWY EL VERANO WY10 836263421,284 R - Residential/Local A - ACLA PRIMAVERA WY EL INVIERNO DR 28.36ELVEWY ELECTA CT10 784774420,988 R - Residential/Local A - ACLAS ANIMAS AVE CUL DE SAC 27.82ELECCT ELEVENTH ST10 705503720,350 R - Residential/Local A - ACROSANA ST END 20.18ELEVST ELM ST10 58201357,035 R - Residential/Local A - ACFOREST ST SPRINGDALE ST 13.52ELMST EMERSON CT10 69152357,281 R - Residential/Local A - ACPETERSEN DR END 19.05EMERCT ENGLE WY10 16213724,784 R - Residential/Local A - ACENDLUCHESSA AVE 0ENGLWY ERVIN CT10 77245348,330 R - Residential/Local A - ACMONTEREY ROAD CUL DE SAC 26.27ERVICT ESCHENBURG DR10 221,342 37 49,654 R - Residential/Local A - ACMILLER AVE PRINCEVALLE ST 0ESCHDR Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver7 SS1030 Criteria: 11.A.a Packet Pg. 335 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) FAIRVIEW DR10 441,062 37 39,294 R - Residential/Local A - ACPRINCEVALLE ST HANNA ST 7.02FAIRDR FALCON CT10 702893511,908 R - Residential/Local A - ACENDEAGLE HILLS WY 19.64FALCCT FANTAIL WAY10 90350258,750 R - Residential/Local A - ACHUMMINGBIRD LANE WREN AVE 32.31FANTL FARMAN FRONTAGE RD 10 492,818 31 87,358 C - Collector A - AC2818 S/O FARMMAN LN FARMAN LN 5.06FARFRD FARRELL AVE10 561,942 43 83,506 A - Arterial A - ACWREN AVE MONTEREY RD 10FARRAV FELLOM CT10 793983716,450 R - Residential/Local A - ACMURRAY AV END 25.79FELLCT FERAGALLI CT10 815173417,578 R - Residential/Local A - ACHIRASAKI DR CUL DE SAC 26.49FERACT FERNWOOD LN10 294913719,974 R - Residential/Local A - ACENDWESTWOOD DR 1.31FERNLN FESTA AGLIO CT10 796193421,046 R - Residential/Local A - ACHIRASAKI DR CUL DE SAC 30.03FESTCT FESTA AGLIO DR90 838983531,430 R - Residential/Local A - ACHIRASAKI AV PADOVA DR 27.76FESTDR FIFTH ST10 701,213 35 42,455 R - Residential/Local A - ACMILLER AVE PRINCEVALLE ST 20.16FIFTST FIFTH ST20 691,621 40 64,840 R - Residential/Local P - PCCPRINCEVALLE ST CHURCH ST 36.57FIFTST FIFTH ST30 696504026,000 R - Residential/Local P - PCCCHURCH ST MONTEREY RD 36.57FIFTST FILBRO DR10 586193521,665 R - Residential/Local A - ACROYAL WY PRINCEVALLE ST 13.49FILBDR FILICE DR10 752,591 37 99,482 R - Residential/Local A - ACSOUTH END NORTH END 23.23FILIDR FINCH LN10 846063420,604 R - Residential/Local A - ACTWINBERRY WY LOGANBERRY DR 28.39FINCLN FINE DR10 85209347,106 R - Residential/Local A - ACRIDGEWAY DR LEARNARD WY 29.01FINEDR FIRST ST10 361,370 68 93,160 NCR - Proposed; Private; Non-County A - ACWREN AVE MILLER AVE 3.93FIRSST FIRST ST20 331,362 63 85,806 NCR - Proposed; Private; Non-County A - ACMILLER AVE HANNA ST 2.72FIRSST FIRST ST30 391,493 50 74,650 NCR - Proposed; Private; Non-County A - ACHANNA ST MONTEREY ST 4.77FIRSST FLORAL ST10 806193521,665 R - Residential/Local A - ACEDEN ST MANTELLI DR 26.05FLORST FOREST ST10 452,574 45 115,830 C - Collector A - ACLEAVESLEY RD YAMANIE DR 4.22FOREST FOREST ST30 721,032 47 48,504 C - Collector O - AC/ACSIXTH ST LEWIS ST 18.52FOREST FOREST ST40 661,312 47 61,664 C - Collector O - AC/ACLEWIS ST I.O.O.F AVE 14.94FOREST FOREST ST50 371,768 37 65,416 R - Residential/Local A - ACSWANSTON ST LEAVESLEY RD 4.35FOREST FOREST ST60 741,200 40 48,000 C - Collector A - ACEIGHTH ST SIXTH ST 13.23FOREST FORUNATA PL10 85384207,680 R - Residential/Local A - ACFOREST ST GENNARO WAY 35.82FORTPL FOURTH ST10 686504026,000 C - Collector A - ACSANTA THERESA DR MILLER DR 10.89FOURST FOURTH ST15 689644038,560 C - Collector A - ACMILLER DR PRINCEVALLE ST 10.89FOURST Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver8 SS1030 Criteria: 11.A.a Packet Pg. 336 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) FOURTH ST20 582,229 40 89,160 C - Collector A - ACPRINCEVALLE ST EIGLEBERRY ST 7.59FOURST FOURTH ST30 193154012,600 C - Collector P - PCCEIGLEBERRY ST MONTEREY RD 0FOURST FOWLER ST10 674983517,430 R - Residential/Local A - ACHOXETT ST WENTZ DR 18.4FOWLST FOXGLOVE CT10 823323411,288 R - Residential/Local A - ACENDWILD IRIS DR 27.26FOXGCT FREEMAN CT10 836932924,311 R - Residential/Local A - ACLAS ANIMAS RD END 27.77FREECT GARDEN CT10 726953727,542 R - Residential/Local A - ACSOUTH END NORTH END 21.35GARDCT GARFIELD CT10 824223416,386 R - Residential/Local A - ACMURRAY AV END 27.71GARFCT GARY ST10 461,024 37 37,888 R - Residential/Local A - ACLAWRENCE DR WREN AVE 7.95GARYST GASCONY CT10 84179346,086 R - Residential/Local A - ACAVEZON WAY CUL DE SAC 28.39GASCON GAUNT AVE10 581,414 37 55,933 R - Residential/Local A - ACSOUTH END NORTH END 13.58GAUNAV GAVILAN CT10 354483618,012 R - Residential/Local A - ACMURRAY AV END 3.48GAVICT GENNARO WY10 834003413,600 R - Residential/Local A - ACLEWIS ST FORTUNATA PLACE 32.77GENNWY GEORGETOWN PL10 534523718,531 R - Residential/Local A - ACENDPRINCEVALLE ST 11.04GEORPL GERONIMO ST10 851,258 32 40,256 R - Residential/Local A - ACZUNI LANE SHOSHONE STREET 33.82GEROST GILMAN RD10 682,102 40 84,080 A - Arterial A - ACROGERS560' E/O CAMINO ARROYO 14GILMRD GLENVIEW CT10 683022910,341 R - Residential/Local A - ACENDGLENVIEW DR 18.96GLEVCT GLENVIEW DR10 709143733,818 R - Residential/Local A - ACTENTH ST JOHNSON WY 20.16GLEVDR GLENWOOD DR10 446273723,199 R - Residential/Local A - ACEL CERRITO WY WELBURN AVE 7.06GLENDR GOLD FINCH CT10 79156347,905 R - Residential/Local A - ACSPARROW GLEN WAY CUL DE SAC 30.03GOLDFI GOLDEN SKY WY10 776983423,732 R - Residential/Local A - ACDREAM CATCHER WAY SUNRISE DRIVE 26.55GOLDWY GOSHAWK CT10 844633417,610 R - Residential/Local A - ACENDLOGANBERRY DR 28.39GOSHCT GRANDE DR10 853153210,080 R - Residential/Local A - ACCHEYENNE DR SPRIG WAY 33.06GRANDR GRANT CT10 823743314,037 R - Residential/Local A - ACMURRAY AVE END 27.71GRANCT GRASSLAND WY10 871,400 28 39,200 R - Residential/Local A - ACTHIRD ST RAB END EAST 33.6GRASLND GRASSLAND WY/THIRD ST RAB 85 87260164,160 R - Residential/Local A - ACTHIRD ST THIRD ST 33.82THIRST GREENFIELD DR90 827463123,126 C - Collector A - ACLUCHESA AV N END GATE 16.76GREEDR GREENFIELD DR10 927863426,724 R - Residential/Local A - ACOAK BROOK WAY W LUCHESSA AVE 33GREENF GREENWICH DR10 795383719,906 R - Residential/Local A - ACYORKTOWN DR ORCHARD DR 25.77GREEDR GRENACHE WY10 401,420 37 52,540 R - Residential/Local A - AC30 FT W/O CLUB DR SYRAH CT 4.81GRENCH GREYSTONE CT10 764633517,916 R - Residential/Local A - ACKERN AVE END 23.31GREYCT Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver9 SS1030 Criteria: 11.A.a Packet Pg. 337 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) GUAYMAS CT10 68125335,984 R - Residential/Local A - ACENDLERMA LN 18.47GUAYCT GURRIES DR10 46973725,789 R - Residential/Local A - ACHANNA ST CHURCH ST 0GURRDR HACIENDA DR10 441,147 37 44,246 R - Residential/Local A - ACORTEGA CIR END 7.02HACIDR HADLEY CT10 766633323,738 R - Residential/Local A - ACENDROGERS LN 23.88HADLCT HAGEN CT10 703923515,681 R - Residential/Local A - ACENDWENTZ DR 20.16HAGECT HANNA ST10 421,984 52 103,168 R - Residential/Local A - ACFIRST ST WELBURN AVE 6.23HANNST HANNA ST20 538253730,525 R - Residential/Local A - ACWELBURN AVE END 11.08HANNST HANNA ST31 331,100 48 52,800 R - Residential/Local A - ACTENTH ST EIGHTH ST 2.73HANNST HANNA ST35 337474835,856 R - Residential/Local A - ACEIGHTH ST SEVENTH ST 2.73HANNST HANNA ST40 771,853 48 88,944 R - Residential/Local A - ACSEVENTH ST FOURTH ST 24.5HANNST HANNA ST50 641,829 48 87,792 R - Residential/Local A - ACFOURTH ST FIRST ST 16.7HANNST HARVARD PL10 683223312,830 R - Residential/Local A - ACENDEIGHTH ST 18.97HARVPL HASTINGS PL10 644983519,391 R - Residential/Local A - ACENDVICTORIA DR 16.68HASTPL HAWTHORNE ST10 82210357,350 R - Residential/Local A - ACWISTERIA DR ALDER ST 27.67HAWTST HAYFIELD ST10 835173417,578 R - Residential/Local A - ACPOPPYFIELD ST GREENFIELD DR 28.3HAYFIE HENNESSEY WY10 65299288,372 R - Residential/Local A - ACCHURCH ST SEVERANCE ST 17.33HENNWY HERITAGE WY10 853433512,005 R - Residential/Local A - ACLIONS CREEK DR SOLEDAD ST 29.01HERIWY HERSMAN DR10 739883534,580 R - Residential/Local A - ACSANTA BARBARA DR STEWART DR 21.98HERSDR HIRASAKI AVE10 462,184 45 98,280 C - Collector A - ACMANTELLI DR LONGMEADOW DR 4.53HIRAAV HIRASAKI AVE20 843204514,400 C - Collector A - ACLONG MEADOW DR END 17.84HIRAAV HIRASAKI CT10 854743416,116 R - Residential/Local A - ACMANTELLI DR CUL DE SAC 29.02HIRACT HOESCH WY10 656713624,156 R - Residential/Local A - ACSILVIA ST CULP DR 17.33HOESWY HOGAN WY10 796283524,520 R - Residential/Local A - ACENDSADDLER DR 25.21HOGAWY HOLLOWAY RD10 712,757 47 129,579 R - Residential/Local A - ACBREM LN SILACCI WY 20.74HOLLRD HOLLY CT10 84130356,343 R - Residential/Local A - ACCUL DE SAC BENASSI DR 28.94HOLLCT HOLLYHOCK CT10 83390207,800 R - Residential/Local A - ACHOLLYHOCK LN CUL DE SAC 33.9HLLYCT HOLLYHOCK LN10 781,950 20 39,000 R - Residential/Local A - ACMANTELLI DR HOLLYHOCK CT 24.57HOLLLN HONEY CT10 80165357,568 R - Residential/Local A - ACFLORAL ST END 26.05HONECT HOOVER CT10 785173015,510 R - Residential/Local A - ACENDROGERS LN 25.15HOOVCT HOPI LN10 806873524,045 R - Residential/Local A - ACSUNRISE DR O'KEEFE CT 30.53HOPILN HORNLEIN CT10 172005010,000 R - Residential/Local A - ACMONTEREY ST END 0HORNCT HOWARD AVE10 589623735,594 R - Residential/Local A - ACKELTON DR CULP DR 13.58HOWAAV Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver10 SS1030 Criteria: 11.A.a Packet Pg. 338 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) HOWARD CT10 73119376,210 R - Residential/Local A - ACENDHOWARD AVE 21.45HOWACT HOWSON ST10 596153722,755 R - Residential/Local A - ACCHURCH ST MONTEREY ST 14.06HOWSST HOXETT ST10 706183523,591 R - Residential/Local A - ACCHADWICK ST FOWLER ST 20.16HOXEST HUDSON PL10 803023312,081 R - Residential/Local A - ACENDORCHARD DR 26.41HUDSPL HUMMINGBIRD LANE10 905003216,000 R - Residential/Local A - ACCOHANSEY AVE VICKERY AVE 32.31HUMMN HYDE PARK DR10 786603523,100 R - Residential/Local A - ACWEST LUCHESSA AVE VICTORIA DR 25.15HYDPDR I.O.O.F AVE10 952,304 37 85,639 C - Collector O - AC/ACMONTEREY RD END 29.94IOOFAV IMPERIAL DR10 573533512,355 R - Residential/Local A - ACROYAL WY PRINCEVALLE ST 12.98IMPEDR IRISH CT10 522293610,044 R - Residential/Local A - ACENDPARISH WY 10.65IRISCT IRONBARK ST10 84452209,040 R - Residential/Local A - ACSTONECRESS ST MANTELLI DR 28.39IRONST IVY ST10 33200357,000 R - Residential/Local A - ACFOREST ST SPRINGDALE ST 2.81IVYST JACARANDA WY10 797243527,051 R - Residential/Local A - ACSOUTH END NORTH END 25.21JACAWY JACKDOW CT10 85151346,919 R - Residential/Local A - ACENDEAGLE`S NEST LN 29.01JACKCT JAMIESON WY10 185553722,342 R - Residential/Local A - ACLUCHESSA AVE END 0JAMIWY JARDIN WY10 853903212,480 R - Residential/Local A - ACBRAZOS ST BOSQUE ST 33.75JARDWY JICARILLA PL10 836403421,760 R - Residential/Local A - ACEAGLE VIEW WAY COOPER PL 30.73JCAPL JOHNSON WY10 624373716,169 R - Residential/Local A - ACPRINCEVALLE ST GLENVIEW DR 15.58JOHNWY JUNIPER DR10 218123730,044 R - Residential/Local A - ACCYPRESS CT WESTWOOD DR 0JUNIDR KAREN CT10 663582811,674 R - Residential/Local A - ACCARIGNANE DR END 17.8KARECT KELTON DR10 411,241 35 43,435 R - Residential/Local A - ACFIRST ST SWANER DR 5.86KELTDR KELTON DR20 411,475 35 51,625 R - Residential/Local A - ACSWANER DR VIOLET WY 5.87KELTDR KENNEDY CT10 794453617,904 R - Residential/Local A - ACMURRAY AV END 25.79KENNCT KENSINGTON PL10 654513517,746 R - Residential/Local A - ACENDVICTORIA DR 17.24KENSPL KENTWOOD CT10 231,023 37 37,851 R - Residential/Local A - ACWESTWOOD DR WESTWOOD DR 0KENTCT KERN AVE20 651,384 47 65,048 C - Collector A - ACFIRST ST WELBURN AVE 9.91KERNAV KERN AVE30 408164536,720 C - Collector A - ACWELBURN AVE CULP DR 2.97KERNAV KERN AVE40 421,065 46 48,990 C - Collector A - ACCULP DR MANTELLI DR 3.43KERNAV KERN AVE50 724294519,305 C - Collector A - ACMANTELLI DR 429' N/O MANTELLI DR 12.48KERNAV KERN AVE60 691,214 35 42,490 C - Collector A - AC429' N. OF MANTELLI DR N CITY LIM 12.1KERNAV KESTREL CT10 84235346,919 R - Residential/Local A - ACCREST HILL DR END 28.39KESTCT KINGS PL10 663473514,021 R - Residential/Local A - ACENDVICTORIA DR 17.8KINGPL KIOWA CT10 85240327,680 R - Residential/Local A - ACJICARILLA PL CUL DE SAC 33.82KIOWCT Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver11 SS1030 Criteria: 11.A.a Packet Pg. 339 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) KISHIMURA DR10 747814635,926 R - Residential/Local A - ACFOREST ST MURRAY AV 25.24KISHST KITE DR10 79229347,786 R - Residential/Local A - ACPEREGRINE DR SUNRISE DR 25.21KITEDR KOSHARE PL10 807253424,650 R - Residential/Local A - ACCOMANCHE ST SHOSHONE ST 26.73KOSHPL LA ALONDRA WY10 527683728,416 R - Residential/Local A - ACWREN AVE WELBURN AVE 10.61LAALWY LA COCHE WY10 697001913,300 R - Residential/Local A - ACEL CERRITO WY END 19.6LACOWY LA PALOMA WY10 509923736,704 R - Residential/Local A - ACWREN AVE WELBURN AVE 9.68LAPAWY LA PRIMAVERA WY10 798373428,458 R - Residential/Local A - ACWREN AVE TAOS WAY 25.81LAPRWY LA SIERRA WY10 581,155 37 42,735 R - Residential/Local A - ACWAYLAND LN HANNA ST 13.54LASIWY LAREDO WY10 834153514,525 R - Residential/Local A - ACSUNRISE DR RIO GRANDE WY 27.76LAREWY LARIAT DR10 846573522,995 R - Residential/Local A - ACSAGE HILL DR ARAPAHO DR 28.39LARIDR LARKSPUR LN10 697692015,380 R - Residential/Local A - ACHOLLYHOCK LN MANTELLI DR 19.05LARKLN LAS ANIMAS AV040 387403223,680 R - Residential/Local A - ACROAD NARROWS MURRAY AVE 4.62LASAAV LAS ANIMAS AV10 827163525,060 C - Collector A - ACCHURCH ST MONTEREY RD 16.86LASAAV LAS ANIMAS AV20 41,210 20 24,200 C - Collector A - ACNONAME UNO AVE 792' E/O SAN YSIDRO AVE 0LASAAV LAS ANIMAS AV30 796023420,468 R - Residential/Local A - ACMONTEREY RD ROAD NARROWS 25.79LASAAV LAS ANIMAS CT10 38201379,329 R - Residential/Local A - ACENDEL CERRITO WY 4.64LAANCT LAUREL DR10 791,897 37 70,189 R - Residential/Local A - ACUVAS PARK DR CYPRESS CT 25.77LAURDR LAWRENCE DR10 681,240 37 45,880 R - Residential/Local A - ACENDWREN AVE 18.47LAWRDR LEARNARD WY10 795643419,176 R - Residential/Local A - ACMANTELLI DR BRENTWOOD LN 25.21LEARWY LEAVESLEY RD10 402,678 30 80,340 A - Arterial A - AC200' E/O ARROYO CIR CITY LIMIT 3.96LEAVRD LEAVESLEY RD30 256005030,000 A - Arterial A - ACSAN YSIDRO AVE 200' E/O ARROYO CIR 0LEAVRD LERMA LN10 757493425,466 R - Residential/Local A - ACCALLE DEL REY SOLEDAD ST 22.68LERMLN LEWIS ST10 371,479 36 53,244 R - Residential/Local P - PCCMONTEREY RD FOREST ST 7.26LEWIST LEWIS ST20 671,088 35 38,080 R - Residential/Local A - ACFOREST ST ROGERS LN 18.42LEWIST LEXINGTON PL10 435953723,822 R - Residential/Local A - ACENDPRINCEVALLE ST 6.61LEXIPL LILLY AVE10 646403723,680 R - Residential/Local A - ACCHURCH ST END 16.74LILLAV LILLY AVE20 823622810,136 R - Residential/Local A - ACLIMAN AVE RONAN AVE 27.73LILLAV LIMAN AVE10 629363028,080 R - Residential/Local A - ACCHURCH ST MONTEREY RD 15.64LIMAAV LINARIA ST10 77394207,880 R - Residential/Local A - ACBANYAN ST OLEA CT 27.11LINAST LINCOLN CT10 744403718,087 R - Residential/Local A - ACMURRAY AV END 22.62LINCCT LINNET CT10 814043413,736 R - Residential/Local A - ACDOVETAIL WAY CUL DE SAC 26.49LINNET Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver12 SS1030 Criteria: 11.A.a Packet Pg. 340 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) LIONS CREEK DR10 709063531,710 R - Residential/Local A - ACMANTELLI DR HERITAGE WY 19.64LIOCDR LISA CT10 793083010,681 R - Residential/Local A - ACENDNICOLE WY 25.75LISACT LODGEPOLE CT10 843223613,310 R - Residential/Local A - ACPONDEROSA DR END 28.94LODGCT LOGANBERRY DR10 851,370 34 46,580 R - Residential/Local A - ACPARTRIDGE DR PHEASANT DR 29.02LOGADR LONDON DR10 641,015 35 35,525 R - Residential/Local A - ACDEVON PL CHURCH ST 16.68LONDDR LONDON PL10 734603518,061 R - Residential/Local A - ACCHURCH ST CUL DE SAC 21.97LONDPL LONE DEER WY10 724133516,166 R - Residential/Local A - ACLONGMEADOW DR END 23.58LONDWY LONE OAK LN10 893602810,080 R - Residential/Local A - ACTHIRD ST RAB 360FT W/O RAB 37.72LONOAK LONE OAK LN/THIRD ST RAB 95 87240184,320 R - Residential/Local A - ACTHIRD ST LONE OAK LN 33.82THIRST LONGMEADOW CT10 871,575 25 39,375 R - Residential/Local A - ACRANCHO HILLS DR W END 30.21LONGCT LONGMEADOW DR10 761,000 44 44,000 C - Collector A - ACRANCHO HILLS DR TRAILBLAZER WY 14.13LONMDR LONGMEADOW DR20 721,502 44 66,088 C - Collector A - ACTRAILBLAZER WY RODEO DR 12.48LONMDR LONGMEADOW DR30 447975947,023 C - Collector A - ACRODEO DR SANTA TERESA BLVD 3.99LONMDR LONGMEADOW DR40 844025421,708 C - Collector A - ACSANTA TERESA BLVD HIRASAKI DR 17.84LONMDR LOPEZ WY10 938703631,320 R - Residential/Local A - ACCHARLES LUX DR DE ANZA PL 33.52LOPEWY LOS PADRES CT10 744613718,864 R - Residential/Local A - ACSAN MIGUEL ST END 22.6LOSPCT LOUPE CT10 643313613,716 R - Residential/Local A - ACCHURCH ST END 16.74LOUPCT LUCHESSA AVE10 791,921 71 136,391 A - Arterial A - ACTHOMAS DR GREENFIELD DR 18.96LUCHAV LUCHESSA AVE15 442,995 41 122,795 A - Arterial A - ACUVAS CREEK/LUCHESSA AVE MONTEREY RD 5.18LUCHAV LUCHESSA AVE20 181,468 58 85,144 A - Arterial A - ACMONTEREY RD JAMIESON WY 0LUCHAV LUCHESSA AVE30 111,478 63 93,114 A - Arterial A - ACJAMIESON WY ROSSI LN 0LUCHAV LUCHESSA AVE40 936003621,600 R - Residential/Local A - ACMILLER AVE TENTH ST/LUCHESSA AVE RAB 33.52LUCHAV LUCHESSA AVE60 857305640,880 R - Residential/Local A - ACCIMINO ST GREENFIELD DR 36.29LUCHAV LUCHESSA AVE70 875303216,960 R - Residential/Local A - ACTHOMAS DR END OF BRIDGE EAST 33.69LUCHAV LUPINE CT10 433403513,611 R - Residential/Local A - ACENDLIONS CREEK DR 6.89LUPICT MADISON CT10 824223516,563 R - Residential/Local A - ACMURRAY AV END 27.71MADICT MANTELLI DR10 793,534 44 155,496 C - Collector A - ACENDLARKSPUR LN 15.45MANTDR MANTELLI DR20 811,594 44 70,136 C - Collector A - ACLARKSPUR LN RANCHO HILLS 16.38MANTDR MANTELLI DR30 621,228 45 55,260 C - Collector A - ACRANCHO HILLS CALLE DEL REY 8.91MANTDR Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver13 SS1030 Criteria: 11.A.a Packet Pg. 341 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) MANTELLI DR40 691,695 45 76,275 A - Arterial O - AC/ACCALLE DEL REY SANTA TERESA BLVD 15.44MANTDR MANTELLI DR50 724656932,085 A - Arterial A - ACZINNIA ST HIRASAKI AVE 15.82MANTDR MANTELLI DR60 371,235 69 85,215 A - Arterial A - ACHIRASAKI AVE KERN AVE 3.22MANTDR MANTELLI DR70 721,494 69 103,086 A - Arterial A - ACKERN AVE WREN AVE 15.82MANTDR MANTELLI DR80 291,787 69 123,303 A - Arterial A - ACWREN AVE CHURCH ST 0.94MANTDR MANTELLI DR90 436356239,370 A - Arterial A - ACSANTA TERESA BLV ZINNIA ST 4.69MANTDR MAPLE ST10 525834827,984 R - Residential/Local A - ACSEVENTH ST SIXTH ST 10.59MAPLST MARIA WY10 508223730,414 R - Residential/Local A - ACAMANDA WY WREN AVE 9.72MARIWY MARIPOSA ST10 714483515,680 R - Residential/Local A - ACORINDA WY JACARANDA WY 20.23MARIST MARSANNE LN10 933003610,800 R - Residential/Local A - ACBOGIALA WY LOPEZ WY 33.52MARSNN MARTIN ST10 651,453 33 47,949 C - Collector A - ACMONTEREY RD CHESTNUT ST 9.99MARTST MARTIRI CT10 814453415,130 R - Residential/Local A - ACHIRASAKI DR CUL DE SAC 26.49MARTIR MARTIRI DR90 776003521,000 R - Residential/Local A - ACHIRASAKI AV PADOVA DR 27.11MARTDR MAYLOCK RD10 426704535,636 R - Residential/Local A - ACENDOBATA WY 6.36MAYLRD MAYLOCK RD20 61,012 47 47,564 R - Residential/Local A - ACOBATA WAY ROSSI LN 0MAYLRD MESA RD10 762,496 31 77,376 C - Collector A - ACGAVILAN COLLEGE THOMAS RD 14.03MESARD MICHELLE CT10 4372207,440 R - Residential/Local A - ACCARIGNANE DR END 0MICHCT MILIAS CT10 713433714,583 R - Residential/Local A - ACENDBYERS ST 20.76MILACT MILLER AVE05 461,900 47 89,300 C - Collector A - ACSARATOGA PL UVAS PARK DR 4.33MILLAV MILLER AVE10 444,547 36 163,692 R - Residential/Local A - ACSANTA TERESA BLVD UVAS PARK DR 7MILLAV MILLER AVE30 109774039,080 C - Collector A - ACSARATOGA PL SIXTH ST 0MILLAV MILLER AVE40 812,000 47 94,000 C - Collector O - AC/ACSIXTH ST THIRD ST 23.99MILLAV MILLER AVE50 811,834 47 86,198 C - Collector O - AC/ACTHIRD ST FIRST ST 23.99MILLAV MILLER AVE60 683,764 26 97,864 R - Residential/Local A - AC2000' NORTH OF MESA RD SANTA TERESA BLVD 18.96MILLAV MILLER AVE70 712,000 27 54,000 R - Residential/Local A - ACMESA RD 2000' NORTH OF MESA RD 20.74MILLAV MIMOSA CT10 835552111,655 R - Residential/Local A - ACBANYAN CT END 33.56MIMOCT MOCKINGBIRD LN10 854443415,096 R - Residential/Local A - ACRED HAWK DR PHEASANT DR 29.01MOCKDR MONTE BELLO DR10 471,526 37 56,462 R - Residential/Local A - ACSANTA BARBARA DR WREN AVE 8.31MONBDR MONTE VISTA WY10 57943729,378 R - Residential/Local A - ACFOUTH ST FOURTH ST 0MONVWY MONTEREY ST10 561,011 78 78,858 A - Arterial O - AC/ACLEAVESLEY RD PIERCE ST 9.76MONTRD Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver14 SS1030 Criteria: 11.A.a Packet Pg. 342 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) MONTEREY ST100 581,130 47 53,110 A - Arterial A - ACTENTH ST EIGHTH ST 9.98MONTRD MONTEREY ST110 771,388 47 65,236 C - Collector A - ACEIGHTH ST SIXTH ST 14.6MONTRD MONTEREY ST120 811,845 47 86,715 C - Collector A - ACSIXTH ST THIRD ST 15.04MONTRD MONTEREY ST130 951,254 51 63,954 A - Arterial O - AC/ACTHIRD ST FIRST ST 29.27MONTRD MONTEREY ST20 181,458 74 107,892 A - Arterial A - ACHWY 101 LUCHESSA AVE 0MONTRD MONTEREY ST30 582,973 78 231,894 A - Arterial A - ACPIERCE ST LAS ANIMAS RD 9.98MONTRD MONTEREY ST40 353,432 74 253,968 A - Arterial A - ACLUCHESSA AVE TENTH ST 2.49MONTRD MONTEREY ST50 501,974 72 142,128 A - Arterial A - ACLAS ANIMAS RD COHANSEY AVE 7.12MONTRD MONTEREY ST70 532,700 73 197,100 A - Arterial A - ACCOHANSEY AVE BUENA VISTA AVE 8.16MONTRD MONTEREY ST80 482,618 73 191,114 A - Arterial A - ACBUENA VISTA AVE NORTH CITY LIMITS 6.46MONTRD MONTICELLI CT10 853913413,294 R - Residential/Local A - ACHIRASAKI DR CUL DE SAC 29.01MONTCT MONTICELLI DR90 739573533,495 R - Residential/Local A - ACHIRASAKI AV PADOVA DR 23.16MONTDR MORO CT10 795513418,734 R - Residential/Local A - ACHIRASAKI DR CUL DE SAC 30.03MOROCT MORO DR90 775643419,176 R - Residential/Local A - ACHIRASAKI AV PADOVA DR 27.11MORODR MUIR DR10 76228368,208 R - Residential/Local A - ACOUSLEY DR MANTELLI DR 23.31MUIRDR MURAOKA DR010 819814544,145 R - Residential/Local A - ACNAGAREDA DR YAMANE DR 27.07MURAOK MURRAY AVE10 622,426 43 104,318 A - Arterial O - AC/ACLEAVESLEY RD LINCOLN CT 12.4MURRAV MURRAY AVE20 751,474 36 53,064 A - Arterial O - AC/ACLINCOLN CT LAS ANIMAS AVE 19.78MURRAV MURRAY AVE40 191,075 64 68,800 C - Collector A - ACCHESTNUT ST I.O.O.F AVE 0MURRAV MURRAY AVE50 602,292 50 114,600 C - Collector A - ACI.O.O.F. AVE LEAVESLEY RD 8.22MURRAV NAGAREDA DR010 805264523,670 R - Residential/Local A - ACFOREST DR MURAOKA DR 26.43NAGARE NANTUCKET PL10 713273713,906 R - Residential/Local A - ACENDCUMBERLAND DR 20.76NANTPL NAVAJO CT10 85120344,080 R - Residential/Local A - ACCHEYENNE DR CUL DE SAC 29.01NAVACT NECTAR CT10 80127376,506 R - Residential/Local A - ACENDFLORAL ST 26.05NECTCT NICOLE CT10 75240369,754 R - Residential/Local A - ACENDNICOLE WY 23.21NICOCT NICOLE WY10 779863635,496 R - Residential/Local A - ACMESA RD CARIGNANE DR 24.48NICOWY NIGHTINGALE DR10 901,375 28 38,500 R - Residential/Local A - ACVICKERY AVE WREN AVE 32.31NIGHDR NINTH ST10 809803736,260 R - Residential/Local A - ACVALLEY FORGE DR PRINCEVALLE ST 26.42NINTST NINTH ST20 511,721 40 68,840 R - Residential/Local A - ACPRINCEVALLE ST CHURCH ST 10.11NINTST NINTH ST30 456483824,624 R - Residential/Local A - ACCHURCH ST MONTEREY RD 7.45NINTST NINTH ST40 347534634,638 R - Residential/Local A - ACENDCHESTNUT ST 3.11NINTST NINTH ST50 271,060 46 48,760 R - Residential/Local A - ACCHESTNUT ST CROCKER LN 0.65NINTST Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver15 SS1030 Criteria: 11.A.a Packet Pg. 343 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) NONAME UNO AVE10 663,740 30 112,200 A - Arterial A - ACLAS ANIMAS RD ADDRESS' 9850 NO. UNO 13.16NONUAV NORTH EGRET CT10 83125346,035 R - Residential/Local A - ACCREST HILL DR END 27.76NEGRCT OAK BROOK WY10 699303431,620 R - Residential/Local A - ACRAPSBERRY CT THOMAS RD 19.55OAKBWY OAK BROOK WY20 691,144 34 38,896 R - Residential/Local A - ACRASPBERRY CT GREENFIELD DR 19.55OAKBWY OAK CT10 745032713,581 R - Residential/Local A - ACHANNA ST HANNA ST 22.64OAKCR OBATA CT10 645474424,068 R - Residential/Local A - ACOBATA WAY CUL DE SAC 15.87OBATCT OBATA WY10 271,755 47 82,485 R - Residential/Local A - ACMAYLOCK RD OBATA CT 0.61OBATWY OHLONE WAY10 834243414,416 R - Residential/Local A - ACSUNRISE DR SPRIG WAY 27.76OHLONE OKEEFE CT10 806333522,155 R - Residential/Local A - ACHOPI LN E. END CDS 30.53OKEECT OLD GILROY ST10 601,500 45 67,500 R - Residential/Local A - ACMONTEREY RD CHESTNUT ST 14.56OLDGIL OLD GILROY ST20 521,057 44 46,508 R - Residential/Local A - ACCHESTNUT ST CROCKER LN 10.59OLDGIL OLEA CT10 651,017 21 21,357 R - Residential/Local A - ACW END CDS E END CDS 17.49OLEACT ORCHARD DR10 747863729,082 R - Residential/Local A - ACTENTH ST 95' N/O DEARBORN PL 22.6ORCHDR ORCHARD DR20 705003618,000 R - Residential/Local A - AC95' N/O DEARBORN PL EIGHTH ST 20.16ORCHDR ORCHARD DR30 681,005 37 37,185 R - Residential/Local A - ACEIGHTH ST CUMBERLAND DR 18.97ORCHDR ORCHARD DR40 483903614,040 R - Residential/Local A - ACCUMBERLAND DR SIXTH ST 9.13ORCHDR ORINDA WY10 815963621,456 R - Residential/Local A - ACMARIPOSA ST LONG MEADOW DR 26.49ORINWY ORTEGA CIR10 621,622 37 60,014 R - Residential/Local A - ACHACIENDA DR WREN AVE 15.6ORTEDR OTOOLE CT10 71158357,578 R - Residential/Local A - ACPETERSEN DR END 22.33OTOOCT OUSLEY DR10 708473630,492 R - Residential/Local O - AC/ACMUIR DR SOLIS DR 22.86OUSLDR OUSLEY DR20 617243626,064 R - Residential/Local A - ACSOLIS DR WELBURN AV 15.14OUSLDR PADOVA DR90 778853530,975 R - Residential/Local A - ACSORRENTO DR MORO DR 27.11PADODR PADOVA DR10 799483432,232 R - Residential/Local A - ACSIENA CT SORRENTO DR 30.03PADOVA PAMPAS LN10 664343515,190 R - Residential/Local A - ACORINDA WY JACARANDA WY 17.9PAMPLN PAPPANI WY10 218753732,375 R - Residential/Local A - ACGAUNT AVE KELTON DR 0PAPPWY PARISH WY10 557323727,084 R - Residential/Local A - ACEL CERRITO WY WELBURN AVE 12.08PARIWY PARTRIDGE DR10 829393535,405 R - Residential/Local A - ACENDCALLE DEL REY 27.13PARTDR PEACOCK CT10 85200348,585 R - Residential/Local A - ACCALLE DEL REY END 29.01PEAKCT PEPPERMINT ST10 84300329,600 R - Residential/Local A - ACCOBBLESTONE ST CINNAMON ST 30.07PPRMNT PEREGRINE DR10 791,692 34 57,528 R - Residential/Local A - ACRANCHO HILLS DR EAGLE VIEW WY 25.21PEREDR PERIWINKLE DR10 787662018,141 R - Residential/Local A - ACENDMANTELLI DR 24.57PERIDR Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver16 SS1030 Criteria: 11.A.a Packet Pg. 344 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) PERRELLI ST10 411,028 37 38,036 R - Residential/Local A - ACWREN AVE FILICE DR 5.79PERRST PETERSEN DR10 707483526,180 R - Residential/Local A - ACGAUNT AVE KELTON DR 19.64PETEDR PHEASANT DR10 831,500 34 51,000 R - Residential/Local A - ACTHISTLE WY CALLE DEL REY 27.76PHEADR PIERCE ST10 47693728,453 R - Residential/Local A - ACCHURCH ST MONTEREY ST 0PIERST PLYMOUTH DR10 829623735,594 R - Residential/Local A - ACYORKTOWN DR ORCHARD DR 27.69PLYMDR POLK CT10 833903314,565 R - Residential/Local O - AC/ACMURRAY AVE END 39.17POLKCT PONDEROSA DR10 799403028,200 R - Residential/Local A - ACTHIRD ST CYPRESS CT 25.77PONDDR POPLAR DR10 776263521,910 R - Residential/Local A - ACMANTELLI DR BAY TREE DR 23.94POPLDR POPPYFIELD ST10 707073424,038 R - Residential/Local A - ACOAK BROOK WY CUL DE SAC 20.14POPPYF POTOMAC PL10 803113312,378 R - Residential/Local A - ACENDPLYMOUTH DR 26.41POTOPL PRAIRIE OWL CT10 79279359,765 R - Residential/Local A - ACSPRIG WY N. END CDS 29.34PRAICT PRINCETON PL10 633273312,995 R - Residential/Local A - ACEIGHTH ST END 16.15PRICPL PRINCEVALLE ST10 671,084 47 50,948 C - Collector O - AC/ACTENTH ST EIGHTH ST 15.99PRINST PRINCEVALLE ST20 831,382 47 64,954 C - Collector O - AC/ACEIGHTH ST SIXTH ST 25.19PRINST PRINCEVALLE ST30 341,815 33 59,895 R - Residential/Local A - ACSIXTH ST THIRD ST 3.1PRINST PRINCEVALLE ST40 11,669 33 55,077 R - Residential/Local A - ACTHIRD ST FIRST ST 0PRINST PRINCEVALLE ST50 121,793 45 80,685 C - Collector A - ACWEST LUCHESSA AVE 140' N/O FILBRO DR 0PRINST PRINCEVALLE ST60 487624635,052 C - Collector A - AC140' N/O FILBRO DR TENTH ST 4.81PRINST PUEBLO CT10 835692715,363 R - Residential/Local A - ACZUNI LN W. END 27.76PUEBCT QUAILWALK DR10 855003417,000 R - Residential/Local A - ACPEREGRINE DR 500' SOUTH OF PEREGRINE DR 29.01QUAIDR QUAILWALK DR20 558633429,342 R - Residential/Local A - AC500' SOUTH OF PEREGRINE DR EAGLE VIEW WY 12.81QUAIDR RAILROAD ST10 371,017 43 43,731 R - Residential/Local A - ACSIXTH ST LEWIS ST 4.24RAILST RAILROAD ST20 354934120,213 R - Residential/Local A - ACOLD GILROY SIXTH ST 3.48RAILST RAMONA WY10 735953822,610 R - Residential/Local O - AC/ACKERN AVE AMANDA AVE 25.84RAMOWY RAMONA WY20 608163730,192 R - Residential/Local O - AC/ACAMANDA AVE WREN AVE 15.52RAMOWY RANCHO HILLS CT10 793143512,701 R - Residential/Local O - AC/ACENDMANTELLI DR 33.14RANHCT RANCHO HILLS DR10 775604525,200 C - Collector A - ACMANTELLI DR CARRIAGE DR 14.56RANHDR RANCHO HILLS DR20 698894540,005 C - Collector A - ACCARRIAGE DR VALLEY OAKS DR 11.34RANHDR RANCHO HILLS DR30 731,448 45 65,160 C - Collector A - ACVALLEY OAKS DR LONG MEADOW DR 12.88RANHDR Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver17 SS1030 Criteria: 11.A.a Packet Pg. 345 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) RANCHO HILLS DR40 823474415,268 C - Collector A - ACLONGMEADOW DR 347' N/O LONGMEADOW DR 16.86RANHDR RANCHO HILLS DR50 822,976 44 130,944 C - Collector A - AC347' N/O LONGMEADOW DR END 16.86RANHDR RANCHO REAL10 599162321,068 R - Residential/Local A - ACVISTA DEL SUR CT WELBURN AV 14.09RANREA RASPBERRY CT10 716113422,642 R - Residential/Local A - ACOAK BROOK WY END 23.08RASPCT REA ST10 491,137 36 40,932 R - Residential/Local A - ACFOURTH ST SECOND ST 9.19REAST RED HAWK DR10 855153417,510 R - Residential/Local A - ACMOCKINGBIRD LN CALLE DEL REY 29.01REDHDR REDWOOD LN10 204533718,653 R - Residential/Local A - ACENDWESTWOOD DR 0REDWLN RENZ LN10 251,190 35 41,650 C - Collector A - ACCUL DE SAC (NW)1085' W. OF CAMINO ARROYO 0.03RENZLN RENZ LN20 661,085 56 60,760 C - Collector A - AC1085' W. OF CAMINO ARROYO CAMINO ARROYO 10.2RENZLN RENZ LN30 731,322 56 74,032 C - Collector A - ACCAMINO ARROYO CUL DE SAC EAST 12.82RENZLN REVERE PL10 742583310,629 R - Residential/Local A - ACENDEIGHTH ST 22.6REVEPL RIDGEWAY DR10 848643429,376 R - Residential/Local A - ACRANCHO HILLS DR FINE DR 28.39RIDGDR RIO GRANDE WY10 835313418,054 R - Residential/Local A - ACLAREDO WY SEDONA WY 27.76RIGRWY RIVERVIEW CIR10 841,052 26 27,352 R - Residential/Local A - ACVILLAGE PL VILLAGE PL 28.92RIVECR ROBIN PL10 905803218,560 R - Residential/Local A - ACWREN AVE NIGHTINGALE DR 32.31ROBIPL ROCKROSE CT10 83315209,121 R - Residential/Local A - ACLARKSPUR LN END 27.76ROCKCT RODEO DR10 361,018 35 35,630 R - Residential/Local A - ACLONG MEADOW DR END 3.63RODEDR ROGERS LN10 781,280 30 38,400 R - Residential/Local A - ACSIXTH ST LEWIS ST 25.15ROGELN RONAN AVE10 791,386 35 48,510 R - Residential/Local A - ACWREN AVE CHURCH ST 25.81RONAAV RONAN AVE20 311,046 36 37,656 R - Residential/Local A - ACCHURCH ST MONTEREY RD 2.05RONAAV ROSANNA ST10 337584836,384 R - Residential/Local A - ACEIGHTH ST SEVENTH ST 2.73ROSAST ROSANNA ST15 331,072 48 51,456 R - Residential/Local A - ACTENTH ST EIGHTH ST 2.73ROSAST ROSANNA ST20 691,232 48 59,136 R - Residential/Local A - ACSIXTH ST FOURTH ST 19.56ROSAST ROSANNA ST30 611,848 48 88,704 R - Residential/Local A - ACFOURTH ST FIRST ST 15.07ROSAST ROSANNA ST40 651,587 52 82,524 R - Residential/Local A - ACLONDON DR TENTH ST 17.26ROSAST ROSSI CT10 333234519,747 R - Residential/Local A - ACCUL DE SAC ROSSI LN 2.64ROSSCT ROSSI LN10 491,915 40 76,600 C - Collector O - AC/ACSOUTHSIDE DR MAYCOCK RD 7.51ROSSLN ROSSI LN20 168064032,240 C - Collector A - ACMAYCOCK RD LUCHESSA AVE 0ROSSLN ROYAL WY10 54224357,840 R - Residential/Local A - ACFILBRO DR IMPERIAL DR 11.5ROYAWY Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver18 SS1030 Criteria: 11.A.a Packet Pg. 346 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) RYAN CT10 544093616,524 R - Residential/Local A - ACPARISH WY CUL DE SAC 11.6RYANCT SADDLER DR10 739933534,755 R - Residential/Local A - ACWAGON WY SPRIG WY 24.46SADDL SAGE HILL DR10 526643523,240 R - Residential/Local A - ACRODEO DR BENBOW DR 10.59SAGHDR SAGEWOOD CT10 85190346,460 R - Residential/Local A - ACRED HAWK DR NORTH END (CUL-DE- SAC) 29.01SAGECT SAN JUAN CT10 63134356,401 R - Residential/Local A - ACCUL DE SAC LERMA LN 17.01SANJCT SAN JUSTO ROAD10 851,400 24 33,600 R - Residential/Local A - ACMILLER RD END 35.41SNJURD SAN MIGUEL ST10 712,062 37 76,294 R - Residential/Local A - ACSANTA BARBARA DR WREN AVE 20.76SANMST SAN YSIDRO AVE10 461,064 61 64,904 C - Collector A - ACLEAVESLEY RD 1064' N/O LEAVESLEY RD 4.33SANYAV SAN YSIDRO AVE20 581,288 43 55,384 C - Collector A - AC1064' N/O LEAVESLEY RD 1478' S/O LAS ANIMAS RD 7.61SANYAV SAN YSIDRO AVE30 221,478 33 48,774 C - Collector A - AC1478' S/O LAS ANIMA RD LAS ANIMAS RD 0SANYAV SANTA BARBARA DR10 444713717,427 R - Residential/Local A - ACHERSMAN DR 130' S/O SAN MIGUEL DR 7.02SANBDR SANTA BARBARA DR20 318683631,248 R - Residential/Local A - AC130' S/O SAN MIGUEL DR THIRD ST 2.01SANBDR SANTA BARBARA DR30 428233730,451 R - Residential/Local A - ACTHIRD ST MONTE BELLO DR 6.19SANBDR SANTA FE DR10 785272915,283 R - Residential/Local A - ACTAOS WY CHURCH ST 24.81SANTFE SANTA INEZ CT10 754663719,049 R - Residential/Local A - ACSAN MIGUEL ST END 23.23SANICT SANTA MARIA CT10 694643718,975 R - Residential/Local A - ACSAN MIGUEL ST END 19.56SANTCT SANTA PAULA DR10 688003729,600 R - Residential/Local A - ACCRAWFORD DR SAN MIGUEL ST 18.98SANPDR SANTA PAULA DR20 699143733,818 R - Residential/Local A - ACSAN MIGUEL ST HACIENDA DR 19.56SANPDR SANTA TERESA BL10 911,825 50 91,250 A - Arterial A - AC800' N/O MANTELLI DR LONG MEADOW DR 24SANTBL SANTA TERESA BL20 918795245,708 A - Arterial A - ACLONG MEADOW DR NORTH CITY LIMIT 24.19SANTBL SANTA THERESA DR10 681,340 35 46,900 R - Residential/Local A - ACSIXTH ST FOURTH ST 18.97SANTDR SANTA THERESA DR20 321,569 35 56,791 R - Residential/Local A - ACFOURTH ST END 2.37SANTDR SARATOGA PL10 783313313,038 R - Residential/Local A - ACENDEIGHTH ST 25.13SARAPL SARGENT ST10 103173711,729 R - Residential/Local A - ACFIRST ST BROADWAY 0SARGST SECOND ST10 294693918,291 R - Residential/Local A - ACMILLER ST PRINCEVALLE ST 1.31SECOST SECOND ST15 298123931,668 R - Residential/Local A - ACENDMILLER ST 1.31SECOST SECOND ST20 83184815,264 R - Residential/Local A - ACPRINCEVALLE ST CARMEL ST 0SECOST SECOND ST30 591,120 55 61,600 R - Residential/Local A - ACHANNA ST EIGLEBERRY ST 14.02SECOST SECOND ST40 613325518,260 R - Residential/Local A - ACEIGLEBERRY ST MONTEREY RD 15.07SECOST Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver19 SS1030 Criteria: 11.A.a Packet Pg. 347 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) SEDONA WY10 834163514,560 R - Residential/Local A - ACSUNRISE DR RIO GRANDE WY 27.76SEDOWY SENEGAL CT10 854743416,116 R - Residential/Local A - ACCUL DE SAC LOGANBERRY DR 29.02SENECT SEQUOIA DR10 773873513,545 R - Residential/Local A - ACBENASSI DR LAUREL DR 24.5SEQUDR SEVENTH ST10 561,845 48 88,560 C - Collector A - ACPRINCEVALLE ST CHURCH ST 7SEVEST SEVENTH ST20 507484835,904 C - Collector A - ACCHURCH ST MONTEREY RD 5.34SEVEST SEVENTH ST30 271,084 40 43,360 R - Residential/Local A - ACFOREST ST EAST ST 0.65SEVEST SEVERANCE ST10 645662916,414 R - Residential/Local A - ACHENNESSEY WY FARREL AVE 17.14SEVRST SHERWOOD DR10 421,454 37 55,605 R - Residential/Local A - ACWAYLAND LN END 6.23SHERDR SHOOTING STAR CT10 84389218,169 R - Residential/Local A - ACHOLLYHOCK LANE CUL DE SAC 35.36SHOOCT SHOSHONE WY10 854182610,868 R - Residential/Local A - ACKOSHARE STREET PUBELO COURT 33.82SHOSWY SIENA CT10 816513422,134 R - Residential/Local A - ACHIRASAKI DR CUL DE SAC 26.49SIENCT SIENA DR10 816793423,086 R - Residential/Local A - ACHIRASAKI DR SORRENTO CT 26.49SIENAD SILACCI WY10 101,527 47 71,769 R - Residential/Local A - ACENDPACHECO PASS HWY 0SILAWY SILVIA ST10 603953413,430 R - Residential/Local A - ACHOESCH WY HOWARD AVE 14.62SILVST SIXTH ST10 551,384 50 69,200 C - Collector A - ACWREN AVE MILLER AVE 6.71SIXTST SIXTH ST20 541,455 50 72,750 C - Collector A - ACMILLER AVE PRINCEVALLE ST 6.42SIXTST SIXTH ST30 731,926 50 96,300 C - Collector O - AC/ACPRINCEVALLE ST CHURCH ST 19.76SIXTST SIXTH ST40 823633813,794 C - Collector O - AC/ACCHURCH ST EIGLEBERRY RD 24.6SIXTST SIXTH ST45 795884224,696 C - Collector O - AC/ACEIGLEBERRY RD RR TRACKS 22.77SIXTST SIXTH ST50 761,243 40 49,720 C - Collector A - ACRR TRACKS CHESTNUT ST 14.07SIXTST SIXTH ST60 793084012,320 C - Collector A - ACCHESTNUT ST 308 E/O CHESTNUT 15.39SIXTST SIXTH ST65 763074012,280 R - Residential/Local O - AC/AC308 E/O CHESTNUT ST ROGERS LN 29.15SIXTST SNOWBERRY CT10 715403520,611 R - Residential/Local A - ACOAK BROOK WY END 23.08SNOWCT SOLANA DR10 808643530,240 R - Residential/Local A - ACVALBUSA DR LONGMEADOW DR 25.85SOLADR SOLEDAD ST10 853213410,914 R - Residential/Local A - ACHERTIAGE WY 248' S/O LERMA LN 29.01SOLEST SOLEDAD ST20 81248358,680 R - Residential/Local A - AC248' S/O LERMA LN LERMA LN 26.49SOLEST SOLIS DR10 563533612,708 R - Residential/Local A - ACOUSLEY DR DELTA DR 12.57SOLIDR SORRENTO CT10 857163424,344 R - Residential/Local A - ACHIRASAKI DR CUL DE SAC 29.01SORRCT SORRENTO DR10 767743426,316 R - Residential/Local A - ACHIRASAKI DR PADOVA DR 26.81SORRDR SOUTH EGRET CT10 85142346,613 R - Residential/Local A - ACENDCREST HILL DR 29.01SEGRCT SOUTHGATE CT10 802653711,612 R - Residential/Local A - ACCHURCH ST CUL DE SAC 26.4SOUTCT SOUTHSIDE DR10 158282823,184 R - Residential/Local A - ACOBATA WAY ROAD NARROWS 0SOUTDR Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver20 SS1030 Criteria: 11.A.a Packet Pg. 348 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) SPARROW GLEN WAY10 806523422,168 R - Residential/Local A - ACDOVETAIL WAY SUNRISE DR 25.85SPARGL SPENCER CT10 846773525,488 R - Residential/Local A - ACMANTELLI DR CUL DE SAC 28.39SPENCT SPRIG WY20 778623429,308 R - Residential/Local A - ACSADDLER WY RODEO DR 27.84SPRIWY SPRINGDALE ST10 721,211 35 46,046 R - Residential/Local A - ACCUL DE SAC CUL DE SAC 21.39SPRIST SPRUCE CT10 81146377,381 R - Residential/Local A - ACENDLAUREL DR 27.05SPRUCT ST CLAR AVE10 843813412,954 R - Residential/Local A - ACKERN AVE AVEZAN WAY 28.39STCLAR ST FRANCIS CT10 804733719,308 R - Residential/Local A - ACSAN MIGUEL ST END 26.42STFRCT STARLING DR10 744033514,105 R - Residential/Local A - ACALDER ST BABBS CREEK DR 25.2STARDR STEPHAN CT10 534603518,061 R - Residential/Local A - ACPRINCEVALLE ST END 11.02STEPCT STEWART DR10 694153516,318 R - Residential/Local A - ACHERSMAN DR END 19.56STEWDR STONECRESS ST10 802,139 21 44,919 R - Residential/Local A - ACCOUNTRY DR BANYAN ST 30.53STONST STONEY CT10 485243016,348 R - Residential/Local A - ACENDSIXTH ST 8.77STONCT STRATFORD PL10 764053516,136 R - Residential/Local A - ACHYDE PARK DR END 23.84STRFPL STRAWBERRY LN10 71411208,220 R - Residential/Local A - ACSUNFLOWER CIR COUNTRY DR 20.23STRALN SUNFLOWER CIR10 76429208,580 R - Residential/Local A - ACWEST END STRAWBERRY LN 23.31SUNCIR SUNFLOWER CIR20 831,523 20 30,460 R - Residential/Local A - ACSTRAWBERRY LN COUNRTY DR 27.76SUNCIR SUNRISE DR10 931,217 44 53,548 A - Arterial A - ACRANCHO HILL DR KITE DR 24.89SUNRDR SUNRISE DR20 933,173 67 212,591 A - Arterial A - ACKITE DR SANTA TERESA BLVD 24.89SUNRDR SUSAN CT10 10233163,728 R - Residential/Local A - ACCUL DE SAC CARIGNANE DR 0SUSACT SUSSEX PL10 695153519,986 R - Residential/Local A - ACCUL DE SAC VICTORIA DR 19.55SUSSPL SWALLOW LN10 846533422,202 R - Residential/Local A - ACTWINBERRY WY LOGANBERRY DR 28.39SWALLN SWANER DR10 248723631,392 R - Residential/Local A - ACGAUNT AVE KELTON DR 0SWANDR SWANSTON LN10 322,086 37 77,182 R - Residential/Local A - ACLEAVESLEY RD FOREST ST 2.44SWANLN SYCAMORE CT10 792783511,523 R - Residential/Local A - ACPOPLAR DR CUL DE SAC 25.21SYCACT TAFT CT10 673953314,730 R - Residential/Local A - ACMURRAY AVE CUL DE SAC 18.42TAFTCT TAOS WAY10 827732922,417 R - Residential/Local A - ACRONAN AVE LA PRIMAVERA WAY 27.73TAOSWY TAOS WAY20 82143294,147 R - Residential/Local A - ACTAOS WAY END 27.73TAOSWY TAPESTRY WY10 727113524,885 R - Residential/Local A - ACSUNRISE DR N. END 22.26TAPEWY TARRAGON DR10 84250328,000 R - Residential/Local A - ACCOBBLESTONE CT CINNAMON WY 30.07TARGN TARYN LN10 546503724,050 R - Residential/Local A - ACCALABRESE WY WELBURN AV 11.6TARYLN TATUM AVE10 843903413,260 R - Residential/Local A - ACKERN AVE AVEZAN WAY 28.39TATUMA TATUM AVE20 501,350 20 27,000 R - Residential/Local A - ACWREN AVE KERN AVE 10.14TATUMA Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver21 SS1030 Criteria: 11.A.a Packet Pg. 349 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TEA TREE CT10 805092613,234 R - Residential/Local A - ACCREST HILL WAY END 28.53TEATCT TEA TREE WY10 821,562 21 32,802 R - Residential/Local A - ACTEA TREE COURT END 31.13TEATWY TEAL CT10 73155357,218 R - Residential/Local A - ACENDVINCA CT 24.29TEALCT TENTH ST10 381,984 63 124,992 A - Arterial O - AC/ACUVAS PARK DR PRINCEVALLE ST 3.31TENTST TENTH ST20 701,665 67 111,555 A - Arterial A - ACPRINCEVALLE ST 150' E/O ROSANNA ST 14.85TENTST TENTH ST30 699536763,851 A - Arterial A - AC150 E/O ROSANNA ST MONTEREY RD 14.42TENTST TENTH ST40 412,118 68 144,024 A - Arterial A - ACMONTEREY RD W/O HWY 101 RAMPS 3.98TENTST TENTH ST/CHARLES LUX DR RAB 55 94320165,120 R - Residential/Local A - ACTENTH ST NORTH TENTH ST SOUTH 33.61TENTST TENTH ST/LUCHESSA AVE RAB 45 89330206,600 R - Residential/Local A - ACLUCHESSA AVE WEST LUCHESSA AVE EAST 37.72LUCHAV THAMES DR10 695793520,265 R - Residential/Local A - ACVICTORIA DR LONDON DR 19.55THAMDR THAYER CT10 694303517,011 R - Residential/Local A - ACCRAWFORD DR CUL DE SAC 19.56THAYCT THIRD ST10 776694026,760 C - Collector O - AC/ACSANTA THERESA DR MILLER AVE 21.55THIRST THIRD ST100 871,650 35 57,750 R - Residential/Local A - ACCOBBLESTONE CT/THIRD ST RAB 470FT W/O ROSEMARY WY 35.97THIRST THIRD ST20 827704030,800 C - Collector O - AC/ACMILLER AVE PRINCEVALLE ST 20.4THIRST THIRD ST30 868214032,840 C - Collector O - AC/ACWREN AVE SANTA THERESA DR 25.48THIRST THIRD ST40 802,957 49 144,893 C - Collector A - ACLAUREL DR WREN AVE 15.84THIRST THIRD ST50 671,845 40 73,800 C - Collector A - ACPRINCEVALLE ST CHURCH ST 10.54THIRST THIRD ST60 676344025,360 C - Collector A - ACCHURCH ST MONTEREY RD 10.54THIRST THIRD ST65 573803914,820 R - Residential/Local A - ACTHIRD ST/SANTA TERESA BLVD ISABELLA WY 12.98THIRST THIRD ST70 844003012,000 R - Residential/Local A - ACISABELLA WY COBBLESTONE CT/THIRD ST RAB 30.85THIRST THIRD ST80 872,020 35 70,700 R - Residential/Local A - AC470 FT W/O ROSEMARY DR THIRD ST/GRASSLAND WY RAB 33.6THIRST THIRD ST90 878402823,520 R - Residential/Local A - ACGRASSLAND WY/THIRD ST RAB LONE OAK LN/THIRD ST RAB 33.6THIRST THISTLE WY10 85224347,616 R - Residential/Local A - ACPHEASANT DR BRIARBERRY LN 29.02THISWY THOMAS RD10 53190417,790 A - Arterial A - ACMESA RD SANTA TERESA BLVD 8.12THOMRD THOMAS RD20 544582511,450 A - Arterial A - ACSANTA TERESA BLVD 123' S/O WISTERIA DR 8.47THOMRD THOMAS RD30 505134824,624 A - Arterial A - AC123' S/O WISTERIA DR 105' N/O ALDER ST 7.53THOMRD THOMAS RD40 71351279,477 A - Arterial A - AC105' N/O ALDER ST 255' S/O VINCA CT 15.28THOMRD Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver22 SS1030 Criteria: 11.A.a Packet Pg. 350 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) THOMAS RD50 401,645 47 77,315 A - Arterial A - AC255' S/O VINCA CT 675' N/O OAK BROOK WY 4.05THOMRD THOMAS RD60 84165416,765 A - Arterial A - AC675' N/O OAK BROOK WY LUCHESSA AVE 21.29THOMRD TICONDEROGA PL10 644873719,826 R - Residential/Local A - ACCUL DE SAC CUMBERLAND DR 16.7TICOPL TOMKINS CT10 383604617,600 R - Residential/Local A - ACCUL DE SAC MURRAY AV 4.75TOMKCT TOYON CT10 633443513,083 R - Residential/Local A - ACCUL DE SAC BAY TREE DR 17.01TOYOCT TRAILBLAZER WY10 594453515,575 R - Residential/Local A - ACLONG MEADOW DR BLACKSMITH DR 14.85TRAIWY TRAVEL PARK CIR10 691,081 45 48,645 R - Residential/Local A - ACBOLSA RD MONTEREY RD 21.39TRAPCR TRENTON PL10 603963716,544 R - Residential/Local A - ACCUL DE SAC EIGHTH ST 14.54TRENPL TRIMBLE CT10 724023514,070 R - Residential/Local A - ACCHURCH ST CUL DE SAC 22.26TRIMCT TWINBERRY WY10 84225347,650 R - Residential/Local A - ACFINCH LN SWALLOW LN 28.39TWINWY UTICA PL10 81134326,480 R - Residential/Local A - ACPLYMOUTH DR CUL DE SAC 27.05UTICPL UVAS PARK DR10 771,174 32 37,568 C - Collector A - ACTHIRD ST LAUREL DR 14.48UVAPDR UVAS PARK DR20 221,177 29 34,133 C - Collector A - ACWREN AVE MILLER AVE 0UVAPDR UVAS PARK DR30 701,912 29 55,448 C - Collector A - ACMILLER AVE TENTH ST 11.63UVAPDR VALBUSA DR10 849173532,095 R - Residential/Local A - ACSOLANA DR JACARANDA WY 28.39VALBDR VALLEY FORGE DR10 815933721,941 R - Residential/Local A - ACTENTH ST NINTH ST 27.05VALFDR VALLEY OAKS CT10 844103413,940 R - Residential/Local A - ACCREST HILL DR END 28.39VALOCT VALLEY OAKS DR10 831,666 34 56,644 R - Residential/Local A - ACCREST HILL DR RANCHO HILLS DR 27.76VALODR VENTURE WY10 801,228 44 54,032 C - Collector A - ACCAMINO ARROYO CAMERON BLVD 17.4VENTWY VICKERY AVE10 699002018,000 R - Residential/Local A - ACKERN AVE WREN AVE 19.05VICKAV VICKERY AVE20 816503522,750 R - Residential/Local A - ACNIGHTINGALE DR WREN AVE 28.47VICKAV VICTORIA DR10 721,075 33 35,475 R - Residential/Local A - ACPRINCEVALLE ST CHURCH ST 21.35VICTDR VICTORIA DR20 751,050 33 34,650 R - Residential/Local A - ACCHURCH ST CUL DE SAC (EAST)23.21VICTDR VILLAGE PL10 607063524,710 R - Residential/Local A - ACLUCHESA AV RIVERVIEW CIR 14.04VILLPL VINCA CT10 615553521,218 R - Residential/Local A - ACCUL DE SAC THOMAS RD 15.92VINCCT VIOLET WY10 847613526,635 R - Residential/Local A - ACKELTON DR CUL DE SAC 28.39VIOLWY VISTA DEL SUR10 50168254,200 R - Residential/Local A - ACGATERANCHO REAL 9.58VISDLS WAGON WY10 616543522,890 R - Residential/Local A - ACSADDLER DR LONE DEER WY 15.48WAGOWY WALNUT LN10 311,429 37 52,873 R - Residential/Local A - ACFOREST ST FOREST ST 2.03WALNLN WAYLAND LN10 389703735,890 C - Collector A - ACFIRST ST EL CERRITO WY 2.49WAYLLN WAYLAND LN20 711,793 37 66,341 C - Collector A - ACEL CERRITO WY CUL DE SAC 12.06WAYLLN Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver23 SS1030 Criteria: 11.A.a Packet Pg. 351 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) WEAVER CT10 80207309,052 R - Residential/Local A - ACENDWOODWORTH WY 26.45WEAVCT WELBURN AVE10 471,110 30 33,300 C - Collector A - ACMANTELLI DR RANCHO REAL 4.64WELBAV WELBURN AVE20 398583025,740 C - Collector A - ACRANCHO REAL 100' E/O TARYN LN 2.74WELBAV WELBURN AVE30 365793620,844 C - Collector A - AC100' E/O TARYN LN SANTA TERESA BLVD 2.09WELBAV WELBURN AVE40 831,298 63 81,774 A - Arterial O - AC/ACSANTA TERESA BLVD WESTWOOD DR 23.9WELBAV WELBURN AVE50 838826355,566 A - Arterial O - AC/ACWESTWOOD DR KERN AVE 23.9WELBAV WELBURN AVE60 471,499 63 94,437 A - Arterial A - ACKERN AVE WREN AVE 6.19WELBAV WELBURN AVE70 199673735,779 C - Collector A - ACWREN AVE WAYLAND LN 0WELBAV WELBURN AVE80A 271,245 37 46,065 C - Collector A - ACWAYLAND LN HANNA ST 0.43WELBAV WELBURN AVE80B 937533727,861 C - Collector O - AC/ACHANNA ST CHURCH ST 29.64WELBAV WELBURN AVE90 456606140,260 A - Arterial O - AC/ACCHURCH ST MONTEREY RD 5.57WELBAV WENTZ DR10 691,193 35 41,755 R - Residential/Local A - ACWREN AVE CARR PL 19.56WENTDR WEST HILLVIEW CT10 563753717,798 R - Residential/Local A - ACENDTARYN LN 12.57WHILCT WESTWOOD DR10 381,492 47 70,124 C - Collector A - ACFIRST ST WELBURN AVE 2.52WESTDR WESTWOOD DR20 471,145 37 42,365 R - Residential/Local A - ACS END THIRD ST 8.31WESTDR WESTWOOD DR30 701,070 37 39,590 C - Collector A - ACTHIRD ST JUNIPER DR 11.46WESTDR WESTWOOD DR40 898324234,944 C - Collector A - ACJUNIPER DR FIRST ST 20.31WESTDR WETSAND CT10 36206358,921 R - Residential/Local A - ACLONG MEADOW DR CUL DE SAC 3.92WETSCT WHEATFIELD CT10 71222347,548 R - Residential/Local A - ACHAYFIELD ST CUL DE SAC 20.74WHEATF WHEELER ST10 93573713,209 R - Residential/Local A - ACENDSWANSTON LN 0WHEEST WILD IRIS DR10 54200204,000 R - Residential/Local A - ACMANTELLI DR SOUTH SIDE OF ROUNDABOUT 12.18WILIDR WILD IRIS DR20 828802017,600 R - Residential/Local A - ACSOUTH SIDE OF ROUNDABOUT LAVENDER WAY 32.59WILIDR WILDGRASS CT10 694273414,518 R - Residential/Local A - ACPOPPY FIELD ST CUL DE SAC 19.54WILDGR WILDROSE CT10 76232207,461 R - Residential/Local A - ACSUNFLOWER CIR CUL DE SAC 23.31WILDCT WILLARD CT10 65953623,304 R - Residential/Local A - ACCUL DE SAC WREN AVE 0WILACT WILLOW CT10 842723511,313 R - Residential/Local A - ACPOPLAR DR CUL DE SAC 28.39WILOCT WILLY CT10 773753715,682 R - Residential/Local A - ACMURRAY AV CUL DE SAC 24.52WILYCT WINDSONG WY10 908702521,750 R - Residential/Local A - ACNIGHTINGALE DR HUMMINGBIRD LN 32.31WNDSWY WISTERIA DR10 825413418,394 R - Residential/Local A - ACHAWTHORNE ST THOMAS RD 27.67WISTDR WOODWORTH WY10 685523019,402 R - Residential/Local A - ACCHURCH ST CUL DE SAC 19.01WOODWY Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver24 SS1030 Criteria: 11.A.a Packet Pg. 352 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) WREN AVE10 531,076 63 67,788 A - Arterial O - AC/ACFIRST ST 125' S/O WELBURN AVE 8.49WRENAV WREN AVE100 881,250 48 60,000 A - Arterial A - ACCITY LIMITS END NORTH 23.12WRENAV WREN AVE20 841,325 43 56,975 A - Arterial O - AC/AC125' S/O WELBURN AVE 125' S/O LAWRENCE DR 25.79WRENAV WREN AVE30 741,099 62 68,138 A - Arterial O - AC/AC125' S/O LAWRENCE DR MANTELLI DR 18.06WRENAV WREN AVE40 824776129,097 A - Arterial A - ACMANTELLI DR RONAN AVE 20.43WRENAV WREN AVE50 699024338,786 A - Arterial A - ACRONAN AVE TATUM AVE 14.46WRENAV WREN AVE60 679934948,657 A - Arterial A - ACTATUM AVE FARREL AVE 13.64WRENAV WREN AVE65 786654932,585 A - Arterial A - ACFARREL DR CITY LIMITS 18.59WRENAV WREN AVE70 668165343,248 A - Arterial O - AC/ACUVAS PARK DR SIXTH ST 14.39WRENAV WREN AVE80 401,875 53 99,375 A - Arterial O - AC/ACSIXTH ST THIRD ST 3.92WRENAV WREN AVE90 571,980 63 124,740 A - Arterial O - AC/ACTHIRD ST FIRST ST 10.12WRENAV YAMANE DR10 585104522,950 R - Residential/Local A - ACMURAOKA DR FOREST DR 13.73YAMACT YORKTOWN DR10 711,740 37 64,380 R - Residential/Local A - ACEIGHTH ST GREENWICH DR 20.76YORKDR YUCCA CT10 83125324,000 R - Residential/Local A - ACCHEYENNE DR CUL DE SAC 29.98YUCCCT ZINNIA ST10 752883710,656 R - Residential/Local A - ACVIOLET WY MANTELLI DR 26.08ZINNST ZINNIA ST20 788153427,710 R - Residential/Local A - ACMANTELLI DR DAFFODIL PL 24.57ZINNST ZUNI LN10 817033423,902 R - Residential/Local A - ACSUNRISE DR PUEBLO CT 31.77ZUNILN 658,121Total Section Length: Total Section Area:27,134,868 Street ID Section ID Length Width Area Functional Class Surface Type CITY OF GILROY Printed: 12/27/2019 Section PCI/RSL Listing Current PCIStreet Name ToFrom Remaining Life MTC StreetSaver25 SS1030 Criteria: 11.A.a Packet Pg. 353 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       PREVENTATIVE MAINTENANCE (PM) DECISION TREE Preventative maintenance is the most cost-effective application to extend the life of streets and investment. Preventive Maintenance is designed to slow pavement deterioration. This preventative maintenance report shows treatments and costs associated with preventative maintenance (Category I PCI Range = PM Treatment greater than/equal to 70 PCI). The PM decision tree is broken down by functional class and surface type. A management section with a PCI equal to/less than 70 is classified under the rehabilitation decision tree. Below is a PM decision tree description: Decision Tree Number/ID – This number is associated with the decision tree functional classification and surface type Functional Classification – This is a group of streets or roadway subsystems that are classified pending on the level of service and traffic. A – Arterial C – Collector R – Residential/Local O – Other (user defined) Surface Type – Is the type of surface specific for a management section. The classifications are: AC – Asphalt Concrete AC/AC – Asphalt Concrete over Asphalt Concrete PCC – Portland Cement Concrete AC/PCC – Asphalt Concrete over Portland Cement Concrete Treatment Type and Descriptions – There are three categories for PM treatment (category I greater than equal to 70 PCI): Cost per Square Yard – Unit cost assigned to each treatment with an exception of crack seal which is a linear foot unit. Years Between Crack Seal – Defines the number of years between crack seal applications Years Between Seal – Defines the number of years between surface seal applications # of Surface Seals before Overlay – Sets the maximum number of surface seals that can be applied before a “restoration” treatment is recommended. 11.A.a Packet Pg. 354 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       REHABILITATION MAINTENANCE DECISION TREE This rehabilitation decision tree report shows treatments and costs associated with rehabilitation maintenance (Category II – V PCI range 0 to 69 PCI. The rehabilitation decision tree is broken down by functional class and surface type. A management section with a PCI equal to/greater than 70 is classified under the rehabilitation decision tree. Below is a PM decision tree description: Decision Tree Number/ID – This number is associated with the decision tree functional classification and surface type Functional Classification – This is a group of streets or roadway subsystems that are classified pending on the level of service and traffic. A – Arterial C – Collector R – Residential/Local O – Other (user defined) Surface Type – Is the type of surface specific for a management section. The classifications are: AC – Asphalt Concrete AC/AC – Asphalt Concrete over Asphalt Concrete PCC – Portland Cement Concrete AC/PCC – Asphalt Concrete over Portland Cement Concrete Condition Category Condition Category II (50-69 PCI)– Good, Non-Load Related – Light Rehabilitation Condition Category III (50-69 PCI)– Good, Load Related – Light Rehabilitation Condition Category IV (25-49 PCI) – Poor – Moderate Rehabilitation Condition Category V (0-24 PCI) – Very Poor – Heavy Rehabilitation Treatments – Treatment is assigned based on the management section PCI rating Cost per Square Yard – Unit cost assigned to each treatment 11.A.a Packet Pg. 355 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Arterial AC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS, DIGOUTS, MICROSURFACING $4.50 7 Restoration Treatment THICK HMA OVERLAY 2"$25.00 2 II - Good, Non-Load Related SEAL CRACKS, DIGOUTS, MICROSURFACING $4.50 7 III - Good, Load Related MILL AND THICK OVERLAY $30.00 IV - Poor AC OVERLAY W/FABRIC $40.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$80.00 AC/AC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS, DIGOUTS, MICROSURFACING $4.50 7 Restoration Treatment MILL AND THICK OVERLAY $30.00 2 II - Good, Non-Load Related SEAL CRACKS, DIGOUTS, MICROSURFACING $4.50 7 III - Good, Load Related MILL AND THICK OVERLAY $30.00 IV - Poor AC OVERLAY W/FABRIC $40.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$80.00 AC/PCC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS/SLURRY SEAL $3.40 7 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SLURRY SEAL W/CRACK SEAL $3.96 III - Good, Load Related SLURRY SEAL W/CRACK SEAL $3.96 IV - Poor MILL, AC OVERLAY & PAVE PREP $34.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$82.85 # of Surface Seals before Overlay Functional Class CITY OF GILROY Printed: 12/27/2019 Decision Tree Surface Condition Category Treatment Type Treatment Yrs Between Crack Seals Yrs Between Surface Seals Cost/Sq Yd, except Seal Cracks in LF: Functional Class and Surface combination not used Criteria:1 MTC StreetSaver Selected Treatment is not a Surface Seal 11.A.a Packet Pg. 356 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Arterial PCC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment DO NOTHING $0.00 99 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related DO NOTHING $0.00 III - Good, Load Related DO NOTHING $0.00 IV - Poor MILL, AC OVERLAY & PAVE PREP $34.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$82.85 ST I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment DO NOTHING $0.00 99 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SINGLE CHIP SEAL $3.15 III - Good, Load Related SINGLE CHIP SEAL $3.15 IV - Poor SINGLE CHIP SEAL $3.15 V - Very Poor THICK AC OVERLAY(2.5 INCHES)$12.00 # of Surface Seals before Overlay Functional Class CITY OF GILROY Printed: 12/27/2019 Decision Tree Surface Condition Category Treatment Type Treatment Yrs Between Crack Seals Yrs Between Surface Seals Cost/Sq Yd, except Seal Cracks in LF: Functional Class and Surface combination not used Criteria:2 MTC StreetSaver Selected Treatment is not a Surface Seal 11.A.a Packet Pg. 357 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Collector AC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS, DIGOUTS, MICROSURFACING $4.50 7 Restoration Treatment RUB CAPE SEAL W/DIGOUTS $6.35 1 II - Good, Non-Load Related RUB CAPE SEAL W/DIGOUTS $6.35 III - Good, Load Related MILL AND THICK OVERLAY $25.00 IV - Poor 2.5 INCH AC OVERLAY W/FABRIC $29.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$77.50 AC/AC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS, DIGOUTS, MICROSURFACING $4.50 7 Restoration Treatment RUB CAPE SEAL W/DIGOUTS $6.35 1 II - Good, Non-Load Related RUB CAPE SEAL W/DIGOUTS $6.35 III - Good, Load Related MILL AND THICK OVERLAY $25.00 IV - Poor 2.5 INCH AC OVERLAY W/FABRIC $29.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$77.50 AC/PCC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS/SLURRY SEAL $3.40 7 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SEAL CRACKS/SINGLE CHIP SEAL $3.35 III - Good, Load Related SEAL CRACKS/SINGLE CHIP SEAL $3.35 IV - Poor MILL, AC OVERLAY & PAVE PREP $34.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$96.00 # of Surface Seals before Overlay Functional Class CITY OF GILROY Printed: 12/27/2019 Decision Tree Surface Condition Category Treatment Type Treatment Yrs Between Crack Seals Yrs Between Surface Seals Cost/Sq Yd, except Seal Cracks in LF: Functional Class and Surface combination not used Criteria:3 MTC StreetSaver Selected Treatment is not a Surface Seal 11.A.a Packet Pg. 358 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Collector PCC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment DIAMOND GRIND AND SEAL CRACK $4.00 7 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related DO NOTHING $0.00 III - Good, Load Related DO NOTHING $0.00 IV - Poor MILL, AC OVERLAY & PAVE PREP $34.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$96.00 ST I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment DO NOTHING $0.00 99 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SINGLE CHIP SEAL $3.15 III - Good, Load Related SINGLE CHIP SEAL $3.15 IV - Poor SINGLE CHIP SEAL $3.15 V - Very Poor THICK AC OVERLAY(2.5 INCHES)$15.00 # of Surface Seals before Overlay Functional Class CITY OF GILROY Printed: 12/27/2019 Decision Tree Surface Condition Category Treatment Type Treatment Yrs Between Crack Seals Yrs Between Surface Seals Cost/Sq Yd, except Seal Cracks in LF: Functional Class and Surface combination not used Criteria:4 MTC StreetSaver Selected Treatment is not a Surface Seal 11.A.a Packet Pg. 359 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Residential/Local AC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS, DIGOUTS, MICROSURFACING $4.00 8 Restoration Treatment RUB CAPE SEAL W/DIGOUTS $6.35 2 II - Good, Non-Load Related SLURRY SEAL W/DIGOUTS $6.00 2 III - Good, Load Related SLURRY SEAL W/DIGOUTS $6.00 2 IV - Poor MILL AND THIN OVERLAY $20.00 V - Very Poor RECONSTRUCT SURFACE (AC)$68.10 AC/AC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS/SLURRY SEAL $4.00 8 Restoration Treatment RUB CAPE SEAL W/DIGOUTS $6.35 2 II - Good, Non-Load Related SLURRY SEAL W/DIGOUTS $6.00 8 III - Good, Load Related RUB CAPE SEAL W/DIGOUTS $6.00 IV - Poor MILL AND THIN OVERLAY $20.00 V - Very Poor RECONSTRUCT SURFACE (AC)$68.10 AC/PCC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS/SLURRY SEAL $4.00 8 Restoration Treatment RUB CAPE SEAL W/DIGOUTS $6.35 2 II - Good, Non-Load Related SEAL CRACKS/SINGLE CHIP SEAL $3.35 8 III - Good, Load Related SEAL CRACKS/SINGLE CHIP SEAL $3.35 8 IV - Poor MILL, AC OVERLAY & PAVE PREP $34.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$100.00 # of Surface Seals before Overlay Functional Class CITY OF GILROY Printed: 12/27/2019 Decision Tree Surface Condition Category Treatment Type Treatment Yrs Between Crack Seals Yrs Between Surface Seals Cost/Sq Yd, except Seal Cracks in LF: Functional Class and Surface combination not used Criteria:5 MTC StreetSaver Selected Treatment is not a Surface Seal 11.A.a Packet Pg. 360 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Residential/Local PCC I - Very Good Crack Treatment SEAL CRACKS $1.00 7 Surface Treatment DIAMOND GRIND AND SEAL CRACK $3.00 10 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related DO NOTHING $0.00 III - Good, Load Related DO NOTHING $0.00 IV - Poor MILL, AC OVERLAY & PAVE PREP $34.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$96.00 ST I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment DO NOTHING $0.00 99 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SINGLE CHIP SEAL $3.15 III - Good, Load Related SINGLE CHIP SEAL $3.15 IV - Poor SINGLE CHIP SEAL $3.15 V - Very Poor THICK AC OVERLAY(2.5 INCHES)$18.00 # of Surface Seals before Overlay Functional Class CITY OF GILROY Printed: 12/27/2019 Decision Tree Surface Condition Category Treatment Type Treatment Yrs Between Crack Seals Yrs Between Surface Seals Cost/Sq Yd, except Seal Cracks in LF: Functional Class and Surface combination not used Criteria:6 MTC StreetSaver Selected Treatment is not a Surface Seal 11.A.a Packet Pg. 361 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Other AC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS/SLURRY SEAL $3.40 7 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SEAL CRACKS/SINGLE CHIP SEAL $1.70 III - Good, Load Related 2.0 INCH AC OVERLAY W/FABRIC $11.30 IV - Poor THIN OVERLAY w/FABRIC $15.00 V - Very Poor RECONSTRUCT SURFACE (AC)$77.50 AC/AC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment SEAL CRACKS/SINGLE CHIP SEAL $1.10 7 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SEAL CRACKS/SINGLE CHIP SEAL $1.70 III - Good, Load Related 2.0 INCH AC OVERLAY W/FABRIC $11.30 IV - Poor THIN OVERLAY w/FABRIC $15.00 V - Very Poor RECONSTRUCT SURFACE (AC)$77.50 AC/PCC I - Very Good Crack Treatment SEAL CRACKS $0.00 9 Surface Treatment SEAL CRACKS/SLURRY SEAL $3.40 7 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SEAL CRACKS/SINGLE CHIP SEAL $1.70 III - Good, Load Related SEAL CRACKS/SINGLE CHIP SEAL $1.70 IV - Poor MILL, AC OVERLAY & PAVE PREP $34.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$82.85 # of Surface Seals before Overlay Functional Class CITY OF GILROY Printed: 12/27/2019 Decision Tree Surface Condition Category Treatment Type Treatment Yrs Between Crack Seals Yrs Between Surface Seals Cost/Sq Yd, except Seal Cracks in LF: Functional Class and Surface combination not used Criteria:7 MTC StreetSaver Selected Treatment is not a Surface Seal 11.A.a Packet Pg. 362 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Other PCC I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment DO NOTHING $0.00 99 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related DO NOTHING $0.00 III - Good, Load Related DO NOTHING $0.00 IV - Poor MILL, AC OVERLAY & PAVE PREP $34.00 V - Very Poor RECONSTRUCT STRUCTURE (AC)$82.85 ST I - Very Good Crack Treatment DO NOTHING $0.00 99 Surface Treatment DO NOTHING $0.00 99 Restoration Treatment DO NOTHING $0.00 100 II - Good, Non-Load Related SINGLE CHIP SEAL $1.70 III - Good, Load Related SINGLE CHIP SEAL $1.80 IV - Poor SINGLE CHIP SEAL $1.90 V - Very Poor THICK AC OVERLAY(2.5 INCHES)$9.00 # of Surface Seals before Overlay Functional Class CITY OF GILROY Printed: 12/27/2019 Decision Tree Surface Condition Category Treatment Type Treatment Yrs Between Crack Seals Yrs Between Surface Seals Cost/Sq Yd, except Seal Cracks in LF: Functional Class and Surface combination not used Criteria:8 MTC StreetSaver Selected Treatment is not a Surface Seal 11.A.a Packet Pg. 363 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       BUDGET NEEDS – PROJECTED PCI/COST SUMMARY The purpose for the budget needs report is to show your agency what it needs to do to fix the management sections that need to be fixed and the associated treatment costs with unlimited funds. The needs calculation is typically calculated over a 5-year period but can be adjusted by the user. The budget needs project PCI/cost summary report shows what the PCI values would be over a five-ear period and how much the treatments would cost each year. In addition, the report would show what the network condition would be if no treatments were not applied. The costs are derived from the agency’s preventative and rehabilitation maintenance trees. Below is a description of the Budget Needs – Project PCI/Cost Summary report Inflation Rate and Interest Rate – This value is user-defined and impacts the overall cost of the analysis period Year – Analysis year PCI Untreated – Overall network PCI when treatments are not applied PCI Treated – Overall network PCI when treatments are applied Cost – The cost per analysis period when treatment costs are applied PM Cost – Preventative Maintenance (PM) Cost is the cost that is projected for preventative maintenance treatment over a 5-year period % PM – Preventative Maintenance (PM) Percent is the percent value that is set aside for preventative maintenance Total Cost – Total cost over a 5-year period 11.A.a Packet Pg. 364 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) 2020 79 62 $33,357,570$2,867,653 $30,489,917 2021 78 59 $6,779,070$83,935 $6,695,135 2022 79 57 $5,466,934$325,251 $5,141,683 2023 82 54 $13,846,767$413,981 $13,432,786 2024 82 52 $8,184,408$880,050 $7,304,358 Total Cost $67,634,749 PM Total Cost $4,570,870 % PM 6.76%$63,063,879 Rehab Total Cost Year PCI Treated PCI Untreated Cost Needs - Projected PCI/Cost Summary Printed: 12/27/2019 CITY OF GILROY Inflation Rate = %4.00 PM Cost Rehab Cost Criteria:1 SS1008 MTC StreetSaver 11.A.a Packet Pg. 365 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       BUDGET NEEDS – PREVENTATIVE MAINTENANCE TREATMENT / COST SUMMARY This report shows the quantities and cost per year for preventative maintenance that is needed for the agency’s road network. Below is a description of the Budget Needs – Preventative Maintenance Treatment/Cost Summary: Treatment – The preventative maintenance treatment applied. All treatments can be referred back to the jurisdiction’s PM decision tree. Year – The year the specific treatment is applied Area Treated – The area treated is the projected quantity amount of the given treatment during the analysis year. Treatment unit costs are in sq.yd. with an exception of linear feet (seal cracks). Cost – The cost is the projected cost that is associated with the specified treatment in the analysis period. 11.A.a Packet Pg. 366 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) RUB CAPE SEAL W/DIGOUTS 2022 $115,509sq.yd.16,817.56 2023 $413,981sq.yd.57,956 2024 $229,069sq.yd.30,835.44 Total 105,609 $758,559 SEAL CRACKS, DIGOUTS, MICROSURFACING 2020 $2,809,393sq.yd.682,341.11 2021 $83,935sq.yd.20,176 2022 $209,742sq.yd.48,477.78 2024 $174,580sq.yd.33,162.11 Total 784,157 $3,277,650 SEAL CRACKS/SLURRY SEAL 2020 $58,260sq.yd.14,564.67 2024 $142,870sq.yd.30,531 Total 45,095.67 $201,130 THICK HMA OVERLAY 2"2024 $333,531sq.yd.11,404.11 Total 11,404.11 $333,531 Treatment Inflation Rate = %4.00 CostArea TreatedYear CITY OF GILROY Needs - Preventive Maintenance Treatment/Cost Summary Printed: 12/27/2019 Criteria:1 SS1007 MTC StreetSaver Total Quantity 946,265.78 $4,570,870 11.A.a Packet Pg. 367 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       BUDGET NEEDS – REHABILITATION MAINTENANCE TREATMENT/COST SUMMARY This report shows the quantities and cost per year for rehabilitation maintenance that is needed for the agency’s road network. Below is a description of the Budget Needs – rehabilitation maintenance treatment/cost summary: Treatment – The rehabilitation maintenance treatment applied. All treatments can be referred back to the jurisdiction’s rehabilitation decision tree. Year – The year the specific treatment is applied Area Treated – The area treated is the projected quantity amount of the given treatment during the analysis year. All treatment unit costs are in sq.yd. Cost – The cost is the projected cost that is associated with the specified treatment in the analysis period. 11.A.a Packet Pg. 368 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) 2.5 INCH AC OVERLAY W/FABRIC 2020 123,146.78 $3,571,263sq.yd. 2021 29,571.33 $891,873sq.yd. 2022 33,285.89 $1,044,060sq.yd. 2023 39,750.89 $1,296,717sq.yd. Total 225,754.89 $6,803,913sq.yd. SEAL CRACKS, DIGOUTS, MICROSURFACING 2020 36,780.11 $165,511sq.yd. 2021 12,395 $58,009sq.yd. 2022 3,565 $17,352sq.yd. 2024 5,896 $31,039sq.yd. Total 58,636.11 $271,911sq.yd. SLURRY SEAL W/DIGOUTS 2020 161,957.67 $971,762sq.yd. 2021 62,629.78 $390,819sq.yd. 2022 43,314.44 $281,103sq.yd. 2023 2,674.22 $18,049sq.yd. 2024 3,670.11 $25,762sq.yd. Total 274,246.22 $1,687,495sq.yd. RECONSTRUCT STRUCTURE (AC)2020 105,984.56 $8,374,778sq.yd. 2021 28,192.89 $2,320,310sq.yd. 2023 59,057.56 $5,255,386sq.yd. 2024 43,324.67 $4,054,701sq.yd. Total 236,559.67 $20,005,175sq.yd. AC OVERLAY W/FABRIC 2020 90,416.22 $3,616,651sq.yd. 2021 865.56 $36,008sq.yd. 2022 30,704.22 $1,328,389sq.yd. 2023 63,567.56 $2,860,196sq.yd. Total 185,553.56 $7,841,244sq.yd. RUB CAPE SEAL W/DIGOUTS 2020 75,795.11 $481,304sq.yd. 2021 9,516.22 $62,846sq.yd. 2022 51,890.78 $356,397sq.yd. Total 137,202.11 $900,547sq.yd. RECONSTRUCT SURFACE (AC)2020 100,430.44 $6,839,327sq.yd. 2021 31,614 $2,239,032sq.yd. 2022 12,997.78 $957,379sq.yd. 2023 47,527.22 $3,640,745sq.yd. 2024 34,048.78 $2,712,582sq.yd. Total 226,618.22 $16,389,065sq.yd. MILL AND THIN OVERLAY 2020 140,604.22 $2,812,097sq.yd. 2021 22,714.44 $472,463sq.yd. 2022 27,008.89 $584,261sq.yd. 2023 16,077 $361,693sq.yd. 2024 20,526.78 $480,274sq.yd. Total 226,931.33 $4,710,788sq.yd. MILL AND THICK OVERLAY 2020 136,079.11 $3,657,224sq.yd. Treatment Year Area Treated Cost Needs - Rehabilitation Treatment/Cost Summary Printed: 12/27/2019 CITY OF GILROY Inflation Rate = %4.00 Criteria:1 SS1010 MTC StreetSaver 11.A.a Packet Pg. 369 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) 2021 8,396.11 $223,775sq.yd. 2022 18,890.44 $572,742sq.yd. Total 163,365.67 $4,453,741sq.yd. Treatment Year Area Treated Cost Needs - Rehabilitation Treatment/Cost Summary Printed: 12/27/2019 CITY OF GILROY Inflation Rate = %4.00 Criteria:2 SS1010 MTC StreetSaver $63,063,879Total Cost 11.A.a Packet Pg. 370 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       BUDGET SCENARIOS – COST SUMMARY REPORT This report summarizes the test scenarios given a specific budget or goal a jurisdiction has in mind. This report is designed to maximize a jurisdiction’s funding cost-effectively. Below is a description of the Cost Summary Report: Year – Analysis year PM Amt – Preventative Maintenance (PM) amount that is applied during the analysis year. This amount is subtracted from the given budget value PM % - Preventative Maintenance (PM) % value that is applied during the analysis year. A percentage amount is subtracted from the overall budget and applied during each analysis year. Budget – Dollar amount value that is used for calculation and analysis Condition Category – This category shows the amount allocated to management sections with PCI values in the condition category II – V range for treatment Project Rehab – This column show the amount set aside for special projects. The special projects rehab are rehabilitation projects that the user can override the PMS system for any given analysis year Preventative Maintenance – The preventative maintenance column show the total dollar amount that is being applied to management sections during the analysis year Project PM – This column show the amount set aside for special projects. The special projects PM are preventative maintenance projects that the user can override the PMS system for any given analysis year Funded Stop Gap – This column shows the dollar amount allocated to management sections that need stop gap. Stop gap is often defined as localized distresses such as potholes, etc. Deferred Maintenance – This column shows the dollar amount of how much the jurisdiction is deferring each analysis year. These management sections were earmarked for treatment bud were not funded Surplus PM – This column shows the dollar amount not allocated after rehabilitation and PM funds were allocated Unmet Stop gap – This column shows the dollar amount of stop gap that was not met and deferred 11.A.a Packet Pg. 371 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CITY OF GILROY Scenarios - Cost Summary Printed: 11/20/2019Interest: .00%Inflation: 4.00% Scenario: #Current Budget 2020 $1,800,000 $897,645 $720,784 $0 $176,861 $0 $901,085 $0$31,619,886$0 $267,642 50% $0 $0 II III IV V Non- Project Project Funded Unmet Project Total 2021 $1,800,000 $896,953 $126,110 $0 $770,843 $0 $902,184 $0$35,036,401$0 $69,990 50% $0 $0 II III IV V Non- Project Project Funded Unmet Project Total 2022 $1,800,000 $899,037 $383,895 $0 $515,142 $0 $899,914 $0$35,915,138$86 $36,935 50% $0 $0 II III IV V Non- Project Project Funded Unmet Project Total 2023 $1,800,000 $896,025 $29,816 $0 $866,209 $0 $768,074 $0$46,144,002$131,926 $123,882 50% $0 $0 II III IV V Non- Project Project Funded Unmet Project Total 2024 $1,800,000 $898,368 $31,039 $12,608 $854,721 $0 $727,929 $0$53,686,017$172,071 $80,986 50% $0 $0 II III IV V Non- Project Project Funded Unmet Project Total Functional Class Stop GapRehabilitationPrev. Maint. Summary Stop Gap UnmetFunded Arterial $271,911 $635,919 $0 $184,115 Collector $991,545 $710,329 $0 $130,409 Residential/Local $3,224,572 $2,852,938 $0 $264,912 $4,488,028 $4,199,186 $0Grand Total:$579,435 Year Budget RehabilitationPM Deferred Stop GapSurplus PM Preventative Maintenance Scenarios Criteria:1 SS1034 MTC StreetSaver 11.A.a Packet Pg. 372 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CITY OF GILROY Target-Driven Scenarios - Cost Summary Printed: 11/20/2019Inflation: 4%Interest: 0% Target: By Year Scenario: #Constant Objective: Minimum Network Average PCI Year Value Year Value Year Value Year Value Year 1 63 Year 2 62 Year 3 62 Year 4 62 Year 5 62 2020 $542,486 $542,486 $0 $0 $0 $733,645 $0 $0 II III IV V Non- Project Project Project Total $542,486Total $0 $1,276,131 $32,142,476 2021 $930,742 $232,571 $0 $698,171 $0 $1,148,480 $0 $0 II III IV V Non- Project Project Project Total $930,742Total $0 $2,079,222 $35,042,170 2022 $2,016,008 $373,749 $0 $1,642,259 $0 $881,669 $0 $0 II III IV V Non- Project Project Project Total $2,016,008Total $0 $2,897,677 $34,752,836 2023 $4,727,925 $365,574 $2,271,369 $2,090,982 $0 $399,625 $0 $0 II III IV V Non- Project Project Project Total $4,727,925Total $0 $5,127,550 $41,484,624 2024 $5,010,942 $41,208 $214,761 $4,754,973 $0 $384,681 $0 $0 II III IV V Non- Project Project Project Total $5,010,942Total $0 $5,395,623 $48,408,538 Year Rehabilitation Preventive Maintenance Total Cost Deferred Scenarios Criteria:1 SS1063 MTC StreetSaver 11.A.a Packet Pg. 373 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Year Rehabilitation Preventive Maintenance Total Cost Deferred SummaryFunctional Class Rehabilitation Prev. Maint. Arterial $5,287,399 $302,523 Collector $4,294,929 $549,547 Residential/Local $3,645,775 $2,696,030 $13,228,103 $3,548,100Total:$16,776,203Grand Total: Scenarios Criteria:2 SS1063 MTC StreetSaver 11.A.a Packet Pg. 374 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CITY OF GILROY Target-Driven Scenarios - Cost Summary Printed: 12/27/2019Inflation: 4%Interest: 0% Target: Overall 67 Scenario: #Plus 5 PCI Increase Objective: Minimum Network Average PCI 2020 $3,458,912 $646,815 $0 $2,812,097 $0 $2,540,550 $0 $0 II III IV V Non- Project Project Project Total $3,458,912Total $0 $5,999,462 $27,358,043 2021 $4,772,933 $180,980 $2,342,851 $2,249,102 $0 $340,186 $0 $0 II III IV V Non- Project Project Project Total $4,772,933Total $0 $5,113,119 $28,323,863 2022 $4,375,573 $488,205 $690,499 $3,196,869 $0 $147,583 $0 $0 II III IV V Non- Project Project Project Total $4,375,573Total $0 $4,523,156 $29,254,794 2023 $4,833,225 $203,469 $683,485 $3,946,271 $0 $90,784 $0 $0 II III IV V Non- Project Project Project Total $4,833,225Total $0 $4,924,009 $38,765,348 2024 $4,092,680 $112,783 $214,761 $3,765,136 $0 $384,682 $0 $0 II III IV V Non- Project Project Project Total $4,092,680Total $0 $4,477,362 $46,312,665 SummaryFunctional Class Rehabilitation Prev. Maint. Arterial $7,701,416 $297,178 Collector $8,934,881 $600,252 Residential/Local $4,897,026 $2,606,355 $21,533,323 $3,503,785Total:$25,037,108Grand Total: Year Rehabilitation Preventive Maintenance Total Cost Deferred Scenarios Criteria:1 SS1063 MTC StreetSaver 11.A.a Packet Pg. 375 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CITY OF GILROY Target-Driven Scenarios - Cost Summary Printed: 11/20/2019Inflation: 4%Interest: 0% Target: Overall 70 Scenario: #Increase PCI to 70 Objective: Minimum Network Average PCI 2020 $9,069,997 $773,542 $1,228,951 $7,067,504 $0 $2,867,653 $0 $0 II III IV V Non- Project Project Project Total $9,069,997Total $0 $11,937,650 $21,481,060 2021 $5,879,490 $126,110 $1,453,053 $4,300,327 $0 $0 $0 $0 II III IV V Non- Project Project Project Total $5,879,490Total $0 $5,879,490 $23,070,454 2022 $4,558,416 $502,036 $943,851 $3,112,529 $0 $222,029 $0 $0 II III IV V Non- Project Project Project Total $4,558,416Total $0 $4,780,445 $24,322,065 2023 $5,113,253 $151,694 $206,501 $4,755,058 $0 $13,361 $0 $0 II III IV V Non- Project Project Project Total $5,113,253Total $0 $5,126,614 $33,617,371 2024 $6,043,577 $742,802 $792,326 $480,274 $4,028,175 $384,681 $0 $0 II III IV V Non- Project Project Project Total $6,043,577Total $4,028,175 $6,428,258 $36,618,580 SummaryFunctional Class Rehabilitation Prev. Maint. Arterial $14,214,728 $295,978 Collector $10,523,028 $597,946 Residential/Local $5,926,977 $2,593,800 $30,664,733 $3,487,724Total:$34,152,457Grand Total: Year Rehabilitation Preventive Maintenance Total Cost Deferred Scenarios Criteria:1 SS1063 MTC StreetSaver 11.A.a Packet Pg. 376 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       BUDGET SCENARIOS – NETWORK CONDITION SUMMARY REPORT This report shows the impacts on the overall network PCI given a specific budget or goal an agency wants to meet. An overall network PCI is generated for each analysis year. In addition, this report also shows the percent breakdown of condition category before and after the test budget scenario. The breakdown is categorized by Functional Classification. 11.A.a Packet Pg. 377 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) YearYearYearBudgetPMBudgetPM Budget PM 2020 $1,800,000 50% 2021 $1,800,000 50% 2022 $1,800,000 50% 2023 $1,800,000 50% 2024 $1,800,000 50% Projected Network Average PCI by year Never TreatedYear With Selected Treatment Treated Centerline Miles Treated Lane Miles 2020 6362 33.6115.81 2021 6259 26.4512.71 2022 6157 28.3913.70 2023 6054 17.278.64 2024 5952 10.895.18 Percent Network Area by Functional Class and Condition Category Condition Condition in base year 2020, prior to applying treatments. Arterial Collector Res/Loc Other Total I 5.4%9.3%27.6%0.0%42.3% II / III 6.5%9.4%12.6%0.0%28.5% IV 6.9%5.2%10.3%0.0%22.3% V 1.8%1.7%3.4%0.0%6.9% Total 20.6%25.6%53.9%0.0%100.0% Condition Condition in year 2020 after schedulable treatments applied. Arterial Collector Res/Loc Other Total I 6.6%12.1%28.0%0.0%46.7% II / III 5.3%6.5%12.5%0.0%24.3% IV 6.9%5.2%10.0%0.0%22.0% V 1.8%1.7%3.4%0.0%6.9% Total 20.6%25.6%53.9%0.0%100.0% Condition Condition in year 2024 after schedulable treatments applied. Arterial Collector Res/Loc Other Total I 5.3%11.2%28.9%0.0%45.5% II / III 3.4%3.8%13.3%0.0%20.4% IV 6.0%7.3%4.1%0.0%17.3% V 5.9%3.3%7.6%0.0%16.8% Total 20.6%25.6%53.9%0.0%100.0% Scenarios - Network Condition Summary Printed: 11/20/2019 CITY OF GILROY Scenario: #Current Budget Interest: 0%Inflation: 4% MTC StreetSaverCriteria: Scenarios Criteria: 1 SS1035 11.A.a Packet Pg. 378 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CITY OF GILROY Target-Driven Scenarios Network Condition Summary Printed: 11/20/2019Interest: 0%Inflation: 4% Projected Network Average PCI by year Year With Selected TreatmentNever Treated Target: By Year Scenario: #Constant Objective: Minimum Network Average PCI Year Value Year Value Year Value Year Value Year 1 63 Year 2 62 Year 3 62 Year 4 62 Year 5 62 2020 6362 2021 6259 2022 6257 2023 6254 2024 6252 Percent Network Area by Functional Classification and Condition Class Condition in base year 2020, prior to applying treatments. Condition Class Arterial Collector Res/Loc Other Total I 5.4%9.3%27.6%0.0%42.3% II / III 6.5%9.4%12.6%0.0%28.5% IV 6.9%5.2%10.3%0.0%22.3% V 1.8%1.7%3.4%0.0%6.9% 20.6%Total 25.6%53.9%0.0%100.0% Condition in year 2020 after schedulable treatments applied. Condition Class Arterial Collector Res/Loc Other Total I 5.4%12.1%27.6%0.0%45.1% II / III 6.5%6.5%12.6%0.0%25.6% IV 6.9%5.2%10.3%0.0%22.3% V 1.8%1.7%3.4%0.0%6.9% 20.6%Total 25.6%53.9%0.0%100.0% Condition in year 2024 after schedulable treatments applied. Condition Class Arterial Collector Res/Loc Other Total I 9.1%14.4%29.5%0.0%53.0% II / III 1.4%3.2%13.2%0.0%17.7% IV 4.2%4.6%3.7%0.0%12.4% V 5.9%3.3%7.6%0.0%16.8% 20.6%Total 25.6%53.9%0.0%100.0% MTC StreetSaverCriteria: Scenarios Criteria: 1 SS1062 11.A.a Packet Pg. 379 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CITY OF GILROY Target-Driven Scenarios Network Condition Summary Printed: 12/27/2019Interest: 0%Inflation: 4% Projected Network Average PCI by year Year With Selected TreatmentNever Treated Target: Overall 67 Scenario: #Plus 5 PCI Increase Objective: Minimum Network Average PCI 2020 6762 2021 6759 2022 6757 2023 6754 2024 6752 Percent Network Area by Functional Classification and Condition Class Condition in base year 2020, prior to applying treatments. Condition Class Arterial Collector Res/Loc Other Total I 5.6%9.8%27.6%0.0%43.1% II / III 6.5%8.8%12.6%0.0%27.9% IV 6.7%5.2%10.3%0.0%22.1% V 1.8%1.7%3.4%0.0%6.9% 20.6%Total 25.6%53.9%0.0%100.0% Condition in year 2020 after schedulable treatments applied. Condition Class Arterial Collector Res/Loc Other Total I 6.8%12.4%32.3%0.0%51.5% II / III 5.3%6.3%12.6%0.0%24.2% IV 6.7%5.2%5.6%0.0%17.4% V 1.8%1.7%3.4%0.0%6.9% 20.6%Total 25.6%53.9%0.0%100.0% Condition in year 2024 after schedulable treatments applied. Condition Class Arterial Collector Res/Loc Other Total I 11.4%20.3%31.8%0.0%63.5% II / III 1.6%1.0%13.2%0.0%15.8% IV 1.9%0.9%1.4%0.0%4.2% V 5.7%3.3%7.6%0.0%16.6% 20.6%Total 25.6%53.9%0.0%100.0% MTC StreetSaverCriteria: Scenarios Criteria: 1 SS1062 11.A.a Packet Pg. 380 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) CITY OF GILROY Target-Driven Scenarios Network Condition Summary Printed: 11/20/2019Interest: 0%Inflation: 4% Projected Network Average PCI by year Year With Selected TreatmentNever Treated Target: Overall 70 Scenario: #Increase PCI to 70 Objective: Minimum Network Average PCI 2020 7062 2021 7059 2022 7057 2023 7054 2024 7052 Percent Network Area by Functional Classification and Condition Class Condition in base year 2020, prior to applying treatments. Condition Class Arterial Collector Res/Loc Other Total I 5.4%9.3%27.6%0.0%42.3% II / III 6.5%9.4%12.6%0.0%28.5% IV 6.9%5.2%10.3%0.0%22.3% V 1.8%1.7%3.4%0.0%6.9% 20.6%Total 25.6%53.9%0.0%100.0% Condition in year 2020 after schedulable treatments applied. Condition Class Arterial Collector Res/Loc Other Total I 8.5%16.1%32.7%0.0%57.4% II / III 4.6%5.7%12.2%0.0%22.5% IV 5.6%2.0%5.6%0.0%13.2% V 1.8%1.7%3.4%0.0%6.9% 20.6%Total 25.6%53.9%0.0%100.0% Condition in year 2024 after schedulable treatments applied. Condition Class Arterial Collector Res/Loc Other Total I 14.7%22.4%36.6%0.0%73.7% II / III 1.6%0.4%8.3%0.0%10.3% IV 0.3%0.0%1.4%0.0%1.6% V 3.9%2.8%7.6%0.0%14.3% 20.6%Total 25.6%53.9%0.0%100.0% MTC StreetSaverCriteria: Scenarios Criteria: 1 SS1062 11.A.a Packet Pg. 381 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) YearYearYearBudgetPMBudgetPM Budget PM 2020 $50,000,000 50% 2021 $50,000,000 50% 2022 $50,000,000 50% 2023 $50,000,000 50% 2024 $50,000,000 50% Projected Network Average PCI by year Never TreatedYear With Selected Treatment Treated Centerline Miles Treated Lane Miles 2020 7762 147.8369.64 2021 7859 26.0812.37 2022 7957 25.1211.27 2023 8254 24.5210.38 2024 8252 18.818.56 Percent Network Area by Functional Class and Condition Category Condition Condition in base year 2020, prior to applying treatments. Arterial Collector Res/Loc Other Total I 5.6%9.8%27.6%0.0%43.1% II / III 6.5%8.8%12.6%0.0%27.9% IV 6.7%5.2%10.3%0.0%22.1% V 1.8%1.7%3.4%0.0%6.9% Total 20.6%25.6%53.9%0.0%100.0% Condition Condition in year 2020 after schedulable treatments applied. Arterial Collector Res/Loc Other Total I 13.4%19.3%40.4%0.0%73.1% II / III 3.6%3.4%7.2%0.0%14.2% IV 3.6%1.0%5.6%0.0%10.2% V 0.0%1.7%0.7%0.0%2.5% Total 20.6%25.6%53.9%0.0%100.0% Condition Condition in year 2024 after schedulable treatments applied. Arterial Collector Res/Loc Other Total I 19.1%25.6%47.2%0.0%91.8% II / III 1.2%0.0%5.3%0.0%6.6% IV 0.3%0.0%1.4%0.0%1.6% Total 20.6%25.6%53.9%0.0%100.0% Scenarios - Network Condition Summary Printed: 12/27/2019 CITY OF GILROY Scenario: #Optimal PCI Interest: 0%Inflation: 4% MTC StreetSaverCriteria: Scenarios Criteria: 1 SS1035 11.A.a Packet Pg. 382 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)       BUDGET SCENARIOS – SECTIONS SELECTED FOR TREATMENT The sections selected for treatment report shows in detail the management sections selected each analysis year for M&R treatment. This report helps the jurisdiction with identifying which streets are needed for M&R each analysis year. Below is a description of the sections selected for treatment: Year – Analysis year Street Name – Name of Street Beginning Location – Start of the management section End Location – End of the management section Section ID – Management section identifier FC – This is a group of streets or roadway subsystems that are classified pending on the level of service and traffic. A – Arterial C – Collector R – Residential/Local O – Other (user defined) Surface – Type of management section surface (AC, AC/AC, PCC, etc.) PCI – Management section pavement condition index Cost – Associated and projected cost applied to the management section Cost Effectiveness Rating – The rating is the weight cost – effectiveness ratio of the recommended treatment. The system is programmed to determine and select sections identified as needing treatment using a ratio. The sections with the highest ratios are selected first until all available funds have been exhausted. The management sections requiring PM/Rehab but not selected for the initial year are reconsidered in the following years of the analysis period. These are deferred maintenance costs and are based on the unmet needed treatments deferred in the present year. Treatment – Treatment contains the type of treatment the system is recommending for the management section 11.A.a Packet Pg. 383 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) YearYearYearBudgetPMBudgetPM Budget PM 2020 $1,800,000 50% 2021 $1,800,000 50% 2022 $1,800,000 50% 2023 $1,800,000 50% 2024 $1,800,000 50% TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID ALEXANDER ST NINTH ST SIXTH ST ALEXST 30 R AC/AC $40,683 68,837 SEAL CRACKS/SLURRY SEAL 8691,536481,907 78784A POLK CT MURRAY AVE END POLKCT 10 R AC/AC $6,474 81,986 SEAL CRACKS/SLURRY SEAL 8914,56533390 82824B RANCHO HILLS CT END MANTELLI DR RANHCT 10 R AC/AC $5,645 68,991 SEAL CRACKS/SLURRY SEAL 8612,70135314 78786C SIXTH ST 308 E/O CHESTNUT ST ROGERS LN SIXTST 65 R AC/AC $5,458 61,137 SEAL CRACKS/SLURRY SEAL 8312,28040307 75754A $58,260Treatment Total CAMINO ARROYO GILMAN RD ARROYO CIR CAMARR 10 C AC $19,292 108,392 RUB CAPE SEAL W/DIGOUTS 10027,34242651 63634C CARMEL ST FIRST ST EL CERRITO WY CARMST 10 C AC $32,690 99,995 RUB CAPE SEAL W/DIGOUTS 10046,332441,053 69692B CHURCH ST SEVENTH ST FOURTH ST CHURST 100 C AC $62,755 102,030 RUB CAPE SEAL W/DIGOUTS 10088,944481,853 67673B CHURCH ST FOURTH ST FIRST ST CHURST 110 C AC $61,875 98,290 RUB CAPE SEAL W/DIGOUTS 10087,696481,827 69703B CHURCH ST LAS ANIMAS AV 100' N/O HENNESSEY WY CHURST 70 C AC/AC $15,281 100,285 RUB CAPE SEAL W/DIGOUTS 10021,65849442 62625B FOURTH ST SANTA THERESA DR MILLER DR FOURST 10 C AC $18,345 102,030 RUB CAPE SEAL W/DIGOUTS 10026,00040650 67671A FOURTH ST MILLER DR PRINCEVALLE ST FOURST 15 C AC $27,207 102,030 RUB CAPE SEAL W/DIGOUTS 10038,56040964 67673B KERN AVE 429' N. OF MANTELLI DR N CITY LIM KERNAV 60 C AC $29,980 97,144 RUB CAPE SEAL W/DIGOUTS 10042,490351,214 69695A MANTELLI DR RANCHO HILLS CALLE DEL REY MANTDR 30 C AC $38,989 111,039 RUB CAPE SEAL W/DIGOUTS 10055,260451,228 62626C MARTIN ST MONTEREY RD CHESTNUT ST MARTST 10 C AC $33,831 106,345 RUB CAPE SEAL W/DIGOUTS 10047,949331,453 65654A RANCHO HILLS DR CARRIAGE DR VALLEY OAKS DR RANHDR 20 C AC $28,226 99,806 RUB CAPE SEAL W/DIGOUTS 10040,00545889 69696B RENZ LN 1085' W. OF CAMINO ARROYO CAMINO ARROYO RENZLN 20 C AC $42,870 105,316 RUB CAPE SEAL W/DIGOUTS 10060,760561,085 65664C THIRD ST PRINCEVALLE ST CHURCH ST THIRST 50 C AC $52,070 103,712 RUB CAPE SEAL W/DIGOUTS 10073,800401,845 66663B THIRD ST CHURCH ST MONTEREY RD THIRST 60 C AC $17,893 103,712 RUB CAPE SEAL W/DIGOUTS 10025,36040634 66663B $481,304Treatment Total Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 1 SS1026 MTC StreetSaver 11.A.a Packet Pg. 384 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID ARMAND CT WREN AVE END ARMACT 10 R AC $2,876 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 836,46935424 75751A BABBS CREEK DR 100FT WEST OF STARLING DR END WEST BABCDR 20 R AC $8,312 54,402 SEAL CRACKS, DIGOUTS, MICROSURFACING 9418,70034550 88887A BANYAN CT BANYAN ST END BANYCT 10 R AC $8,886 74,331 SEAL CRACKS, DIGOUTS, MICROSURFACING 9019,99221952 83836C BANYAN CT END TEA TREE WAY BANYCT 20 R AC $1,867 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 894,20021200 82826C BENNETT ST CHURCH ST SEVERANCE ST BENNST 10 R AC $4,667 55,694 SEAL CRACKS, DIGOUTS, MICROSURFACING 8110,50035300 72725B BLACKFOOT CT GERONIMO ST CUL DE SAC BLCKCT 10 R AC $5,689 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 9112,80032400 84846B BLUE HERON CT END PEREGRINE DR BLUHCT 10 R AC $4,043 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 839,09534215 74746B BOLSA RD CARNADERO RD 1076' S/O TRAVEL PARK CIR BOLSRD 10 A AC $58,092 40,248 SEAL CRACKS, DIGOUTS, MICROSURFACING 71116,184244,841 60617C CAMERON BLVD HWY 152 VENTURE WY CAMBL 10 A AC $101,000 75,791 SEAL CRACKS, DIGOUTS, MICROSURFACING 84202,0001002,020 76767C CAROB CT TEA TREE WAY END CAROCT 10 R AC $8,267 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 8918,60020930 82826C CARRIAGE DR END RANCHO HILLS DR CARRDR 10 R AC $10,208 55,694 SEAL CRACKS, DIGOUTS, MICROSURFACING 8122,96734623 72726C CHERRYWOOD CT SPRIG WAY CUL DE SAC CHERCT 10 R AC $4,534 75,898 SEAL CRACKS, DIGOUTS, MICROSURFACING 8910,20034300 82826B CHESTNUT ST EIGHTH ST SIXTH ST CHESST 70 C AC/AC $30,454 62,002 SEAL CRACKS, DIGOUTS, MICROSURFACING 8260,907491,243 73734A CHARLES LUX DR GREENFIELD DR CIMINO ST CHRLUX 10 R AC $8,392 55,070 SEAL CRACKS, DIGOUTS, MICROSURFACING 9118,88032590 84847A CIELO VISTA CT DANCING WIND WAY CUL DE SAC CIELCT 10 R AC $2,112 56,678 SEAL CRACKS, DIGOUTS, MICROSURFACING 844,75227176 76766B CIELO VISTA LN DANCING WIND WAY DREAM CATCHER WAY CIELLN 10 R AC $15,696 59,142 SEAL CRACKS, DIGOUTS, MICROSURFACING 8535,316271,308 77776B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 2 SS1026 MTC StreetSaver 11.A.a Packet Pg. 385 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CIMINO ST LUCHESSA AVE CHARLES LUX DR CIMNO 10 R AC $12,743 50,433 SEAL CRACKS, DIGOUTS, MICROSURFACING 8928,67047610 82827A COLONY WY END RANCHO HILLS DR COLOWY 10 R AC $9,528 58,140 SEAL CRACKS, DIGOUTS, MICROSURFACING 8221,43734578 73736C COMANCHE ST SUNRISE DR PUBELO COMAST 10 R AC $9,529 53,890 SEAL CRACKS, DIGOUTS, MICROSURFACING 8921,44032670 82826B COOPER PL JICARRILLA PL SUNRISE DR COOPPL 10 R AC $7,405 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 8816,66035476 80806B COYOTE MOON LN DREAM CATCHER WAY SUNRISE DR COYOLN 10 R AC $16,698 52,213 SEAL CRACKS, DIGOUTS, MICROSURFACING 8337,570341,105 74746B DANCING WIND WY RANCHO HILLS DRIVE CIELO VISTA LAND DANCWY 10 R AC $8,221 50,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 8218,49634544 73736B DESERT BLOOM PL O'KEEFE LANE SUNRISE DRIVE DESEPL 10 R AC $11,265 61,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 8625,34638667 78786B DOVETAIL WAY RANCHO HILLS DR END DOVETA 10 R AC $22,788 57,958 SEAL CRACKS, DIGOUTS, MICROSURFACING 8351,272341,508 74746B DREAM CATCHER WY CIELO VISTA WAY SUNRISE DRIVE DREAWY 10 R AC $11,122 54,391 SEAL CRACKS, DIGOUTS, MICROSURFACING 8325,02434736 75756B ELECTA CT LAS ANIMAS AVE CUL DE SAC ELECCT 10 R AC $9,328 62,562 SEAL CRACKS, DIGOUTS, MICROSURFACING 8520,98844477 77774B ERVIN CT MONTEREY ROAD CUL DE SAC ERVICT 10 R AC $3,703 51,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 848,33034245 76767A FESTA AGLIO CT HIRASAKI DR CUL DE SAC FESTCT 10 R AC $9,354 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 8621,04634619 78785A FORUNATA PL FOREST ST GENNARO WAY FORTPL 10 R AC $3,414 68,305 SEAL CRACKS, DIGOUTS, MICROSURFACING 917,68020384 84844A GENNARO WY LEWIS ST FORTUNATA PLACE GENNWY 10 R AC $6,045 62,513 SEAL CRACKS, DIGOUTS, MICROSURFACING 8913,60034400 82824A GERONIMO ST ZUNI LANE SHOSHONE STREET GEROST 10 R AC $17,892 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 9140,256321,258 84846B GOLD FINCH CT SPARROW GLEN WAY CUL DE SAC GOLDFI 10 R AC $3,514 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 867,90534156 78786B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 3 SS1026 MTC StreetSaver 11.A.a Packet Pg. 386 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID GOLDEN SKY WY DREAM CATCHER WAY SUNRISE DRIVE GOLDWY 10 R AC $10,548 56,678 SEAL CRACKS, DIGOUTS, MICROSURFACING 8423,73234698 76766B GRANDE DR CHEYENNE DR SPRIG WAY GRANDR 10 R AC $4,480 53,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 9110,08032315 84846B HOLLYHOCK CT HOLLYHOCK LN CUL DE SAC HLLYCT 10 R AC $3,467 74,280 SEAL CRACKS, DIGOUTS, MICROSURFACING 897,80020390 82826C HOPI LN SUNRISE DR O'KEEFE CT HOPILN 10 R AC $10,687 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 8724,04535687 79796B JARDIN WY BRAZOS ST BOSQUE ST JARDWY 10 R AC $5,547 58,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 9112,48032390 84842B JICARILLA PL EAGLE VIEW WAY COOPER PL JCAPL 10 R AC $9,672 53,890 SEAL CRACKS, DIGOUTS, MICROSURFACING 8921,76034640 82826B KIOWA CT JICARILLA PL CUL DE SAC KIOWCT 10 R AC $3,414 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 917,68032240 84846B KISHIMURA DR FOREST ST MURRAY AV KISHST 10 R AC $15,968 60,360 SEAL CRACKS, DIGOUTS, MICROSURFACING 8235,92646781 73734B LINARIA ST BANYAN ST OLEA CT LINAST 10 R AC $3,503 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 847,88020394 76766C LUCHESSA AVE CIMINO ST GREENFIELD DR LUCHAV 60 R AC $18,169 70,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 9140,88056730 84847A MARTIRI DR HIRASAKI AV PADOVA DR MARTDR 90 R AC $9,334 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8421,00035600 76765A MIMOSA CT BANYAN CT END MIMOCT 10 R AC $5,180 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 8911,65521555 82826C MORO CT HIRASAKI DR CUL DE SAC MOROCT 10 R AC $8,327 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 8618,73434551 78785A MORO DR HIRASAKI AV PADOVA DR MORODR 90 R AC $8,523 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8419,17634564 76765A NONAME UNO AVE LAS ANIMAS RD ADDRESS' 9850 NO. UNO NONUAV 10 A AC $56,100 43,252 SEAL CRACKS, DIGOUTS, MICROSURFACING 75112,200303,740 66664C OKEEFE CT HOPI LN E. END CDS OKEECT 10 R AC $9,847 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,15535633 79796B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 4 SS1026 MTC StreetSaver 11.A.a Packet Pg. 387 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID PADOVA DR SORRENTO DR MORO DR PADODR 90 R AC $13,767 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8430,97535885 76765A PADOVA DR SIENA CT SORRENTO DR PADOVA 10 R AC $14,326 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 8632,23234948 78785A PRAIRIE OWL CT SPRIG WY N. END CDS PRAICT 10 R AC $4,340 67,108 SEAL CRACKS, DIGOUTS, MICROSURFACING 869,76535279 78786B SADDLER DR WAGON WY SPRIG WY SADDL 10 R AC $15,447 58,997 SEAL CRACKS, DIGOUTS, MICROSURFACING 8134,75535993 72726B SHOOTING STAR CT HOLLYHOCK LANE CUL DE SAC SHOOCT 10 R AC $3,631 77,687 SEAL CRACKS, DIGOUTS, MICROSURFACING 908,16921389 83836C SHOSHONE WY KOSHARE STREET PUBELO COURT SHOSWY 10 R AC $4,831 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 9110,86826418 84846B SIXTH ST PRINCEVALLE ST CHURCH ST SIXTST 30 C AC/AC $48,150 61,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 8296,300501,926 73733B SAN JUSTO ROAD MILLER RD END SNJURD 10 R AC $14,934 71,994 SEAL CRACKS, DIGOUTS, MICROSURFACING 9133,600241,400 84847B SORRENTO DR HIRASAKI DR PADOVA DR SORRDR 10 R AC $11,696 60,547 SEAL CRACKS, DIGOUTS, MICROSURFACING 8326,31634774 75755A SPRIG WY SADDLER WY RODEO DR SPRIWY 20 R AC $13,026 63,306 SEAL CRACKS, DIGOUTS, MICROSURFACING 8429,30834862 76766B STARLING DR ALDER ST BABBS CREEK DR STARDR 10 R AC $6,269 60,249 SEAL CRACKS, DIGOUTS, MICROSURFACING 8214,10535403 73737A STONECRESS ST COUNTRY DR BANYAN ST STONST 10 R AC $19,964 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 8744,919212,139 79796C TEAL CT END VINCA CT TEALCT 10 R AC $3,208 57,700 SEAL CRACKS, DIGOUTS, MICROSURFACING 817,21835155 72727A TEA TREE CT CREST HILL WAY END TEATCT 10 R AC $5,882 58,600 SEAL CRACKS, DIGOUTS, MICROSURFACING 8713,23426509 79796C TEA TREE WY TEA TREE COURT END TEATWY 10 R AC $14,579 63,586 SEAL CRACKS, DIGOUTS, MICROSURFACING 8932,802211,562 81816C TENTH ST 150 E/O ROSANNA ST MONTEREY RD TENTST 30 A AC $31,926 44,966 SEAL CRACKS, DIGOUTS, MICROSURFACING 7863,85167953 69691A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 5 SS1026 MTC StreetSaver 11.A.a Packet Pg. 388 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID THIRD ST COBBLESTONE CT/THIRD ST RAB 470FT W/O ROSEMARY WY THIRST 100 R AC $25,667 50,204 SEAL CRACKS, DIGOUTS, MICROSURFACING 9257,750351,650 86867B COBBLESTONE CT/THIRD ST RAB THIRD ST THIRD ST THIRST 75 R AC $1,849 54,590 SEAL CRACKS, DIGOUTS, MICROSURFACING 944,16016260 8888 VENTURE WY CAMINO ARROYO CAMERON BLVD VENTWY 10 C AC $27,016 51,879 SEAL CRACKS, DIGOUTS, MICROSURFACING 8754,032441,228 80807C WILD IRIS DR SOUTH SIDE OF ROUNDABOUT LAVENDER WAY WILIDR 20 R AC $7,823 65,311 SEAL CRACKS, DIGOUTS, MICROSURFACING 8917,60020880 81816C WREN AVE 125' S/O WELBURN AVE 125' S/O LAWRENCE DR WRENAV 20 A AC/AC $28,488 79,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 9056,975431,325 83832B WREN AVE 125' S/O LAWRENCE DR MANTELLI DR WRENAV 30 A AC/AC $34,069 56,460 SEAL CRACKS, DIGOUTS, MICROSURFACING 8268,138621,099 74742B WREN AVE RONAN AVE TATUM AVE WRENAV 50 A AC $19,393 45,011 SEAL CRACKS, DIGOUTS, MICROSURFACING 7838,78643902 69692B YUCCA CT CHEYENNE DR CUL DE SAC YUCCCT 10 R AC $1,778 49,369 SEAL CRACKS, DIGOUTS, MICROSURFACING 894,00032125 82826B ZINNIA ST VIOLET WY MANTELLI DR ZINNST 10 R AC $4,736 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 8310,65637288 74745A ZUNI LN SUNRISE DR PUEBLO CT ZUNILN 10 R AC $10,624 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 8823,90234703 80806B $1,007,829Treatment Total FALCON CT END EAGLE HILLS WY FALCCT 10 R AC $7,939 25,367 SLURRY SEAL W/DIGOUTS 7811,90835289 69696B $7,939Treatment Total DRIFTWOOD TER WESTWOOD DR JUNIPER DR DRIFTR 10 R AC $92,336 39,024 MILL AND THIN OVERLAY 10041,551371,123 40401B PERRELLI ST WREN AVE FILICE DR PERRST 10 R AC $84,525 38,856 MILL AND THIN OVERLAY 10038,036371,028 41411A SANTA BARBARA DR THIRD ST MONTE BELLO DR SANBDR 30 R AC $67,669 38,673 MILL AND THIN OVERLAY 10030,45137823 42421B $244,530Treatment Total $1,799,862Year 2020 TotalYear 2020 Area Total 3,094,065 Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 6 SS1026 MTC StreetSaver 11.A.a Packet Pg. 389 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID KERN AVE MANTELLI DR 429' N/O MANTELLI DR KERNAV 50 C AC $14,166 95,257 RUB CAPE SEAL W/DIGOUTS 10019,30545429 69725A WAYLAND LN EL CERRITO WY CUL DE SAC WAYLLN 20 C AC $48,680 97,362 RUB CAPE SEAL W/DIGOUTS 10066,341371,793 68712B $62,846Treatment Total ADAMS CT MURRAY AVE END ADAMCT 10 R AC $6,275 38,248 SEAL CRACKS, DIGOUTS, MICROSURFACING 8313,57533360 74764B ALEXANDER ST SIXTH ST LEWIS ST ALEXST 10 R AC $21,009 38,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 8445,452441,033 75774A ASHBURY CT END ALDER ST ASHBCT 10 R AC $3,246 38,237 SEAL CRACKS, DIGOUTS, MICROSURFACING 847,02134154 76787A AZARA ST STONECRESS ST MANTELLI DR AZARST 10 R AC $3,948 38,636 SEAL CRACKS, DIGOUTS, MICROSURFACING 908,54020427 82846C BANYAN ST LINARIA ST E END BANYST 10 R AC $8,995 39,859 SEAL CRACKS, DIGOUTS, MICROSURFACING 8919,46020973 81836C BENBOW DR SAGE HILL DR ARAPAHO DR BENBDR 10 R AC $9,400 37,923 SEAL CRACKS, DIGOUTS, MICROSURFACING 8520,33535581 77796B BENNETT CT SEVERANCE ST END BENNCT 10 R AC $7,944 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 8617,18535491 78805B BOSQUE ST JARDIN WY TAOS WY BOSQST 10 R AC $4,857 38,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8910,50634309 82842B BRAZOS ST JARDIN WY TAOS WY BRAZST 10 R AC $5,705 40,911 SEAL CRACKS, DIGOUTS, MICROSURFACING 8812,34234363 80822B BRITTANY CT MANTELLI DR END BRITCT 10 R AC $6,583 38,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 8414,24135358 75775A BUTTERCUP LN KERN AVE WESTWOOD DR BUTTLN 10 R AC $6,455 37,809 SEAL CRACKS, DIGOUTS, MICROSURFACING 8613,96521665 78795A CANYON CT CHEYENNE DR CUL DE SAC CANYCT 10 R AC $1,572 36,860 SEAL CRACKS, DIGOUTS, MICROSURFACING 903,40034100 82846B CHADWICK ST HOXETT ST WENTZ DR CHADST 10 R AC $9,416 38,220 SEAL CRACKS, DIGOUTS, MICROSURFACING 8420,37035582 76781A CHEYENNE DR SADDLER WY 100' W/O NAVAJO CT CHEYDR 10 R AC $6,926 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 8814,98233454 80826B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 7 SS1026 MTC StreetSaver 11.A.a Packet Pg. 390 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CHURCH ST 98' S/O RONAN LIMAN AVE CHURST 50 C AC/AC $13,949 41,968 SEAL CRACKS, DIGOUTS, MICROSURFACING 8226,82456479 74762B CLARK WY CRAWFORD DR WREN AVE CLARWY 10 R AC $14,269 37,558 SEAL CRACKS, DIGOUTS, MICROSURFACING 8630,87035882 78801A CONCORD PL NINTH ST END CONCPL 10 R AC $5,142 37,961 SEAL CRACKS, DIGOUTS, MICROSURFACING 8511,12433273 77791A COUNTRY DR SUNFLOWER CIR MANTELLI DR COUNDR 30 R AC $9,522 37,922 SEAL CRACKS, DIGOUTS, MICROSURFACING 8520,600201,030 77796C CRAWFORD CT CRAWFORD DR END CRAWCT 10 R AC $3,076 37,789 SEAL CRACKS, DIGOUTS, MICROSURFACING 816,65437131 72741A CRAWFORD DR SANTA PAULA DR END CRAWDR 10 R AC $19,754 38,220 SEAL CRACKS, DIGOUTS, MICROSURFACING 8442,735351,221 76781A CUMBERLAND DR MILLER AVE ORCHARD DR CUMBDR 10 R AC $15,974 38,239 SEAL CRACKS, DIGOUTS, MICROSURFACING 8334,55837934 74763B CYPRESS CT PONDEROSA DR LAUREL DR CYPREC 20 R AC $8,361 38,237 SEAL CRACKS, DIGOUTS, MICROSURFACING 8418,08834532 76781B DAFODIL PL MANTELLI DR ZINNIA ST DAFOPL 10 R AC $10,743 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 8823,24035664 80825A DEL RIO CIR SANTA FE DR SANTA FE DR DELRIO 10 R AC $9,679 37,811 SEAL CRACKS, DIGOUTS, MICROSURFACING 8620,93829722 78792B EAGLE`S NEST LN EAGLE HILLS WY 324' N/O EAGLE HILLS WY EAGNLN 10 R AC $5,092 37,922 SEAL CRACKS, DIGOUTS, MICROSURFACING 8511,01634324 77796B EDEN ST WREN AV FLORAL ST EDENST 10 R AC $21,420 37,812 SEAL CRACKS, DIGOUTS, MICROSURFACING 8646,340351,324 78792B FELLOM CT MURRAY AV END FELLCT 10 R AC $7,604 37,951 SEAL CRACKS, DIGOUTS, MICROSURFACING 8516,45037398 77794B FESTA AGLIO DR HIRASAKI AV PADOVA DR FESTDR 90 R AC $14,528 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 8831,43035898 80825A FILICE DR SOUTH END NORTH END FILIDR 10 R AC $45,983 38,086 SEAL CRACKS, DIGOUTS, MICROSURFACING 8299,482372,591 73751A FLORAL ST EDEN ST MANTELLI DR FLORST 10 R AC $10,015 37,812 SEAL CRACKS, DIGOUTS, MICROSURFACING 8621,66535619 78792B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 8 SS1026 MTC StreetSaver 11.A.a Packet Pg. 391 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID GREENFIELD DR LUCHESA AV N END GATE GREEDR 90 C AC $12,026 39,555 SEAL CRACKS, DIGOUTS, MICROSURFACING 8723,12631746 80827A GREYSTONE CT KERN AVE END GREYCT 10 R AC $8,282 38,099 SEAL CRACKS, DIGOUTS, MICROSURFACING 8217,91635463 73755A HADLEY CT END ROGERS LN HADLCT 10 R AC $10,973 38,247 SEAL CRACKS, DIGOUTS, MICROSURFACING 8323,73833663 74764A HERSMAN DR SANTA BARBARA DR STEWART DR HERSDR 10 R AC $15,984 37,545 SEAL CRACKS, DIGOUTS, MICROSURFACING 8034,58035988 71731A HOGAN WY END SADDLER DR HOGAWY 10 R AC $11,334 38,194 SEAL CRACKS, DIGOUTS, MICROSURFACING 8524,52035628 76786B HOLLYHOCK LN MANTELLI DR HOLLYHOCK CT HOLLLN 10 R AC $18,027 38,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 8439,000201,950 75776C HONEY CT FLORAL ST END HONECT 10 R AC $3,499 37,812 SEAL CRACKS, DIGOUTS, MICROSURFACING 867,56835165 78792B HOOVER CT END ROGERS LN HOOVCT 10 R AC $7,170 38,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 8515,51030517 76784A IRONBARK ST STONECRESS ST MANTELLI DR IRONST 10 R AC $4,179 39,859 SEAL CRACKS, DIGOUTS, MICROSURFACING 899,04020452 81836C JACARANDA WY SOUTH END NORTH END JACAWY 10 R AC $12,504 38,194 SEAL CRACKS, DIGOUTS, MICROSURFACING 8527,05135724 76786B KENNEDY CT MURRAY AV END KENNCT 10 R AC $8,276 37,951 SEAL CRACKS, DIGOUTS, MICROSURFACING 8517,90436445 77794B KITE DR PEREGRINE DR SUNRISE DR KITEDR 10 R AC $3,599 38,194 SEAL CRACKS, DIGOUTS, MICROSURFACING 857,78634229 76786B KOSHARE PL COMANCHE ST SHOSHONE ST KOSHPL 10 R AC $11,394 46,425 SEAL CRACKS, DIGOUTS, MICROSURFACING 8624,65034725 78796B LA PRIMAVERA WY WREN AVE TAOS WAY LAPRWY 10 R AC $13,154 37,941 SEAL CRACKS, DIGOUTS, MICROSURFACING 8528,45834837 77792B LAREDO WY SUNRISE DR RIO GRANDE WY LAREWY 10 R AC $6,714 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 8814,52535415 80826B LAS ANIMAS AV MONTEREY RD ROAD NARROWS LASAAV 30 R AC $9,461 37,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 8520,46834602 77794B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 9 SS1026 MTC StreetSaver 11.A.a Packet Pg. 392 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID LEARNARD WY MANTELLI DR BRENTWOOD LN LEARWY 10 R AC $8,864 38,194 SEAL CRACKS, DIGOUTS, MICROSURFACING 8519,17634564 76786B LINCOLN CT MURRAY AV END LINCCT 10 R AC $8,361 37,802 SEAL CRACKS, DIGOUTS, MICROSURFACING 8118,08737440 72744B LISA CT END NICOLE WY LISACT 10 R AC $4,937 37,970 SEAL CRACKS, DIGOUTS, MICROSURFACING 8510,68130308 77797B LOS PADRES CT SAN MIGUEL ST END LOSPCT 10 R AC $8,720 37,789 SEAL CRACKS, DIGOUTS, MICROSURFACING 8118,86437461 72741A LUCHESSA AVE THOMAS DR GREENFIELD DR LUCHAV 10 A AC $70,924 45,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 85136,391711,921 77797A NAGAREDA DR FOREST DR MURAOKA DR NAGARE 010 R AC $10,941 37,543 SEAL CRACKS, DIGOUTS, MICROSURFACING 8623,67045526 78804B NECTAR CT END FLORAL ST NECTCT 10 R AC $3,008 37,812 SEAL CRACKS, DIGOUTS, MICROSURFACING 866,50637127 78792B NICOLE CT END NICOLE WY NICOCT 10 R AC $4,509 38,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 829,75436240 73757B NICOLE WY MESA RD CARIGNANE DR NICOWY 10 R AC $16,408 38,271 SEAL CRACKS, DIGOUTS, MICROSURFACING 8435,49636986 75777B NINTH ST VALLEY FORGE DR PRINCEVALLE ST NINTST 10 R AC $16,761 37,556 SEAL CRACKS, DIGOUTS, MICROSURFACING 8636,26037980 78801A OAK CT HANNA ST HANNA ST OAKCR 10 R AC $6,278 37,814 SEAL CRACKS, DIGOUTS, MICROSURFACING 8113,58127503 72742B ORCHARD DR TENTH ST 95' N/O DEARBORN PL ORCHDR 10 R AC $13,443 37,789 SEAL CRACKS, DIGOUTS, MICROSURFACING 8129,08237786 72741A PEREGRINE DR RANCHO HILLS DR EAGLE VIEW WY PEREDR 10 R AC $26,591 38,194 SEAL CRACKS, DIGOUTS, MICROSURFACING 8557,528341,692 76786B PERIWINKLE DR END MANTELLI DR PERIDR 10 R AC $8,386 38,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 8418,14120766 75776C PONDEROSA DR THIRD ST CYPRESS CT PONDDR 10 R AC $13,035 37,961 SEAL CRACKS, DIGOUTS, MICROSURFACING 8528,20030940 77791B PUEBLO CT ZUNI LN W. END PUEBCT 10 R AC $7,102 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 8815,36327569 80826B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 10 SS1026 MTC StreetSaver 11.A.a Packet Pg. 393 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID RIO GRANDE WY LAREDO WY SEDONA WY RIGRWY 10 R AC $8,345 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 8818,05434531 80826B ROGERS LN SIXTH ST LEWIS ST ROGELN 10 R AC $17,750 38,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 8538,400301,280 76784A RONAN AVE WREN AVE CHURCH ST RONAAV 10 R AC $22,423 37,941 SEAL CRACKS, DIGOUTS, MICROSURFACING 8548,510351,386 77792B SANTA INEZ CT SAN MIGUEL ST END SANICT 10 R AC $8,805 38,086 SEAL CRACKS, DIGOUTS, MICROSURFACING 8219,04937466 73751A SANTA FE DR TAOS WY CHURCH ST SANTFE 10 R AC $7,065 38,228 SEAL CRACKS, DIGOUTS, MICROSURFACING 8415,28329527 76772B SEDONA WY SUNRISE DR RIO GRANDE WY SEDOWY 10 R AC $6,730 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 8814,56035416 80826B SIXTH ST EIGLEBERRY RD RR TRACKS SIXTST 45 C AC/AC $12,842 42,038 SEAL CRACKS, DIGOUTS, MICROSURFACING 8524,69642588 77793B SOLANA DR VALBUSA DR LONGMEADOW DR SOLADR 10 R AC $13,978 37,922 SEAL CRACKS, DIGOUTS, MICROSURFACING 8530,24035864 77796B SPARROW GLEN WAY DOVETAIL WAY SUNRISE DR SPARGL 10 R AC $10,247 37,922 SEAL CRACKS, DIGOUTS, MICROSURFACING 8522,16834652 77796B ST FRANCIS CT SAN MIGUEL ST END STFRCT 10 R AC $8,925 37,556 SEAL CRACKS, DIGOUTS, MICROSURFACING 8619,30837473 78801A SUNFLOWER CIR WEST END STRAWBERRY LN SUNCIR 10 R AC $3,966 38,098 SEAL CRACKS, DIGOUTS, MICROSURFACING 828,58020429 73756C TENTH ST PRINCEVALLE ST 150' E/O ROSANNA ST TENTST 20 A AC $58,009 42,451 SEAL CRACKS, DIGOUTS, MICROSURFACING 77111,555671,665 67701A THIRD ST ISABELLA WY COBBLESTONE CT/THIRD ST RAB THIRST 70 R AC $5,547 44,177 SEAL CRACKS, DIGOUTS, MICROSURFACING 8912,00030400 82837B THOMAS RD 675' N/O OAK BROOK WY LUCHESSA AVE THOMRD 60 A AC $3,518 42,009 SEAL CRACKS, DIGOUTS, MICROSURFACING 896,76541165 81847A VICKERY AVE NIGHTINGALE DR WREN AVE VICKAV 20 R AC $10,516 45,227 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,75035650 79805B WEAVER CT END WOODWORTH WY WEAVCT 10 R AC $4,185 37,526 SEAL CRACKS, DIGOUTS, MICROSURFACING 869,05230207 78802B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 11 SS1026 MTC StreetSaver 11.A.a Packet Pg. 394 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID WILDROSE CT SUNFLOWER CIR CUL DE SAC WILDCT 10 R AC $3,449 38,098 SEAL CRACKS, DIGOUTS, MICROSURFACING 827,46120232 73756C WILLY CT MURRAY AV CUL DE SAC WILYCT 10 R AC $7,249 38,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 8415,68237375 75774B WREN AVE MANTELLI DR RONAN AVE WRENAV 40 A AC $15,131 43,919 SEAL CRACKS, DIGOUTS, MICROSURFACING 8729,09761477 80822B WREN AVE FARREL DR CITY LIMITS WRENAV 65 A AC $16,945 45,548 SEAL CRACKS, DIGOUTS, MICROSURFACING 8432,58549665 76785B ZINNIA ST MANTELLI DR DAFFODIL PL ZINNST 20 R AC $12,809 38,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 8427,71034815 75775A $960,720Treatment Total OTOOLE CT PETERSEN DR END OTOOCT 10 R AC $5,255 31,177 SLURRY SEAL W/DIGOUTS 787,57835158 69705A $5,255Treatment Total DELTA CT END DELTA DR DELTCT 10 R AC $19,056 37,030 MILL AND THIN OVERLAY 1008,24537174 42456C FAIRVIEW DR PRINCEVALLE ST HANNA ST FAIRDR 10 R AC $90,813 37,267 MILL AND THIN OVERLAY 10039,294371,062 41441A GLENWOOD DR EL CERRITO WY WELBURN AVE GLENDR 10 R AC $53,616 37,248 MILL AND THIN OVERLAY 10023,19937627 41442B HACIENDA DR ORTEGA CIR END HACIDR 10 R AC $102,258 37,267 MILL AND THIN OVERLAY 10044,246371,147 41441B LEXINGTON PL END PRINCEVALLE ST LEXIPL 10 R AC $55,056 37,435 MILL AND THIN OVERLAY 10023,82237595 40433B LUPINE CT END LIONS CREEK DR LUPICT 10 R AC $31,457 37,346 MILL AND THIN OVERLAY 10013,61135340 40436B MILLER AVE SANTA TERESA BLVD UVAS PARK DR MILLAV 10 R AC $378,311 37,275 MILL AND THIN OVERLAY 100163,692364,547 41447A SANTA BARBARA DR HERSMAN DR 130' S/O SAN MIGUEL DR SANBDR 10 R AC $40,276 37,268 MILL AND THIN OVERLAY 10017,42737471 41441A $770,843Treatment Total $1,799,664Year 2021 TotalYear 2021 Area Total 2,456,273 TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CAMINO ARROYO ARROYO CIR END CAMARR 20 C AC $44,564 94,637 RUB CAPE SEAL W/DIGOUTS 10058,396421,248 67734C Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 12 SS1026 MTC StreetSaver 11.A.a Packet Pg. 395 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CAMINO ARROYO VENTURE WAY PACHECO PASS RD CAMARR 90 C AC $134,540 87,920 RUB CAPE SEAL W/DIGOUTS 100176,300822,150 69747C CHESTNUT ST SIXTH ST END CHESST 10 C AC $34,440 94,628 RUB CAPE SEAL W/DIGOUTS 10045,12949921 67734A FOREST ST EIGHTH ST SIXTH ST FOREST 60 C AC $36,631 92,779 RUB CAPE SEAL W/DIGOUTS 10048,000401,200 68744A RANCHO HILLS DR VALLEY OAKS DR LONG MEADOW DR RANHDR 30 C AC $49,726 94,388 RUB CAPE SEAL W/DIGOUTS 10065,160451,448 67736B RENZ LN CAMINO ARROYO CUL DE SAC EAST RENZLN 30 C AC $56,496 94,637 RUB CAPE SEAL W/DIGOUTS 10074,032561,322 67734C $356,397Treatment Total ACORN WY END VALLEY OAKS DR ACORWY 10 R AC $1,978 34,316 SEAL CRACKS, DIGOUTS, MICROSURFACING 884,11434121 81846C ALDER ST STARLING DR THOMAS RD ALDEST 10 R AC $17,044 35,915 SEAL CRACKS, DIGOUTS, MICROSURFACING 8735,455351,013 79827A APACHE CT END RODEO DR APACCT 10 R AC $7,250 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8715,08135382 79826B ARAPAHO DR DURANGO LN BENBOW DR ARAPDR 10 R AC $18,272 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8738,010351,086 79826B AVEZAN WAY TATUM AVE ST CLAR AVE AVEZAN 10 R AC $10,346 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 8721,52234633 80835A BABBS CREEK DR END THOMAS RD BABCDR 10 R AC $22,916 34,448 SEAL CRACKS, DIGOUTS, MICROSURFACING 8847,670351,362 81847A BANES LN ALEXANDER ST END BANELN 10 R AC $3,577 36,877 SEAL CRACKS, DIGOUTS, MICROSURFACING 877,44031240 80837C BERRYBUSH CT OAK BROOK WY END BERRYC 10 R AC $11,008 35,227 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,89835603 80837A BLUEBELL DR BURCHELL RD COUNTRY DR BLUBDR 10 R AC $13,114 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8727,280201,364 79826C BUNTING CT SUNRISE DR CUL DE SAC BUNTIN 10 R AC $4,920 36,309 SEAL CRACKS, DIGOUTS, MICROSURFACING 8610,23434301 78816B CHAPPELL CT END CHURCH ST CHAPCT 10 R AC $5,540 35,868 SEAL CRACKS, DIGOUTS, MICROSURFACING 8711,52335278 79822B CHARLES LUX DR CIMINO ST TENTH ST/CHARLES LUX DR RAB CHRLUX 20 R AC $10,816 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 9022,50030750 83867A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 13 SS1026 MTC StreetSaver 11.A.a Packet Pg. 396 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CINNAMON WY PEPPERMINT ST CULDESAC SOUTH CINNMN 10 R AC $21,075 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 8843,840321,370 81847B CLOVE PL CINNAMON ST COBBLESTONE CT CLOVPL 10 R AC $4,000 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 888,32032260 81847B COBBLESTONE CT THIRD ST PEPPERMINT ST COBBSTN 10 R AC $18,844 50,813 SEAL CRACKS, DIGOUTS, MICROSURFACING 9439,200281,400 88907B COLONY CT RANCHO HILLS DR END COLOCT 10 R AC $2,898 34,316 SEAL CRACKS, DIGOUTS, MICROSURFACING 886,02835121 81846B COLUMBINE CT MANTELLI DR END COLUCR 10 R AC $7,600 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 8715,80820618 80836C CONNELL CT LAS ANIMAS AV END CONNCT 10 R AC $5,131 36,309 SEAL CRACKS, DIGOUTS, MICROSURFACING 8610,67329278 78815B CORAL BELL CT END PERIWINKLE DR CORACT 10 R AC $4,428 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 879,21120329 80836C COUNTRY DR END STRAWBERRY LN COUNDR 10 R AC $10,701 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,260201,113 80836C COUNTRY DR STRAWBERRY LN SUNFLOWER CIR COUNDR 20 R AC $13,460 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 8728,000201,400 80836C CREST HILL CT RANCHO HILLS DR END CREHCT 10 R AC $8,312 35,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 8717,28934456 79826B CREST HILL WY END RANCHO HILLS DR CREHWY 10 R AC $27,998 35,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 8758,242341,713 79826C CYPRESS CT END PONDEROSA DR CYPREC 10 R AC $6,865 34,422 SEAL CRACKS, DIGOUTS, MICROSURFACING 8814,28035408 81841B DOVE CT CREST HILL WY END DOVECT 10 R AC $5,875 34,316 SEAL CRACKS, DIGOUTS, MICROSURFACING 8812,22034302 81846C DURANGO LN WAGON WY ARAPAHO DR DURALN 10 R AC $9,456 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 8719,67035562 80836B EAGLE HILLS WY BLANKWING WY 300' S/O PEREGRINE DR EAGHWY 10 R AC $15,749 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8732,76035936 79826B EAGLE HILLS WY 300' S/O PEREGRINE DR PEREGRINE DR EAGHWY 20 R AC $5,048 34,316 SEAL CRACKS, DIGOUTS, MICROSURFACING 8810,50035300 81846B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 14 SS1026 MTC StreetSaver 11.A.a Packet Pg. 397 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID EAGLE`S NEST LN 324' N/O EAGLE HILLS WY PEREGRINE DR EAGNLN 20 R AC $18,126 36,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8537,706341,109 77806B EAGLE VIEW WY LONGMEADOW DR 241' N/O QUAILWALK DR EAGVWY 10 R AC $14,955 36,309 SEAL CRACKS, DIGOUTS, MICROSURFACING 8631,11034915 78816B EAGLE VIEW WY 241' N/O QUAILWALK DR PEREGRINE DR EAGVWY 20 R AC $7,976 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8716,59234488 79826B EL INVIERNO DR WREN AVE EL VERANO WY ELINDR 10 R AC $4,838 34,369 SEAL CRACKS, DIGOUTS, MICROSURFACING 8810,06434296 81842B EL VERANO WY LA PRIMAVERA WY EL INVIERNO DR ELVEWY 10 R AC $10,232 35,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 8721,28434626 80832B FERAGALLI CT HIRASAKI DR CUL DE SAC FERACT 10 R AC $8,450 36,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8517,57834517 77805A FINCH LN TWINBERRY WY LOGANBERRY DR FINCLN 10 R AC $9,905 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 8720,60434606 80836B FINE DR RIDGEWAY DR LEARNARD WY FINEDR 10 R AC $3,416 34,316 SEAL CRACKS, DIGOUTS, MICROSURFACING 887,10634209 81846B FOXGLOVE CT END WILD IRIS DR FOXGCT 10 R AC $5,427 36,221 SEAL CRACKS, DIGOUTS, MICROSURFACING 8611,28834332 78816C FREEMAN CT LAS ANIMAS RD END FREECT 10 R AC $11,687 35,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 8724,31129693 79825B GARFIELD CT MURRAY AV END GARFCT 10 R AC $7,877 35,885 SEAL CRACKS, DIGOUTS, MICROSURFACING 8716,38634422 79824B GASCONY CT AVEZON WAY CUL DE SAC GASCON 10 R AC $2,926 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 876,08634179 80835A GOSHAWK CT END LOGANBERRY DR GOSHCT 10 R AC $8,466 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 8717,61034463 80836B GRANT CT MURRAY AVE END GRANCT 10 R AC $6,748 35,883 SEAL CRACKS, DIGOUTS, MICROSURFACING 8714,03733374 79824B GRASSLAND WY THIRD ST RAB END EAST GRASLND 10 R AC $18,844 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 9039,200281,400 83867B HAWTHORNE ST WISTERIA DR ALDER ST HAWTST 10 R AC $3,534 35,915 SEAL CRACKS, DIGOUTS, MICROSURFACING 877,35035210 79827A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 15 SS1026 MTC StreetSaver 11.A.a Packet Pg. 398 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID HAYFIELD ST POPPYFIELD ST GREENFIELD DR HAYFIE 10 R AC $8,450 35,228 SEAL CRACKS, DIGOUTS, MICROSURFACING 8717,57834517 80837A HERITAGE WY LIONS CREEK DR SOLEDAD ST HERIWY 10 R AC $5,771 34,316 SEAL CRACKS, DIGOUTS, MICROSURFACING 8812,00535343 81846B KESTREL CT CREST HILL DR END KESTCT 10 R AC $3,327 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 876,91934235 80836C LARIAT DR SAGE HILL DR ARAPAHO DR LARIDR 10 R AC $11,054 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,99535657 80836B LILLY AVE LIMAN AVE RONAN AVE LILLAV 20 R AC $4,873 35,867 SEAL CRACKS, DIGOUTS, MICROSURFACING 8710,13628362 79822B LINNET CT DOVETAIL WAY CUL DE SAC LINNET 10 R AC $6,604 36,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8513,73634404 77806B LONGMEADOW CT RANCHO HILLS DR W END LONGCT 10 R AC $18,928 36,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 9039,375251,575 83866C LONE OAK LN THIRD ST RAB 360FT W/O RAB LONOAK 10 R AC $4,846 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 9210,08028360 86887B TENTH ST/LUCHESSA AVE RAB LUCHESSA AVE WEST LUCHESSA AVE EAST LUCHAV 45 R AC $3,173 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 926,60020330 86887A LUCHESSA AVE THOMAS DR END OF BRIDGE EAST LUCHAV 70 R AC $8,153 41,798 SEAL CRACKS, DIGOUTS, MICROSURFACING 9016,96032530 84864B MADISON CT MURRAY AV END MADICT 10 R AC $7,963 35,883 SEAL CRACKS, DIGOUTS, MICROSURFACING 8716,56335422 79824B MANTELLI DR ZINNIA ST HIRASAKI AVE MANTDR 50 A AC $17,352 40,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 7732,08569465 67725A MARTIRI CT HIRASAKI DR CUL DE SAC MARTIR 10 R AC $7,274 36,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8515,13034445 77805A MURAOKA DR NAGAREDA DR YAMANE DR MURAOK 010 R AC $21,221 36,347 SEAL CRACKS, DIGOUTS, MICROSURFACING 8644,14545981 78814B NAVAJO CT CHEYENNE DR CUL DE SAC NAVACT 10 R AC $1,962 37,284 SEAL CRACKS, DIGOUTS, MICROSURFACING 884,08034120 81846B NORTH EGRET CT CREST HILL DR END NEGRCT 10 R AC $2,902 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 876,03534125 79826C Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 16 SS1026 MTC StreetSaver 11.A.a Packet Pg. 399 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID OHLONE WAY SUNRISE DR SPRIG WAY OHLONE 10 R AC $6,930 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8714,41634424 79826B ORINDA WY MARIPOSA ST LONG MEADOW DR ORINWY 10 R AC $10,315 36,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8521,45636596 77806B PARTRIDGE DR END CALLE DEL REY PARTDR 10 R AC $17,020 36,309 SEAL CRACKS, DIGOUTS, MICROSURFACING 8635,40535939 78816B PEACOCK CT CALLE DEL REY END PEAKCT 10 R AC $4,127 34,316 SEAL CRACKS, DIGOUTS, MICROSURFACING 888,58534200 81846B PHEASANT DR THISTLE WY CALLE DEL REY PHEADR 10 R AC $24,517 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8751,000341,500 79826B PEPPERMINT ST COBBLESTONE ST CINNAMON ST PPRMNT 10 R AC $4,615 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 889,60032300 81847B RIDGEWAY DR RANCHO HILLS DR FINE DR RIDGDR 10 R AC $14,122 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 8729,37634864 80836B ROCKROSE CT LARKSPUR LN END ROCKCT 10 R AC $4,385 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 879,12120315 79826C SIENA DR HIRASAKI DR SORRENTO CT SIENAD 10 R AC $11,098 36,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8523,08634679 77805A SIENA CT HIRASAKI DR CUL DE SAC SIENCT 10 R AC $10,641 36,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8522,13434651 77805A SOLEDAD ST 248' S/O LERMA LN LERMA LN SOLEST 20 R AC $4,173 36,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 858,68035248 77806B SPENCER CT MANTELLI DR CUL DE SAC SPENCT 10 R AC $12,253 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 8725,48835677 80835A ST CLAR AVE KERN AVE AVEZAN WAY STCLAR 10 R AC $6,228 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 8712,95434381 80835A SUNFLOWER CIR STRAWBERRY LN COUNRTY DR SUNCIR 20 R AC $14,643 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8730,460201,523 79826C SWALLOW LN TWINBERRY WY LOGANBERRY DR SWALLN 10 R AC $10,673 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,20234653 80836B TAOS WAY RONAN AVE LA PRIMAVERA WAY TAOSWY 10 R AC $10,777 35,868 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,41729773 79822B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 17 SS1026 MTC StreetSaver 11.A.a Packet Pg. 400 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID TAOS WAY TAOS WAY END TAOSWY 20 R AC $1,994 35,868 SEAL CRACKS, DIGOUTS, MICROSURFACING 874,14729143 79822B TARRAGON DR COBBLESTONE CT CINNAMON WY TARGN 10 R AC $3,846 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 888,00032250 81847B TATUM AVE KERN AVE AVEZAN WAY TATUMA 10 R AC $6,375 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 8713,26034390 80835A THIRD ST 470 FT W/O ROSEMARY DR THIRD ST/GRASSLAND WY RAB THIRST 80 R AC $33,987 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 9070,700352,020 83867B GRASSLAND WY/THIRD ST RAB THIRD ST THIRD ST THIRST 85 R AC $2,000 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 904,16016260 8486 THIRD ST GRASSLAND WY/THIRD ST RAB LONE OAK LN/THIRD ST RAB THIRST 90 R AC $11,307 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 9023,52028840 83867B LONE OAK LN/THIRD ST RAB THIRD ST LONE OAK LN THIRST 95 R AC $2,077 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 904,32018240 8486 TWINBERRY WY FINCH LN SWALLOW LN TWINWY 10 R AC $3,678 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 877,65034225 80836B VALBUSA DR SOLANA DR JACARANDA WY VALBDR 10 R AC $15,429 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 8732,09535917 80836B VALLEY FORGE DR TENTH ST NINTH ST VALFDR 10 R AC $10,548 36,359 SEAL CRACKS, DIGOUTS, MICROSURFACING 8621,94137593 78811A VALLEY OAKS CT CREST HILL DR END VALOCT 10 R AC $6,702 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 8713,94034410 80836C VALLEY OAKS DR CREST HILL DR RANCHO HILLS DR VALODR 10 R AC $27,230 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 8756,644341,666 79826C VIOLET WY KELTON DR CUL DE SAC VIOLWY 10 R AC $12,804 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 8726,63535761 80835A WISTERIA DR HAWTHORNE ST THOMAS RD WISTDR 10 R AC $8,843 35,915 SEAL CRACKS, DIGOUTS, MICROSURFACING 8718,39434541 79827A WREN AVE CITY LIMITS END NORTH WRENAV 100 A AC $32,448 37,564 SEAL CRACKS, DIGOUTS, MICROSURFACING 9060,000481,250 83885B $917,266Treatment Total Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 18 SS1026 MTC StreetSaver 11.A.a Packet Pg. 401 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID TRIMBLE CT CHURCH ST CUL DE SAC TRIMCT 10 R AC $10,146 29,458 SLURRY SEAL W/DIGOUTS 7714,07035402 68715B $10,146Treatment Total CYPRESS CT WEST WOOD DR CUL DE SAC CYPRCT 10 R AC $130,754 36,126 MILL AND THIN OVERLAY 10054,400341,600 4045 EL CAMINITO LERMA LN LONG MEADOW DR ELCAMI 10 R AC $88,331 35,949 MILL AND THIN OVERLAY 10036,750351,050 40456B GARY ST LAWRENCE DR WREN AVE GARYST 10 R AC $91,066 35,863 MILL AND THIN OVERLAY 10037,888371,024 41465A MONTE BELLO DR SANTA BARBARA DR WREN AVE MONBDR 10 R AC $135,710 35,703 MILL AND THIN OVERLAY 10056,462371,526 42471B NINTH ST CHURCH ST MONTEREY RD NINTST 30 R AC $59,186 36,058 MILL AND THIN OVERLAY 10024,62438648 40451A VISTA DEL SUR GATE RANCHO REAL VISDLS 10 R AC $10,095 35,070 MILL AND THIN OVERLAY 1004,20025168 45506C $515,142Treatment Total $1,798,951Year 2022 TotalYear 2022 Area Total 2,591,959 TreatmentYear:2023 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID ANTONIO CT END PRINCEVALLE ST ANTOCT 10 R AC $9,925 75,689 RUB CAPE SEAL W/DIGOUTS 10012,50532333 69747A BARRON PL END VICTORIA DR BARRPL 10 R AC $16,029 75,689 RUB CAPE SEAL W/DIGOUTS 10020,19635521 69747A BURKE DR MURRAY AV END BURKDR 10 R AC $13,856 75,560 RUB CAPE SEAL W/DIGOUTS 10017,45837423 69744B CHURCH ST FARRELL AV N. END CHURST 85 C AC $30,822 88,492 RUB CAPE SEAL W/DIGOUTS 10038,83545863 67745B DEARBORN PL END ORCHARD DR DEARPL 10 R AC $10,243 77,752 RUB CAPE SEAL W/DIGOUTS 10012,90633327 68731A LERMA LN CALLE DEL REY SOLEDAD ST LERMLN 10 R AC $20,212 75,366 RUB CAPE SEAL W/DIGOUTS 10025,46634749 69746B LONDON PL CHURCH ST CUL DE SAC LONDPL 10 R AC $14,335 77,810 RUB CAPE SEAL W/DIGOUTS 10018,06135460 68737A MESA RD GAVILAN COLLEGE THOMAS RD MESARD 10 C AC $61,410 90,141 RUB CAPE SEAL W/DIGOUTS 10077,376312,496 68767B MONTEREY ST EIGHTH ST SIXTH ST MONTRD 110 C AC $51,775 87,527 RUB CAPE SEAL W/DIGOUTS 10065,236471,388 69774A RANCHO HILLS DR MANTELLI DR CARRIAGE DR RANHDR 10 C AC $20,001 87,729 RUB CAPE SEAL W/DIGOUTS 10025,20045560 69776B REVERE PL END EIGHTH ST REVEPL 10 R AC $8,436 75,631 RUB CAPE SEAL W/DIGOUTS 10010,62933258 69741A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 19 SS1026 MTC StreetSaver 11.A.a Packet Pg. 402 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2023 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID SIXTH ST RR TRACKS CHESTNUT ST SIXTST 50 C AC $39,461 89,956 RUB CAPE SEAL W/DIGOUTS 10049,720401,243 68764A UVAS PARK DR THIRD ST LAUREL DR UVAPDR 10 C AC $29,816 88,070 RUB CAPE SEAL W/DIGOUTS 10037,568321,174 69771A $326,321Treatment Total ARBOR ST MANTELLI DR EDEN ST ARBOST 10 R AC $7,910 22,939 SEAL CRACKS, DIGOUTS, MICROSURFACING 9315,82035452 87932B BOGIALA WY MARSANNE LN DE ANZA PL BOGAWY 10 R AC $13,499 23,183 SEAL CRACKS, DIGOUTS, MICROSURFACING 9327,00036750 87937A BRIARBERRY LN RANCHO HILLS DR PHEASANT DR BRIALN 10 R AC $28,727 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 8757,460341,690 79846B CANOPY CT ARBOR ST END CANOCT 10 R AC $7,453 33,543 SEAL CRACKS, DIGOUTS, MICROSURFACING 8814,90635357 80852B COHANSEY AVE NIGHTINGALE DR END EAST COHAV 25 R AC $25,647 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 9151,30054950 84905B DE ANZA PL TENTH ST LOPEZ WY DEANZ 10 R AC $8,819 23,183 SEAL CRACKS, DIGOUTS, MICROSURFACING 9317,64036490 87937A FANTAIL WAY HUMMINGBIRD LANE WREN AVE FANTL 10 R AC $4,375 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 918,75025350 84905B GREENFIELD DR OAK BROOK WAY W LUCHESSA AVE GREENF 10 R AC $13,361 25,290 SEAL CRACKS, DIGOUTS, MICROSURFACING 9226,72434786 86917A HIRASAKI AVE LONG MEADOW DR END HIRAAV 20 C AC $8,100 30,713 SEAL CRACKS, DIGOUTS, MICROSURFACING 8514,40045320 77845A HIRASAKI CT MANTELLI DR CUL DE SAC HIRACT 10 R AC $8,058 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 8716,11634474 79845A HUMMINGBIRD LANE COHANSEY AVE VICKERY AVE HUMMN 10 R AC $8,000 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 9116,00032500 84905B JACKDOW CT END EAGLE`S NEST LN JACKCT 10 R AC $3,460 34,244 SEAL CRACKS, DIGOUTS, MICROSURFACING 876,91934151 79846B LOGANBERRY DR PARTRIDGE DR PHEASANT DR LOGADR 10 R AC $23,288 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 8746,580341,370 79846B LONGMEADOW DR SANTA TERESA BLVD HIRASAKI DR LONMDR 40 C AC $12,210 30,713 SEAL CRACKS, DIGOUTS, MICROSURFACING 8521,70854402 77845A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 20 SS1026 MTC StreetSaver 11.A.a Packet Pg. 403 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2023 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID LOPEZ WY CHARLES LUX DR DE ANZA PL LOPEWY 10 R AC $15,659 23,183 SEAL CRACKS, DIGOUTS, MICROSURFACING 9331,32036870 87937A LUCHESSA AVE MILLER AVE TENTH ST/LUCHESSA AVE RAB LUCHAV 40 R AC $10,799 23,183 SEAL CRACKS, DIGOUTS, MICROSURFACING 9321,60036600 87937A MANTELLI DR END LARKSPUR LN MANTDR 10 C AC $87,456 27,348 SEAL CRACKS, DIGOUTS, MICROSURFACING 80155,496443,534 72796C MANTELLI DR LARKSPUR LN RANCHO HILLS MANTDR 20 C AC $39,447 28,760 SEAL CRACKS, DIGOUTS, MICROSURFACING 8270,136441,594 74816C MARSANNE LN BOGIALA WY LOPEZ WY MARSNN 10 R AC $5,400 23,183 SEAL CRACKS, DIGOUTS, MICROSURFACING 9310,80036300 87937A MOCKINGBIRD LN RED HAWK DR PHEASANT DR MOCKDR 10 R AC $7,548 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 8715,09634444 79846B MONTICELLI CT HIRASAKI DR CUL DE SAC MONTCT 10 R AC $6,647 34,244 SEAL CRACKS, DIGOUTS, MICROSURFACING 8713,29434391 79845A NIGHTINGALE DR VICKERY AVE WREN AVE NIGHDR 10 R AC $19,248 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 9138,500281,375 84905B QUAILWALK DR PEREGRINE DR 500' SOUTH OF PEREGRINE DR QUAIDR 10 R AC $8,499 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 8717,00034500 79846B RANCHO HILLS DR LONGMEADOW DR 347' N/O LONGMEADOW DR RANHDR 40 C AC $8,588 29,521 SEAL CRACKS, DIGOUTS, MICROSURFACING 8315,26844347 75826B RANCHO HILLS DR 347' N/O LONGMEADOW DR END RANHDR 50 C AC $73,648 29,519 SEAL CRACKS, DIGOUTS, MICROSURFACING 83130,944442,976 75826B RED HAWK DR MOCKINGBIRD LN CALLE DEL REY REDHDR 10 R AC $8,754 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 8717,51034515 79846B ROBIN PL WREN AVE NIGHTINGALE DR ROBIPL 10 R AC $9,279 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 9118,56032580 84905B SAGEWOOD CT RED HAWK DR NORTH END (CUL-DE-SAC) SAGECT 10 R AC $3,230 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 876,46034190 79846B SOUTH EGRET CT END CREST HILL DR SEGRCT 10 R AC $3,307 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 876,61334142 79846C SENEGAL CT CUL DE SAC LOGANBERRY DR SENECT 10 R AC $8,058 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 8716,11634474 79846B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 21 SS1026 MTC StreetSaver 11.A.a Packet Pg. 404 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2023 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID SOLEDAD ST HERTIAGE WY 248' S/O LERMA LN SOLEST 10 R AC $5,457 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 8710,91434321 79846B SORRENTO CT HIRASAKI DR CUL DE SAC SORRCT 10 R AC $12,171 34,244 SEAL CRACKS, DIGOUTS, MICROSURFACING 8724,34434716 79845A TENTH ST/CHARLES LUX DR RAB TENTH ST NORTH TENTH ST SOUTH TENTST 55 R AC $2,560 22,793 SEAL CRACKS, DIGOUTS, MICROSURFACING 935,12016320 8793 THISTLE WY PHEASANT DR BRIARBERRY LN THISWY 10 R AC $3,808 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 877,61634224 79846B WINDSONG WY NIGHTINGALE DR HUMMINGBIRD LN WNDSWY 10 R AC $10,874 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 9121,75025870 84905B $523,344Treatment Total DAWN WY END MESA RD DAWNWY 10 R AC $93,169 33,755 MILL AND THIN OVERLAY 10037,272311,132 45527B EL TORO WY HANNA ST LA COCHE WY ELTOWY 20 R AC $26,452 34,363 MILL AND THIN OVERLAY 10010,58237286 42492B IRISH CT END PARISH WY IRISCT 10 R AC $25,107 33,708 MILL AND THIN OVERLAY 10010,04436229 45525A LA PALOMA WY WREN AVE WELBURN AVE LAPAWY 10 R AC $91,749 34,165 MILL AND THIN OVERLAY 10036,70437992 43502B MARIA WY AMANDA WY WREN AVE MARIWY 10 R AC $76,026 34,149 MILL AND THIN OVERLAY 10030,41437822 43505A NINTH ST PRINCEVALLE ST CHURCH ST NINTST 20 R AC $172,080 33,977 MILL AND THIN OVERLAY 10068,840401,721 44511A OLD GILROY ST CHESTNUT ST CROCKER LN OLDGIL 20 R AC $116,256 33,736 MILL AND THIN OVERLAY 10046,508441,057 45524A ORCHARD DR CUMBERLAND DR SIXTH ST ORCHDR 40 R AC $35,096 34,435 MILL AND THIN OVERLAY 10014,04036390 41483B REA ST FOURTH ST SECOND ST REAST 10 R AC $102,318 34,380 MILL AND THIN OVERLAY 10040,932361,137 42493B ROYAL WY FILBRO DR IMPERIAL DR ROYAWY 10 R AC $19,598 33,256 MILL AND THIN OVERLAY 1007,84035224 47547A STONEY CT END SIXTH ST STONCT 10 R AC $40,866 34,551 MILL AND THIN OVERLAY 10016,34830524 41484A TATUM AVE WREN AVE KERN AVE TATUMA 20 R AC $67,492 33,978 MILL AND THIN OVERLAY 10027,000201,350 43505A $866,209Treatment Total $1,715,874Year 2023 TotalYear 2023 Area Total 1,753,460 Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 22 SS1026 MTC StreetSaver 11.A.a Packet Pg. 405 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2024 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID TENTH ST 150 E/O ROSANNA ST MONTEREY RD TENTST 30 A AC $207,491 27,338 THICK HMA OVERLAY 2"10063,85167953 69691A WREN AVE RONAN AVE TATUM AVE WRENAV 50 A AC $126,040 27,283 THICK HMA OVERLAY 2"10038,78643902 69692B $333,531Treatment Total EIGLEBERRY ST TENTH ST EIGHTH ST EIGLST 10 R AC/AC $27,254 43,471 SEAL CRACKS/SLURRY SEAL 9252,416481,092 85901A EIGLEBERRY ST EIGHTH ST SIXTH ST EIGLST 15 R AC/AC $33,917 43,471 SEAL CRACKS/SLURRY SEAL 9265,232481,359 85903B EIGLEBERRY ST SIXTH ST FOURTH ST EIGLST 20 R AC/PCC $33,146 40,988 SEAL CRACKS/SLURRY SEAL 9163,750511,250 84893B EIGLEBERRY ST FOURTH ST SECOND ST EIGLST 30 R AC/PCC $34,446 43,471 SEAL CRACKS/SLURRY SEAL 9266,249511,299 85903B EIGLEBERRY ST SECOND ST FIRST ST EIGLST 40 R AC/AC $14,107 43,471 SEAL CRACKS/SLURRY SEAL 9227,13251532 85903B $142,870Treatment Total MONTEREY ST SIXTH ST THIRD ST MONTRD 120 C AC $71,575 85,782 RUB CAPE SEAL W/DIGOUTS 10086,715471,845 69804A MUIR DR OUSLEY DR MANTELLI DR MUIRDR 10 R AC $6,775 73,694 RUB CAPE SEAL W/DIGOUTS 1008,20836228 68756C POPLAR DR MANTELLI DR BAY TREE DR POPLDR 10 R AC $18,085 71,633 RUB CAPE SEAL W/DIGOUTS 10021,91035626 69766B SIXTH ST CHESTNUT ST 308 E/O CHESTNUT SIXTST 60 C AC $10,169 85,066 RUB CAPE SEAL W/DIGOUTS 10012,32040308 69794A STRATFORD PL HYDE PARK DR END STRFPL 10 R AC $13,319 71,940 RUB CAPE SEAL W/DIGOUTS 10016,13635405 69767A VICTORIA DR CHURCH ST CUL DE SAC (EAST) VICTDR 20 R AC $28,601 74,005 RUB CAPE SEAL W/DIGOUTS 10034,650331,050 68757A $148,524Treatment Total MILLER AVE SIXTH ST THIRD ST MILLAV 40 C AC/AC $54,984 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 8394,000472,000 74813B MILLER AVE THIRD ST FIRST ST MILLAV 50 C AC/AC $50,420 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 8386,198471,834 74813B MURRAY AVE LINCOLN CT LAS ANIMAS AVE MURRAV 20 A AC/AC $31,039 58,514 SEAL CRACKS, DIGOUTS, MICROSURFACING 7853,064361,474 68754B THIRD ST SANTA THERESA DR MILLER AVE THIRST 10 C AC/AC $15,653 39,638 SEAL CRACKS, DIGOUTS, MICROSURFACING 7926,76040669 70771A THIRD ST MILLER AVE PRINCEVALLE ST THIRST 20 C AC/AC $18,016 28,546 SEAL CRACKS, DIGOUTS, MICROSURFACING 8030,80040770 72813B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 23 SS1026 MTC StreetSaver 11.A.a Packet Pg. 406 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2024 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID THIRD ST WREN AVE SANTA THERESA DR THIRST 30 C AC/AC $19,210 36,307 SEAL CRACKS, DIGOUTS, MICROSURFACING 8632,84040821 78861A WELBURN AVE HANNA ST CHURCH ST WELBAV 80B C AC/AC $16,297 33,773 SEAL CRACKS, DIGOUTS, MICROSURFACING 9027,86137753 84922B $205,619Treatment Total LONE DEER WY LONGMEADOW DR END LONDWY 10 R AC $12,608 27,816 SLURRY SEAL W/DIGOUTS 7516,16635413 66716B $12,608Treatment Total ANGELA CT END PRINCEVALLE ST ANGECT 10 R AC $24,006 32,250 MILL AND THIN OVERLAY 1009,23433226 46557A CALABRESE WY END DELTA DR CALAWY 10 R AC $90,306 31,938 MILL AND THIN OVERLAY 10034,73737890 47566C CARLYLE CT CHURCH ST END CARLCT 10 R AC $43,894 31,957 MILL AND THIN OVERLAY 10016,88436419 47562B CARLA WY AMANDA AV WREN AVE CARLWY 10 R AC $83,011 32,664 MILL AND THIN OVERLAY 10031,93137863 44535A EL TORO WY WAYLAND LN CARMEL ST ELTOWY 10 R AC $45,690 32,221 MILL AND THIN OVERLAY 10017,57537475 46552B GEORGETOWN PL END PRINCEVALLE ST GEORPL 10 R AC $48,175 32,701 MILL AND THIN OVERLAY 10018,53137452 44533B HANNA ST WELBURN AVE END HANNST 20 R AC $79,356 32,682 MILL AND THIN OVERLAY 10030,52537825 44532B LA ALONDRA WY WREN AVE WELBURN AVE LAALWY 10 R AC $73,873 32,883 MILL AND THIN OVERLAY 10028,41637768 43522B MAPLE ST SEVENTH ST SIXTH ST MAPLST 10 R AC $72,750 32,890 MILL AND THIN OVERLAY 10027,98448583 43524A PARISH WY EL CERRITO WY WELBURN AVE PARIWY 10 R AC $70,410 32,200 MILL AND THIN OVERLAY 10027,08437732 46555A RYAN CT PARISH WY CUL DE SAC RYANCT 10 R AC $42,958 32,434 MILL AND THIN OVERLAY 10016,52436409 45545A SAGE HILL DR RODEO DR BENBOW DR SAGHDR 10 R AC $60,417 32,886 MILL AND THIN OVERLAY 10023,24035664 43526B STEPHAN CT PRINCEVALLE ST END STEPCT 10 R AC $46,953 32,710 MILL AND THIN OVERLAY 10018,06135460 44537A TARYN LN CALABRESE WY WELBURN AV TARYLN 10 R AC $62,523 32,435 MILL AND THIN OVERLAY 10024,05037650 45546C WILD IRIS DR MANTELLI DR SOUTH SIDE OF ROUNDABOUT WILIDR 10 R AC $10,399 32,199 MILL AND THIN OVERLAY 1004,00020200 46546C $854,721Treatment Total $1,697,873Year 2024 TotalYear 2024 Area Total 1,253,820 Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget Scenarios Criteria: ** - Treatment from Project Selection 24 SS1026 MTC StreetSaver 11.A.a Packet Pg. 407 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Current Budget $8,812,224Grand Total11,149,577Total Section Area: Scenarios Criteria: ** - Treatment from Project Selection 25 SS1026 MTC StreetSaver 11.A.a Packet Pg. 408 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Interest: .00% CITY OF GILROY Target-Driven Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Target: By Year Scenario: #Constant Objective: Minimum Network Average PCI Year Value Year Value Year Value Year Value Year 1 63 Year 2 62 Year 3 62 Year 4 62 Year 5 62 Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2020 ALEXANDER ST NINTH ST SIXTH ST ALEXST 30 R AC/AC $40,683 68,837 SEAL CRACKS/SLURRY SEAL86 POLK CT MURRAY AVE END POLKCT 10 R AC/AC $6,474 81,986 SEAL CRACKS/SLURRY SEAL89 RANCHO HILLS CT END MANTELLI DR RANHCT 10 R AC/AC $5,645 68,991 SEAL CRACKS/SLURRY SEAL86 SIXTH ST 308 E/O CHESTNUT ST ROGERS LN SIXTST 65 R AC/AC $5,458 61,137 SEAL CRACKS/SLURRY SEAL83 $58,260Treatment Total CAMINO ARROYO GILMAN RD ARROYO CIR CAMARR 10 C AC $19,292 108,392 RUB CAPE SEAL W/DIGOUTS100 CARMEL ST FIRST ST EL CERRITO WY CARMST 10 C AC $32,690 99,995 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST SEVENTH ST FOURTH ST CHURST 100 C AC $62,755 102,030 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST FOURTH ST FIRST ST CHURST 110 C AC $61,875 98,290 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST LAS ANIMAS AV 100' N/O HENNESSEY WY CHURST 70 C AC/AC $15,281 100,285 RUB CAPE SEAL W/DIGOUTS100 FOURTH ST SANTA THERESA DR MILLER DR FOURST 10 C AC $18,345 102,030 RUB CAPE SEAL W/DIGOUTS100 FOURTH ST MILLER DR PRINCEVALLE ST FOURST 15 C AC $27,207 102,030 RUB CAPE SEAL W/DIGOUTS100 KERN AVE 429' N. OF MANTELLI DR N CITY LIM KERNAV 60 C AC $29,980 97,144 RUB CAPE SEAL W/DIGOUTS100 MANTELLI DR RANCHO HILLS CALLE DEL REY MANTDR 30 C AC $38,989 111,039 RUB CAPE SEAL W/DIGOUTS100 MARTIN ST MONTEREY RD CHESTNUT ST MARTST 10 C AC $33,831 106,345 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR CARRIAGE DR VALLEY OAKS DR RANHDR 20 C AC $28,226 99,806 RUB CAPE SEAL W/DIGOUTS100 RENZ LN 1085' W. OF CAMINO ARROYO CAMINO ARROYO RENZLN 20 C AC $42,870 105,316 RUB CAPE SEAL W/DIGOUTS100 THIRD ST PRINCEVALLE ST CHURCH ST THIRST 50 C AC $52,070 103,712 RUB CAPE SEAL W/DIGOUTS100 Scenarios Criteria: 1 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 409 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI THIRD ST CHURCH ST MONTEREY RD THIRST 60 C AC $17,893 103,712 RUB CAPE SEAL W/DIGOUTS100 $481,304Treatment Total BANYAN CT BANYAN ST END BANYCT 10 R AC $8,886 74,331 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BANYAN CT END TEA TREE WAY BANYCT 20 R AC $1,867 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BLUE HERON CT END PEREGRINE DR BLUHCT 10 R AC $4,043 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 CAMERON BLVD HWY 152 VENTURE WY CAMBL 10 A AC $101,000 75,791 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CAROB CT TEA TREE WAY END CAROCT 10 R AC $8,267 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CHERRYWOOD CT SPRIG WAY CUL DE SAC CHERCT 10 R AC $4,534 75,898 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CHESTNUT ST EIGHTH ST SIXTH ST CHESST 70 C AC/AC $30,454 62,002 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 COOPER PL JICARRILLA PL SUNRISE DR COOPPL 10 R AC $7,405 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 DESERT BLOOM PL O'KEEFE LANE SUNRISE DRIVE DESEPL 10 R AC $11,265 61,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 ELECTA CT LAS ANIMAS AVE CUL DE SAC ELECCT 10 R AC $9,328 62,562 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 FESTA AGLIO CT HIRASAKI DR CUL DE SAC FESTCT 10 R AC $9,354 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 FORUNATA PL FOREST ST GENNARO WAY FORTPL 10 R AC $3,414 68,305 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 GENNARO WY LEWIS ST FORTUNATA PLACE GENNWY 10 R AC $6,045 62,513 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GOLD FINCH CT SPARROW GLEN WAY CUL DE SAC GOLDFI 10 R AC $3,514 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 HOLLYHOCK CT HOLLYHOCK LN CUL DE SAC HLLYCT 10 R AC $3,467 74,280 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 HOPI LN SUNRISE DR O'KEEFE CT HOPILN 10 R AC $10,687 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LINARIA ST BANYAN ST OLEA CT LINAST 10 R AC $3,503 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 LUCHESSA AVE CIMINO ST GREENFIELD DR LUCHAV 60 R AC $18,169 70,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MARTIRI DR HIRASAKI AV PADOVA DR MARTDR 90 R AC $9,334 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 MIMOSA CT BANYAN CT END MIMOCT 10 R AC $5,180 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 MORO CT HIRASAKI DR CUL DE SAC MOROCT 10 R AC $8,327 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 Scenarios Criteria: 2 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 410 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI MORO DR HIRASAKI AV PADOVA DR MORODR 90 R AC $8,523 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 OKEEFE CT HOPI LN E. END CDS OKEECT 10 R AC $9,847 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 PADOVA DR SORRENTO DR MORO DR PADODR 90 R AC $13,767 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 PADOVA DR SIENA CT SORRENTO DR PADOVA 10 R AC $14,326 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PRAIRIE OWL CT SPRIG WY N. END CDS PRAICT 10 R AC $4,340 67,108 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 SHOOTING STAR CT HOLLYHOCK LANE CUL DE SAC SHOOCT 10 R AC $3,631 77,687 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SIXTH ST PRINCEVALLE ST CHURCH ST SIXTST 30 C AC/AC $48,150 61,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 SAN JUSTO ROAD MILLER RD END SNJURD 10 R AC $14,934 71,994 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SORRENTO DR HIRASAKI DR PADOVA DR SORRDR 10 R AC $11,696 60,547 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 SPRIG WY SADDLER WY RODEO DR SPRIWY 20 R AC $13,026 63,306 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 STONECRESS ST COUNTRY DR BANYAN ST STONST 10 R AC $19,964 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 TEA TREE WY TEA TREE COURT END TEATWY 10 R AC $14,579 63,586 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 WILD IRIS DR SOUTH SIDE OF ROUNDABOUT LAVENDER WAY WILIDR 20 R AC $7,823 65,311 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 WREN AVE 125' S/O WELBURN AVE 125' S/O LAWRENCE DR WRENAV 20 A AC/AC $28,488 79,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 ZINNIA ST VIOLET WY MANTELLI DR ZINNST 10 R AC $4,736 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 ZUNI LN SUNRISE DR PUEBLO CT ZUNILN 10 R AC $10,624 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 $496,497Treatment Total $1,036,061Year 2020 Total Scenarios Criteria: 3 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 411 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2021 KERN AVE MANTELLI DR 429' N/O MANTELLI DR KERNAV 50 C AC $14,166 95,257 RUB CAPE SEAL W/DIGOUTS100 WAYLAND LN EL CERRITO WY CUL DE SAC WAYLLN 20 C AC $48,680 97,362 RUB CAPE SEAL W/DIGOUTS100 $62,846Treatment Total ADAMS CT MURRAY AVE END ADAMCT 10 R AC $6,275 38,248 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 ALEXANDER ST SIXTH ST LEWIS ST ALEXST 10 R AC $21,009 38,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 ARMAND CT WREN AVE END ARMACT 10 R AC $2,991 38,087 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 ASHBURY CT END ALDER ST ASHBCT 10 R AC $3,246 38,237 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 AZARA ST STONECRESS ST MANTELLI DR AZARST 10 R AC $3,948 38,636 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BABBS CREEK DR 100FT WEST OF STARLING DR END WEST BABCDR 20 R AC $8,644 55,636 SEAL CRACKS, DIGOUTS, MICROSURFACING 93 BANYAN ST LINARIA ST E END BANYST 10 R AC $8,995 39,859 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BENBOW DR SAGE HILL DR ARAPAHO DR BENBDR 10 R AC $9,400 37,923 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 BENNETT CT SEVERANCE ST END BENNCT 10 R AC $7,944 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 BENNETT ST CHURCH ST SEVERANCE ST BENNST 10 R AC $4,854 51,897 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 BLACKFOOT CT GERONIMO ST CUL DE SAC BLCKCT 10 R AC $5,917 57,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BOSQUE ST JARDIN WY TAOS WY BOSQST 10 R AC $4,857 38,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BRAZOS ST JARDIN WY TAOS WY BRAZST 10 R AC $5,705 40,911 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 BRITTANY CT MANTELLI DR END BRITCT 10 R AC $6,583 38,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 BUTTERCUP LN KERN AVE WESTWOOD DR BUTTLN 10 R AC $6,455 37,809 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 CARRIAGE DR END RANCHO HILLS DR CARRDR 10 R AC $10,616 51,897 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 CHADWICK ST HOXETT ST WENTZ DR CHADST 10 R AC $9,416 38,220 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CHEYENNE DR SADDLER WY 100' W/O NAVAJO CT CHEYDR 10 R AC $6,926 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CHARLES LUX DR GREENFIELD DR CIMINO ST CHRLUX 10 R AC $8,727 54,344 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 Scenarios Criteria: 4 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 412 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI CHURCH ST 98' S/O RONAN LIMAN AVE CHURST 50 C AC/AC $13,949 41,968 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 CIELO VISTA CT DANCING WIND WAY CUL DE SAC CIELCT 10 R AC $2,197 53,608 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 CIELO VISTA LN DANCING WIND WAY DREAM CATCHER WAY CIELLN 10 R AC $16,324 56,053 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CIMINO ST LUCHESSA AVE CHARLES LUX DR CIMNO 10 R AC $13,252 49,443 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CLARK WY CRAWFORD DR WREN AVE CLARWY 10 R AC $14,269 37,558 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 COLONY WY END RANCHO HILLS DR COLOWY 10 R AC $9,909 54,197 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 COMANCHE ST SUNRISE DR PUBELO COMAST 10 R AC $9,911 52,850 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CONCORD PL NINTH ST END CONCPL 10 R AC $5,142 37,961 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 COUNTRY DR SUNFLOWER CIR MANTELLI DR COUNDR 30 R AC $9,522 37,922 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 COYOTE MOON LN DREAM CATCHER WAY SUNRISE DR COYOLN 10 R AC $17,366 49,235 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 CRAWFORD CT CRAWFORD DR END CRAWCT 10 R AC $3,076 37,789 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 CRAWFORD DR SANTA PAULA DR END CRAWDR 10 R AC $19,754 38,220 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CUMBERLAND DR MILLER AVE ORCHARD DR CUMBDR 10 R AC $15,974 38,240 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 CYPRESS CT PONDEROSA DR LAUREL DR CYPREC 20 R AC $8,361 38,237 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 DAFODIL PL MANTELLI DR ZINNIA ST DAFOPL 10 R AC $10,743 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 DANCING WIND WY RANCHO HILLS DRIVE CIELO VISTA LAND DANCWY 10 R AC $8,550 47,229 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 DEL RIO CIR SANTA FE DR SANTA FE DR DELRIO 10 R AC $9,679 37,811 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 DOVETAIL WAY RANCHO HILLS DR END DOVETA 10 R AC $23,700 54,218 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 DREAM CATCHER WY CIELO VISTA WAY SUNRISE DRIVE DREAWY 10 R AC $11,567 51,363 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 EAGLE`S NEST LN EAGLE HILLS WY 324' N/O EAGLE HILLS WY EAGNLN 10 R AC $5,092 37,922 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 EAGLE`S NEST LN 324' N/O EAGLE HILLS WY PEREGRINE DR EAGNLN 20 R AC $17,429 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 EDEN ST WREN AV FLORAL ST EDENST 10 R AC $21,420 37,812 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 ERVIN CT MONTEREY ROAD CUL DE SAC ERVICT 10 R AC $3,851 48,936 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 Scenarios Criteria: 5 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 413 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI FELLOM CT MURRAY AV END FELLCT 10 R AC $7,604 37,951 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 FERAGALLI CT HIRASAKI DR CUL DE SAC FERACT 10 R AC $8,125 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 FESTA AGLIO DR HIRASAKI AV PADOVA DR FESTDR 90 R AC $14,528 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 FILICE DR SOUTH END NORTH END FILIDR 10 R AC $45,983 38,086 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 FLORAL ST EDEN ST MANTELLI DR FLORST 10 R AC $10,015 37,812 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 GERONIMO ST ZUNI LANE SHOSHONE STREET GEROST 10 R AC $18,608 57,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GOLDEN SKY WY DREAM CATCHER WAY SUNRISE DRIVE GOLDWY 10 R AC $10,970 53,608 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 GRANDE DR CHEYENNE DR SPRIG WAY GRANDR 10 R AC $4,660 53,145 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GREENFIELD DR LUCHESA AV N END GATE GREEDR 90 C AC $12,026 39,555 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 GREYSTONE CT KERN AVE END GREYCT 10 R AC $8,282 38,099 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 HADLEY CT END ROGERS LN HADLCT 10 R AC $10,973 38,247 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 HERSMAN DR SANTA BARBARA DR STEWART DR HERSDR 10 R AC $15,984 37,545 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 HOGAN WY END SADDLER DR HOGAWY 10 R AC $11,334 38,194 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 HOLLYHOCK LN MANTELLI DR HOLLYHOCK CT HOLLLN 10 R AC $18,027 38,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 HONEY CT FLORAL ST END HONECT 10 R AC $3,499 37,812 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 HOOVER CT END ROGERS LN HOOVCT 10 R AC $7,170 38,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 IRONBARK ST STONECRESS ST MANTELLI DR IRONST 10 R AC $4,179 39,859 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 JACARANDA WY SOUTH END NORTH END JACAWY 10 R AC $12,504 38,195 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 JARDIN WY BRAZOS ST BOSQUE ST JARDWY 10 R AC $5,769 57,527 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 JICARILLA PL EAGLE VIEW WAY COOPER PL JCAPL 10 R AC $10,058 52,850 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 KENNEDY CT MURRAY AV END KENNCT 10 R AC $8,276 37,951 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 KIOWA CT JICARILLA PL CUL DE SAC KIOWCT 10 R AC $3,550 57,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 KISHIMURA DR FOREST ST MURRAY AV KISHST 10 R AC $16,606 56,167 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 Scenarios Criteria: 6 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 414 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI KITE DR PEREGRINE DR SUNRISE DR KITEDR 10 R AC $3,599 38,195 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 KOSHARE PL COMANCHE ST SHOSHONE ST KOSHPL 10 R AC $11,394 46,425 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 LA PRIMAVERA WY WREN AVE TAOS WAY LAPRWY 10 R AC $13,154 37,941 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 LAREDO WY SUNRISE DR RIO GRANDE WY LAREWY 10 R AC $6,714 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 LAS ANIMAS AV MONTEREY RD ROAD NARROWS LASAAV 30 R AC $9,461 37,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 LEARNARD WY MANTELLI DR BRENTWOOD LN LEARWY 10 R AC $8,864 38,195 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 LINCOLN CT MURRAY AV END LINCCT 10 R AC $8,361 37,802 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 LINNET CT DOVETAIL WAY CUL DE SAC LINNET 10 R AC $6,350 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 LISA CT END NICOLE WY LISACT 10 R AC $4,937 37,970 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 LOS PADRES CT SAN MIGUEL ST END LOSPCT 10 R AC $8,720 37,789 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 LUCHESSA AVE THOMAS DR GREENFIELD DR LUCHAV 10 A AC $70,924 45,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 MARTIRI CT HIRASAKI DR CUL DE SAC MARTIR 10 R AC $6,994 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 NAGAREDA DR FOREST DR MURAOKA DR NAGARE 010 R AC $10,941 37,543 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 NECTAR CT END FLORAL ST NECTCT 10 R AC $3,008 37,812 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 NICOLE CT END NICOLE WY NICOCT 10 R AC $4,509 38,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 NICOLE WY MESA RD CARIGNANE DR NICOWY 10 R AC $16,408 38,271 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 NINTH ST VALLEY FORGE DR PRINCEVALLE ST NINTST 10 R AC $16,761 37,556 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 NONAME UNO AVE LAS ANIMAS RD ADDRESS' 9850 NO. UNO NONUAV 10 A AC $58,344 40,174 SEAL CRACKS, DIGOUTS, MICROSURFACING 73 OAK CT HANNA ST HANNA ST OAKCR 10 R AC $6,278 37,814 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 ORCHARD DR TENTH ST 95' N/O DEARBORN PL ORCHDR 10 R AC $13,443 37,789 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 ORINDA WY MARIPOSA ST LONG MEADOW DR ORINWY 10 R AC $9,918 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PEREGRINE DR RANCHO HILLS DR EAGLE VIEW WY PEREDR 10 R AC $26,591 38,195 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 PERIWINKLE DR END MANTELLI DR PERIDR 10 R AC $8,386 38,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 Scenarios Criteria: 7 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 415 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI PONDEROSA DR THIRD ST CYPRESS CT PONDDR 10 R AC $13,035 37,961 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 PUEBLO CT ZUNI LN W. END PUEBCT 10 R AC $7,102 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 RIO GRANDE WY LAREDO WY SEDONA WY RIGRWY 10 R AC $8,345 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 ROGERS LN SIXTH ST LEWIS ST ROGELN 10 R AC $17,750 38,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 RONAN AVE WREN AVE CHURCH ST RONAAV 10 R AC $22,423 37,941 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 SADDLER DR WAGON WY SPRIG WY SADDL 10 R AC $16,065 54,815 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 SANTA INEZ CT SAN MIGUEL ST END SANICT 10 R AC $8,805 38,086 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 SANTA FE DR TAOS WY CHURCH ST SANTFE 10 R AC $7,065 38,228 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 SEDONA WY SUNRISE DR RIO GRANDE WY SEDOWY 10 R AC $6,730 40,857 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 SHOSHONE WY KOSHARE STREET PUBELO COURT SHOSWY 10 R AC $5,024 57,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SIENA DR HIRASAKI DR SORRENTO CT SIENAD 10 R AC $10,671 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 SIENA CT HIRASAKI DR CUL DE SAC SIENCT 10 R AC $10,231 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 SIXTH ST EIGLEBERRY RD RR TRACKS SIXTST 45 C AC/AC $12,842 42,038 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 SOLANA DR VALBUSA DR LONGMEADOW DR SOLADR 10 R AC $13,978 37,922 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 SOLEDAD ST 248' S/O LERMA LN LERMA LN SOLEST 20 R AC $4,013 37,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 SPARROW GLEN WAY DOVETAIL WAY SUNRISE DR SPARGL 10 R AC $10,247 37,922 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 STARLING DR ALDER ST BABBS CREEK DR STARDR 10 R AC $6,520 56,059 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 ST FRANCIS CT SAN MIGUEL ST END STFRCT 10 R AC $8,925 37,556 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 SUNFLOWER CIR WEST END STRAWBERRY LN SUNCIR 10 R AC $3,966 38,098 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 TEAL CT END VINCA CT TEALCT 10 R AC $3,337 53,641 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 TEA TREE CT CREST HILL WAY END TEATCT 10 R AC $6,118 56,202 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 TENTH ST PRINCEVALLE ST 150' E/O ROSANNA ST TENTST 20 A AC $58,009 42,451 SEAL CRACKS, DIGOUTS, MICROSURFACING 77 TENTH ST 150 E/O ROSANNA ST MONTEREY RD TENTST 30 A AC $33,203 41,903 SEAL CRACKS, DIGOUTS, MICROSURFACING 76 Scenarios Criteria: 8 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 416 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI THIRD ST COBBLESTONE CT/THIRD ST RAB 470FT W/O ROSEMARY WY THIRST 100 R AC $26,694 50,760 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 THIRD ST ISABELLA WY COBBLESTONE CT/THIRD ST RAB THIRST 70 R AC $5,547 44,177 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 COBBLESTONE CT/THIRD ST RAB THIRD ST THIRD ST THIRST 75 R AC $1,923 55,815 SEAL CRACKS, DIGOUTS, MICROSURFACING 93 THOMAS RD 675' N/O OAK BROOK WY LUCHESSA AVE THOMRD 60 A AC $3,518 42,009 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 VENTURE WY CAMINO ARROYO CAMERON BLVD VENTWY 10 C AC $28,097 47,961 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 VICKERY AVE NIGHTINGALE DR WREN AVE VICKAV 20 R AC $10,516 45,227 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 WEAVER CT END WOODWORTH WY WEAVCT 10 R AC $4,185 37,527 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 WILDROSE CT SUNFLOWER CIR CUL DE SAC WILDCT 10 R AC $3,449 38,098 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 WILLY CT MURRAY AV CUL DE SAC WILYCT 10 R AC $7,249 38,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 WREN AVE 125' S/O LAWRENCE DR MANTELLI DR WRENAV 30 A AC/AC $35,432 54,409 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 WREN AVE MANTELLI DR RONAN AVE WRENAV 40 A AC $15,131 43,919 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 WREN AVE RONAN AVE TATUM AVE WRENAV 50 A AC $20,169 41,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 76 WREN AVE FARREL DR CITY LIMITS WRENAV 65 A AC $16,945 45,548 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 YUCCA CT CHEYENNE DR CUL DE SAC YUCCCT 10 R AC $1,849 48,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 ZINNIA ST MANTELLI DR DAFFODIL PL ZINNST 20 R AC $12,809 38,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 $1,504,251Treatment Total FAIRVIEW DR PRINCEVALLE ST HANNA ST FAIRDR 10 R AC $90,813 37,267 MILL AND THIN OVERLAY100 LEXINGTON PL END PRINCEVALLE ST LEXIPL 10 R AC $55,056 37,435 MILL AND THIN OVERLAY100 LUPINE CT END LIONS CREEK DR LUPICT 10 R AC $31,457 37,346 MILL AND THIN OVERLAY100 MILLER AVE SANTA TERESA BLVD UVAS PARK DR MILLAV 10 R AC $378,311 37,275 MILL AND THIN OVERLAY100 SANTA BARBARA DR HERSMAN DR 130' S/O SAN MIGUEL DR SANBDR 10 R AC $40,276 37,268 MILL AND THIN OVERLAY100 $595,913Treatment Total $2,163,010Year 2021 Total Scenarios Criteria: 9 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 417 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2022 CAMINO ARROYO ARROYO CIR END CAMARR 20 C AC $44,564 94,637 RUB CAPE SEAL W/DIGOUTS100 CAMINO ARROYO VENTURE WAY PACHECO PASS RD CAMARR 90 C AC $134,540 87,920 RUB CAPE SEAL W/DIGOUTS100 CHESTNUT ST SIXTH ST END CHESST 10 C AC $34,440 94,628 RUB CAPE SEAL W/DIGOUTS100 FOREST ST EIGHTH ST SIXTH ST FOREST 60 C AC $36,631 92,779 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR VALLEY OAKS DR LONG MEADOW DR RANHDR 30 C AC $49,726 94,388 RUB CAPE SEAL W/DIGOUTS100 RENZ LN CAMINO ARROYO CUL DE SAC EAST RENZLN 30 C AC $56,496 94,637 RUB CAPE SEAL W/DIGOUTS100 $356,397Treatment Total ALDER ST STARLING DR THOMAS RD ALDEST 10 R AC $17,044 35,915 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 APACHE CT END RODEO DR APACCT 10 R AC $7,250 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 ARAPAHO DR DURANGO LN BENBOW DR ARAPDR 10 R AC $18,272 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 AVEZAN WAY TATUM AVE ST CLAR AVE AVEZAN 10 R AC $10,346 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 BABBS CREEK DR END THOMAS RD BABCDR 10 R AC $22,916 34,448 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 BANES LN ALEXANDER ST END BANELN 10 R AC $3,577 36,877 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 BERRYBUSH CT OAK BROOK WY END BERRYC 10 R AC $11,008 35,227 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 BLUEBELL DR BURCHELL RD COUNTRY DR BLUBDR 10 R AC $13,114 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 BUNTING CT SUNRISE DR CUL DE SAC BUNTIN 10 R AC $4,920 36,309 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 CANYON CT CHEYENNE DR CUL DE SAC CANYCT 10 R AC $1,635 37,284 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CHAPPELL CT END CHURCH ST CHAPCT 10 R AC $5,540 35,868 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 CHARLES LUX DR CIMINO ST TENTH ST/CHARLES LUX DR RAB CHRLUX 20 R AC $10,816 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 CINNAMON WY PEPPERMINT ST CULDESAC SOUTH CINNMN 10 R AC $21,075 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CLOVE PL CINNAMON ST COBBLESTONE CT CLOVPL 10 R AC $4,000 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 COBBLESTONE CT THIRD ST PEPPERMINT ST COBBSTN 10 R AC $18,844 50,813 SEAL CRACKS, DIGOUTS, MICROSURFACING 94 COLUMBINE CT MANTELLI DR END COLUCR 10 R AC $7,600 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 Scenarios Criteria: 10 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 418 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI CONNELL CT LAS ANIMAS AV END CONNCT 10 R AC $5,131 36,309 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 CORAL BELL CT END PERIWINKLE DR CORACT 10 R AC $4,428 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 COUNTRY DR END STRAWBERRY LN COUNDR 10 R AC $10,701 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 COUNTRY DR STRAWBERRY LN SUNFLOWER CIR COUNDR 20 R AC $13,460 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 CREST HILL CT RANCHO HILLS DR END CREHCT 10 R AC $8,312 35,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 CREST HILL WY END RANCHO HILLS DR CREHWY 10 R AC $27,998 35,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 DURANGO LN WAGON WY ARAPAHO DR DURALN 10 R AC $9,456 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 EAGLE HILLS WY BLANKWING WY 300' S/O PEREGRINE DR EAGHWY 10 R AC $15,749 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 EAGLE VIEW WY LONGMEADOW DR 241' N/O QUAILWALK DR EAGVWY 10 R AC $14,955 36,309 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 EAGLE VIEW WY 241' N/O QUAILWALK DR PEREGRINE DR EAGVWY 20 R AC $7,976 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 EL VERANO WY LA PRIMAVERA WY EL INVIERNO DR ELVEWY 10 R AC $10,232 35,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 FINCH LN TWINBERRY WY LOGANBERRY DR FINCLN 10 R AC $9,905 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 FOXGLOVE CT END WILD IRIS DR FOXGCT 10 R AC $5,427 36,221 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 FREEMAN CT LAS ANIMAS RD END FREECT 10 R AC $11,687 35,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 GARFIELD CT MURRAY AV END GARFCT 10 R AC $7,877 35,885 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 GASCONY CT AVEZON WAY CUL DE SAC GASCON 10 R AC $2,926 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 GOSHAWK CT END LOGANBERRY DR GOSHCT 10 R AC $8,466 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 GRANT CT MURRAY AVE END GRANCT 10 R AC $6,748 35,883 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 GRASSLAND WY THIRD ST RAB END EAST GRASLND 10 R AC $18,844 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 HAWTHORNE ST WISTERIA DR ALDER ST HAWTST 10 R AC $3,534 35,915 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 HAYFIELD ST POPPYFIELD ST GREENFIELD DR HAYFIE 10 R AC $8,450 35,229 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 KESTREL CT CREST HILL DR END KESTCT 10 R AC $3,327 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LARIAT DR SAGE HILL DR ARAPAHO DR LARIDR 10 R AC $11,054 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 Scenarios Criteria: 11 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 419 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI LILLY AVE LIMAN AVE RONAN AVE LILLAV 20 R AC $4,873 35,867 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LONGMEADOW CT RANCHO HILLS DR W END LONGCT 10 R AC $18,928 36,498 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LONE OAK LN THIRD ST RAB 360FT W/O RAB LONOAK 10 R AC $4,846 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 TENTH ST/LUCHESSA AVE RAB LUCHESSA AVE WEST LUCHESSA AVE EAST LUCHAV 45 R AC $3,173 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 LUCHESSA AVE THOMAS DR END OF BRIDGE EAST LUCHAV 70 R AC $8,153 41,798 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 MADISON CT MURRAY AV END MADICT 10 R AC $7,963 35,883 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 MANTELLI DR ZINNIA ST HIRASAKI AVE MANTDR 50 A AC $17,352 40,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 77 MURAOKA DR NAGAREDA DR YAMANE DR MURAOK 010 R AC $21,221 36,347 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 NAVAJO CT CHEYENNE DR CUL DE SAC NAVACT 10 R AC $1,962 37,284 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 NORTH EGRET CT CREST HILL DR END NEGRCT 10 R AC $2,902 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 OHLONE WAY SUNRISE DR SPRIG WAY OHLONE 10 R AC $6,930 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 PARTRIDGE DR END CALLE DEL REY PARTDR 10 R AC $17,020 36,309 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PHEASANT DR THISTLE WY CALLE DEL REY PHEADR 10 R AC $24,517 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 PEPPERMINT ST COBBLESTONE ST CINNAMON ST PPRMNT 10 R AC $4,615 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 RIDGEWAY DR RANCHO HILLS DR FINE DR RIDGDR 10 R AC $14,122 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 ROCKROSE CT LARKSPUR LN END ROCKCT 10 R AC $4,385 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SPENCER CT MANTELLI DR CUL DE SAC SPENCT 10 R AC $12,253 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 ST CLAR AVE KERN AVE AVEZAN WAY STCLAR 10 R AC $6,228 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SUNFLOWER CIR STRAWBERRY LN COUNRTY DR SUNCIR 20 R AC $14,643 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SWALLOW LN TWINBERRY WY LOGANBERRY DR SWALLN 10 R AC $10,673 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 TAOS WAY RONAN AVE LA PRIMAVERA WAY TAOSWY 10 R AC $10,777 35,868 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 TAOS WAY TAOS WAY END TAOSWY 20 R AC $1,994 35,868 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 TARRAGON DR COBBLESTONE CT CINNAMON WY TARGN 10 R AC $3,846 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 Scenarios Criteria: 12 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 420 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI TATUM AVE KERN AVE AVEZAN WAY TATUMA 10 R AC $6,375 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 THIRD ST 470 FT W/O ROSEMARY DR THIRD ST/GRASSLAND WY RAB THIRST 80 R AC $33,987 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GRASSLAND WY/THIRD ST RAB THIRD ST THIRD ST THIRST 85 R AC $2,000 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 THIRD ST GRASSLAND WY/THIRD ST RAB LONE OAK LN/THIRD ST RAB THIRST 90 R AC $11,307 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LONE OAK LN/THIRD ST RAB THIRD ST LONE OAK LN THIRST 95 R AC $2,077 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 TWINBERRY WY FINCH LN SWALLOW LN TWINWY 10 R AC $3,678 35,111 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 VALBUSA DR SOLANA DR JACARANDA WY VALBDR 10 R AC $15,429 35,112 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 VALLEY FORGE DR TENTH ST NINTH ST VALFDR 10 R AC $10,548 36,359 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 VALLEY OAKS CT CREST HILL DR END VALOCT 10 R AC $6,702 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 VALLEY OAKS DR CREST HILL DR RANCHO HILLS DR VALODR 10 R AC $27,230 35,836 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 VIOLET WY KELTON DR CUL DE SAC VIOLWY 10 R AC $12,804 35,113 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 WISTERIA DR HAWTHORNE ST THOMAS RD WISTDR 10 R AC $8,843 35,915 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 WREN AVE CITY LIMITS END NORTH WRENAV 100 A AC $32,448 37,564 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 $801,404Treatment Total CYPRESS CT WEST WOOD DR CUL DE SAC CYPRCT 10 R AC $130,754 36,126 MILL AND THIN OVERLAY100 DAWN WY END MESA RD DAWNWY 10 R AC $89,586 34,558 MILL AND THIN OVERLAY100 DELTA CT END DELTA DR DELTCT 10 R AC $19,818 36,029 MILL AND THIN OVERLAY100 EL CAMINITO LERMA LN LONG MEADOW DR ELCAMI 10 R AC $88,331 35,949 MILL AND THIN OVERLAY100 EL TORO WY HANNA ST LA COCHE WY ELTOWY 20 R AC $25,435 35,270 MILL AND THIN OVERLAY100 GARY ST LAWRENCE DR WREN AVE GARYST 10 R AC $91,066 35,863 MILL AND THIN OVERLAY100 IRISH CT END PARISH WY IRISCT 10 R AC $24,142 34,503 MILL AND THIN OVERLAY100 LA ALONDRA WY WREN AVE WELBURN AVE LAALWY 10 R AC $68,300 34,524 MILL AND THIN OVERLAY100 LA PALOMA WY WREN AVE WELBURN AVE LAPAWY 10 R AC $88,221 35,036 MILL AND THIN OVERLAY100 MAPLE ST SEVENTH ST SIXTH ST MAPLST 10 R AC $67,262 34,535 MILL AND THIN OVERLAY100 MARIA WY AMANDA WY WREN AVE MARIWY 10 R AC $73,102 35,017 MILL AND THIN OVERLAY100 MONTE BELLO DR SANTA BARBARA DR WREN AVE MONBDR 10 R AC $135,710 35,703 MILL AND THIN OVERLAY100 NINTH ST PRINCEVALLE ST CHURCH ST NINTST 20 R AC $165,461 34,815 MILL AND THIN OVERLAY100 Scenarios Criteria: 13 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 421 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI NINTH ST CHURCH ST MONTEREY RD NINTST 30 R AC $59,186 36,058 MILL AND THIN OVERLAY100 OLD GILROY ST CHESTNUT ST CROCKER LN OLDGIL 20 R AC $111,785 34,536 MILL AND THIN OVERLAY100 ORCHARD DR CUMBERLAND DR SIXTH ST ORCHDR 40 R AC $33,746 35,363 MILL AND THIN OVERLAY100 REA ST FOURTH ST SECOND ST REAST 10 R AC $98,383 35,290 MILL AND THIN OVERLAY100 SAGE HILL DR RODEO DR BENBOW DR SAGHDR 10 R AC $55,859 34,526 MILL AND THIN OVERLAY100 STONEY CT END SIXTH ST STONCT 10 R AC $39,294 35,495 MILL AND THIN OVERLAY100 TATUM AVE WREN AVE KERN AVE TATUMA 20 R AC $64,896 34,826 MILL AND THIN OVERLAY100 VISTA DEL SUR GATE RANCHO REAL VISDLS 10 R AC $10,095 35,070 MILL AND THIN OVERLAY100 WESTWOOD DR S END THIRD ST WESTDR 20 R AC $101,827 35,703 MILL AND THIN OVERLAY100 $1,642,259Treatment Total $2,800,060Year 2022 Total Scenarios Criteria: 14 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 422 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2023 CHESTNUT ST 505' N/O STUTZ WY 689' S/O TENTH ST CHESST 40 A AC $74,961 24,948 AC OVERLAY W/FABRIC100 MONTEREY ST LAS ANIMAS RD COHANSEY AVE MONTRD 50 A AC $710,555 24,934 AC OVERLAY W/FABRIC100 $785,516Treatment Total CHURCH ST FARRELL AV N. END CHURST 85 C AC $30,822 88,492 RUB CAPE SEAL W/DIGOUTS100 MESA RD GAVILAN COLLEGE THOMAS RD MESARD 10 C AC $61,410 90,141 RUB CAPE SEAL W/DIGOUTS100 MONTEREY ST EIGHTH ST SIXTH ST MONTRD 110 C AC $51,775 87,527 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR MANTELLI DR CARRIAGE DR RANHDR 10 C AC $20,001 87,729 RUB CAPE SEAL W/DIGOUTS100 SIXTH ST RR TRACKS CHESTNUT ST SIXTST 50 C AC $39,461 89,956 RUB CAPE SEAL W/DIGOUTS100 UVAS PARK DR THIRD ST LAUREL DR UVAPDR 10 C AC $29,816 88,070 RUB CAPE SEAL W/DIGOUTS100 $233,285Treatment Total CARMEL ST SIXTH ST THIRD ST CARMST 40 C AC $324,471 24,926 2.5 INCH AC OVERLAY W/FABRIC 100 EIGHTH ST CHURCH ST MONTEREY RD EIGHST 40 C AC $88,425 25,032 2.5 INCH AC OVERLAY W/FABRIC 100 SIXTH ST MILLER AVE PRINCEVALLE ST SIXTST 20 C AC $263,687 24,926 2.5 INCH AC OVERLAY W/FABRIC 100 $676,583Treatment Total ACORN WY END VALLEY OAKS DR ACORWY 10 R AC $2,057 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 BRIARBERRY LN RANCHO HILLS DR PHEASANT DR BRIALN 10 R AC $28,727 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 CANOPY CT ARBOR ST END CANOCT 10 R AC $7,453 33,543 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 COHANSEY AVE NIGHTINGALE DR END EAST COHAV 25 R AC $25,647 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 COLONY CT RANCHO HILLS DR END COLOCT 10 R AC $3,014 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 CYPRESS CT END PONDEROSA DR CYPREC 10 R AC $7,140 34,312 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 DOVE CT CREST HILL WY END DOVECT 10 R AC $6,110 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 EAGLE HILLS WY 300' S/O PEREGRINE DR PEREGRINE DR EAGHWY 20 R AC $5,250 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 EL INVIERNO DR WREN AVE EL VERANO WY ELINDR 10 R AC $5,032 34,279 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 Scenarios Criteria: 15 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 423 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI FANTAIL WAY HUMMINGBIRD LANE WREN AVE FANTL 10 R AC $4,375 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 FINE DR RIDGEWAY DR LEARNARD WY FINEDR 10 R AC $3,553 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 GREENFIELD DR OAK BROOK WAY W LUCHESSA AVE GREENF 10 R AC $13,361 25,290 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 HERITAGE WY LIONS CREEK DR SOLEDAD ST HERIWY 10 R AC $6,002 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 HIRASAKI AVE LONG MEADOW DR END HIRAAV 20 C AC $8,100 30,713 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 HIRASAKI CT MANTELLI DR CUL DE SAC HIRACT 10 R AC $8,058 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 HUMMINGBIRD LANE COHANSEY AVE VICKERY AVE HUMMN 10 R AC $8,000 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 JACKDOW CT END EAGLE`S NEST LN JACKCT 10 R AC $3,460 34,244 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LOGANBERRY DR PARTRIDGE DR PHEASANT DR LOGADR 10 R AC $23,288 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LONGMEADOW DR SANTA TERESA BLVD HIRASAKI DR LONMDR 40 C AC $12,210 30,713 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 MANTELLI DR END LARKSPUR LN MANTDR 10 C AC $87,456 27,348 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 MANTELLI DR LARKSPUR LN RANCHO HILLS MANTDR 20 C AC $39,447 28,760 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 MOCKINGBIRD LN RED HAWK DR PHEASANT DR MOCKDR 10 R AC $7,548 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 MONTICELLI CT HIRASAKI DR CUL DE SAC MONTCT 10 R AC $6,647 34,244 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 NIGHTINGALE DR VICKERY AVE WREN AVE NIGHDR 10 R AC $19,248 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 PEACOCK CT CALLE DEL REY END PEAKCT 10 R AC $4,292 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 QUAILWALK DR PEREGRINE DR 500' SOUTH OF PEREGRINE DR QUAIDR 10 R AC $8,499 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 RANCHO HILLS DR LONGMEADOW DR 347' N/O LONGMEADOW DR RANHDR 40 C AC $8,588 29,521 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 RANCHO HILLS DR 347' N/O LONGMEADOW DR END RANHDR 50 C AC $73,648 29,519 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 RED HAWK DR MOCKINGBIRD LN CALLE DEL REY REDHDR 10 R AC $8,754 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 ROBIN PL WREN AVE NIGHTINGALE DR ROBIPL 10 R AC $9,279 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SAGEWOOD CT RED HAWK DR NORTH END (CUL-DE- SAC) SAGECT 10 R AC $3,230 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SOUTH EGRET CT END CREST HILL DR SEGRCT 10 R AC $3,307 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 Scenarios Criteria: 16 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 424 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI SENEGAL CT CUL DE SAC LOGANBERRY DR SENECT 10 R AC $8,058 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SOLEDAD ST HERTIAGE WY 248' S/O LERMA LN SOLEST 10 R AC $5,457 34,245 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SORRENTO CT HIRASAKI DR CUL DE SAC SORRCT 10 R AC $12,171 34,244 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 THISTLE WY PHEASANT DR BRIARBERRY LN THISWY 10 R AC $3,808 34,243 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 WINDSONG WY NIGHTINGALE DR HUMMINGBIRD LN WNDSWY 10 R AC $10,874 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 $501,148Treatment Total BLACKBERRY CT OAK BROOK WY END BLACCT 10 R AC $15,308 27,948 SLURRY SEAL W/DIGOUTS76 LONE DEER WY LONGMEADOW DR END LONDWY 10 R AC $12,124 30,064 SLURRY SEAL W/DIGOUTS77 MONTICELLI DR HIRASAKI AV PADOVA DR MONTDR 90 R AC $25,119 28,651 SLURRY SEAL W/DIGOUTS77 OTOOLE CT PETERSEN DR END OTOOCT 10 R AC $5,683 26,940 SLURRY SEAL W/DIGOUTS75 OUSLEY DR MUIR DR SOLIS DR OUSLDR 10 R AC/AC $22,867 26,696 SLURRY SEAL W/DIGOUTS74 RAMONA WY KERN AVE AMANDA AVE RAMOWY 10 R AC/AC $16,956 30,329 SLURRY SEAL W/DIGOUTS77 RASPBERRY CT OAK BROOK WY END RASPCT 10 R AC $16,980 27,948 SLURRY SEAL W/DIGOUTS76 SNOWBERRY CT OAK BROOK WY END SNOWCT 10 R AC $15,457 27,948 SLURRY SEAL W/DIGOUTS76 TAPESTRY WY SUNRISE DR N. END TAPEWY 10 R AC $18,662 27,507 SLURRY SEAL W/DIGOUTS76 TRAVEL PARK CIR BOLSA RD MONTEREY RD TRAPCR 10 R AC $36,480 25,749 SLURRY SEAL W/DIGOUTS74 TRIMBLE CT CHURCH ST CUL DE SAC TRIMCT 10 R AC $10,552 27,507 SLURRY SEAL W/DIGOUTS76 $196,188Treatment Total ANGELA CT END PRINCEVALLE ST ANGECT 10 R AC $23,083 32,989 MILL AND THIN OVERLAY100 CARLYLE CT CHURCH ST END CARLCT 10 R AC $42,205 32,654 MILL AND THIN OVERLAY100 CARLA WY AMANDA AV WREN AVE CARLWY 10 R AC $79,818 33,469 MILL AND THIN OVERLAY100 EL TORO WY WAYLAND LN CARMEL ST ELTOWY 10 R AC $43,933 32,955 MILL AND THIN OVERLAY100 GEORGETOWN PL END PRINCEVALLE ST GEORPL 10 R AC $46,322 33,511 MILL AND THIN OVERLAY100 HANNA ST WELBURN AVE END HANNST 20 R AC $76,304 33,490 MILL AND THIN OVERLAY100 PARISH WY EL CERRITO WY WELBURN AVE PARIWY 10 R AC $67,702 32,932 MILL AND THIN OVERLAY100 QUAILWALK DR 500' SOUTH OF PEREGRINE DR EAGLE VIEW WY QUAIDR 20 R AC $73,347 32,570 MILL AND THIN OVERLAY100 ROYAL WY FILBRO DR IMPERIAL DR ROYAWY 10 R AC $19,598 33,256 MILL AND THIN OVERLAY100 RYAN CT PARISH WY CUL DE SAC RYANCT 10 R AC $41,306 33,202 MILL AND THIN OVERLAY100 STEPHAN CT PRINCEVALLE ST END STEPCT 10 R AC $45,148 33,522 MILL AND THIN OVERLAY100 Scenarios Criteria: 17 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 425 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI TARYN LN CALABRESE WY WELBURN AV TARYLN 10 R AC $60,118 33,203 MILL AND THIN OVERLAY100 WILD IRIS DR MANTELLI DR SOUTH SIDE OF ROUNDABOUT WILIDR 10 R AC $9,999 32,943 MILL AND THIN OVERLAY100 $628,883Treatment Total ARROYO CIR CAMINO ARROYO CAMINO ARROYO ARROCR 10 A AC $776,805 27,470 MILL AND THICK OVERLAY100 GILMAN RD ROGERS 560' E/O CAMINO ARROYO GILMRD 10 A AC $315,262 27,947 MILL AND THICK OVERLAY100 MANTELLI DR CALLE DEL REY SANTA TERESA BLVD MANTDR 40 A AC/AC $285,997 26,307 MILL AND THICK OVERLAY100 MANTELLI DR KERN AVE WREN AVE MANTDR 70 A AC $386,526 25,891 MILL AND THICK OVERLAY100 THOMAS RD 105' N/O ALDER ST 255' S/O VINCA CT THOMRD 40 A AC $35,535 26,527 MILL AND THICK OVERLAY100 UVAS PARK DR MILLER AVE TENTH ST UVAPDR 30 C AC $173,255 25,323 MILL AND THICK OVERLAY100 WESTWOOD DR THIRD ST JUNIPER DR WESTDR 30 C AC $123,704 25,485 MILL AND THICK OVERLAY100 WREN AVE UVAS PARK DR SIXTH ST WRENAV 70 A AC/AC $162,161 27,646 MILL AND THICK OVERLAY100 $2,259,245Treatment Total $5,280,848Year 2023 Total Scenarios Criteria: 18 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 426 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2024 FARRELL AVE WREN AVE MONTEREY RD FARRAV 10 A AC $434,179 23,293 AC OVERLAY W/FABRIC100 MONTEREY ST LEAVESLEY RD PIERCE ST MONTRD 10 A AC/AC $410,013 23,347 AC OVERLAY W/FABRIC100 MONTEREY ST COHANSEY AVE BUENA VISTA AVE MONTRD 70 A AC $1,024,797 23,962 AC OVERLAY W/FABRIC100 THOMAS RD MESA RD SANTA TERESA BLVD THOMRD 10 A AC $40,504 23,977 AC OVERLAY W/FABRIC100 THOMAS RD SANTA TERESA BLVD 123' S/O WISTERIA DR THOMRD 20 A AC $59,533 23,849 AC OVERLAY W/FABRIC100 WREN AVE FIRST ST 125' S/O WELBURN AVE WRENAV 10 A AC/AC $352,455 23,830 AC OVERLAY W/FABRIC100 $2,321,481Treatment Total EIGLEBERRY ST TENTH ST EIGHTH ST EIGLST 10 R AC/AC $27,254 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST EIGHTH ST SIXTH ST EIGLST 15 R AC/AC $33,917 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST SIXTH ST FOURTH ST EIGLST 20 R AC/PCC $33,146 40,988 SEAL CRACKS/SLURRY SEAL91 EIGLEBERRY ST FOURTH ST SECOND ST EIGLST 30 R AC/PCC $34,446 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST SECOND ST FIRST ST EIGLST 40 R AC/AC $14,107 43,471 SEAL CRACKS/SLURRY SEAL92 $142,870Treatment Total MONTEREY ST SIXTH ST THIRD ST MONTRD 120 C AC $71,575 85,782 RUB CAPE SEAL W/DIGOUTS100 SIXTH ST CHESTNUT ST 308 E/O CHESTNUT SIXTST 60 C AC $10,169 85,066 RUB CAPE SEAL W/DIGOUTS100 $81,744Treatment Total CARMEL ST EL CERRITO WY SHERWOOD DR CARMST 20 C AC $195,881 23,894 2.5 INCH AC OVERLAY W/FABRIC 100 CHESTNUT ST LEWIS ST MURRAY ST CHESST 20 C AC $130,615 24,010 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST WELBURN AVE MANTELLI DR CHURST 30 C AC/AC $403,956 23,598 2.5 INCH AC OVERLAY W/FABRIC 100 FOURTH ST PRINCEVALLE ST EIGLEBERRY ST FOURST 20 C AC $336,093 23,908 2.5 INCH AC OVERLAY W/FABRIC 100 MURRAY AVE I.O.O.F. AVE LEAVESLEY RD MURRAV 50 C AC $431,990 23,661 2.5 INCH AC OVERLAY W/FABRIC 100 SAN YSIDRO AVE 1064' N/O LEAVESLEY RD 1478' S/O LAS ANIMAS RD SANYAV 20 C AC $208,773 23,902 2.5 INCH AC OVERLAY W/FABRIC 100 $1,707,308Treatment Total ARBOR ST MANTELLI DR EDEN ST ARBOST 10 R AC $8,226 25,715 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BOGIALA WY MARSANNE LN DE ANZA PL BOGAWY 10 R AC $14,039 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 Scenarios Criteria: 19 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 427 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI DE ANZA PL TENTH ST LOPEZ WY DEANZ 10 R AC $9,172 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LOPEZ WY CHARLES LUX DR DE ANZA PL LOPEWY 10 R AC $16,285 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LUCHESSA AVE MILLER AVE TENTH ST/LUCHESSA AVE RAB LUCHAV 40 R AC $11,231 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MARSANNE LN BOGIALA WY LOPEZ WY MARSNN 10 R AC $5,616 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MILLER AVE SIXTH ST THIRD ST MILLAV 40 C AC/AC $54,984 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 MILLER AVE THIRD ST FIRST ST MILLAV 50 C AC/AC $50,420 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 MURRAY AVE LINCOLN CT LAS ANIMAS AVE MURRAV 20 A AC/AC $31,039 58,514 SEAL CRACKS, DIGOUTS, MICROSURFACING 78 TENTH ST/CHARLES LUX DR RAB TENTH ST NORTH TENTH ST SOUTH TENTST 55 R AC $2,663 25,607 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 THIRD ST SANTA THERESA DR MILLER AVE THIRST 10 C AC/AC $15,653 39,638 SEAL CRACKS, DIGOUTS, MICROSURFACING 79 THIRD ST MILLER AVE PRINCEVALLE ST THIRST 20 C AC/AC $18,016 28,546 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 THIRD ST WREN AVE SANTA THERESA DR THIRST 30 C AC/AC $19,210 36,307 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 WELBURN AVE HANNA ST CHURCH ST WELBAV 80B C AC/AC $16,297 33,773 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 $272,851Treatment Total CALABRESE WY END DELTA DR CALAWY 10 R AC $90,306 31,938 MILL AND THIN OVERLAY100 CATHERINE CT PRINCEVALLE ST END CATHCT 10 R AC $19,550 31,428 MILL AND THIN OVERLAY100 DARTMOUTH PL END PRINCEVALLE ST DARTPL 10 R AC $34,753 31,417 MILL AND THIN OVERLAY100 ELM ST FOREST ST SPRINGDALE ST ELMST 10 R AC $18,289 31,406 MILL AND THIN OVERLAY100 FILBRO DR ROYAL WY PRINCEVALLE ST FILBDR 10 R AC $56,323 31,428 MILL AND THIN OVERLAY100 IMPERIAL DR ROYAL WY PRINCEVALLE ST IMPEDR 10 R AC $32,120 31,725 MILL AND THIN OVERLAY100 LA SIERRA WY WAYLAND LN HANNA ST LASIWY 10 R AC $111,098 31,394 MILL AND THIN OVERLAY100 SOLIS DR OUSLEY DR DELTA DR SOLIDR 10 R AC $33,037 31,938 MILL AND THIN OVERLAY100 THIRD ST THIRD ST/SANTA TERESA BLVD ISABELLA WY THIRST 65 R AC $38,528 31,725 MILL AND THIN OVERLAY100 WEST HILLVIEW CT END TARYN LN WHILCT 10 R AC $46,270 31,938 MILL AND THIN OVERLAY100 $480,274Treatment Total LONGMEADOW DR TRAILBLAZER WY RODEO DR LONMDR 20 C AC $214,761 24,481 MILL AND THICK OVERLAY100 Scenarios Criteria: 20 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 428 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $214,761Treatment Total $5,221,289Year 2024 Total Scenarios Criteria: 21 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 429 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $16,501,268Grand Total Scenarios Criteria: 22 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 430 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Interest: .00% CITY OF GILROY Target-Driven Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Target: Overall 67 Scenario: #Plus 5 PCI Increase Objective: Minimum Network Average PCI Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2020 ALEXANDER ST NINTH ST SIXTH ST ALEXST 30 R AC/AC $40,683 68,837 SEAL CRACKS/SLURRY SEAL86 POLK CT MURRAY AVE END POLKCT 10 R AC/AC $6,474 81,986 SEAL CRACKS/SLURRY SEAL89 RANCHO HILLS CT END MANTELLI DR RANHCT 10 R AC/AC $5,645 68,991 SEAL CRACKS/SLURRY SEAL86 SIXTH ST 308 E/O CHESTNUT ST ROGERS LN SIXTST 65 R AC/AC $5,458 61,137 SEAL CRACKS/SLURRY SEAL83 $58,260Treatment Total CAMINO ARROYO GILMAN RD ARROYO CIR CAMARR 10 C AC $19,292 108,392 RUB CAPE SEAL W/DIGOUTS100 CARMEL ST FIRST ST EL CERRITO WY CARMST 10 C AC $32,690 99,995 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST SEVENTH ST FOURTH ST CHURST 100 C AC $62,755 102,030 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST FOURTH ST FIRST ST CHURST 110 C AC $61,875 98,290 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST LAS ANIMAS AV 100' N/O HENNESSEY WY CHURST 70 C AC/AC $15,281 100,285 RUB CAPE SEAL W/DIGOUTS100 FOURTH ST SANTA THERESA DR MILLER DR FOURST 10 C AC $18,345 102,030 RUB CAPE SEAL W/DIGOUTS100 FOURTH ST MILLER DR PRINCEVALLE ST FOURST 15 C AC $27,207 102,030 RUB CAPE SEAL W/DIGOUTS100 KERN AVE 429' N. OF MANTELLI DR N CITY LIM KERNAV 60 C AC $29,980 97,144 RUB CAPE SEAL W/DIGOUTS100 MANTELLI DR RANCHO HILLS CALLE DEL REY MANTDR 30 C AC $38,989 111,039 RUB CAPE SEAL W/DIGOUTS100 MARTIN ST MONTEREY RD CHESTNUT ST MARTST 10 C AC $33,831 106,345 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR CARRIAGE DR VALLEY OAKS DR RANHDR 20 C AC $28,226 99,806 RUB CAPE SEAL W/DIGOUTS100 RENZ LN 1085' W. OF CAMINO ARROYO CAMINO ARROYO RENZLN 20 C AC $42,870 105,316 RUB CAPE SEAL W/DIGOUTS100 THIRD ST PRINCEVALLE ST CHURCH ST THIRST 50 C AC $52,070 103,712 RUB CAPE SEAL W/DIGOUTS100 THIRD ST CHURCH ST MONTEREY RD THIRST 60 C AC $17,893 103,712 RUB CAPE SEAL W/DIGOUTS100 Scenarios Criteria: 1 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 431 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $481,304Treatment Total ADAMS CT MURRAY AVE END ADAMCT 10 R AC $6,034 39,770 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 ALDER ST STARLING DR THOMAS RD ALDEST 10 R AC $15,758 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ALEXANDER ST SIXTH ST LEWIS ST ALEXST 10 R AC $20,201 39,601 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 APACHE CT END RODEO DR APACCT 10 R AC $6,703 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ARAPAHO DR DURANGO LN BENBOW DR ARAPDR 10 R AC $16,894 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ARMAND CT WREN AVE END ARMACT 10 R AC $2,876 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 ASHBURY CT END ALDER ST ASHBCT 10 R AC $3,121 39,433 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 AZARA ST STONECRESS ST MANTELLI DR AZARST 10 R AC $3,796 37,418 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BABBS CREEK DR 100FT WEST OF STARLING DR END WEST BABCDR 20 R AC $8,312 54,402 SEAL CRACKS, DIGOUTS, MICROSURFACING 94 BANES LN ALEXANDER ST END BANELN 10 R AC $3,307 36,084 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BANYAN CT BANYAN ST END BANYCT 10 R AC $8,886 74,331 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BANYAN CT END TEA TREE WAY BANYCT 20 R AC $1,867 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BANYAN ST LINARIA ST E END BANYST 10 R AC $8,649 39,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BENBOW DR SAGE HILL DR ARAPAHO DR BENBDR 10 R AC $9,038 38,681 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 BENNETT CT SEVERANCE ST END BENNCT 10 R AC $7,638 37,855 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 BENNETT ST CHURCH ST SEVERANCE ST BENNST 10 R AC $4,667 55,694 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 BERRYBUSH CT OAK BROOK WY END BERRYC 10 R AC $10,177 34,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BLACKFOOT CT GERONIMO ST CUL DE SAC BLCKCT 10 R AC $5,689 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BLUEBELL DR BURCHELL RD COUNTRY DR BLUBDR 10 R AC $12,125 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BLUE HERON CT END PEREGRINE DR BLUHCT 10 R AC $4,043 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 BOLSA RD CARNADERO RD 1076' S/O TRAVEL PARK CIR BOLSRD 10 A AC $58,092 40,248 SEAL CRACKS, DIGOUTS, MICROSURFACING 71 BOSQUE ST JARDIN WY TAOS WY BOSQST 10 R AC $4,670 37,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 Scenarios Criteria: 2 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 432 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI BRAZOS ST JARDIN WY TAOS WY BRAZST 10 R AC $5,486 40,795 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BRITTANY CT MANTELLI DR END BRITCT 10 R AC $6,330 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 BUNTING CT SUNRISE DR CUL DE SAC BUNTIN 10 R AC $4,549 36,888 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 BUTTERCUP LN KERN AVE WESTWOOD DR BUTTLN 10 R AC $6,207 38,457 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 CAMERON BLVD HWY 152 VENTURE WY CAMBL 10 A AC $101,000 75,791 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CANYON CT CHEYENNE DR CUL DE SAC CANYCT 10 R AC $1,512 35,500 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 CAROB CT TEA TREE WAY END CAROCT 10 R AC $8,267 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CARRIAGE DR END RANCHO HILLS DR CARRDR 10 R AC $10,208 55,694 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 CHADWICK ST HOXETT ST WENTZ DR CHADST 10 R AC $9,054 39,269 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 CHAPPELL CT END CHURCH ST CHAPCT 10 R AC $5,122 35,619 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CHERRYWOOD CT SPRIG WAY CUL DE SAC CHERCT 10 R AC $4,534 75,898 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CHESTNUT ST EIGHTH ST SIXTH ST CHESST 70 C AC/AC $30,454 62,002 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 CHEYENNE DR SADDLER WY 100' W/O NAVAJO CT CHEYDR 10 R AC $6,659 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CHARLES LUX DR GREENFIELD DR CIMINO ST CHRLUX 10 R AC $8,392 55,070 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 CHURCH ST 98' S/O RONAN LIMAN AVE CHURST 50 C AC/AC $13,412 43,172 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CIELO VISTA CT DANCING WIND WAY CUL DE SAC CIELCT 10 R AC $2,112 56,678 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CIELO VISTA LN DANCING WIND WAY DREAM CATCHER WAY CIELLN 10 R AC $15,696 59,142 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 CIMINO ST LUCHESSA AVE CHARLES LUX DR CIMNO 10 R AC $12,743 50,433 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CLARK WY CRAWFORD DR WREN AVE CLARWY 10 R AC $13,720 37,953 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 COLONY WY END RANCHO HILLS DR COLOWY 10 R AC $9,528 58,140 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 COLUMBINE CT MANTELLI DR END COLUCR 10 R AC $7,026 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COMANCHE ST SUNRISE DR PUBELO COMAST 10 R AC $9,529 53,890 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CONCORD PL NINTH ST END CONCPL 10 R AC $4,944 38,752 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 Scenarios Criteria: 3 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 433 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI CONNELL CT LAS ANIMAS AV END CONNCT 10 R AC $4,744 36,886 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 COOPER PL JICARRILLA PL SUNRISE DR COOPPL 10 R AC $7,405 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CORAL BELL CT END PERIWINKLE DR CORACT 10 R AC $4,094 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COUNTRY DR END STRAWBERRY LN COUNDR 10 R AC $9,894 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COUNTRY DR STRAWBERRY LN SUNFLOWER CIR COUNDR 20 R AC $12,445 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COUNTRY DR SUNFLOWER CIR MANTELLI DR COUNDR 30 R AC $9,156 38,680 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 COYOTE MOON LN DREAM CATCHER WAY SUNRISE DR COYOLN 10 R AC $16,698 52,213 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 CRAWFORD CT CRAWFORD DR END CRAWCT 10 R AC $2,958 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 CRAWFORD DR SANTA PAULA DR END CRAWDR 10 R AC $18,994 39,268 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 CREST HILL CT RANCHO HILLS DR END CREHCT 10 R AC $7,684 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CREST HILL WY END RANCHO HILLS DR CREHWY 10 R AC $25,886 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CUMBERLAND DR MILLER AVE ORCHARD DR CUMBDR 10 R AC $15,360 39,767 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CYPRESS CT PONDEROSA DR LAUREL DR CYPREC 20 R AC $8,040 39,434 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 DAFODIL PL MANTELLI DR ZINNIA ST DAFOPL 10 R AC $10,329 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 DANCING WIND WY RANCHO HILLS DRIVE CIELO VISTA LAND DANCWY 10 R AC $8,221 50,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 DEL RIO CIR SANTA FE DR SANTA FE DR DELRIO 10 R AC $9,306 38,461 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 DESERT BLOOM PL O'KEEFE LANE SUNRISE DRIVE DESEPL 10 R AC $11,265 61,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 DOVETAIL WAY RANCHO HILLS DR END DOVETA 10 R AC $22,788 57,958 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 DREAM CATCHER WY CIELO VISTA WAY SUNRISE DRIVE DREAWY 10 R AC $11,122 54,391 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 DURANGO LN WAGON WY ARAPAHO DR DURALN 10 R AC $8,743 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 EAGLE HILLS WY BLANKWING WY 300' S/O PEREGRINE DR EAGHWY 10 R AC $14,560 35,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 EAGLE`S NEST LN EAGLE HILLS WY 324' N/O EAGLE HILLS WY EAGNLN 10 R AC $4,896 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 EAGLE`S NEST LN 324' N/O EAGLE HILLS WY PEREGRINE DR EAGNLN 20 R AC $16,759 37,855 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 Scenarios Criteria: 4 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 434 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI EAGLE VIEW WY LONGMEADOW DR 241' N/O QUAILWALK DR EAGVWY 10 R AC $13,827 36,888 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 EAGLE VIEW WY 241' N/O QUAILWALK DR PEREGRINE DR EAGVWY 20 R AC $7,375 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 EDEN ST WREN AV FLORAL ST EDENST 10 R AC $20,596 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 ELECTA CT LAS ANIMAS AVE CUL DE SAC ELECCT 10 R AC $9,328 62,562 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 EL VERANO WY LA PRIMAVERA WY EL INVIERNO DR ELVEWY 10 R AC $9,460 34,097 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 ERVIN CT MONTEREY ROAD CUL DE SAC ERVICT 10 R AC $3,703 51,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 FELLOM CT MURRAY AV END FELLCT 10 R AC $7,312 38,734 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 FERAGALLI CT HIRASAKI DR CUL DE SAC FERACT 10 R AC $7,813 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 FESTA AGLIO CT HIRASAKI DR CUL DE SAC FESTCT 10 R AC $9,354 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 FESTA AGLIO DR HIRASAKI AV PADOVA DR FESTDR 90 R AC $13,969 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 FILICE DR SOUTH END NORTH END FILIDR 10 R AC $44,215 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 FLORAL ST EDEN ST MANTELLI DR FLORST 10 R AC $9,629 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 FORUNATA PL FOREST ST GENNARO WAY FORTPL 10 R AC $3,414 68,305 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 FOXGLOVE CT END WILD IRIS DR FOXGCT 10 R AC $5,017 36,621 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 FREEMAN CT LAS ANIMAS RD END FREECT 10 R AC $10,805 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GARFIELD CT MURRAY AV END GARFCT 10 R AC $7,283 35,664 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GASCONY CT AVEZON WAY CUL DE SAC GASCON 10 R AC $2,705 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GENNARO WY LEWIS ST FORTUNATA PLACE GENNWY 10 R AC $6,045 62,513 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GERONIMO ST ZUNI LANE SHOSHONE STREET GEROST 10 R AC $17,892 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 GOLD FINCH CT SPARROW GLEN WAY CUL DE SAC GOLDFI 10 R AC $3,514 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 GOLDEN SKY WY DREAM CATCHER WAY SUNRISE DRIVE GOLDWY 10 R AC $10,548 56,678 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 GOSHAWK CT END LOGANBERRY DR GOSHCT 10 R AC $7,827 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GRANT CT MURRAY AVE END GRANCT 10 R AC $6,239 35,660 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 Scenarios Criteria: 5 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 435 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI GRANDE DR CHEYENNE DR SPRIG WAY GRANDR 10 R AC $4,480 53,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 GREENFIELD DR LUCHESA AV N END GATE GREEDR 90 C AC $11,563 41,682 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GREYSTONE CT KERN AVE END GREYCT 10 R AC $7,963 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 HADLEY CT END ROGERS LN HADLCT 10 R AC $10,551 39,769 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 HAWTHORNE ST WISTERIA DR ALDER ST HAWTST 10 R AC $3,267 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 HAYFIELD ST POPPYFIELD ST GREENFIELD DR HAYFIE 10 R AC $7,813 34,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 HERSMAN DR SANTA BARBARA DR STEWART DR HERSDR 10 R AC $15,369 39,551 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 HIRASAKI AVE LONG MEADOW DR END HIRAAV 20 C AC $7,200 35,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 HOLLYHOCK CT HOLLYHOCK LN CUL DE SAC HLLYCT 10 R AC $3,467 74,280 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 HOGAN WY END SADDLER DR HOGAWY 10 R AC $10,898 39,213 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 HOLLYHOCK LN MANTELLI DR HOLLYHOCK CT HOLLLN 10 R AC $17,334 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 HONEY CT FLORAL ST END HONECT 10 R AC $3,364 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 HOOVER CT END ROGERS LN HOOVCT 10 R AC $6,894 39,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 HOPI LN SUNRISE DR O'KEEFE CT HOPILN 10 R AC $10,687 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 IRONBARK ST STONECRESS ST MANTELLI DR IRONST 10 R AC $4,018 39,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 JACARANDA WY SOUTH END NORTH END JACAWY 10 R AC $12,023 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 JARDIN WY BRAZOS ST BOSQUE ST JARDWY 10 R AC $5,547 58,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 JICARILLA PL EAGLE VIEW WAY COOPER PL JCAPL 10 R AC $9,672 53,890 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 KENNEDY CT MURRAY AV END KENNCT 10 R AC $7,958 38,734 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 KESTREL CT CREST HILL DR END KESTCT 10 R AC $3,076 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 KIOWA CT JICARILLA PL CUL DE SAC KIOWCT 10 R AC $3,414 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 KISHIMURA DR FOREST ST MURRAY AV KISHST 10 R AC $15,968 60,360 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 KITE DR PEREGRINE DR SUNRISE DR KITEDR 10 R AC $3,461 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 Scenarios Criteria: 6 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 436 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI KOSHARE PL COMANCHE ST SHOSHONE ST KOSHPL 10 R AC $10,956 47,858 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LA PRIMAVERA WY WREN AVE TAOS WAY LAPRWY 10 R AC $12,648 38,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LAREDO WY SUNRISE DR RIO GRANDE WY LAREWY 10 R AC $6,456 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 LARIAT DR SAGE HILL DR ARAPAHO DR LARIDR 10 R AC $10,220 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LAS ANIMAS AV MONTEREY RD ROAD NARROWS LASAAV 30 R AC $9,097 38,732 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LEARNARD WY MANTELLI DR BRENTWOOD LN LEARWY 10 R AC $8,523 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 LILLY AVE LIMAN AVE RONAN AVE LILLAV 20 R AC $4,505 35,615 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 LINARIA ST BANYAN ST OLEA CT LINAST 10 R AC $3,503 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 LINCOLN CT MURRAY AV END LINCCT 10 R AC $8,039 39,664 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 LINNET CT DOVETAIL WAY CUL DE SAC LINNET 10 R AC $6,105 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 LISA CT END NICOLE WY LISACT 10 R AC $4,748 38,770 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LONGMEADOW DR SANTA TERESA BLVD HIRASAKI DR LONMDR 40 C AC $10,854 35,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LOS PADRES CT SAN MIGUEL ST END LOSPCT 10 R AC $8,384 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 LUCHESSA AVE THOMAS DR GREENFIELD DR LUCHAV 10 A AC $68,196 46,570 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 LUCHESSA AVE CIMINO ST GREENFIELD DR LUCHAV 60 R AC $18,169 70,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MADISON CT MURRAY AV END MADICT 10 R AC $7,362 35,660 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 MANTELLI DR END LARKSPUR LN MANTDR 10 C AC $77,748 35,105 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 MANTELLI DR LARKSPUR LN RANCHO HILLS MANTDR 20 C AC $35,068 35,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 MARTIRI DR HIRASAKI AV PADOVA DR MARTDR 90 R AC $9,334 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 MARTIRI CT HIRASAKI DR CUL DE SAC MARTIR 10 R AC $6,725 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 MIMOSA CT BANYAN CT END MIMOCT 10 R AC $5,180 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 MORO CT HIRASAKI DR CUL DE SAC MOROCT 10 R AC $8,327 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 MORO DR HIRASAKI AV PADOVA DR MORODR 90 R AC $8,523 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 Scenarios Criteria: 7 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 437 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI MURAOKA DR NAGAREDA DR YAMANE DR MURAOK 010 R AC $19,620 37,005 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 NAGAREDA DR FOREST DR MURAOKA DR NAGARE 010 R AC $10,520 37,928 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 NAVAJO CT CHEYENNE DR CUL DE SAC NAVACT 10 R AC $1,814 35,500 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 NECTAR CT END FLORAL ST NECTCT 10 R AC $2,892 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 NORTH EGRET CT CREST HILL DR END NEGRCT 10 R AC $2,683 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 NICOLE CT END NICOLE WY NICOCT 10 R AC $4,336 39,825 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 NICOLE WY MESA RD CARIGNANE DR NICOWY 10 R AC $15,776 39,618 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 NINTH ST VALLEY FORGE DR PRINCEVALLE ST NINTST 10 R AC $16,116 37,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 NONAME UNO AVE LAS ANIMAS RD ADDRESS' 9850 NO. UNO NONUAV 10 A AC $56,100 43,252 SEAL CRACKS, DIGOUTS, MICROSURFACING 75 OAK CT HANNA ST HANNA ST OAKCR 10 R AC $6,036 39,669 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 OHLONE WAY SUNRISE DR SPRIG WAY OHLONE 10 R AC $6,408 35,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 OKEEFE CT HOPI LN E. END CDS OKEECT 10 R AC $9,847 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 ORCHARD DR TENTH ST 95' N/O DEARBORN PL ORCHDR 10 R AC $12,926 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 ORINDA WY MARIPOSA ST LONG MEADOW DR ORINWY 10 R AC $9,536 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 PADOVA DR SORRENTO DR MORO DR PADODR 90 R AC $13,767 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 PADOVA DR SIENA CT SORRENTO DR PADOVA 10 R AC $14,326 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PARTRIDGE DR END CALLE DEL REY PARTDR 10 R AC $15,736 36,886 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 PEREGRINE DR RANCHO HILLS DR EAGLE VIEW WY PEREDR 10 R AC $25,568 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PERIWINKLE DR END MANTELLI DR PERIDR 10 R AC $8,063 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 PHEASANT DR THISTLE WY CALLE DEL REY PHEADR 10 R AC $22,667 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 PONDEROSA DR THIRD ST CYPRESS CT PONDDR 10 R AC $12,534 38,752 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 PRAIRIE OWL CT SPRIG WY N. END CDS PRAICT 10 R AC $4,340 67,108 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PUEBLO CT ZUNI LN W. END PUEBCT 10 R AC $6,828 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 Scenarios Criteria: 8 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 438 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI RANCHO HILLS DR LONGMEADOW DR 347' N/O LONGMEADOW DR RANHDR 40 C AC $7,634 35,863 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 RANCHO HILLS DR 347' N/O LONGMEADOW DR END RANHDR 50 C AC $65,472 35,863 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 RIDGEWAY DR RANCHO HILLS DR FINE DR RIDGDR 10 R AC $13,056 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 RIO GRANDE WY LAREDO WY SEDONA WY RIGRWY 10 R AC $8,024 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ROCKROSE CT LARKSPUR LN END ROCKCT 10 R AC $4,054 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ROGERS LN SIXTH ST LEWIS ST ROGELN 10 R AC $17,067 39,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 RONAN AVE WREN AVE CHURCH ST RONAAV 10 R AC $21,560 38,715 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SADDLER DR WAGON WY SPRIG WY SADDL 10 R AC $15,447 58,997 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 SANTA INEZ CT SAN MIGUEL ST END SANICT 10 R AC $8,467 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 SANTA FE DR TAOS WY CHURCH ST SANTFE 10 R AC $6,793 39,463 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 SEDONA WY SUNRISE DR RIO GRANDE WY SEDOWY 10 R AC $6,472 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 SHOOTING STAR CT HOLLYHOCK LANE CUL DE SAC SHOOCT 10 R AC $3,631 77,687 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SHOSHONE WY KOSHARE STREET PUBELO COURT SHOSWY 10 R AC $4,831 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SIENA DR HIRASAKI DR SORRENTO CT SIENAD 10 R AC $10,261 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 SIENA CT HIRASAKI DR CUL DE SAC SIENCT 10 R AC $9,838 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 SIXTH ST PRINCEVALLE ST CHURCH ST SIXTST 30 C AC/AC $48,150 61,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 SIXTH ST EIGLEBERRY RD RR TRACKS SIXTST 45 C AC/AC $12,348 42,565 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SAN JUSTO ROAD MILLER RD END SNJURD 10 R AC $14,934 71,994 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SOLANA DR VALBUSA DR LONGMEADOW DR SOLADR 10 R AC $13,440 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SOLEDAD ST 248' S/O LERMA LN LERMA LN SOLEST 20 R AC $3,858 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 SORRENTO DR HIRASAKI DR PADOVA DR SORRDR 10 R AC $11,696 60,547 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 SPARROW GLEN WAY DOVETAIL WAY SUNRISE DR SPARGL 10 R AC $9,853 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SPRIG WY SADDLER WY RODEO DR SPRIWY 20 R AC $13,026 63,306 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 Scenarios Criteria: 9 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 439 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI STARLING DR ALDER ST BABBS CREEK DR STARDR 10 R AC $6,269 60,249 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 ST CLAR AVE KERN AVE AVEZAN WAY STCLAR 10 R AC $5,758 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 ST FRANCIS CT SAN MIGUEL ST END STFRCT 10 R AC $8,582 37,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 STONECRESS ST COUNTRY DR BANYAN ST STONST 10 R AC $19,964 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SUNFLOWER CIR WEST END STRAWBERRY LN SUNCIR 10 R AC $3,814 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 SUNFLOWER CIR STRAWBERRY LN COUNRTY DR SUNCIR 20 R AC $13,538 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 TAOS WAY RONAN AVE LA PRIMAVERA WAY TAOSWY 10 R AC $9,964 35,617 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 TAOS WAY TAOS WAY END TAOSWY 20 R AC $1,844 35,617 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 TATUM AVE KERN AVE AVEZAN WAY TATUMA 10 R AC $5,894 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 TEAL CT END VINCA CT TEALCT 10 R AC $3,208 57,700 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 TEA TREE CT CREST HILL WAY END TEATCT 10 R AC $5,882 58,600 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 TEA TREE WY TEA TREE COURT END TEATWY 10 R AC $14,579 63,586 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 TENTH ST 150 E/O ROSANNA ST MONTEREY RD TENTST 30 A AC $31,926 44,966 SEAL CRACKS, DIGOUTS, MICROSURFACING 78 THIRD ST COBBLESTONE CT/THIRD ST RAB 470FT W/O ROSEMARY WY THIRST 100 R AC $25,667 50,204 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 THIRD ST ISABELLA WY COBBLESTONE CT/THIRD ST RAB THIRST 70 R AC $5,334 44,210 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COBBLESTONE CT/THIRD ST RAB THIRD ST THIRD ST THIRST 75 R AC $1,849 54,590 SEAL CRACKS, DIGOUTS, MICROSURFACING 94 THOMAS RD 675' N/O OAK BROOK WY LUCHESSA AVE THOMRD 60 A AC $3,383 39,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 TWINBERRY WY FINCH LN SWALLOW LN TWINWY 10 R AC $3,400 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 UVAS PARK DR THIRD ST LAUREL DR UVAPDR 10 C AC $18,784 34,025 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 VALBUSA DR SOLANA DR JACARANDA WY VALBDR 10 R AC $14,265 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 VALLEY FORGE DR TENTH ST NINTH ST VALFDR 10 R AC $9,752 37,043 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 VALLEY OAKS CT CREST HILL DR END VALOCT 10 R AC $6,196 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 VALLEY OAKS DR CREST HILL DR RANCHO HILLS DR VALODR 10 R AC $25,176 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 Scenarios Criteria: 10 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 440 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI VENTURE WY CAMINO ARROYO CAMERON BLVD VENTWY 10 C AC $27,016 51,879 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 VICKERY AVE NIGHTINGALE DR WREN AVE VICKAV 20 R AC $10,112 46,438 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 VIOLET WY KELTON DR CUL DE SAC VIOLWY 10 R AC $11,838 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 WEAVER CT END WOODWORTH WY WEAVCT 10 R AC $4,024 37,901 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 WILDROSE CT SUNFLOWER CIR CUL DE SAC WILDCT 10 R AC $3,316 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 WILD IRIS DR SOUTH SIDE OF ROUNDABOUT LAVENDER WAY WILIDR 20 R AC $7,823 65,311 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 WILLY CT MURRAY AV CUL DE SAC WILYCT 10 R AC $6,970 39,601 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 WISTERIA DR HAWTHORNE ST THOMAS RD WISTDR 10 R AC $8,176 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 WREN AVE 125' S/O WELBURN AVE 125' S/O LAWRENCE DR WRENAV 20 A AC/AC $28,488 79,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 WREN AVE 125' S/O LAWRENCE DR MANTELLI DR WRENAV 30 A AC/AC $34,069 56,460 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 WREN AVE MANTELLI DR RONAN AVE WRENAV 40 A AC $14,549 43,252 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 WREN AVE RONAN AVE TATUM AVE WRENAV 50 A AC $19,393 45,011 SEAL CRACKS, DIGOUTS, MICROSURFACING 78 WREN AVE FARREL DR CITY LIMITS WRENAV 65 A AC $16,293 46,870 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 YUCCA CT CHEYENNE DR CUL DE SAC YUCCCT 10 R AC $1,778 49,369 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ZINNIA ST VIOLET WY MANTELLI DR ZINNST 10 R AC $4,736 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 ZINNIA ST MANTELLI DR DAFFODIL PL ZINNST 20 R AC $12,316 39,576 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 ZUNI LN SUNRISE DR PUEBLO CT ZUNILN 10 R AC $10,624 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 $2,647,801Treatment Total ARNOLD DR WAYLAND LN END ARNODR 10 R AC $126,034 38,654 MILL AND THIN OVERLAY100 CYPRESS CT WEST WOOD DR CUL DE SAC CYPRCT 10 R AC $120,889 38,103 MILL AND THIN OVERLAY100 DELTA CT END DELTA DR DELTCT 10 R AC $18,323 37,986 MILL AND THIN OVERLAY100 DELTA DR EL DORADO DR MANTELLI DR DELTDR 10 R AC $169,840 38,635 MILL AND THIN OVERLAY100 DRIFTWOOD TER WESTWOOD DR JUNIPER DR DRIFTR 10 R AC $92,336 39,024 MILL AND THIN OVERLAY100 EL CAMINITO LERMA LN LONG MEADOW DR ELCAMI 10 R AC $81,667 37,892 MILL AND THIN OVERLAY100 EL CERRITO WY PARISH WY WREN AVE ELCEWY 10 R AC $51,472 38,224 MILL AND THIN OVERLAY100 Scenarios Criteria: 11 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 441 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI EL CERRITO WY WREN AVE WAYLAND LN ELCEWY 20 R AC $92,665 38,244 MILL AND THIN OVERLAY100 EL TORO WY HANNA ST LA COCHE WY ELTOWY 20 R AC $23,516 36,941 MILL AND THIN OVERLAY100 FAIRVIEW DR PRINCEVALLE ST HANNA ST FAIRDR 10 R AC $87,320 38,266 MILL AND THIN OVERLAY100 GARY ST LAWRENCE DR WREN AVE GARYST 10 R AC $84,196 37,749 MILL AND THIN OVERLAY100 GLENWOOD DR EL CERRITO WY WELBURN AVE GLENDR 10 R AC $51,554 38,244 MILL AND THIN OVERLAY100 HACIENDA DR ORTEGA CIR END HACIDR 10 R AC $98,325 38,266 MILL AND THIN OVERLAY100 HANNA ST FIRST ST WELBURN AVE HANNST 10 R AC $229,263 38,653 MILL AND THIN OVERLAY100 KELTON DR FIRST ST SWANER DR KELTDR 10 R AC $96,523 38,825 MILL AND THIN OVERLAY100 KELTON DR SWANER DR VIOLET WY KELTDR 20 R AC $114,723 38,824 MILL AND THIN OVERLAY100 LEXINGTON PL END PRINCEVALLE ST LEXIPL 10 R AC $52,938 38,470 MILL AND THIN OVERLAY100 LUPINE CT END LIONS CREEK DR LUPICT 10 R AC $30,247 38,369 MILL AND THIN OVERLAY100 MAYLOCK RD END OBATA WY MAYLRD 10 R AC $79,192 38,623 MILL AND THIN OVERLAY100 MILLER AVE SANTA TERESA BLVD UVAS PARK DR MILLAV 10 R AC $363,760 38,276 MILL AND THIN OVERLAY100 MONTE BELLO DR SANTA BARBARA DR WREN AVE MONBDR 10 R AC $125,472 37,529 MILL AND THIN OVERLAY100 NINTH ST CHURCH ST MONTEREY RD NINTST 30 R AC $54,720 38,028 MILL AND THIN OVERLAY100 ORCHARD DR CUMBERLAND DR SIXTH ST ORCHDR 40 R AC $31,200 37,093 MILL AND THIN OVERLAY100 PERRELLI ST WREN AVE FILICE DR PERRST 10 R AC $84,525 38,856 MILL AND THIN OVERLAY100 REA ST FOURTH ST SECOND ST REAST 10 R AC $90,960 36,968 MILL AND THIN OVERLAY100 SANTA BARBARA DR HERSMAN DR 130' S/O SAN MIGUEL DR SANBDR 10 R AC $38,727 38,267 MILL AND THIN OVERLAY100 SANTA BARBARA DR THIRD ST MONTE BELLO DR SANBDR 30 R AC $67,669 38,673 MILL AND THIN OVERLAY100 SHERWOOD DR WAYLAND LN END SHERDR 10 R AC $123,567 38,653 MILL AND THIN OVERLAY100 STONEY CT END SIXTH ST STONCT 10 R AC $36,329 37,244 MILL AND THIN OVERLAY100 WESTWOOD DR S END THIRD ST WESTDR 20 R AC $94,145 37,529 MILL AND THIN OVERLAY100 $2,812,097Treatment Total $5,999,462Year 2020 Total Scenarios Criteria: 12 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 442 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2021 LUCHESSA AVE UVAS CREEK/LUCHESSA AVE MONTEREY RD LUCHAV 15 A AC $567,586 26,947 AC OVERLAY W/FABRIC100 $567,586Treatment Total KERN AVE MANTELLI DR 429' N/O MANTELLI DR KERNAV 50 C AC $14,166 95,257 RUB CAPE SEAL W/DIGOUTS100 WAYLAND LN EL CERRITO WY CUL DE SAC WAYLLN 20 C AC $48,680 97,362 RUB CAPE SEAL W/DIGOUTS100 $62,846Treatment Total EIGHTH ST MILLER AVE PRINCEVALLE ST EIGHST 20 C AC $304,137 27,005 2.5 INCH AC OVERLAY W/FABRIC 100 FOREST ST LEAVESLEY RD YAMANIE DR FOREST 10 C AC $388,160 27,056 2.5 INCH AC OVERLAY W/FABRIC 100 MILLER AVE SARATOGA PL UVAS PARK DR MILLAV 05 C AC $299,255 26,998 2.5 INCH AC OVERLAY W/FABRIC 100 SAN YSIDRO AVE LEAVESLEY RD 1064' N/O LEAVESLEY RD SANYAV 10 C AC $217,501 26,997 2.5 INCH AC OVERLAY W/FABRIC 100 $1,209,053Treatment Total ACORN WY END VALLEY OAKS DR ACORWY 10 R AC $1,902 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 AVEZAN WAY TATUM AVE ST CLAR AVE AVEZAN 10 R AC $9,948 34,946 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BABBS CREEK DR END THOMAS RD BABCDR 10 R AC $22,035 33,855 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BRIARBERRY LN RANCHO HILLS DR PHEASANT DR BRIALN 10 R AC $26,560 33,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 CALLE DEL REY MANTELLI DR LERMA LN CALDRY 10 C AC $37,089 30,757 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 CANOPY CT ARBOR ST END CANOCT 10 R AC $6,890 32,168 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COLONY CT RANCHO HILLS DR END COLOCT 10 R AC $2,787 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 CYPRESS CT END PONDEROSA DR CYPREC 10 R AC $6,601 33,817 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 DOVE CT CREST HILL WY END DOVECT 10 R AC $5,649 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 EAGLE HILLS WY 300' S/O PEREGRINE DR PEREGRINE DR EAGHWY 20 R AC $4,854 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 EL INVIERNO DR WREN AVE EL VERANO WY ELINDR 10 R AC $4,652 33,739 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 Scenarios Criteria: 13 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 443 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI FINCH LN TWINBERRY WY LOGANBERRY DR FINCLN 10 R AC $9,524 34,946 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 FINE DR RIDGEWAY DR LEARNARD WY FINEDR 10 R AC $3,285 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 HERITAGE WY LIONS CREEK DR SOLEDAD ST HERIWY 10 R AC $5,549 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 HIRASAKI CT MANTELLI DR CUL DE SAC HIRACT 10 R AC $7,450 33,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 JACKDOW CT END EAGLE`S NEST LN JACKCT 10 R AC $3,199 33,659 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LOGANBERRY DR PARTRIDGE DR PHEASANT DR LOGADR 10 R AC $21,531 33,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LONGMEADOW CT RANCHO HILLS DR W END LONGCT 10 R AC $18,200 35,151 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LONGMEADOW DR RANCHO HILLS DR TRAILBLAZER WY LONMDR 10 C AC $22,880 30,758 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 MOCKINGBIRD LN RED HAWK DR PHEASANT DR MOCKDR 10 R AC $6,978 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 MONTICELLI CT HIRASAKI DR CUL DE SAC MONTCT 10 R AC $6,145 33,659 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 PEACOCK CT CALLE DEL REY END PEAKCT 10 R AC $3,969 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 QUAILWALK DR PEREGRINE DR 500' SOUTH OF PEREGRINE DR QUAIDR 10 R AC $7,858 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 RED HAWK DR MOCKINGBIRD LN CALLE DEL REY REDHDR 10 R AC $8,094 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SAGEWOOD CT RED HAWK DR NORTH END (CUL-DE- SAC) SAGECT 10 R AC $2,986 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SOUTH EGRET CT END CREST HILL DR SEGRCT 10 R AC $3,057 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SENEGAL CT CUL DE SAC LOGANBERRY DR SENECT 10 R AC $7,450 33,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SOLEDAD ST HERTIAGE WY 248' S/O LERMA LN SOLEST 10 R AC $5,045 33,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SORRENTO CT HIRASAKI DR CUL DE SAC SORRCT 10 R AC $11,253 33,659 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SPENCER CT MANTELLI DR CUL DE SAC SPENCT 10 R AC $11,782 34,946 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 SWALLOW LN TWINBERRY WY LOGANBERRY DR SWALLN 10 R AC $10,263 34,946 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 TENTH ST PRINCEVALLE ST 150' E/O ROSANNA ST TENTST 20 A AC $58,009 42,451 SEAL CRACKS, DIGOUTS, MICROSURFACING 77 THISTLE WY PHEASANT DR BRIARBERRY LN THISWY 10 R AC $3,521 33,657 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 WREN AVE CITY LIMITS END NORTH WRENAV 100 A AC $31,200 34,062 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 Scenarios Criteria: 14 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 444 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $398,195Treatment Total OTOOLE CT PETERSEN DR END OTOOCT 10 R AC $5,255 31,177 SLURRY SEAL W/DIGOUTS78 OUSLEY DR MUIR DR SOLIS DR OUSLDR 10 R AC/AC $21,142 30,206 SLURRY SEAL W/DIGOUTS77 TRAVEL PARK CIR BOLSA RD MONTEREY RD TRAPCR 10 R AC $33,728 29,801 SLURRY SEAL W/DIGOUTS77 $60,125Treatment Total DAWN WY END MESA RD DAWNWY 10 R AC $86,140 35,311 MILL AND THIN OVERLAY100 LA PALOMA WY WREN AVE WELBURN AVE LAPAWY 10 R AC $84,828 35,860 MILL AND THIN OVERLAY100 MARIA WY AMANDA WY WREN AVE MARIWY 10 R AC $70,291 35,838 MILL AND THIN OVERLAY100 NINTH ST PRINCEVALLE ST CHURCH ST NINTST 20 R AC $159,097 35,604 MILL AND THIN OVERLAY100 TATUM AVE WREN AVE KERN AVE TATUMA 20 R AC $62,400 35,629 MILL AND THIN OVERLAY100 VISTA DEL SUR GATE RANCHO REAL VISDLS 10 R AC $9,707 35,895 MILL AND THIN OVERLAY100 $472,463Treatment Total ARROYO CIR CAMINO ARROYO CAMINO ARROYO ARROCR 10 A AC $718,200 27,188 MILL AND THICK OVERLAY100 CAMINO ARROYO PACHECO PASS RD GILMAN RD CAMARR 95 C AC $668,027 27,250 MILL AND THICK OVERLAY100 CHURCH ST FIRST ST HOWSON ST CHURST 10 C AC $158,624 27,155 MILL AND THICK OVERLAY100 GILMAN RD ROGERS 560' E/O CAMINO ARROYO GILMRD 10 A AC $291,478 27,773 MILL AND THICK OVERLAY100 KERN AVE FIRST ST WELBURN AVE KERNAV 20 C AC $187,917 27,119 MILL AND THICK OVERLAY100 WREN AVE TATUM AVE FARREL AVE WRENAV 60 A AC $168,678 28,235 MILL AND THICK OVERLAY100 WREN AVE UVAS PARK DR SIXTH ST WRENAV 70 A AC/AC $149,927 27,519 MILL AND THICK OVERLAY100 $2,342,851Treatment Total $5,113,119Year 2021 Total Scenarios Criteria: 15 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 445 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2022 MONTEREY ST BUENA VISTA AVE NORTH CITY LIMITS MONTRD 80 A AC $918,707 25,801 AC OVERLAY W/FABRIC100 WELBURN AVE KERN AVE WREN AVE WELBAV 60 A AC $453,970 25,905 AC OVERLAY W/FABRIC100 $1,372,677Treatment Total CAMINO ARROYO ARROYO CIR END CAMARR 20 C AC $44,564 94,637 RUB CAPE SEAL W/DIGOUTS100 CAMINO ARROYO VENTURE WAY PACHECO PASS RD CAMARR 90 C AC $134,540 87,920 RUB CAPE SEAL W/DIGOUTS100 CHESTNUT ST SIXTH ST END CHESST 10 C AC $34,440 94,628 RUB CAPE SEAL W/DIGOUTS100 FOREST ST EIGHTH ST SIXTH ST FOREST 60 C AC $36,631 92,779 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR VALLEY OAKS DR LONG MEADOW DR RANHDR 30 C AC $49,726 94,388 RUB CAPE SEAL W/DIGOUTS100 RENZ LN CAMINO ARROYO CUL DE SAC EAST RENZLN 30 C AC $56,496 94,637 RUB CAPE SEAL W/DIGOUTS100 $356,397Treatment Total ARROYO CIR CAMINO ARROYO LEAVESLEY RD ARROCR 20 C AC $276,987 25,847 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST LONDON DR TENTH ST CHURST 121 C AC $225,267 25,958 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST LUCHESSA AVE LONDON DR CHURST 125 C AC $308,088 25,958 2.5 INCH AC OVERLAY W/FABRIC 100 FARMAN FRONTAGE RD 2818 S/O FARMMAN LN FARMAN LN FARFRD 10 C AC $304,457 26,070 2.5 INCH AC OVERLAY W/FABRIC 100 SEVENTH ST CHURCH ST MONTEREY RD SEVEST 20 C AC $125,132 25,958 2.5 INCH AC OVERLAY W/FABRIC 100 $1,239,931Treatment Total CHARLES LUX DR CIMINO ST TENTH ST/CHARLES LUX DR RAB CHRLUX 20 R AC $10,816 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 CINNAMON WY PEPPERMINT ST CULDESAC SOUTH CINNMN 10 R AC $21,075 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CLOVE PL CINNAMON ST COBBLESTONE CT CLOVPL 10 R AC $4,000 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 COBBLESTONE CT THIRD ST PEPPERMINT ST COBBSTN 10 R AC $18,844 50,813 SEAL CRACKS, DIGOUTS, MICROSURFACING 94 GRASSLAND WY THIRD ST RAB END EAST GRASLND 10 R AC $18,844 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LONE OAK LN THIRD ST RAB 360FT W/O RAB LONOAK 10 R AC $4,846 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 TENTH ST/LUCHESSA AVE RAB LUCHESSA AVE WEST LUCHESSA AVE EAST LUCHAV 45 R AC $3,173 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 Scenarios Criteria: 16 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 446 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI LUCHESSA AVE THOMAS DR END OF BRIDGE EAST LUCHAV 70 R AC $8,153 41,798 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 MANTELLI DR ZINNIA ST HIRASAKI AVE MANTDR 50 A AC $17,352 40,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 77 PEPPERMINT ST COBBLESTONE ST CINNAMON ST PPRMNT 10 R AC $4,615 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 TARRAGON DR COBBLESTONE CT CINNAMON WY TARGN 10 R AC $3,846 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 THIRD ST 470 FT W/O ROSEMARY DR THIRD ST/GRASSLAND WY RAB THIRST 80 R AC $33,987 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GRASSLAND WY/THIRD ST RAB THIRD ST THIRD ST THIRST 85 R AC $2,000 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 THIRD ST GRASSLAND WY/THIRD ST RAB LONE OAK LN/THIRD ST RAB THIRST 90 R AC $11,307 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LONE OAK LN/THIRD ST RAB THIRD ST LONE OAK LN THIRST 95 R AC $2,077 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 $164,935Treatment Total BLACKBERRY CT OAK BROOK WY END BLACCT 10 R AC $14,720 30,080 SLURRY SEAL W/DIGOUTS78 LONE DEER WY LONGMEADOW DR END LONDWY 10 R AC $11,657 32,466 SLURRY SEAL W/DIGOUTS78 MONTICELLI DR HIRASAKI AV PADOVA DR MONTDR 90 R AC $24,153 30,673 SLURRY SEAL W/DIGOUTS78 RAMONA WY KERN AVE AMANDA AVE RAMOWY 10 R AC/AC $16,304 32,254 SLURRY SEAL W/DIGOUTS78 RASPBERRY CT OAK BROOK WY END RASPCT 10 R AC $16,327 30,080 SLURRY SEAL W/DIGOUTS78 SNOWBERRY CT OAK BROOK WY END SNOWCT 10 R AC $14,862 30,080 SLURRY SEAL W/DIGOUTS78 TAPESTRY WY SUNRISE DR N. END TAPEWY 10 R AC $17,944 29,458 SLURRY SEAL W/DIGOUTS77 TRIMBLE CT CHURCH ST CUL DE SAC TRIMCT 10 R AC $10,146 29,458 SLURRY SEAL W/DIGOUTS77 $126,113Treatment Total CARLA WY AMANDA AV WREN AVE CARLWY 10 R AC $76,748 34,227 MILL AND THIN OVERLAY100 GEORGETOWN PL END PRINCEVALLE ST GEORPL 10 R AC $44,541 34,275 MILL AND THIN OVERLAY100 HANNA ST WELBURN AVE END HANNST 20 R AC $73,369 34,250 MILL AND THIN OVERLAY100 IRISH CT END PARISH WY IRISCT 10 R AC $24,142 34,503 MILL AND THIN OVERLAY100 LA ALONDRA WY WREN AVE WELBURN AVE LAALWY 10 R AC $68,300 34,524 MILL AND THIN OVERLAY100 MAPLE ST SEVENTH ST SIXTH ST MAPLST 10 R AC $67,262 34,535 MILL AND THIN OVERLAY100 OLD GILROY ST CHESTNUT ST CROCKER LN OLDGIL 20 R AC $111,785 34,536 MILL AND THIN OVERLAY100 ROYAL WY FILBRO DR IMPERIAL DR ROYAWY 10 R AC $18,844 33,983 MILL AND THIN OVERLAY100 SAGE HILL DR RODEO DR BENBOW DR SAGHDR 10 R AC $55,859 34,526 MILL AND THIN OVERLAY100 STEPHAN CT PRINCEVALLE ST END STEPCT 10 R AC $43,411 34,288 MILL AND THIN OVERLAY100 Scenarios Criteria: 17 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 447 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $584,261Treatment Total CALLE DEL REY LERMA LN LONG MEADOW DR CALDRY 20 C AC $157,779 26,358 MILL AND THICK OVERLAY100 EIGHTH ST PRINCEVALLE ST CHURCH ST EIGHST 30 C AC $211,898 26,429 MILL AND THICK OVERLAY100 MANTELLI DR CALLE DEL REY SANTA TERESA BLVD MANTDR 40 A AC/AC $274,997 26,164 MILL AND THICK OVERLAY100 THOMAS RD 105' N/O ALDER ST 255' S/O VINCA CT THOMRD 40 A AC $34,168 26,349 MILL AND THICK OVERLAY100 $678,842Treatment Total $4,523,156Year 2022 Total Scenarios Criteria: 18 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 448 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2023 CHESTNUT ST 505' N/O STUTZ WY 689' S/O TENTH ST CHESST 40 A AC $74,961 24,948 AC OVERLAY W/FABRIC100 MONTEREY ST LAS ANIMAS RD COHANSEY AVE MONTRD 50 A AC $710,555 24,934 AC OVERLAY W/FABRIC100 MONTEREY ST COHANSEY AVE BUENA VISTA AVE MONTRD 70 A AC $985,381 24,540 AC OVERLAY W/FABRIC100 THOMAS RD MESA RD SANTA TERESA BLVD THOMRD 10 A AC $38,946 24,558 AC OVERLAY W/FABRIC100 THOMAS RD 123' S/O WISTERIA DR 105' N/O ALDER ST THOMRD 30 A AC $123,106 24,811 AC OVERLAY W/FABRIC100 $1,932,949Treatment Total CHURCH ST FARRELL AV N. END CHURST 85 C AC $30,822 88,492 RUB CAPE SEAL W/DIGOUTS100 MESA RD GAVILAN COLLEGE THOMAS RD MESARD 10 C AC $61,410 90,141 RUB CAPE SEAL W/DIGOUTS100 MONTEREY ST EIGHTH ST SIXTH ST MONTRD 110 C AC $51,775 87,527 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR MANTELLI DR CARRIAGE DR RANHDR 10 C AC $20,001 87,729 RUB CAPE SEAL W/DIGOUTS100 SIXTH ST RR TRACKS CHESTNUT ST SIXTST 50 C AC $39,461 89,956 RUB CAPE SEAL W/DIGOUTS100 $203,469Treatment Total CARMEL ST SIXTH ST THIRD ST CARMST 40 C AC $324,471 24,926 2.5 INCH AC OVERLAY W/FABRIC 100 CHESTNUT ST LEWIS ST MURRAY ST CHESST 20 C AC $125,592 24,566 2.5 INCH AC OVERLAY W/FABRIC 100 EIGHTH ST CHURCH ST MONTEREY RD EIGHST 40 C AC $88,425 25,032 2.5 INCH AC OVERLAY W/FABRIC 100 ROSSI LN SOUTHSIDE DR MAYCOCK RD ROSSLN 10 C AC/AC $277,642 24,780 2.5 INCH AC OVERLAY W/FABRIC 100 SEVENTH ST PRINCEVALLE ST CHURCH ST SEVEST 10 C AC $320,992 24,713 2.5 INCH AC OVERLAY W/FABRIC 100 SIXTH ST WREN AVE MILLER AVE SIXTST 10 C AC $250,820 24,820 2.5 INCH AC OVERLAY W/FABRIC 100 SIXTH ST MILLER AVE PRINCEVALLE ST SIXTST 20 C AC $263,687 24,926 2.5 INCH AC OVERLAY W/FABRIC 100 $1,651,629Treatment Total COHANSEY AVE NIGHTINGALE DR END EAST COHAV 25 R AC $25,647 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 FANTAIL WAY HUMMINGBIRD LANE WREN AVE FANTL 10 R AC $4,375 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 GREENFIELD DR OAK BROOK WAY W LUCHESSA AVE GREENF 10 R AC $13,361 25,290 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 HUMMINGBIRD LANE COHANSEY AVE VICKERY AVE HUMMN 10 R AC $8,000 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 Scenarios Criteria: 19 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 449 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI NIGHTINGALE DR VICKERY AVE WREN AVE NIGHDR 10 R AC $19,248 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 ROBIN PL WREN AVE NIGHTINGALE DR ROBIPL 10 R AC $9,279 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 WINDSONG WY NIGHTINGALE DR HUMMINGBIRD LN WNDSWY 10 R AC $10,874 27,628 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 $90,784Treatment Total ANGELA CT END PRINCEVALLE ST ANGECT 10 R AC $23,083 32,989 MILL AND THIN OVERLAY100 CARLYLE CT CHURCH ST END CARLCT 10 R AC $42,205 32,654 MILL AND THIN OVERLAY100 EL TORO WY WAYLAND LN CARMEL ST ELTOWY 10 R AC $43,933 32,955 MILL AND THIN OVERLAY100 PARISH WY EL CERRITO WY WELBURN AVE PARIWY 10 R AC $67,702 32,932 MILL AND THIN OVERLAY100 QUAILWALK DR 500' SOUTH OF PEREGRINE DR EAGLE VIEW WY QUAIDR 20 R AC $73,347 32,570 MILL AND THIN OVERLAY100 RYAN CT PARISH WY CUL DE SAC RYANCT 10 R AC $41,306 33,202 MILL AND THIN OVERLAY100 TARYN LN CALABRESE WY WELBURN AV TARYLN 10 R AC $60,118 33,203 MILL AND THIN OVERLAY100 WILD IRIS DR MANTELLI DR SOUTH SIDE OF ROUNDABOUT WILIDR 10 R AC $9,999 32,943 MILL AND THIN OVERLAY100 $361,693Treatment Total MANTELLI DR KERN AVE WREN AVE MANTDR 70 A AC $386,526 25,891 MILL AND THICK OVERLAY100 UVAS PARK DR MILLER AVE TENTH ST UVAPDR 30 C AC $173,255 25,323 MILL AND THICK OVERLAY100 WESTWOOD DR THIRD ST JUNIPER DR WESTDR 30 C AC $123,704 25,485 MILL AND THICK OVERLAY100 $683,485Treatment Total $4,924,009Year 2023 Total Scenarios Criteria: 20 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 450 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2024 FARRELL AVE WREN AVE MONTEREY RD FARRAV 10 A AC $434,179 23,293 AC OVERLAY W/FABRIC100 MONTEREY ST LEAVESLEY RD PIERCE ST MONTRD 10 A AC/AC $410,013 23,347 AC OVERLAY W/FABRIC100 MONTEREY ST TENTH ST EIGHTH ST MONTRD 100 A AC $276,139 23,248 AC OVERLAY W/FABRIC100 THOMAS RD SANTA TERESA BLVD 123' S/O WISTERIA DR THOMRD 20 A AC $59,533 23,849 AC OVERLAY W/FABRIC100 WREN AVE FIRST ST 125' S/O WELBURN AVE WRENAV 10 A AC/AC $352,455 23,830 AC OVERLAY W/FABRIC100 $1,532,319Treatment Total EIGLEBERRY ST TENTH ST EIGHTH ST EIGLST 10 R AC/AC $27,254 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST EIGHTH ST SIXTH ST EIGLST 15 R AC/AC $33,917 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST SIXTH ST FOURTH ST EIGLST 20 R AC/PCC $33,146 40,988 SEAL CRACKS/SLURRY SEAL91 EIGLEBERRY ST FOURTH ST SECOND ST EIGLST 30 R AC/PCC $34,446 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST SECOND ST FIRST ST EIGLST 40 R AC/AC $14,107 43,471 SEAL CRACKS/SLURRY SEAL92 $142,870Treatment Total MONTEREY ST SIXTH ST THIRD ST MONTRD 120 C AC $71,575 85,782 RUB CAPE SEAL W/DIGOUTS100 SIXTH ST CHESTNUT ST 308 E/O CHESTNUT SIXTST 60 C AC $10,169 85,066 RUB CAPE SEAL W/DIGOUTS100 $81,744Treatment Total CARMEL ST EL CERRITO WY SHERWOOD DR CARMST 20 C AC $195,881 23,894 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST WELBURN AVE MANTELLI DR CHURST 30 C AC/AC $403,956 23,598 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST LIMAN AVE LAS ANIMAS AV CHURST 60 C AC/AC $175,850 23,267 2.5 INCH AC OVERLAY W/FABRIC 100 FOURTH ST PRINCEVALLE ST EIGLEBERRY ST FOURST 20 C AC $336,093 23,908 2.5 INCH AC OVERLAY W/FABRIC 100 MURRAY AVE I.O.O.F. AVE LEAVESLEY RD MURRAV 50 C AC $431,990 23,661 2.5 INCH AC OVERLAY W/FABRIC 100 SAN YSIDRO AVE 1064' N/O LEAVESLEY RD 1478' S/O LAS ANIMAS RD SANYAV 20 C AC $208,773 23,902 2.5 INCH AC OVERLAY W/FABRIC 100 $1,752,543Treatment Total ARBOR ST MANTELLI DR EDEN ST ARBOST 10 R AC $8,226 25,715 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BOGIALA WY MARSANNE LN DE ANZA PL BOGAWY 10 R AC $14,039 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 Scenarios Criteria: 21 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 451 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI DE ANZA PL TENTH ST LOPEZ WY DEANZ 10 R AC $9,172 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LOPEZ WY CHARLES LUX DR DE ANZA PL LOPEWY 10 R AC $16,285 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LUCHESSA AVE MILLER AVE TENTH ST/LUCHESSA AVE RAB LUCHAV 40 R AC $11,231 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MARSANNE LN BOGIALA WY LOPEZ WY MARSNN 10 R AC $5,616 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MILLER AVE SIXTH ST THIRD ST MILLAV 40 C AC/AC $54,984 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 MILLER AVE THIRD ST FIRST ST MILLAV 50 C AC/AC $50,420 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 MURRAY AVE LINCOLN CT LAS ANIMAS AVE MURRAV 20 A AC/AC $31,039 58,514 SEAL CRACKS, DIGOUTS, MICROSURFACING 78 TENTH ST/CHARLES LUX DR RAB TENTH ST NORTH TENTH ST SOUTH TENTST 55 R AC $2,663 25,607 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 THIRD ST SANTA THERESA DR MILLER AVE THIRST 10 C AC/AC $15,653 39,638 SEAL CRACKS, DIGOUTS, MICROSURFACING 79 THIRD ST MILLER AVE PRINCEVALLE ST THIRST 20 C AC/AC $18,016 28,546 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 THIRD ST WREN AVE SANTA THERESA DR THIRST 30 C AC/AC $19,210 36,307 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 WELBURN AVE HANNA ST CHURCH ST WELBAV 80B C AC/AC $16,297 33,773 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 $272,851Treatment Total CALABRESE WY END DELTA DR CALAWY 10 R AC $90,306 31,938 MILL AND THIN OVERLAY100 CATHERINE CT PRINCEVALLE ST END CATHCT 10 R AC $19,550 31,428 MILL AND THIN OVERLAY100 DARTMOUTH PL END PRINCEVALLE ST DARTPL 10 R AC $34,753 31,417 MILL AND THIN OVERLAY100 ELM ST FOREST ST SPRINGDALE ST ELMST 10 R AC $18,289 31,406 MILL AND THIN OVERLAY100 FILBRO DR ROYAL WY PRINCEVALLE ST FILBDR 10 R AC $56,323 31,428 MILL AND THIN OVERLAY100 IMPERIAL DR ROYAL WY PRINCEVALLE ST IMPEDR 10 R AC $32,120 31,725 MILL AND THIN OVERLAY100 LA SIERRA WY WAYLAND LN HANNA ST LASIWY 10 R AC $111,098 31,394 MILL AND THIN OVERLAY100 SOLIS DR OUSLEY DR DELTA DR SOLIDR 10 R AC $33,037 31,938 MILL AND THIN OVERLAY100 THIRD ST THIRD ST/SANTA TERESA BLVD ISABELLA WY THIRST 65 R AC $38,528 31,725 MILL AND THIN OVERLAY100 WEST HILLVIEW CT END TARYN LN WHILCT 10 R AC $46,270 31,938 MILL AND THIN OVERLAY100 $480,274Treatment Total LONGMEADOW DR TRAILBLAZER WY RODEO DR LONMDR 20 C AC $214,761 24,481 MILL AND THICK OVERLAY100 Scenarios Criteria: 22 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 452 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $214,761Treatment Total $4,477,362Year 2024 Total Scenarios Criteria: 23 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 453 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $25,037,108Grand Total Scenarios Criteria: 24 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 454 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Interest: .00% CITY OF GILROY Target-Driven Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Target: Overall 70 Scenario: #Increase PCI to 70 Objective: Minimum Network Average PCI Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2020 LUCHESSA AVE UVAS CREEK/LUCHESSA AVE MONTEREY RD LUCHAV 15 A AC $545,756 27,595 AC OVERLAY W/FABRIC100 MANTELLI DR SANTA TERESA BLV ZINNIA ST MANTDR 90 A AC $174,978 27,769 AC OVERLAY W/FABRIC100 TENTH ST MONTEREY RD W/O HWY 101 RAMPS TENTST 40 A AC $640,107 28,070 AC OVERLAY W/FABRIC100 WELBURN AVE CHURCH ST MONTEREY RD WELBAV 90 A AC/AC $178,934 27,381 AC OVERLAY W/FABRIC100 $1,539,775Treatment Total ALEXANDER ST NINTH ST SIXTH ST ALEXST 30 R AC/AC $40,683 68,837 SEAL CRACKS/SLURRY SEAL86 POLK CT MURRAY AVE END POLKCT 10 R AC/AC $6,474 81,986 SEAL CRACKS/SLURRY SEAL89 RANCHO HILLS CT END MANTELLI DR RANHCT 10 R AC/AC $5,645 68,991 SEAL CRACKS/SLURRY SEAL86 SIXTH ST 308 E/O CHESTNUT ST ROGERS LN SIXTST 65 R AC/AC $5,458 61,137 SEAL CRACKS/SLURRY SEAL83 $58,260Treatment Total CAMINO ARROYO GILMAN RD ARROYO CIR CAMARR 10 C AC $19,292 108,392 RUB CAPE SEAL W/DIGOUTS100 CARMEL ST FIRST ST EL CERRITO WY CARMST 10 C AC $32,690 99,995 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST SEVENTH ST FOURTH ST CHURST 100 C AC $62,755 102,030 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST FOURTH ST FIRST ST CHURST 110 C AC $61,875 98,290 RUB CAPE SEAL W/DIGOUTS100 CHURCH ST LAS ANIMAS AV 100' N/O HENNESSEY WY CHURST 70 C AC/AC $15,281 100,285 RUB CAPE SEAL W/DIGOUTS100 FOURTH ST SANTA THERESA DR MILLER DR FOURST 10 C AC $18,345 102,030 RUB CAPE SEAL W/DIGOUTS100 FOURTH ST MILLER DR PRINCEVALLE ST FOURST 15 C AC $27,207 102,030 RUB CAPE SEAL W/DIGOUTS100 KERN AVE 429' N. OF MANTELLI DR N CITY LIM KERNAV 60 C AC $29,980 97,144 RUB CAPE SEAL W/DIGOUTS100 MANTELLI DR RANCHO HILLS CALLE DEL REY MANTDR 30 C AC $38,989 111,039 RUB CAPE SEAL W/DIGOUTS100 Scenarios Criteria: 1 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 455 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI MARTIN ST MONTEREY RD CHESTNUT ST MARTST 10 C AC $33,831 106,345 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR CARRIAGE DR VALLEY OAKS DR RANHDR 20 C AC $28,226 99,806 RUB CAPE SEAL W/DIGOUTS100 RENZ LN 1085' W. OF CAMINO ARROYO CAMINO ARROYO RENZLN 20 C AC $42,870 105,316 RUB CAPE SEAL W/DIGOUTS100 THIRD ST PRINCEVALLE ST CHURCH ST THIRST 50 C AC $52,070 103,712 RUB CAPE SEAL W/DIGOUTS100 THIRD ST CHURCH ST MONTEREY RD THIRST 60 C AC $17,893 103,712 RUB CAPE SEAL W/DIGOUTS100 $481,304Treatment Total CHESTNUT ST TENTH ST EIGHTH ST CHESST 60 C AC/AC $259,637 27,582 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST HOWSON ST WELBURN AVE CHURST 20 C AC $165,655 27,952 2.5 INCH AC OVERLAY W/FABRIC 100 EIGHTH ST MILLER AVE PRINCEVALLE ST EIGHST 20 C AC $292,440 27,630 2.5 INCH AC OVERLAY W/FABRIC 100 FOREST ST LEAVESLEY RD YAMANIE DR FOREST 10 C AC $373,230 27,703 2.5 INCH AC OVERLAY W/FABRIC 100 HIRASAKI AVE MANTELLI DR LONGMEADOW DR HIRAAV 10 C AC $316,680 27,543 2.5 INCH AC OVERLAY W/FABRIC 100 KERN AVE CULP DR MANTELLI DR KERNAV 40 C AC $157,857 28,036 2.5 INCH AC OVERLAY W/FABRIC 100 LONGMEADOW DR RODEO DR SANTA TERESA BLVD LONMDR 30 C AC $151,519 27,818 2.5 INCH AC OVERLAY W/FABRIC 100 MILLER AVE SARATOGA PL UVAS PARK DR MILLAV 05 C AC $287,745 27,621 2.5 INCH AC OVERLAY W/FABRIC 100 PRINCEVALLE ST 140' N/O FILBRO DR TENTH ST PRINST 60 C AC $112,946 27,367 2.5 INCH AC OVERLAY W/FABRIC 100 SAN YSIDRO AVE LEAVESLEY RD 1064' N/O LEAVESLEY RD SANYAV 10 C AC $209,136 27,620 2.5 INCH AC OVERLAY W/FABRIC 100 WELBURN AVE MANTELLI DR RANCHO REAL WELBAV 10 C AC $107,300 27,458 2.5 INCH AC OVERLAY W/FABRIC 100 $2,434,145Treatment Total ACORN WY END VALLEY OAKS DR ACORWY 10 R AC $1,829 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 ADAMS CT MURRAY AVE END ADAMCT 10 R AC $6,034 39,770 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 ALDER ST STARLING DR THOMAS RD ALDEST 10 R AC $15,758 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ALEXANDER ST SIXTH ST LEWIS ST ALEXST 10 R AC $20,201 39,601 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 APACHE CT END RODEO DR APACCT 10 R AC $6,703 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 Scenarios Criteria: 2 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 456 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI ARAPAHO DR DURANGO LN BENBOW DR ARAPDR 10 R AC $16,894 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ARMAND CT WREN AVE END ARMACT 10 R AC $2,876 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 ASHBURY CT END ALDER ST ASHBCT 10 R AC $3,121 39,433 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 AVEZAN WAY TATUM AVE ST CLAR AVE AVEZAN 10 R AC $9,566 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 AZARA ST STONECRESS ST MANTELLI DR AZARST 10 R AC $3,796 37,418 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BABBS CREEK DR END THOMAS RD BABCDR 10 R AC $21,187 32,458 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BABBS CREEK DR 100FT WEST OF STARLING DR END WEST BABCDR 20 R AC $8,312 54,402 SEAL CRACKS, DIGOUTS, MICROSURFACING 94 BANES LN ALEXANDER ST END BANELN 10 R AC $3,307 36,084 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BANYAN CT BANYAN ST END BANYCT 10 R AC $8,886 74,331 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BANYAN CT END TEA TREE WAY BANYCT 20 R AC $1,867 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BANYAN ST LINARIA ST E END BANYST 10 R AC $8,649 39,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BENBOW DR SAGE HILL DR ARAPAHO DR BENBDR 10 R AC $9,038 38,681 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 BENNETT CT SEVERANCE ST END BENNCT 10 R AC $7,638 37,855 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 BENNETT ST CHURCH ST SEVERANCE ST BENNST 10 R AC $4,667 55,694 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 BERRYBUSH CT OAK BROOK WY END BERRYC 10 R AC $10,177 34,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 BLACKFOOT CT GERONIMO ST CUL DE SAC BLCKCT 10 R AC $5,689 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BLUEBELL DR BURCHELL RD COUNTRY DR BLUBDR 10 R AC $12,125 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BLUE HERON CT END PEREGRINE DR BLUHCT 10 R AC $4,043 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 BOLSA RD CARNADERO RD 1076' S/O TRAVEL PARK CIR BOLSRD 10 A AC $58,092 40,248 SEAL CRACKS, DIGOUTS, MICROSURFACING 71 BOSQUE ST JARDIN WY TAOS WY BOSQST 10 R AC $4,670 37,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BRAZOS ST JARDIN WY TAOS WY BRAZST 10 R AC $5,486 40,795 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 BRIARBERRY LN RANCHO HILLS DR PHEASANT DR BRIALN 10 R AC $25,538 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BRITTANY CT MANTELLI DR END BRITCT 10 R AC $6,330 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 Scenarios Criteria: 3 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 457 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI BUNTING CT SUNRISE DR CUL DE SAC BUNTIN 10 R AC $4,549 36,888 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 BUTTERCUP LN KERN AVE WESTWOOD DR BUTTLN 10 R AC $6,207 38,457 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 CALLE DEL REY MANTELLI DR LERMA LN CALDRY 10 C AC $35,663 33,555 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CAMERON BLVD HWY 152 VENTURE WY CAMBL 10 A AC $101,000 75,791 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CANOPY CT ARBOR ST END CANOCT 10 R AC $6,625 30,046 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 CANYON CT CHEYENNE DR CUL DE SAC CANYCT 10 R AC $1,512 35,500 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 CAROB CT TEA TREE WAY END CAROCT 10 R AC $8,267 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CARRIAGE DR END RANCHO HILLS DR CARRDR 10 R AC $10,208 55,694 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 CHADWICK ST HOXETT ST WENTZ DR CHADST 10 R AC $9,054 39,269 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 CHAPPELL CT END CHURCH ST CHAPCT 10 R AC $5,122 35,619 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CHERRYWOOD CT SPRIG WAY CUL DE SAC CHERCT 10 R AC $4,534 75,898 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CHESTNUT ST EIGHTH ST SIXTH ST CHESST 70 C AC/AC $30,454 62,002 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 CHEYENNE DR SADDLER WY 100' W/O NAVAJO CT CHEYDR 10 R AC $6,659 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CHARLES LUX DR GREENFIELD DR CIMINO ST CHRLUX 10 R AC $8,392 55,070 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 CHURCH ST 98' S/O RONAN LIMAN AVE CHURST 50 C AC/AC $13,412 43,172 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CIELO VISTA CT DANCING WIND WAY CUL DE SAC CIELCT 10 R AC $2,112 56,678 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CIELO VISTA LN DANCING WIND WAY DREAM CATCHER WAY CIELLN 10 R AC $15,696 59,142 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 CIMINO ST LUCHESSA AVE CHARLES LUX DR CIMNO 10 R AC $12,743 50,433 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CLARK WY CRAWFORD DR WREN AVE CLARWY 10 R AC $13,720 37,953 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 COLONY CT RANCHO HILLS DR END COLOCT 10 R AC $2,680 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 COLONY WY END RANCHO HILLS DR COLOWY 10 R AC $9,528 58,140 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 COLUMBINE CT MANTELLI DR END COLUCR 10 R AC $7,026 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COMANCHE ST SUNRISE DR PUBELO COMAST 10 R AC $9,529 53,890 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 Scenarios Criteria: 4 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 458 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI CONCORD PL NINTH ST END CONCPL 10 R AC $4,944 38,752 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 CONNELL CT LAS ANIMAS AV END CONNCT 10 R AC $4,744 36,886 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 COOPER PL JICARRILLA PL SUNRISE DR COOPPL 10 R AC $7,405 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CORAL BELL CT END PERIWINKLE DR CORACT 10 R AC $4,094 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COUNTRY DR END STRAWBERRY LN COUNDR 10 R AC $9,894 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COUNTRY DR STRAWBERRY LN SUNFLOWER CIR COUNDR 20 R AC $12,445 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COUNTRY DR SUNFLOWER CIR MANTELLI DR COUNDR 30 R AC $9,156 38,680 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 COYOTE MOON LN DREAM CATCHER WAY SUNRISE DR COYOLN 10 R AC $16,698 52,213 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 CRAWFORD CT CRAWFORD DR END CRAWCT 10 R AC $2,958 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 CRAWFORD DR SANTA PAULA DR END CRAWDR 10 R AC $18,994 39,268 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 CREST HILL CT RANCHO HILLS DR END CREHCT 10 R AC $7,684 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CREST HILL WY END RANCHO HILLS DR CREHWY 10 R AC $25,886 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 CUMBERLAND DR MILLER AVE ORCHARD DR CUMBDR 10 R AC $15,360 39,767 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 CYPRESS CT END PONDEROSA DR CYPREC 10 R AC $6,347 32,399 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 CYPRESS CT PONDEROSA DR LAUREL DR CYPREC 20 R AC $8,040 39,434 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 DAFODIL PL MANTELLI DR ZINNIA ST DAFOPL 10 R AC $10,329 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 DANCING WIND WY RANCHO HILLS DRIVE CIELO VISTA LAND DANCWY 10 R AC $8,221 50,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 DEL RIO CIR SANTA FE DR SANTA FE DR DELRIO 10 R AC $9,306 38,461 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 DESERT BLOOM PL O'KEEFE LANE SUNRISE DRIVE DESEPL 10 R AC $11,265 61,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 DOVE CT CREST HILL WY END DOVECT 10 R AC $5,432 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 DOVETAIL WAY RANCHO HILLS DR END DOVETA 10 R AC $22,788 57,958 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 DREAM CATCHER WY CIELO VISTA WAY SUNRISE DRIVE DREAWY 10 R AC $11,122 54,391 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 DURANGO LN WAGON WY ARAPAHO DR DURALN 10 R AC $8,743 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 Scenarios Criteria: 5 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 459 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI EAGLE HILLS WY BLANKWING WY 300' S/O PEREGRINE DR EAGHWY 10 R AC $14,560 35,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 EAGLE HILLS WY 300' S/O PEREGRINE DR PEREGRINE DR EAGHWY 20 R AC $4,667 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 EAGLE`S NEST LN EAGLE HILLS WY 324' N/O EAGLE HILLS WY EAGNLN 10 R AC $4,896 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 EAGLE`S NEST LN 324' N/O EAGLE HILLS WY PEREGRINE DR EAGNLN 20 R AC $16,759 37,855 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 EAGLE VIEW WY LONGMEADOW DR 241' N/O QUAILWALK DR EAGVWY 10 R AC $13,827 36,888 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 EAGLE VIEW WY 241' N/O QUAILWALK DR PEREGRINE DR EAGVWY 20 R AC $7,375 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 EDEN ST WREN AV FLORAL ST EDENST 10 R AC $20,596 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 ELECTA CT LAS ANIMAS AVE CUL DE SAC ELECCT 10 R AC $9,328 62,562 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 EL INVIERNO DR WREN AVE EL VERANO WY ELINDR 10 R AC $4,473 32,282 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 EL VERANO WY LA PRIMAVERA WY EL INVIERNO DR ELVEWY 10 R AC $9,460 34,097 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 ERVIN CT MONTEREY ROAD CUL DE SAC ERVICT 10 R AC $3,703 51,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 FELLOM CT MURRAY AV END FELLCT 10 R AC $7,312 38,734 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 FERAGALLI CT HIRASAKI DR CUL DE SAC FERACT 10 R AC $7,813 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 FESTA AGLIO CT HIRASAKI DR CUL DE SAC FESTCT 10 R AC $9,354 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 FESTA AGLIO DR HIRASAKI AV PADOVA DR FESTDR 90 R AC $13,969 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 FILICE DR SOUTH END NORTH END FILIDR 10 R AC $44,215 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 FINCH LN TWINBERRY WY LOGANBERRY DR FINCLN 10 R AC $9,158 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 FINE DR RIDGEWAY DR LEARNARD WY FINEDR 10 R AC $3,159 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 FLORAL ST EDEN ST MANTELLI DR FLORST 10 R AC $9,629 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 FORUNATA PL FOREST ST GENNARO WAY FORTPL 10 R AC $3,414 68,305 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 FOXGLOVE CT END WILD IRIS DR FOXGCT 10 R AC $5,017 36,621 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 FREEMAN CT LAS ANIMAS RD END FREECT 10 R AC $10,805 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GARFIELD CT MURRAY AV END GARFCT 10 R AC $7,283 35,664 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 Scenarios Criteria: 6 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 460 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI GASCONY CT AVEZON WAY CUL DE SAC GASCON 10 R AC $2,705 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GENNARO WY LEWIS ST FORTUNATA PLACE GENNWY 10 R AC $6,045 62,513 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GERONIMO ST ZUNI LANE SHOSHONE STREET GEROST 10 R AC $17,892 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 GOLD FINCH CT SPARROW GLEN WAY CUL DE SAC GOLDFI 10 R AC $3,514 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 GOLDEN SKY WY DREAM CATCHER WAY SUNRISE DRIVE GOLDWY 10 R AC $10,548 56,678 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 GOSHAWK CT END LOGANBERRY DR GOSHCT 10 R AC $7,827 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GRANT CT MURRAY AVE END GRANCT 10 R AC $6,239 35,660 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GRANDE DR CHEYENNE DR SPRIG WAY GRANDR 10 R AC $4,480 53,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 GREENFIELD DR LUCHESA AV N END GATE GREEDR 90 C AC $11,563 41,682 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 GREYSTONE CT KERN AVE END GREYCT 10 R AC $7,963 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 HADLEY CT END ROGERS LN HADLCT 10 R AC $10,551 39,769 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 HAWTHORNE ST WISTERIA DR ALDER ST HAWTST 10 R AC $3,267 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 HAYFIELD ST POPPYFIELD ST GREENFIELD DR HAYFIE 10 R AC $7,813 34,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 HERITAGE WY LIONS CREEK DR SOLEDAD ST HERIWY 10 R AC $5,336 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 HERSMAN DR SANTA BARBARA DR STEWART DR HERSDR 10 R AC $15,369 39,551 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 HIRASAKI AVE LONG MEADOW DR END HIRAAV 20 C AC $7,200 35,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 HIRASAKI CT MANTELLI DR CUL DE SAC HIRACT 10 R AC $7,163 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 HOLLYHOCK CT HOLLYHOCK LN CUL DE SAC HLLYCT 10 R AC $3,467 74,280 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 HOGAN WY END SADDLER DR HOGAWY 10 R AC $10,898 39,213 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 HOLLYHOCK LN MANTELLI DR HOLLYHOCK CT HOLLLN 10 R AC $17,334 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 HONEY CT FLORAL ST END HONECT 10 R AC $3,364 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 HOOVER CT END ROGERS LN HOOVCT 10 R AC $6,894 39,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 HOPI LN SUNRISE DR O'KEEFE CT HOPILN 10 R AC $10,687 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 Scenarios Criteria: 7 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 461 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI IRONBARK ST STONECRESS ST MANTELLI DR IRONST 10 R AC $4,018 39,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 JACARANDA WY SOUTH END NORTH END JACAWY 10 R AC $12,023 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 JACKDOW CT END EAGLE`S NEST LN JACKCT 10 R AC $3,076 32,160 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 JARDIN WY BRAZOS ST BOSQUE ST JARDWY 10 R AC $5,547 58,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 JICARILLA PL EAGLE VIEW WAY COOPER PL JCAPL 10 R AC $9,672 53,890 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 KENNEDY CT MURRAY AV END KENNCT 10 R AC $7,958 38,734 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 KESTREL CT CREST HILL DR END KESTCT 10 R AC $3,076 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 KIOWA CT JICARILLA PL CUL DE SAC KIOWCT 10 R AC $3,414 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 KISHIMURA DR FOREST ST MURRAY AV KISHST 10 R AC $15,968 60,360 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 KITE DR PEREGRINE DR SUNRISE DR KITEDR 10 R AC $3,461 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 KOSHARE PL COMANCHE ST SHOSHONE ST KOSHPL 10 R AC $10,956 47,858 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LA PRIMAVERA WY WREN AVE TAOS WAY LAPRWY 10 R AC $12,648 38,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LAREDO WY SUNRISE DR RIO GRANDE WY LAREWY 10 R AC $6,456 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 LARIAT DR SAGE HILL DR ARAPAHO DR LARIDR 10 R AC $10,220 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LAS ANIMAS AV MONTEREY RD ROAD NARROWS LASAAV 30 R AC $9,097 38,732 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LEARNARD WY MANTELLI DR BRENTWOOD LN LEARWY 10 R AC $8,523 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 LILLY AVE LIMAN AVE RONAN AVE LILLAV 20 R AC $4,505 35,615 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 LINARIA ST BANYAN ST OLEA CT LINAST 10 R AC $3,503 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 LINCOLN CT MURRAY AV END LINCCT 10 R AC $8,039 39,664 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 LINNET CT DOVETAIL WAY CUL DE SAC LINNET 10 R AC $6,105 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 LISA CT END NICOLE WY LISACT 10 R AC $4,748 38,770 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 LOGANBERRY DR PARTRIDGE DR PHEASANT DR LOGADR 10 R AC $20,703 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LONGMEADOW CT RANCHO HILLS DR W END LONGCT 10 R AC $17,500 32,656 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 Scenarios Criteria: 8 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 462 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI LONGMEADOW DR RANCHO HILLS DR TRAILBLAZER WY LONMDR 10 C AC $22,000 33,556 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 LONGMEADOW DR SANTA TERESA BLVD HIRASAKI DR LONMDR 40 C AC $10,854 35,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LOS PADRES CT SAN MIGUEL ST END LOSPCT 10 R AC $8,384 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 LUCHESSA AVE THOMAS DR GREENFIELD DR LUCHAV 10 A AC $68,196 46,570 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 LUCHESSA AVE CIMINO ST GREENFIELD DR LUCHAV 60 R AC $18,169 70,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MADISON CT MURRAY AV END MADICT 10 R AC $7,362 35,660 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 MANTELLI DR END LARKSPUR LN MANTDR 10 C AC $77,748 35,105 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 MANTELLI DR LARKSPUR LN RANCHO HILLS MANTDR 20 C AC $35,068 35,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 MARTIRI DR HIRASAKI AV PADOVA DR MARTDR 90 R AC $9,334 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 MARTIRI CT HIRASAKI DR CUL DE SAC MARTIR 10 R AC $6,725 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 MIMOSA CT BANYAN CT END MIMOCT 10 R AC $5,180 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 MOCKINGBIRD LN RED HAWK DR PHEASANT DR MOCKDR 10 R AC $6,710 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MONTICELLI CT HIRASAKI DR CUL DE SAC MONTCT 10 R AC $5,909 32,160 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MORO CT HIRASAKI DR CUL DE SAC MOROCT 10 R AC $8,327 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 MORO DR HIRASAKI AV PADOVA DR MORODR 90 R AC $8,523 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 MURAOKA DR NAGAREDA DR YAMANE DR MURAOK 010 R AC $19,620 37,005 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 NAGAREDA DR FOREST DR MURAOKA DR NAGARE 010 R AC $10,520 37,928 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 NAVAJO CT CHEYENNE DR CUL DE SAC NAVACT 10 R AC $1,814 35,500 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 NECTAR CT END FLORAL ST NECTCT 10 R AC $2,892 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 NORTH EGRET CT CREST HILL DR END NEGRCT 10 R AC $2,683 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 NICOLE CT END NICOLE WY NICOCT 10 R AC $4,336 39,825 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 NICOLE WY MESA RD CARIGNANE DR NICOWY 10 R AC $15,776 39,618 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 NINTH ST VALLEY FORGE DR PRINCEVALLE ST NINTST 10 R AC $16,116 37,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 Scenarios Criteria: 9 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 463 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI NONAME UNO AVE LAS ANIMAS RD ADDRESS' 9850 NO. UNO NONUAV 10 A AC $56,100 43,252 SEAL CRACKS, DIGOUTS, MICROSURFACING 75 OAK CT HANNA ST HANNA ST OAKCR 10 R AC $6,036 39,669 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 OHLONE WAY SUNRISE DR SPRIG WAY OHLONE 10 R AC $6,408 35,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 OKEEFE CT HOPI LN E. END CDS OKEECT 10 R AC $9,847 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 ORCHARD DR TENTH ST 95' N/O DEARBORN PL ORCHDR 10 R AC $12,926 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 ORINDA WY MARIPOSA ST LONG MEADOW DR ORINWY 10 R AC $9,536 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 PADOVA DR SORRENTO DR MORO DR PADODR 90 R AC $13,767 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 PADOVA DR SIENA CT SORRENTO DR PADOVA 10 R AC $14,326 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PARTRIDGE DR END CALLE DEL REY PARTDR 10 R AC $15,736 36,886 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 PEACOCK CT CALLE DEL REY END PEAKCT 10 R AC $3,816 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 PEREGRINE DR RANCHO HILLS DR EAGLE VIEW WY PEREDR 10 R AC $25,568 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PERIWINKLE DR END MANTELLI DR PERIDR 10 R AC $8,063 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 PHEASANT DR THISTLE WY CALLE DEL REY PHEADR 10 R AC $22,667 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 PONDEROSA DR THIRD ST CYPRESS CT PONDDR 10 R AC $12,534 38,752 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 PRAIRIE OWL CT SPRIG WY N. END CDS PRAICT 10 R AC $4,340 67,108 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 PUEBLO CT ZUNI LN W. END PUEBCT 10 R AC $6,828 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 QUAILWALK DR PEREGRINE DR 500' SOUTH OF PEREGRINE DR QUAIDR 10 R AC $7,556 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 RANCHO HILLS DR LONGMEADOW DR 347' N/O LONGMEADOW DR RANHDR 40 C AC $7,634 35,863 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 RANCHO HILLS DR 347' N/O LONGMEADOW DR END RANHDR 50 C AC $65,472 35,863 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 RED HAWK DR MOCKINGBIRD LN CALLE DEL REY REDHDR 10 R AC $7,783 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 RIDGEWAY DR RANCHO HILLS DR FINE DR RIDGDR 10 R AC $13,056 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 RIO GRANDE WY LAREDO WY SEDONA WY RIGRWY 10 R AC $8,024 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ROCKROSE CT LARKSPUR LN END ROCKCT 10 R AC $4,054 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 Scenarios Criteria: 10 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 464 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI ROGERS LN SIXTH ST LEWIS ST ROGELN 10 R AC $17,067 39,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 RONAN AVE WREN AVE CHURCH ST RONAAV 10 R AC $21,560 38,715 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SADDLER DR WAGON WY SPRIG WY SADDL 10 R AC $15,447 58,997 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 SAGEWOOD CT RED HAWK DR NORTH END (CUL-DE- SAC) SAGECT 10 R AC $2,872 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SANTA INEZ CT SAN MIGUEL ST END SANICT 10 R AC $8,467 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 SANTA FE DR TAOS WY CHURCH ST SANTFE 10 R AC $6,793 39,463 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 SEDONA WY SUNRISE DR RIO GRANDE WY SEDOWY 10 R AC $6,472 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 SOUTH EGRET CT END CREST HILL DR SEGRCT 10 R AC $2,940 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SENEGAL CT CUL DE SAC LOGANBERRY DR SENECT 10 R AC $7,163 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SHOOTING STAR CT HOLLYHOCK LANE CUL DE SAC SHOOCT 10 R AC $3,631 77,687 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 SHOSHONE WY KOSHARE STREET PUBELO COURT SHOSWY 10 R AC $4,831 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SIENA DR HIRASAKI DR SORRENTO CT SIENAD 10 R AC $10,261 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 SIENA CT HIRASAKI DR CUL DE SAC SIENCT 10 R AC $9,838 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 SIXTH ST PRINCEVALLE ST CHURCH ST SIXTST 30 C AC/AC $48,150 61,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 SIXTH ST EIGLEBERRY RD RR TRACKS SIXTST 45 C AC/AC $12,348 42,565 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SAN JUSTO ROAD MILLER RD END SNJURD 10 R AC $14,934 71,994 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SOLANA DR VALBUSA DR LONGMEADOW DR SOLADR 10 R AC $13,440 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SOLEDAD ST HERTIAGE WY 248' S/O LERMA LN SOLEST 10 R AC $4,851 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SOLEDAD ST 248' S/O LERMA LN LERMA LN SOLEST 20 R AC $3,858 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 SORRENTO CT HIRASAKI DR CUL DE SAC SORRCT 10 R AC $10,820 32,160 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 SORRENTO DR HIRASAKI DR PADOVA DR SORRDR 10 R AC $11,696 60,547 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 SPARROW GLEN WAY DOVETAIL WAY SUNRISE DR SPARGL 10 R AC $9,853 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SPENCER CT MANTELLI DR CUL DE SAC SPENCT 10 R AC $11,328 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 Scenarios Criteria: 11 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 465 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI SPRIG WY SADDLER WY RODEO DR SPRIWY 20 R AC $13,026 63,306 SEAL CRACKS, DIGOUTS, MICROSURFACING 84 STARLING DR ALDER ST BABBS CREEK DR STARDR 10 R AC $6,269 60,249 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 ST CLAR AVE KERN AVE AVEZAN WAY STCLAR 10 R AC $5,758 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 ST FRANCIS CT SAN MIGUEL ST END STFRCT 10 R AC $8,582 37,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 STONECRESS ST COUNTRY DR BANYAN ST STONST 10 R AC $19,964 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 SUNFLOWER CIR WEST END STRAWBERRY LN SUNCIR 10 R AC $3,814 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 SUNFLOWER CIR STRAWBERRY LN COUNRTY DR SUNCIR 20 R AC $13,538 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 SWALLOW LN TWINBERRY WY LOGANBERRY DR SWALLN 10 R AC $9,868 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 TAOS WAY RONAN AVE LA PRIMAVERA WAY TAOSWY 10 R AC $9,964 35,617 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 TAOS WAY TAOS WAY END TAOSWY 20 R AC $1,844 35,617 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 TATUM AVE KERN AVE AVEZAN WAY TATUMA 10 R AC $5,894 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 TEAL CT END VINCA CT TEALCT 10 R AC $3,208 57,700 SEAL CRACKS, DIGOUTS, MICROSURFACING 81 TEA TREE CT CREST HILL WAY END TEATCT 10 R AC $5,882 58,600 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 TEA TREE WY TEA TREE COURT END TEATWY 10 R AC $14,579 63,586 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 TENTH ST 150 E/O ROSANNA ST MONTEREY RD TENTST 30 A AC $31,926 44,966 SEAL CRACKS, DIGOUTS, MICROSURFACING 78 THIRD ST COBBLESTONE CT/THIRD ST RAB 470FT W/O ROSEMARY WY THIRST 100 R AC $25,667 50,204 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 THIRD ST ISABELLA WY COBBLESTONE CT/THIRD ST RAB THIRST 70 R AC $5,334 44,210 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 COBBLESTONE CT/THIRD ST RAB THIRD ST THIRD ST THIRST 75 R AC $1,849 54,590 SEAL CRACKS, DIGOUTS, MICROSURFACING 94 THISTLE WY PHEASANT DR BRIARBERRY LN THISWY 10 R AC $3,385 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 THOMAS RD 675' N/O OAK BROOK WY LUCHESSA AVE THOMRD 60 A AC $3,383 39,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 TWINBERRY WY FINCH LN SWALLOW LN TWINWY 10 R AC $3,400 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 UVAS PARK DR THIRD ST LAUREL DR UVAPDR 10 C AC $18,784 34,025 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 VALBUSA DR SOLANA DR JACARANDA WY VALBDR 10 R AC $14,265 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 Scenarios Criteria: 12 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 466 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI VALLEY FORGE DR TENTH ST NINTH ST VALFDR 10 R AC $9,752 37,043 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 VALLEY OAKS CT CREST HILL DR END VALOCT 10 R AC $6,196 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 VALLEY OAKS DR CREST HILL DR RANCHO HILLS DR VALODR 10 R AC $25,176 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 VENTURE WY CAMINO ARROYO CAMERON BLVD VENTWY 10 C AC $27,016 51,879 SEAL CRACKS, DIGOUTS, MICROSURFACING 87 VICKERY AVE NIGHTINGALE DR WREN AVE VICKAV 20 R AC $10,112 46,438 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 VIOLET WY KELTON DR CUL DE SAC VIOLWY 10 R AC $11,838 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 WEAVER CT END WOODWORTH WY WEAVCT 10 R AC $4,024 37,901 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 WILDROSE CT SUNFLOWER CIR CUL DE SAC WILDCT 10 R AC $3,316 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 WILD IRIS DR SOUTH SIDE OF ROUNDABOUT LAVENDER WAY WILIDR 20 R AC $7,823 65,311 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 WILLY CT MURRAY AV CUL DE SAC WILYCT 10 R AC $6,970 39,601 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 WISTERIA DR HAWTHORNE ST THOMAS RD WISTDR 10 R AC $8,176 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 WREN AVE CITY LIMITS END NORTH WRENAV 100 A AC $30,000 27,867 SEAL CRACKS, DIGOUTS, MICROSURFACING 94 WREN AVE 125' S/O WELBURN AVE 125' S/O LAWRENCE DR WRENAV 20 A AC/AC $28,488 79,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 WREN AVE 125' S/O LAWRENCE DR MANTELLI DR WRENAV 30 A AC/AC $34,069 56,460 SEAL CRACKS, DIGOUTS, MICROSURFACING 82 WREN AVE MANTELLI DR RONAN AVE WRENAV 40 A AC $14,549 43,252 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 WREN AVE RONAN AVE TATUM AVE WRENAV 50 A AC $19,393 45,011 SEAL CRACKS, DIGOUTS, MICROSURFACING 78 WREN AVE FARREL DR CITY LIMITS WRENAV 65 A AC $16,293 46,870 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 YUCCA CT CHEYENNE DR CUL DE SAC YUCCCT 10 R AC $1,778 49,369 SEAL CRACKS, DIGOUTS, MICROSURFACING 89 ZINNIA ST VIOLET WY MANTELLI DR ZINNST 10 R AC $4,736 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 ZINNIA ST MANTELLI DR DAFFODIL PL ZINNST 20 R AC $12,316 39,576 SEAL CRACKS, DIGOUTS, MICROSURFACING 85 ZUNI LN SUNRISE DR PUEBLO CT ZUNILN 10 R AC $10,624 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 $2,974,904Treatment Total BLACKWING WY RANCHO HILLS DR EAGLE HILLS WY BLACWY 10 R AC $12,787 28,672 SLURRY SEAL W/DIGOUTS71 Scenarios Criteria: 13 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 467 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI OUSLEY DR MUIR DR SOLIS DR OUSLDR 10 R AC/AC $20,328 32,071 SLURRY SEAL W/DIGOUTS78 TRAVEL PARK CIR BOLSA RD MONTEREY RD TRAPCR 10 R AC $32,430 32,009 SLURRY SEAL W/DIGOUTS78 $65,545Treatment Total ARNOLD DR WAYLAND LN END ARNODR 10 R AC $126,034 38,654 MILL AND THIN OVERLAY100 CYPRESS CT WEST WOOD DR CUL DE SAC CYPRCT 10 R AC $120,889 38,103 MILL AND THIN OVERLAY100 DELTA CT END DELTA DR DELTCT 10 R AC $18,323 37,986 MILL AND THIN OVERLAY100 DELTA DR EL DORADO DR MANTELLI DR DELTDR 10 R AC $169,840 38,635 MILL AND THIN OVERLAY100 DRIFTWOOD TER WESTWOOD DR JUNIPER DR DRIFTR 10 R AC $92,336 39,024 MILL AND THIN OVERLAY100 EL CAMINITO LERMA LN LONG MEADOW DR ELCAMI 10 R AC $81,667 37,892 MILL AND THIN OVERLAY100 EL CERRITO WY PARISH WY WREN AVE ELCEWY 10 R AC $51,472 38,224 MILL AND THIN OVERLAY100 EL CERRITO WY WREN AVE WAYLAND LN ELCEWY 20 R AC $92,665 38,244 MILL AND THIN OVERLAY100 EL TORO WY HANNA ST LA COCHE WY ELTOWY 20 R AC $23,516 36,941 MILL AND THIN OVERLAY100 FAIRVIEW DR PRINCEVALLE ST HANNA ST FAIRDR 10 R AC $87,320 38,266 MILL AND THIN OVERLAY100 GARY ST LAWRENCE DR WREN AVE GARYST 10 R AC $84,196 37,749 MILL AND THIN OVERLAY100 GLENWOOD DR EL CERRITO WY WELBURN AVE GLENDR 10 R AC $51,554 38,244 MILL AND THIN OVERLAY100 HACIENDA DR ORTEGA CIR END HACIDR 10 R AC $98,325 38,266 MILL AND THIN OVERLAY100 HANNA ST FIRST ST WELBURN AVE HANNST 10 R AC $229,263 38,653 MILL AND THIN OVERLAY100 KELTON DR FIRST ST SWANER DR KELTDR 10 R AC $96,523 38,825 MILL AND THIN OVERLAY100 KELTON DR SWANER DR VIOLET WY KELTDR 20 R AC $114,723 38,824 MILL AND THIN OVERLAY100 LEXINGTON PL END PRINCEVALLE ST LEXIPL 10 R AC $52,938 38,470 MILL AND THIN OVERLAY100 LUPINE CT END LIONS CREEK DR LUPICT 10 R AC $30,247 38,369 MILL AND THIN OVERLAY100 MAYLOCK RD END OBATA WY MAYLRD 10 R AC $79,192 38,623 MILL AND THIN OVERLAY100 MILLER AVE SANTA TERESA BLVD UVAS PARK DR MILLAV 10 R AC $363,760 38,276 MILL AND THIN OVERLAY100 MONTE BELLO DR SANTA BARBARA DR WREN AVE MONBDR 10 R AC $125,472 37,529 MILL AND THIN OVERLAY100 NINTH ST CHURCH ST MONTEREY RD NINTST 30 R AC $54,720 38,028 MILL AND THIN OVERLAY100 ORCHARD DR CUMBERLAND DR SIXTH ST ORCHDR 40 R AC $31,200 37,093 MILL AND THIN OVERLAY100 PERRELLI ST WREN AVE FILICE DR PERRST 10 R AC $84,525 38,856 MILL AND THIN OVERLAY100 REA ST FOURTH ST SECOND ST REAST 10 R AC $90,960 36,968 MILL AND THIN OVERLAY100 SANTA BARBARA DR HERSMAN DR 130' S/O SAN MIGUEL DR SANBDR 10 R AC $38,727 38,267 MILL AND THIN OVERLAY100 SANTA BARBARA DR THIRD ST MONTE BELLO DR SANBDR 30 R AC $67,669 38,673 MILL AND THIN OVERLAY100 SHERWOOD DR WAYLAND LN END SHERDR 10 R AC $123,567 38,653 MILL AND THIN OVERLAY100 STONEY CT END SIXTH ST STONCT 10 R AC $36,329 37,244 MILL AND THIN OVERLAY100 WESTWOOD DR S END THIRD ST WESTDR 20 R AC $94,145 37,529 MILL AND THIN OVERLAY100 Scenarios Criteria: 14 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 468 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $2,812,097Treatment Total CAMINO ARROYO PACHECO PASS RD GILMAN RD CAMARR 95 C AC $642,334 27,260 MILL AND THICK OVERLAY100 GILMAN RD ROGERS 560' E/O CAMINO ARROYO GILMRD 10 A AC $280,267 27,485 MILL AND THICK OVERLAY100 WREN AVE TATUM AVE FARREL AVE WRENAV 60 A AC $162,190 27,995 MILL AND THICK OVERLAY100 WREN AVE UVAS PARK DR SIXTH ST WRENAV 70 A AC/AC $144,160 27,277 MILL AND THICK OVERLAY100 $1,228,951Treatment Total $11,594,981Year 2020 Total Scenarios Criteria: 15 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 469 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2021 CHESTNUT ST 505' N/O STUTZ WY 689' S/O TENTH ST CHESST 40 A AC $69,306 26,093 AC OVERLAY W/FABRIC100 MONTEREY ST LAS ANIMAS RD COHANSEY AVE MONTRD 50 A AC $656,948 26,072 AC OVERLAY W/FABRIC100 MONTEREY ST BUENA VISTA AVE NORTH CITY LIMITS MONTRD 80 A AC $883,372 26,398 AC OVERLAY W/FABRIC100 WELBURN AVE KERN AVE WREN AVE WELBAV 60 A AC $436,509 26,528 AC OVERLAY W/FABRIC100 $2,046,135Treatment Total KERN AVE MANTELLI DR 429' N/O MANTELLI DR KERNAV 50 C AC $14,166 95,257 RUB CAPE SEAL W/DIGOUTS100 WAYLAND LN EL CERRITO WY CUL DE SAC WAYLLN 20 C AC $48,680 97,362 RUB CAPE SEAL W/DIGOUTS100 $62,846Treatment Total ARROYO CIR CAMINO ARROYO LEAVESLEY RD ARROCR 20 C AC $266,333 26,412 2.5 INCH AC OVERLAY W/FABRIC 100 CARMEL ST SIXTH ST THIRD ST CARMST 40 C AC $299,992 25,964 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST LONDON DR TENTH ST CHURST 121 C AC $216,603 26,557 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST LUCHESSA AVE LONDON DR CHURST 125 C AC $296,239 26,557 2.5 INCH AC OVERLAY W/FABRIC 100 EIGHTH ST CHURCH ST MONTEREY RD EIGHST 40 C AC $81,754 26,134 2.5 INCH AC OVERLAY W/FABRIC 100 FARMAN FRONTAGE RD 2818 S/O FARMMAN LN FARMAN LN FARFRD 10 C AC $292,747 26,701 2.5 INCH AC OVERLAY W/FABRIC 100 SEVENTH ST CHURCH ST MONTEREY RD SEVEST 20 C AC $120,319 26,556 2.5 INCH AC OVERLAY W/FABRIC 100 SIXTH ST MILLER AVE PRINCEVALLE ST SIXTST 20 C AC $243,794 25,964 2.5 INCH AC OVERLAY W/FABRIC 100 $1,817,781Treatment Total TENTH ST PRINCEVALLE ST 150' E/O ROSANNA ST TENTST 20 A AC $58,009 42,451 SEAL CRACKS, DIGOUTS, MICROSURFACING 77 $58,009Treatment Total OTOOLE CT PETERSEN DR END OTOOCT 10 R AC $5,255 31,177 SLURRY SEAL W/DIGOUTS78 $5,255Treatment Total DAWN WY END MESA RD DAWNWY 10 R AC $86,140 35,311 MILL AND THIN OVERLAY100 LA PALOMA WY WREN AVE WELBURN AVE LAPAWY 10 R AC $84,828 35,860 MILL AND THIN OVERLAY100 Scenarios Criteria: 16 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 470 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI MARIA WY AMANDA WY WREN AVE MARIWY 10 R AC $70,291 35,838 MILL AND THIN OVERLAY100 NINTH ST PRINCEVALLE ST CHURCH ST NINTST 20 R AC $159,097 35,604 MILL AND THIN OVERLAY100 TATUM AVE WREN AVE KERN AVE TATUMA 20 R AC $62,400 35,629 MILL AND THIN OVERLAY100 VISTA DEL SUR GATE RANCHO REAL VISDLS 10 R AC $9,707 35,895 MILL AND THIN OVERLAY100 $472,463Treatment Total ARROYO CIR CAMINO ARROYO CAMINO ARROYO ARROCR 10 A AC $718,200 27,188 MILL AND THICK OVERLAY100 CALLE DEL REY LERMA LN LONG MEADOW DR CALDRY 20 C AC $151,710 26,370 MILL AND THICK OVERLAY100 CHURCH ST FIRST ST HOWSON ST CHURST 10 C AC $158,624 27,155 MILL AND THICK OVERLAY100 EIGHTH ST PRINCEVALLE ST CHURCH ST EIGHST 30 C AC $203,748 26,450 MILL AND THICK OVERLAY100 KERN AVE FIRST ST WELBURN AVE KERNAV 20 C AC $187,917 27,119 MILL AND THICK OVERLAY100 THOMAS RD 105' N/O ALDER ST 255' S/O VINCA CT THOMRD 40 A AC $32,854 26,037 MILL AND THICK OVERLAY100 $1,453,053Treatment Total $5,915,542Year 2021 Total Scenarios Criteria: 17 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 471 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2022 MONTEREY ST COHANSEY AVE BUENA VISTA AVE MONTRD 70 A AC $947,482 25,051 AC OVERLAY W/FABRIC100 THOMAS RD MESA RD SANTA TERESA BLVD THOMRD 10 A AC $37,448 25,072 AC OVERLAY W/FABRIC100 THOMAS RD SANTA TERESA BLVD 123' S/O WISTERIA DR THOMRD 20 A AC $55,042 24,881 AC OVERLAY W/FABRIC100 THOMAS RD 123' S/O WISTERIA DR 105' N/O ALDER ST THOMRD 30 A AC $118,371 25,397 AC OVERLAY W/FABRIC100 WREN AVE FIRST ST 125' S/O WELBURN AVE WRENAV 10 A AC/AC $325,865 24,864 AC OVERLAY W/FABRIC100 $1,484,208Treatment Total CAMINO ARROYO ARROYO CIR END CAMARR 20 C AC $44,564 94,637 RUB CAPE SEAL W/DIGOUTS100 CAMINO ARROYO VENTURE WAY PACHECO PASS RD CAMARR 90 C AC $134,540 87,920 RUB CAPE SEAL W/DIGOUTS100 CHESTNUT ST SIXTH ST END CHESST 10 C AC $34,440 94,628 RUB CAPE SEAL W/DIGOUTS100 FOREST ST EIGHTH ST SIXTH ST FOREST 60 C AC $36,631 92,779 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR VALLEY OAKS DR LONG MEADOW DR RANHDR 30 C AC $49,726 94,388 RUB CAPE SEAL W/DIGOUTS100 RENZ LN CAMINO ARROYO CUL DE SAC EAST RENZLN 30 C AC $56,496 94,637 RUB CAPE SEAL W/DIGOUTS100 $356,397Treatment Total CHESTNUT ST LEWIS ST MURRAY ST CHESST 20 C AC $120,761 25,034 2.5 INCH AC OVERLAY W/FABRIC 100 ROSSI LN SOUTHSIDE DR MAYCOCK RD ROSSLN 10 C AC/AC $266,963 25,381 2.5 INCH AC OVERLAY W/FABRIC 100 SEVENTH ST PRINCEVALLE ST CHURCH ST SEVEST 10 C AC $308,646 25,216 2.5 INCH AC OVERLAY W/FABRIC 100 SIXTH ST WREN AVE MILLER AVE SIXTST 10 C AC $241,173 25,354 2.5 INCH AC OVERLAY W/FABRIC 100 $937,543Treatment Total CHARLES LUX DR CIMINO ST TENTH ST/CHARLES LUX DR RAB CHRLUX 20 R AC $10,816 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 CINNAMON WY PEPPERMINT ST CULDESAC SOUTH CINNMN 10 R AC $21,075 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 CLOVE PL CINNAMON ST COBBLESTONE CT CLOVPL 10 R AC $4,000 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 COBBLESTONE CT THIRD ST PEPPERMINT ST COBBSTN 10 R AC $18,844 50,813 SEAL CRACKS, DIGOUTS, MICROSURFACING 94 COHANSEY AVE NIGHTINGALE DR END EAST COHAV 25 R AC $24,661 25,003 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 FANTAIL WAY HUMMINGBIRD LANE WREN AVE FANTL 10 R AC $4,207 25,003 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 Scenarios Criteria: 18 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 472 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI GRASSLAND WY THIRD ST RAB END EAST GRASLND 10 R AC $18,844 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 HUMMINGBIRD LANE COHANSEY AVE VICKERY AVE HUMMN 10 R AC $7,692 25,003 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 LONE OAK LN THIRD ST RAB 360FT W/O RAB LONOAK 10 R AC $4,846 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 TENTH ST/LUCHESSA AVE RAB LUCHESSA AVE WEST LUCHESSA AVE EAST LUCHAV 45 R AC $3,173 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 LUCHESSA AVE THOMAS DR END OF BRIDGE EAST LUCHAV 70 R AC $8,153 41,798 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 MANTELLI DR ZINNIA ST HIRASAKI AVE MANTDR 50 A AC $17,352 40,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 77 NIGHTINGALE DR VICKERY AVE WREN AVE NIGHDR 10 R AC $18,508 25,003 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 PEPPERMINT ST COBBLESTONE ST CINNAMON ST PPRMNT 10 R AC $4,615 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 ROBIN PL WREN AVE NIGHTINGALE DR ROBIPL 10 R AC $8,922 25,003 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 TARRAGON DR COBBLESTONE CT CINNAMON WY TARGN 10 R AC $3,846 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 88 THIRD ST 470 FT W/O ROSEMARY DR THIRD ST/GRASSLAND WY RAB THIRST 80 R AC $33,987 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 GRASSLAND WY/THIRD ST RAB THIRD ST THIRD ST THIRST 85 R AC $2,000 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 THIRD ST GRASSLAND WY/THIRD ST RAB LONE OAK LN/THIRD ST RAB THIRST 90 R AC $11,307 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 LONE OAK LN/THIRD ST RAB THIRD ST LONE OAK LN THIRST 95 R AC $2,077 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 WINDSONG WY NIGHTINGALE DR HUMMINGBIRD LN WNDSWY 10 R AC $10,456 25,003 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 $239,381Treatment Total BLACKBERRY CT OAK BROOK WY END BLACCT 10 R AC $14,720 30,080 SLURRY SEAL W/DIGOUTS78 BLACKWING WY RANCHO HILLS DR EAGLE HILLS WY BLACWY 10 R AC $13,831 32,699 SLURRY SEAL W/DIGOUTS78 LONE DEER WY LONGMEADOW DR END LONDWY 10 R AC $11,657 32,466 SLURRY SEAL W/DIGOUTS78 MONTICELLI DR HIRASAKI AV PADOVA DR MONTDR 90 R AC $24,153 30,673 SLURRY SEAL W/DIGOUTS78 RAMONA WY KERN AVE AMANDA AVE RAMOWY 10 R AC/AC $16,304 32,254 SLURRY SEAL W/DIGOUTS78 RASPBERRY CT OAK BROOK WY END RASPCT 10 R AC $16,327 30,080 SLURRY SEAL W/DIGOUTS78 SNOWBERRY CT OAK BROOK WY END SNOWCT 10 R AC $14,862 30,080 SLURRY SEAL W/DIGOUTS78 TAPESTRY WY SUNRISE DR N. END TAPEWY 10 R AC $17,944 29,458 SLURRY SEAL W/DIGOUTS77 TRIMBLE CT CHURCH ST CUL DE SAC TRIMCT 10 R AC $10,146 29,458 SLURRY SEAL W/DIGOUTS77 Scenarios Criteria: 19 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 473 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $139,944Treatment Total CARLA WY AMANDA AV WREN AVE CARLWY 10 R AC $76,748 34,227 MILL AND THIN OVERLAY100 GEORGETOWN PL END PRINCEVALLE ST GEORPL 10 R AC $44,541 34,275 MILL AND THIN OVERLAY100 HANNA ST WELBURN AVE END HANNST 20 R AC $73,369 34,250 MILL AND THIN OVERLAY100 IRISH CT END PARISH WY IRISCT 10 R AC $24,142 34,503 MILL AND THIN OVERLAY100 LA ALONDRA WY WREN AVE WELBURN AVE LAALWY 10 R AC $68,300 34,524 MILL AND THIN OVERLAY100 MAPLE ST SEVENTH ST SIXTH ST MAPLST 10 R AC $67,262 34,535 MILL AND THIN OVERLAY100 OLD GILROY ST CHESTNUT ST CROCKER LN OLDGIL 20 R AC $111,785 34,536 MILL AND THIN OVERLAY100 ROYAL WY FILBRO DR IMPERIAL DR ROYAWY 10 R AC $18,844 33,983 MILL AND THIN OVERLAY100 SAGE HILL DR RODEO DR BENBOW DR SAGHDR 10 R AC $55,859 34,526 MILL AND THIN OVERLAY100 STEPHAN CT PRINCEVALLE ST END STEPCT 10 R AC $43,411 34,288 MILL AND THIN OVERLAY100 $584,261Treatment Total MANTELLI DR CALLE DEL REY SANTA TERESA BLVD MANTDR 40 A AC/AC $274,997 26,164 MILL AND THICK OVERLAY100 MANTELLI DR KERN AVE WREN AVE MANTDR 70 A AC $371,660 25,647 MILL AND THICK OVERLAY100 UVAS PARK DR MILLER AVE TENTH ST UVAPDR 30 C AC $166,591 25,331 MILL AND THICK OVERLAY100 WESTWOOD DR THIRD ST JUNIPER DR WESTDR 30 C AC $118,946 25,515 MILL AND THICK OVERLAY100 $932,194Treatment Total $4,673,928Year 2022 Total Scenarios Criteria: 20 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 474 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2023 FARRELL AVE WREN AVE MONTEREY RD FARRAV 10 A AC $417,480 23,737 AC OVERLAY W/FABRIC100 MONTEREY ST LEAVESLEY RD PIERCE ST MONTRD 10 A AC/AC $394,243 23,797 AC OVERLAY W/FABRIC100 MONTEREY ST TENTH ST EIGHTH ST MONTRD 100 A AC $265,518 23,668 AC OVERLAY W/FABRIC100 MONTEREY ST PIERCE ST LAS ANIMAS RD MONTRD 30 A AC $1,159,330 23,668 AC OVERLAY W/FABRIC100 WREN AVE THIRD ST FIRST ST WRENAV 90 A AC/AC $623,625 23,580 AC OVERLAY W/FABRIC100 $2,860,196Treatment Total CHURCH ST FARRELL AV N. END CHURST 85 C AC $30,822 88,492 RUB CAPE SEAL W/DIGOUTS100 MESA RD GAVILAN COLLEGE THOMAS RD MESARD 10 C AC $61,410 90,141 RUB CAPE SEAL W/DIGOUTS100 MONTEREY ST EIGHTH ST SIXTH ST MONTRD 110 C AC $51,775 87,527 RUB CAPE SEAL W/DIGOUTS100 RANCHO HILLS DR MANTELLI DR CARRIAGE DR RANHDR 10 C AC $20,001 87,729 RUB CAPE SEAL W/DIGOUTS100 SIXTH ST RR TRACKS CHESTNUT ST SIXTST 50 C AC $39,461 89,956 RUB CAPE SEAL W/DIGOUTS100 $203,469Treatment Total CARMEL ST EL CERRITO WY SHERWOOD DR CARMST 20 C AC $188,347 24,416 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST WELBURN AVE MANTELLI DR CHURST 30 C AC/AC $388,419 24,125 2.5 INCH AC OVERLAY W/FABRIC 100 CHURCH ST LIMAN AVE LAS ANIMAS AV CHURST 60 C AC/AC $169,086 23,727 2.5 INCH AC OVERLAY W/FABRIC 100 FOURTH ST PRINCEVALLE ST EIGLEBERRY ST FOURST 20 C AC $323,166 24,434 2.5 INCH AC OVERLAY W/FABRIC 100 MURRAY AVE I.O.O.F. AVE LEAVESLEY RD MURRAV 50 C AC $415,375 24,120 2.5 INCH AC OVERLAY W/FABRIC 100 SAN YSIDRO AVE 1064' N/O LEAVESLEY RD 1478' S/O LAS ANIMAS RD SANYAV 20 C AC $200,743 24,426 2.5 INCH AC OVERLAY W/FABRIC 100 $1,685,136Treatment Total GREENFIELD DR OAK BROOK WAY W LUCHESSA AVE GREENF 10 R AC $13,361 25,290 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 $13,361Treatment Total ANGELA CT END PRINCEVALLE ST ANGECT 10 R AC $23,083 32,989 MILL AND THIN OVERLAY100 CARLYLE CT CHURCH ST END CARLCT 10 R AC $42,205 32,654 MILL AND THIN OVERLAY100 EL TORO WY WAYLAND LN CARMEL ST ELTOWY 10 R AC $43,933 32,955 MILL AND THIN OVERLAY100 PARISH WY EL CERRITO WY WELBURN AVE PARIWY 10 R AC $67,702 32,932 MILL AND THIN OVERLAY100 Scenarios Criteria: 21 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 475 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI QUAILWALK DR 500' SOUTH OF PEREGRINE DR EAGLE VIEW WY QUAIDR 20 R AC $73,347 32,570 MILL AND THIN OVERLAY100 RYAN CT PARISH WY CUL DE SAC RYANCT 10 R AC $41,306 33,202 MILL AND THIN OVERLAY100 TARYN LN CALABRESE WY WELBURN AV TARYLN 10 R AC $60,118 33,203 MILL AND THIN OVERLAY100 WILD IRIS DR MANTELLI DR SOUTH SIDE OF ROUNDABOUT WILIDR 10 R AC $9,999 32,943 MILL AND THIN OVERLAY100 $361,693Treatment Total LONGMEADOW DR TRAILBLAZER WY RODEO DR LONMDR 20 C AC $206,501 24,506 MILL AND THICK OVERLAY100 $206,501Treatment Total $5,330,356Year 2023 Total Scenarios Criteria: 22 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 476 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI Year:2024 EIGLEBERRY ST TENTH ST EIGHTH ST EIGLST 10 R AC/AC $27,254 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST EIGHTH ST SIXTH ST EIGLST 15 R AC/AC $33,917 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST SIXTH ST FOURTH ST EIGLST 20 R AC/PCC $33,146 40,988 SEAL CRACKS/SLURRY SEAL91 EIGLEBERRY ST FOURTH ST SECOND ST EIGLST 30 R AC/PCC $34,446 43,471 SEAL CRACKS/SLURRY SEAL92 EIGLEBERRY ST SECOND ST FIRST ST EIGLST 40 R AC/AC $14,107 43,471 SEAL CRACKS/SLURRY SEAL92 $142,870Treatment Total MONTEREY ST SIXTH ST THIRD ST MONTRD 120 C AC $71,575 85,782 RUB CAPE SEAL W/DIGOUTS100 SIXTH ST CHESTNUT ST 308 E/O CHESTNUT SIXTST 60 C AC $10,169 85,066 RUB CAPE SEAL W/DIGOUTS100 $81,744Treatment Total ARBOR ST MANTELLI DR EDEN ST ARBOST 10 R AC $8,226 25,715 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 BOGIALA WY MARSANNE LN DE ANZA PL BOGAWY 10 R AC $14,039 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 DE ANZA PL TENTH ST LOPEZ WY DEANZ 10 R AC $9,172 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LOPEZ WY CHARLES LUX DR DE ANZA PL LOPEWY 10 R AC $16,285 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 LUCHESSA AVE MILLER AVE TENTH ST/LUCHESSA AVE RAB LUCHAV 40 R AC $11,231 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MARSANNE LN BOGIALA WY LOPEZ WY MARSNN 10 R AC $5,616 25,900 SEAL CRACKS, DIGOUTS, MICROSURFACING 91 MILLER AVE SIXTH ST THIRD ST MILLAV 40 C AC/AC $54,984 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 MILLER AVE THIRD ST FIRST ST MILLAV 50 C AC/AC $50,420 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 83 MURRAY AVE LINCOLN CT LAS ANIMAS AVE MURRAV 20 A AC/AC $31,039 58,514 SEAL CRACKS, DIGOUTS, MICROSURFACING 78 TENTH ST/CHARLES LUX DR RAB TENTH ST NORTH TENTH ST SOUTH TENTST 55 R AC $2,663 25,607 SEAL CRACKS, DIGOUTS, MICROSURFACING 92 THIRD ST SANTA THERESA DR MILLER AVE THIRST 10 C AC/AC $15,653 39,638 SEAL CRACKS, DIGOUTS, MICROSURFACING 79 THIRD ST MILLER AVE PRINCEVALLE ST THIRST 20 C AC/AC $18,016 28,546 SEAL CRACKS, DIGOUTS, MICROSURFACING 80 THIRD ST WREN AVE SANTA THERESA DR THIRST 30 C AC/AC $19,210 36,307 SEAL CRACKS, DIGOUTS, MICROSURFACING 86 WELBURN AVE HANNA ST CHURCH ST WELBAV 80B C AC/AC $16,297 33,773 SEAL CRACKS, DIGOUTS, MICROSURFACING 90 Scenarios Criteria: 23 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 477 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $272,851Treatment Total ALEXANDER ST S END(CUL-DE-SAC)NINTH ST ALEXST 20 R AC $53,554 20,236 SLURRY SEAL W/DIGOUTS74 ANSON CT LEARNARD WY END ANSOCT 10 R AC $12,636 20,291 SLURRY SEAL W/DIGOUTS74 BLAKE CT END SANTA THERESA DR BLAKCT 10 R AC $15,397 19,604 SLURRY SEAL W/DIGOUTS72 BURCHELL RD HWY 152 BLUEBELL DR BURCRD 10 R AC $21,311 19,335 SLURRY SEAL W/DIGOUTS71 CARR PL END SIXTH ST CARRPL 10 R AC $21,527 18,997 SLURRY SEAL W/DIGOUTS70 CHESBRO WY GAUNT AVE KELTON DR CHESWY 10 R AC $21,563 19,947 SLURRY SEAL W/DIGOUTS73 EMERSON CT PETERSEN DR END EMERCT 10 R AC $5,679 19,335 SLURRY SEAL W/DIGOUTS71 FALCON CT END EAGLE HILLS WY FALCCT 10 R AC $9,288 19,647 SLURRY SEAL W/DIGOUTS72 FIFTH ST MILLER AVE PRINCEVALLE ST FIFTST 10 R AC $33,111 19,906 SLURRY SEAL W/DIGOUTS73 FOWLER ST HOXETT ST WENTZ DR FOWLST 10 R AC $13,594 18,996 SLURRY SEAL W/DIGOUTS70 HAGEN CT END WENTZ DR HAGECT 10 R AC $12,230 19,906 SLURRY SEAL W/DIGOUTS73 HOLLOWAY RD BREM LN SILACCI WY HOLLRD 10 R AC $101,060 20,236 SLURRY SEAL W/DIGOUTS74 HOWARD CT END HOWARD AVE HOWACT 10 R AC $4,844 20,593 SLURRY SEAL W/DIGOUTS75 HOXETT ST CHADWICK ST FOWLER ST HOXEST 10 R AC $18,399 19,906 SLURRY SEAL W/DIGOUTS73 LA COCHE WY EL CERRITO WY END LACOWY 10 R AC $10,373 19,626 SLURRY SEAL W/DIGOUTS72 LARKSPUR LN HOLLYHOCK LN MANTELLI DR LARKLN 10 R AC $11,995 19,335 SLURRY SEAL W/DIGOUTS71 LEWIS ST FOREST ST ROGERS LN LEWIST 20 R AC $29,699 19,006 SLURRY SEAL W/DIGOUTS70 MARIPOSA ST ORINDA WY JACARANDA WY MARIST 10 R AC $12,229 19,947 SLURRY SEAL W/DIGOUTS73 MILIAS CT END BYERS ST MILACT 10 R AC $11,374 20,247 SLURRY SEAL W/DIGOUTS74 MILLER AVE 2000' NORTH OF MESA RD SANTA TERESA BLVD MILLAV 60 R AC $76,325 19,293 SLURRY SEAL W/DIGOUTS71 MILLER AVE MESA RD 2000' NORTH OF MESA RD MILLAV 70 R AC $42,115 20,237 SLURRY SEAL W/DIGOUTS74 NANTUCKET PL END CUMBERLAND DR NANTPL 10 R AC $10,846 20,247 SLURRY SEAL W/DIGOUTS74 OAK BROOK WY RAPSBERRY CT THOMAS RD OAKBWY 10 R AC $24,661 19,594 SLURRY SEAL W/DIGOUTS72 OAK BROOK WY RASPBERRY CT GREENFIELD DR OAKBWY 20 R AC $30,336 19,594 SLURRY SEAL W/DIGOUTS72 ORCHARD DR 95' N/O DEARBORN PL EIGHTH ST ORCHDR 20 R AC $14,039 19,906 SLURRY SEAL W/DIGOUTS73 ORCHARD DR EIGHTH ST CUMBERLAND DR ORCHDR 30 R AC $29,001 19,302 SLURRY SEAL W/DIGOUTS71 PETERSEN DR GAUNT AVE KELTON DR PETEDR 10 R AC $20,418 19,646 SLURRY SEAL W/DIGOUTS72 POPPYFIELD ST OAK BROOK WY CUL DE SAC POPPYF 10 R AC $18,748 19,899 SLURRY SEAL W/DIGOUTS73 SAN MIGUEL ST SANTA BARBARA DR WREN AVE SANMST 10 R AC $59,503 20,247 SLURRY SEAL W/DIGOUTS74 SANTA PAULA DR CRAWFORD DR SAN MIGUEL ST SANPDR 10 R AC $23,086 19,302 SLURRY SEAL W/DIGOUTS71 SANTA PAULA DR SAN MIGUEL ST HACIENDA DR SANPDR 20 R AC $26,375 19,605 SLURRY SEAL W/DIGOUTS72 SANTA MARIA CT SAN MIGUEL ST END SANTCT 10 R AC $14,799 19,604 SLURRY SEAL W/DIGOUTS72 SANTA THERESA DR SIXTH ST FOURTH ST SANTDR 10 R AC $36,578 19,302 SLURRY SEAL W/DIGOUTS71 Scenarios Criteria: 24 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 478 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI SPRINGDALE ST CUL DE SAC CUL DE SAC SPRIST 10 R AC $35,912 20,560 SLURRY SEAL W/DIGOUTS75 STEWART DR HERSMAN DR END STEWDR 10 R AC $12,727 19,604 SLURRY SEAL W/DIGOUTS72 STRAWBERRY LN SUNFLOWER CIR COUNTRY DR STRALN 10 R AC $6,411 19,947 SLURRY SEAL W/DIGOUTS73 TAFT CT MURRAY AVE CUL DE SAC TAFTCT 10 R AC $11,489 19,006 SLURRY SEAL W/DIGOUTS70 THAYER CT CRAWFORD DR CUL DE SAC THAYCT 10 R AC $13,267 19,605 SLURRY SEAL W/DIGOUTS72 VICKERY AVE KERN AVE WREN AVE VICKAV 10 R AC $14,039 19,335 SLURRY SEAL W/DIGOUTS71 WENTZ DR WREN AVE CARR PL WENTDR 10 R AC $32,565 19,604 SLURRY SEAL W/DIGOUTS72 WHEATFIELD CT HAYFIELD ST CUL DE SAC WHEATF 10 R AC $5,887 20,236 SLURRY SEAL W/DIGOUTS74 WILDGRASS CT POPPY FIELD ST CUL DE SAC WILDGR 10 R AC $11,323 19,593 SLURRY SEAL W/DIGOUTS72 WOODWORTH WY CHURCH ST CUL DE SAC WOODWY 10 R AC $15,132 19,324 SLURRY SEAL W/DIGOUTS71 $1,005,445Treatment Total CALABRESE WY END DELTA DR CALAWY 10 R AC $90,306 31,938 MILL AND THIN OVERLAY100 CATHERINE CT PRINCEVALLE ST END CATHCT 10 R AC $19,550 31,428 MILL AND THIN OVERLAY100 DARTMOUTH PL END PRINCEVALLE ST DARTPL 10 R AC $34,753 31,417 MILL AND THIN OVERLAY100 ELM ST FOREST ST SPRINGDALE ST ELMST 10 R AC $18,289 31,406 MILL AND THIN OVERLAY100 FILBRO DR ROYAL WY PRINCEVALLE ST FILBDR 10 R AC $56,323 31,428 MILL AND THIN OVERLAY100 IMPERIAL DR ROYAL WY PRINCEVALLE ST IMPEDR 10 R AC $32,120 31,725 MILL AND THIN OVERLAY100 LA SIERRA WY WAYLAND LN HANNA ST LASIWY 10 R AC $111,098 31,394 MILL AND THIN OVERLAY100 SOLIS DR OUSLEY DR DELTA DR SOLIDR 10 R AC $33,037 31,938 MILL AND THIN OVERLAY100 THIRD ST THIRD ST/SANTA TERESA BLVD ISABELLA WY THIRST 65 R AC $38,528 31,725 MILL AND THIN OVERLAY100 WEST HILLVIEW CT END TARYN LN WHILCT 10 R AC $46,270 31,938 MILL AND THIN OVERLAY100 $480,274Treatment Total CHURCH ST MANTELLI DR 98' S/O RONAN CHURST 40 C AC/AC $270,985 22,606 MILL AND THICK OVERLAY100 CHURCH ST 100' N/O HENNESSEY WY FARRELL AVE CHURST 80 C AC/AC $59,871 21,762 MILL AND THICK OVERLAY100 FOREST ST SIXTH ST LEWIS ST FOREST 30 C AC/AC $157,619 20,602 MILL AND THICK OVERLAY100 $488,475Treatment Total CHESTNUT ST 689' S/O TENTHST TENTH ST CHESST 50 A AC $444,214 10,383 RECONSTRUCT STRUCTURE (AC) 100 LEAVESLEY RD 200' E/O ARROYO CIR CITY LIMIT LEAVRD 10 A AC $835,436 10,383 RECONSTRUCT STRUCTURE (AC) 100 LEAVESLEY RD SAN YSIDRO AVE 200' E/O ARROYO CIR LEAVRD 30 A AC $311,963 10,383 RECONSTRUCT STRUCTURE (AC) 100 Scenarios Criteria: 25 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 479 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) Street Name Begin Location End Location Street ID Section ID FC Surface Cost Rating TreatmentPCI LUCHESSA AVE MONTEREY RD JAMIESON WY LUCHAV 20 A AC $885,391 10,383 RECONSTRUCT STRUCTURE (AC) 100 MANTELLI DR HIRASAKI AVE KERN AVE MANTDR 60 A AC $886,129 10,383 RECONSTRUCT STRUCTURE (AC) 100 $3,363,133Treatment Total $5,834,792Year 2024 Total Scenarios Criteria: 26 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 480 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $33,349,599Grand Total Scenarios Criteria: 27 SS1059 MTC StreetSaver** - Treatment from Project Selection 11.A.a Packet Pg. 481 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) YearYearYearBudgetPMBudgetPM Budget PM 2020 $50,000,000 50% 2021 $50,000,000 50% 2022 $50,000,000 50% 2023 $50,000,000 50% 2024 $50,000,000 50% TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CHESTNUT ST 505' N/O STUTZ WY 689' S/O TENTH ST CHESST 40 A AC $66,640 26,555 AC OVERLAY W/FABRIC10014,99442357 49497C LUCHESSA AVE UVAS CREEK/LUCHESS A AVE MONTEREY RD LUCHAV 15 A AC $545,756 27,595 AC OVERLAY W/FABRIC100122,795412,995 43437A MANTELLI DR SANTA TERESA BLV ZINNIA ST MANTDR 90 A AC $174,978 27,769 AC OVERLAY W/FABRIC10039,37062635 42435A MONTEREY ST LAS ANIMAS RD COHANSEY AVE MONTRD 50 A AC $631,680 26,530 AC OVERLAY W/FABRIC100142,128721,974 49494B MONTEREY ST BUENA VISTA AVE NORTH CITY LIMITS MONTRD 80 A AC $849,396 26,920 AC OVERLAY W/FABRIC100191,114732,618 47474B TENTH ST MONTEREY RD W/O HWY 101 RAMPS TENTST 40 A AC $640,107 28,070 AC OVERLAY W/FABRIC100144,024682,118 40407C THOMAS RD 123' S/O WISTERIA DR 105' N/O ALDER ST THOMRD 30 A AC $109,440 26,365 AC OVERLAY W/FABRIC10024,62448513 49497B WELBURN AVE KERN AVE WREN AVE WELBAV 60 A AC $419,720 27,077 AC OVERLAY W/FABRIC10094,437631,499 47475A WELBURN AVE CHURCH ST MONTEREY RD WELBAV 90 A AC/AC $178,934 27,381 AC OVERLAY W/FABRIC10040,26061660 44452B $3,616,651Treatment Total ALEXANDER ST NINTH ST SIXTH ST ALEXST 30 R AC/AC $40,683 68,837 SEAL CRACKS/SLURRY SEAL 8691,536481,907 78784A POLK CT MURRAY AVE END POLKCT 10 R AC/AC $6,474 81,986 SEAL CRACKS/SLURRY SEAL 8914,56533390 82824B RANCHO HILLS CT END MANTELLI DR RANHCT 10 R AC/AC $5,645 68,991 SEAL CRACKS/SLURRY SEAL 8612,70135314 78786C SIXTH ST 308 E/O CHESTNUT ST ROGERS LN SIXTST 65 R AC/AC $5,458 61,137 SEAL CRACKS/SLURRY SEAL 8312,28040307 75754A $58,260Treatment Total CAMINO ARROYO GILMAN RD ARROYO CIR CAMARR 10 C AC $19,292 108,392 RUB CAPE SEAL W/DIGOUTS 10027,34242651 63634C CARMEL ST FIRST ST EL CERRITO WY CARMST 10 C AC $32,690 99,995 RUB CAPE SEAL W/DIGOUTS 10046,332441,053 69692B CHURCH ST SEVENTH ST FOURTH ST CHURST 100 C AC $62,755 102,030 RUB CAPE SEAL W/DIGOUTS 10088,944481,853 67673B CHURCH ST FOURTH ST FIRST ST CHURST 110 C AC $61,875 98,290 RUB CAPE SEAL W/DIGOUTS 10087,696481,827 69703B CHURCH ST LAS ANIMAS AV 100' N/O HENNESSEY WY CHURST 70 C AC/AC $15,281 100,285 RUB CAPE SEAL W/DIGOUTS 10021,65849442 62625B FOURTH ST SANTA THERESA DR MILLER DR FOURST 10 C AC $18,345 102,030 RUB CAPE SEAL W/DIGOUTS 10026,00040650 67671A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 1 SS1026 MTC StreetSaver 11.A.a Packet Pg. 482 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID FOURTH ST MILLER DR PRINCEVALLE ST FOURST 15 C AC $27,207 102,030 RUB CAPE SEAL W/DIGOUTS 10038,56040964 67673B KERN AVE 429' N. OF MANTELLI DR N CITY LIM KERNAV 60 C AC $29,980 97,144 RUB CAPE SEAL W/DIGOUTS 10042,490351,214 69695A MANTELLI DR RANCHO HILLS CALLE DEL REY MANTDR 30 C AC $38,989 111,039 RUB CAPE SEAL W/DIGOUTS 10055,260451,228 62626C MARTIN ST MONTEREY RD CHESTNUT ST MARTST 10 C AC $33,831 106,345 RUB CAPE SEAL W/DIGOUTS 10047,949331,453 65654A RANCHO HILLS DR CARRIAGE DR VALLEY OAKS DR RANHDR 20 C AC $28,226 99,806 RUB CAPE SEAL W/DIGOUTS 10040,00545889 69696B RENZ LN 1085' W. OF CAMINO ARROYO CAMINO ARROYO RENZLN 20 C AC $42,870 105,316 RUB CAPE SEAL W/DIGOUTS 10060,760561,085 65664C THIRD ST PRINCEVALLE ST CHURCH ST THIRST 50 C AC $52,070 103,712 RUB CAPE SEAL W/DIGOUTS 10073,800401,845 66663B THIRD ST CHURCH ST MONTEREY RD THIRST 60 C AC $17,893 103,712 RUB CAPE SEAL W/DIGOUTS 10025,36040634 66663B $481,304Treatment Total CHESTNUT ST TENTH ST EIGHTH ST CHESST 60 C AC/AC $259,637 27,582 2.5 INCH AC OVERLAY W/FABRIC 10080,577631,279 42424A CHURCH ST LONDON DR TENTH ST CHURST 121 C AC $208,272 27,059 2.5 INCH AC OVERLAY W/FABRIC 10064,636521,243 49491A CHURCH ST LUCHESSA AVE LONDON DR CHURST 125 C AC $284,845 27,059 2.5 INCH AC OVERLAY W/FABRIC 10088,400521,700 49497A CHURCH ST HOWSON ST WELBURN AVE CHURST 20 C AC $165,655 27,952 2.5 INCH AC OVERLAY W/FABRIC 10051,41053970 42422B EIGHTH ST MILLER AVE PRINCEVALLE ST EIGHST 20 C AC $292,440 27,630 2.5 INCH AC OVERLAY W/FABRIC 10090,757471,931 45453B FARMAN FRONTAGE RD 2818 S/O FARMMAN LN FARMAN LN FARFRD 10 C AC $281,487 27,237 2.5 INCH AC OVERLAY W/FABRIC 10087,358312,818 48487B FOREST ST LEAVESLEY RD YAMANIE DR FOREST 10 C AC $373,230 27,703 2.5 INCH AC OVERLAY W/FABRIC 100115,830452,574 44444B HIRASAKI AVE MANTELLI DR LONGMEADOW DR HIRAAV 10 C AC $316,680 27,543 2.5 INCH AC OVERLAY W/FABRIC 10098,280452,184 45455A KERN AVE CULP DR MANTELLI DR KERNAV 40 C AC $157,857 28,036 2.5 INCH AC OVERLAY W/FABRIC 10048,990461,065 41415A LONGMEADOW DR RODEO DR SANTA TERESA BLVD LONMDR 30 C AC $151,519 27,818 2.5 INCH AC OVERLAY W/FABRIC 10047,02359797 43436B MILLER AVE SARATOGA PL UVAS PARK DR MILLAV 05 C AC $287,745 27,621 2.5 INCH AC OVERLAY W/FABRIC 10089,300471,900 45454B PRINCEVALLE ST 140' N/O FILBRO DR TENTH ST PRINST 60 C AC $112,946 27,367 2.5 INCH AC OVERLAY W/FABRIC 10035,05246762 47471A ROSSI LN SOUTHSIDE DR MAYCOCK RD ROSSLN 10 C AC/AC $246,823 26,397 2.5 INCH AC OVERLAY W/FABRIC 10076,600401,915 48497C SAN YSIDRO AVE LEAVESLEY RD 1064' N/O LEAVESLEY RD SANYAV 10 C AC $209,136 27,620 2.5 INCH AC OVERLAY W/FABRIC 10064,904611,064 45454C Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 2 SS1026 MTC StreetSaver 11.A.a Packet Pg. 483 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID SEVENTH ST CHURCH ST MONTEREY RD SEVEST 20 C AC $115,691 27,059 2.5 INCH AC OVERLAY W/FABRIC 10035,90448748 49493B WELBURN AVE MANTELLI DR RANCHO REAL WELBAV 10 C AC $107,300 27,458 2.5 INCH AC OVERLAY W/FABRIC 10033,300301,110 46466C $3,571,263Treatment Total ACORN WY END VALLEY OAKS DR ACORWY 10 R AC $1,829 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 914,11434121 84846C ADAMS CT MURRAY AVE END ADAMCT 10 R AC $6,034 39,770 SEAL CRACKS, DIGOUTS, MICROSURFACING 8413,57533360 76764B ALDER ST STARLING DR THOMAS RD ALDEST 10 R AC $15,758 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 8935,455351,013 82827A ALEXANDER ST SIXTH ST LEWIS ST ALEXST 10 R AC $20,201 39,601 SEAL CRACKS, DIGOUTS, MICROSURFACING 8545,452441,033 77774A APACHE CT END RODEO DR APACCT 10 R AC $6,703 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 8915,08135382 82826B ARAPAHO DR DURANGO LN BENBOW DR ARAPDR 10 R AC $16,894 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 8938,010351,086 82826B ARMAND CT WREN AVE END ARMACT 10 R AC $2,876 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 836,46935424 75751A ASHBURY CT END ALDER ST ASHBCT 10 R AC $3,121 39,433 SEAL CRACKS, DIGOUTS, MICROSURFACING 857,02134154 77787A AVEZAN WAY TATUM AVE ST CLAR AVE AVEZAN 10 R AC $9,566 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 9021,52234633 83835A AZARA ST STONECRESS ST MANTELLI DR AZARST 10 R AC $3,796 37,418 SEAL CRACKS, DIGOUTS, MICROSURFACING 918,54020427 84846C BABBS CREEK DR END THOMAS RD BABCDR 10 R AC $21,187 32,458 SEAL CRACKS, DIGOUTS, MICROSURFACING 9147,670351,362 84847A BABBS CREEK DR 100FT WEST OF STARLING DR END WEST BABCDR 20 R AC $8,312 54,402 SEAL CRACKS, DIGOUTS, MICROSURFACING 9418,70034550 88887A BANES LN ALEXANDER ST END BANELN 10 R AC $3,307 36,084 SEAL CRACKS, DIGOUTS, MICROSURFACING 907,44031240 83837C BANYAN CT BANYAN ST END BANYCT 10 R AC $8,886 74,331 SEAL CRACKS, DIGOUTS, MICROSURFACING 9019,99221952 83836C Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 3 SS1026 MTC StreetSaver 11.A.a Packet Pg. 484 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID BANYAN CT END TEA TREE WAY BANYCT 20 R AC $1,867 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 894,20021200 82826C BANYAN ST LINARIA ST E END BANYST 10 R AC $8,649 39,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 9019,46020973 83836C BENBOW DR SAGE HILL DR ARAPAHO DR BENBDR 10 R AC $9,038 38,681 SEAL CRACKS, DIGOUTS, MICROSURFACING 8720,33535581 79796B BENNETT CT SEVERANCE ST END BENNCT 10 R AC $7,638 37,855 SEAL CRACKS, DIGOUTS, MICROSURFACING 8817,18535491 80805B BENNETT ST CHURCH ST SEVERANCE ST BENNST 10 R AC $4,667 55,694 SEAL CRACKS, DIGOUTS, MICROSURFACING 8110,50035300 72725B BERRYBUSH CT OAK BROOK WY END BERRYC 10 R AC $10,177 34,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 9022,89835603 83837A BLACKFOOT CT GERONIMO ST CUL DE SAC BLCKCT 10 R AC $5,689 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 9112,80032400 84846B BLUEBELL DR BURCHELL RD COUNTRY DR BLUBDR 10 R AC $12,125 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 8927,280201,364 82826C BLUE HERON CT END PEREGRINE DR BLUHCT 10 R AC $4,043 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 839,09534215 74746B BOLSA RD CARNADERO RD 1076' S/O TRAVEL PARK CIR BOLSRD 10 A AC $58,092 40,248 SEAL CRACKS, DIGOUTS, MICROSURFACING 71116,184244,841 60617C BOSQUE ST JARDIN WY TAOS WY BOSQST 10 R AC $4,670 37,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 9110,50634309 84842B BRAZOS ST JARDIN WY TAOS WY BRAZST 10 R AC $5,486 40,795 SEAL CRACKS, DIGOUTS, MICROSURFACING 8912,34234363 82822B BRIARBERRY LN RANCHO HILLS DR PHEASANT DR BRIALN 10 R AC $25,538 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 9157,460341,690 84846B BRITTANY CT MANTELLI DR END BRITCT 10 R AC $6,330 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 8514,24135358 77775A BUNTING CT SUNRISE DR CUL DE SAC BUNTIN 10 R AC $4,549 36,888 SEAL CRACKS, DIGOUTS, MICROSURFACING 8810,23434301 81816B BUTTERCUP LN KERN AVE WESTWOOD DR BUTTLN 10 R AC $6,207 38,457 SEAL CRACKS, DIGOUTS, MICROSURFACING 8713,96521665 79795A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 4 SS1026 MTC StreetSaver 11.A.a Packet Pg. 485 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CALLE DEL REY MANTELLI DR LERMA LN CALDRY 10 C AC $35,663 33,555 SEAL CRACKS, DIGOUTS, MICROSURFACING 8471,325451,585 76766B CAMERON BLVD HWY 152 VENTURE WY CAMBL 10 A AC $101,000 75,791 SEAL CRACKS, DIGOUTS, MICROSURFACING 84202,0001002,020 76767C CANOPY CT ARBOR ST END CANOCT 10 R AC $6,625 30,046 SEAL CRACKS, DIGOUTS, MICROSURFACING 9114,90635357 85852B CANYON CT CHEYENNE DR CUL DE SAC CANYCT 10 R AC $1,512 35,500 SEAL CRACKS, DIGOUTS, MICROSURFACING 913,40034100 84846B CAROB CT TEA TREE WAY END CAROCT 10 R AC $8,267 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 8918,60020930 82826C CARRIAGE DR END RANCHO HILLS DR CARRDR 10 R AC $10,208 55,694 SEAL CRACKS, DIGOUTS, MICROSURFACING 8122,96734623 72726C CHADWICK ST HOXETT ST WENTZ DR CHADST 10 R AC $9,054 39,269 SEAL CRACKS, DIGOUTS, MICROSURFACING 8620,37035582 78781A CHAPPELL CT END CHURCH ST CHAPCT 10 R AC $5,122 35,619 SEAL CRACKS, DIGOUTS, MICROSURFACING 8911,52335278 82822B CHERRYWOOD CT SPRIG WAY CUL DE SAC CHERCT 10 R AC $4,534 75,898 SEAL CRACKS, DIGOUTS, MICROSURFACING 8910,20034300 82826B CHESTNUT ST EIGHTH ST SIXTH ST CHESST 70 C AC/AC $30,454 62,002 SEAL CRACKS, DIGOUTS, MICROSURFACING 8260,907491,243 73734A CHEYENNE DR SADDLER WY 100' W/O NAVAJO CT CHEYDR 10 R AC $6,659 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8914,98233454 82826B CHARLES LUX DR GREENFIELD DR CIMINO ST CHRLUX 10 R AC $8,392 55,070 SEAL CRACKS, DIGOUTS, MICROSURFACING 9118,88032590 84847A CHURCH ST 98' S/O RONAN LIMAN AVE CHURST 50 C AC/AC $13,412 43,172 SEAL CRACKS, DIGOUTS, MICROSURFACING 8426,82456479 76762B CIELO VISTA CT DANCING WIND WAY CUL DE SAC CIELCT 10 R AC $2,112 56,678 SEAL CRACKS, DIGOUTS, MICROSURFACING 844,75227176 76766B CIELO VISTA LN DANCING WIND WAY DREAM CATCHER WAY CIELLN 10 R AC $15,696 59,142 SEAL CRACKS, DIGOUTS, MICROSURFACING 8535,316271,308 77776B CIMINO ST LUCHESSA AVE CHARLES LUX DR CIMNO 10 R AC $12,743 50,433 SEAL CRACKS, DIGOUTS, MICROSURFACING 8928,67047610 82827A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 5 SS1026 MTC StreetSaver 11.A.a Packet Pg. 486 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CLARK WY CRAWFORD DR WREN AVE CLARWY 10 R AC $13,720 37,953 SEAL CRACKS, DIGOUTS, MICROSURFACING 8730,87035882 80801A COLONY CT RANCHO HILLS DR END COLOCT 10 R AC $2,680 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 916,02835121 84846B COLONY WY END RANCHO HILLS DR COLOWY 10 R AC $9,528 58,140 SEAL CRACKS, DIGOUTS, MICROSURFACING 8221,43734578 73736C COLUMBINE CT MANTELLI DR END COLUCR 10 R AC $7,026 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 9015,80820618 83836C COMANCHE ST SUNRISE DR PUBELO COMAST 10 R AC $9,529 53,890 SEAL CRACKS, DIGOUTS, MICROSURFACING 8921,44032670 82826B CONCORD PL NINTH ST END CONCPL 10 R AC $4,944 38,752 SEAL CRACKS, DIGOUTS, MICROSURFACING 8711,12433273 79791A CONNELL CT LAS ANIMAS AV END CONNCT 10 R AC $4,744 36,886 SEAL CRACKS, DIGOUTS, MICROSURFACING 8810,67329278 81815B COOPER PL JICARRILLA PL SUNRISE DR COOPPL 10 R AC $7,405 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 8816,66035476 80806B CORAL BELL CT END PERIWINKLE DR CORACT 10 R AC $4,094 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 909,21120329 83836C COUNTRY DR END STRAWBERRY LN COUNDR 10 R AC $9,894 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 9022,260201,113 83836C COUNTRY DR STRAWBERRY LN SUNFLOWER CIR COUNDR 20 R AC $12,445 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 9028,000201,400 83836C COUNTRY DR SUNFLOWER CIR MANTELLI DR COUNDR 30 R AC $9,156 38,680 SEAL CRACKS, DIGOUTS, MICROSURFACING 8720,600201,030 79796C COYOTE MOON LN DREAM CATCHER WAY SUNRISE DR COYOLN 10 R AC $16,698 52,213 SEAL CRACKS, DIGOUTS, MICROSURFACING 8337,570341,105 74746B CRAWFORD CT CRAWFORD DR END CRAWCT 10 R AC $2,958 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 826,65437131 74741A CRAWFORD DR SANTA PAULA DR END CRAWDR 10 R AC $18,994 39,268 SEAL CRACKS, DIGOUTS, MICROSURFACING 8642,735351,221 78781A CREST HILL CT RANCHO HILLS DR END CREHCT 10 R AC $7,684 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 8917,28934456 82826B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 6 SS1026 MTC StreetSaver 11.A.a Packet Pg. 487 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CREST HILL WY END RANCHO HILLS DR CREHWY 10 R AC $25,886 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 8958,242341,713 82826C CUMBERLAND DR MILLER AVE ORCHARD DR CUMBDR 10 R AC $15,360 39,767 SEAL CRACKS, DIGOUTS, MICROSURFACING 8434,55837934 76763B CYPRESS CT END PONDEROSA DR CYPREC 10 R AC $6,347 32,399 SEAL CRACKS, DIGOUTS, MICROSURFACING 9114,28035408 84841B CYPRESS CT PONDEROSA DR LAUREL DR CYPREC 20 R AC $8,040 39,434 SEAL CRACKS, DIGOUTS, MICROSURFACING 8518,08834532 77781B DAFODIL PL MANTELLI DR ZINNIA ST DAFOPL 10 R AC $10,329 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8923,24035664 82825A DANCING WIND WY RANCHO HILLS DRIVE CIELO VISTA LAND DANCWY 10 R AC $8,221 50,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 8218,49634544 73736B DEL RIO CIR SANTA FE DR SANTA FE DR DELRIO 10 R AC $9,306 38,461 SEAL CRACKS, DIGOUTS, MICROSURFACING 8720,93829722 79792B DESERT BLOOM PL O'KEEFE LANE SUNRISE DRIVE DESEPL 10 R AC $11,265 61,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 8625,34638667 78786B DOVE CT CREST HILL WY END DOVECT 10 R AC $5,432 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 9112,22034302 84846C DOVETAIL WAY RANCHO HILLS DR END DOVETA 10 R AC $22,788 57,958 SEAL CRACKS, DIGOUTS, MICROSURFACING 8351,272341,508 74746B DREAM CATCHER WY CIELO VISTA WAY SUNRISE DRIVE DREAWY 10 R AC $11,122 54,391 SEAL CRACKS, DIGOUTS, MICROSURFACING 8325,02434736 75756B DURANGO LN WAGON WY ARAPAHO DR DURALN 10 R AC $8,743 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 9019,67035562 83836B EAGLE HILLS WY BLANKWING WY 300' S/O PEREGRINE DR EAGHWY 10 R AC $14,560 35,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 8932,76035936 82826B EAGLE HILLS WY 300' S/O PEREGRINE DR PEREGRINE DR EAGHWY 20 R AC $4,667 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 9110,50035300 84846B EAGLE`S NEST LN EAGLE HILLS WY 324' N/O EAGLE HILLS WY EAGNLN 10 R AC $4,896 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 8711,01634324 79796B EAGLE`S NEST LN 324' N/O EAGLE HILLS WY PEREGRINE DR EAGNLN 20 R AC $16,759 37,855 SEAL CRACKS, DIGOUTS, MICROSURFACING 8837,706341,109 80806B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 7 SS1026 MTC StreetSaver 11.A.a Packet Pg. 488 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID EAGLE VIEW WY LONGMEADOW DR 241' N/O QUAILWALK DR EAGVWY 10 R AC $13,827 36,888 SEAL CRACKS, DIGOUTS, MICROSURFACING 8831,11034915 81816B EAGLE VIEW WY 241' N/O QUAILWALK DR PEREGRINE DR EAGVWY 20 R AC $7,375 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 8916,59234488 82826B EDEN ST WREN AV FLORAL ST EDENST 10 R AC $20,596 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 8746,340351,324 79792B ELECTA CT LAS ANIMAS AVE CUL DE SAC ELECCT 10 R AC $9,328 62,562 SEAL CRACKS, DIGOUTS, MICROSURFACING 8520,98844477 77774B EL INVIERNO DR WREN AVE EL VERANO WY ELINDR 10 R AC $4,473 32,282 SEAL CRACKS, DIGOUTS, MICROSURFACING 9110,06434296 84842B EL VERANO WY LA PRIMAVERA WY EL INVIERNO DR ELVEWY 10 R AC $9,460 34,097 SEAL CRACKS, DIGOUTS, MICROSURFACING 9021,28434626 83832B ERVIN CT MONTEREY ROAD CUL DE SAC ERVICT 10 R AC $3,703 51,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 848,33034245 76767A FELLOM CT MURRAY AV END FELLCT 10 R AC $7,312 38,734 SEAL CRACKS, DIGOUTS, MICROSURFACING 8716,45037398 79794B FERAGALLI CT HIRASAKI DR CUL DE SAC FERACT 10 R AC $7,813 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 8817,57834517 80805A FESTA AGLIO CT HIRASAKI DR CUL DE SAC FESTCT 10 R AC $9,354 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 8621,04634619 78785A FESTA AGLIO DR HIRASAKI AV PADOVA DR FESTDR 90 R AC $13,969 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8931,43035898 82825A FILICE DR SOUTH END NORTH END FILIDR 10 R AC $44,215 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 8399,482372,591 75751A FINCH LN TWINBERRY WY LOGANBERRY DR FINCLN 10 R AC $9,158 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 9020,60434606 83836B FINE DR RIDGEWAY DR LEARNARD WY FINEDR 10 R AC $3,159 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 917,10634209 84846B FLORAL ST EDEN ST MANTELLI DR FLORST 10 R AC $9,629 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 8721,66535619 79792B FORUNATA PL FOREST ST GENNARO WAY FORTPL 10 R AC $3,414 68,305 SEAL CRACKS, DIGOUTS, MICROSURFACING 917,68020384 84844A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 8 SS1026 MTC StreetSaver 11.A.a Packet Pg. 489 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID FOXGLOVE CT END WILD IRIS DR FOXGCT 10 R AC $5,017 36,621 SEAL CRACKS, DIGOUTS, MICROSURFACING 8911,28834332 81816C FREEMAN CT LAS ANIMAS RD END FREECT 10 R AC $10,805 35,528 SEAL CRACKS, DIGOUTS, MICROSURFACING 8924,31129693 82825B GARFIELD CT MURRAY AV END GARFCT 10 R AC $7,283 35,664 SEAL CRACKS, DIGOUTS, MICROSURFACING 8916,38634422 82824B GASCONY CT AVEZON WAY CUL DE SAC GASCON 10 R AC $2,705 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 906,08634179 83835A GENNARO WY LEWIS ST FORTUNATA PLACE GENNWY 10 R AC $6,045 62,513 SEAL CRACKS, DIGOUTS, MICROSURFACING 8913,60034400 82824A GERONIMO ST ZUNI LANE SHOSHONE STREET GEROST 10 R AC $17,892 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 9140,256321,258 84846B GOLD FINCH CT SPARROW GLEN WAY CUL DE SAC GOLDFI 10 R AC $3,514 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 867,90534156 78786B GOLDEN SKY WY DREAM CATCHER WAY SUNRISE DRIVE GOLDWY 10 R AC $10,548 56,678 SEAL CRACKS, DIGOUTS, MICROSURFACING 8423,73234698 76766B GOSHAWK CT END LOGANBERRY DR GOSHCT 10 R AC $7,827 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 9017,61034463 83836B GRANT CT MURRAY AVE END GRANCT 10 R AC $6,239 35,660 SEAL CRACKS, DIGOUTS, MICROSURFACING 8914,03733374 82824B GRANDE DR CHEYENNE DR SPRIG WAY GRANDR 10 R AC $4,480 53,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 9110,08032315 84846B GREENFIELD DR LUCHESA AV N END GATE GREEDR 90 C AC $11,563 41,682 SEAL CRACKS, DIGOUTS, MICROSURFACING 8923,12631746 82827A GREYSTONE CT KERN AVE END GREYCT 10 R AC $7,963 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 8317,91635463 75755A HADLEY CT END ROGERS LN HADLCT 10 R AC $10,551 39,769 SEAL CRACKS, DIGOUTS, MICROSURFACING 8423,73833663 76764A HAWTHORNE ST WISTERIA DR ALDER ST HAWTST 10 R AC $3,267 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 897,35035210 82827A HAYFIELD ST POPPYFIELD ST GREENFIELD DR HAYFIE 10 R AC $7,813 34,259 SEAL CRACKS, DIGOUTS, MICROSURFACING 9017,57834517 83837A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 9 SS1026 MTC StreetSaver 11.A.a Packet Pg. 490 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID HERITAGE WY LIONS CREEK DR SOLEDAD ST HERIWY 10 R AC $5,336 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 9112,00535343 84846B HERSMAN DR SANTA BARBARA DR STEWART DR HERSDR 10 R AC $15,369 39,551 SEAL CRACKS, DIGOUTS, MICROSURFACING 8234,58035988 73731A HIRASAKI AVE LONG MEADOW DR END HIRAAV 20 C AC $7,200 35,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 9114,40045320 84845A HIRASAKI CT MANTELLI DR CUL DE SAC HIRACT 10 R AC $7,163 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 9116,11634474 84845A HOLLYHOCK CT HOLLYHOCK LN CUL DE SAC HLLYCT 10 R AC $3,467 74,280 SEAL CRACKS, DIGOUTS, MICROSURFACING 897,80020390 82826C HOGAN WY END SADDLER DR HOGAWY 10 R AC $10,898 39,213 SEAL CRACKS, DIGOUTS, MICROSURFACING 8624,52035628 78786B HOLLYHOCK LN MANTELLI DR HOLLYHOCK CT HOLLLN 10 R AC $17,334 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 8539,000201,950 77776C HONEY CT FLORAL ST END HONECT 10 R AC $3,364 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 877,56835165 79792B HOOVER CT END ROGERS LN HOOVCT 10 R AC $6,894 39,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 8615,51030517 78784A HOPI LN SUNRISE DR O'KEEFE CT HOPILN 10 R AC $10,687 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 8724,04535687 79796B IRONBARK ST STONECRESS ST MANTELLI DR IRONST 10 R AC $4,018 39,149 SEAL CRACKS, DIGOUTS, MICROSURFACING 909,04020452 83836C JACARANDA WY SOUTH END NORTH END JACAWY 10 R AC $12,023 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 8627,05135724 78786B JACKDOW CT END EAGLE`S NEST LN JACKCT 10 R AC $3,076 32,160 SEAL CRACKS, DIGOUTS, MICROSURFACING 916,91934151 84846B JARDIN WY BRAZOS ST BOSQUE ST JARDWY 10 R AC $5,547 58,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 9112,48032390 84842B JICARILLA PL EAGLE VIEW WAY COOPER PL JCAPL 10 R AC $9,672 53,890 SEAL CRACKS, DIGOUTS, MICROSURFACING 8921,76034640 82826B KENNEDY CT MURRAY AV END KENNCT 10 R AC $7,958 38,734 SEAL CRACKS, DIGOUTS, MICROSURFACING 8717,90436445 79794B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 10 SS1026 MTC StreetSaver 11.A.a Packet Pg. 491 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID KESTREL CT CREST HILL DR END KESTCT 10 R AC $3,076 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 906,91934235 83836C KIOWA CT JICARILLA PL CUL DE SAC KIOWCT 10 R AC $3,414 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 917,68032240 84846B KISHIMURA DR FOREST ST MURRAY AV KISHST 10 R AC $15,968 60,360 SEAL CRACKS, DIGOUTS, MICROSURFACING 8235,92646781 73734B KITE DR PEREGRINE DR SUNRISE DR KITEDR 10 R AC $3,461 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 867,78634229 78786B KOSHARE PL COMANCHE ST SHOSHONE ST KOSHPL 10 R AC $10,956 47,858 SEAL CRACKS, DIGOUTS, MICROSURFACING 8724,65034725 79796B LA PRIMAVERA WY WREN AVE TAOS WAY LAPRWY 10 R AC $12,648 38,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8728,45834837 79792B LAREDO WY SUNRISE DR RIO GRANDE WY LAREWY 10 R AC $6,456 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8914,52535415 82826B LARIAT DR SAGE HILL DR ARAPAHO DR LARIDR 10 R AC $10,220 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 9022,99535657 83836B LAS ANIMAS AV MONTEREY RD ROAD NARROWS LASAAV 30 R AC $9,097 38,732 SEAL CRACKS, DIGOUTS, MICROSURFACING 8720,46834602 79794B LEARNARD WY MANTELLI DR BRENTWOOD LN LEARWY 10 R AC $8,523 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 8619,17634564 78786B LILLY AVE LIMAN AVE RONAN AVE LILLAV 20 R AC $4,505 35,615 SEAL CRACKS, DIGOUTS, MICROSURFACING 8910,13628362 82822B LINARIA ST BANYAN ST OLEA CT LINAST 10 R AC $3,503 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 847,88020394 76766C LINCOLN CT MURRAY AV END LINCCT 10 R AC $8,039 39,664 SEAL CRACKS, DIGOUTS, MICROSURFACING 8218,08737440 74744B LINNET CT DOVETAIL WAY CUL DE SAC LINNET 10 R AC $6,105 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 8813,73634404 80806B LISA CT END NICOLE WY LISACT 10 R AC $4,748 38,770 SEAL CRACKS, DIGOUTS, MICROSURFACING 8710,68130308 79797B LOGANBERRY DR PARTRIDGE DR PHEASANT DR LOGADR 10 R AC $20,703 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 9146,580341,370 84846B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 11 SS1026 MTC StreetSaver 11.A.a Packet Pg. 492 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID LONGMEADOW CT RANCHO HILLS DR W END LONGCT 10 R AC $17,500 32,656 SEAL CRACKS, DIGOUTS, MICROSURFACING 9239,375251,575 86866C LONGMEADOW DR RANCHO HILLS DR TRAILBLAZER WY LONMDR 10 C AC $22,000 33,556 SEAL CRACKS, DIGOUTS, MICROSURFACING 8444,000441,000 76766B LONGMEADOW DR SANTA TERESA BLVD HIRASAKI DR LONMDR 40 C AC $10,854 35,429 SEAL CRACKS, DIGOUTS, MICROSURFACING 9121,70854402 84845A LOS PADRES CT SAN MIGUEL ST END LOSPCT 10 R AC $8,384 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 8218,86437461 74741A LUCHESSA AVE THOMAS DR GREENFIELD DR LUCHAV 10 A AC $68,196 46,570 SEAL CRACKS, DIGOUTS, MICROSURFACING 86136,391711,921 79797A LUCHESSA AVE CIMINO ST GREENFIELD DR LUCHAV 60 R AC $18,169 70,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 9140,88056730 84847A MADISON CT MURRAY AV END MADICT 10 R AC $7,362 35,660 SEAL CRACKS, DIGOUTS, MICROSURFACING 8916,56335422 82824B MANTELLI DR END LARKSPUR LN MANTDR 10 C AC $77,748 35,105 SEAL CRACKS, DIGOUTS, MICROSURFACING 87155,496443,534 79796C MANTELLI DR LARKSPUR LN RANCHO HILLS MANTDR 20 C AC $35,068 35,661 SEAL CRACKS, DIGOUTS, MICROSURFACING 8870,136441,594 81816C MARTIRI DR HIRASAKI AV PADOVA DR MARTDR 90 R AC $9,334 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8421,00035600 76765A MARTIRI CT HIRASAKI DR CUL DE SAC MARTIR 10 R AC $6,725 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 8815,13034445 80805A MIMOSA CT BANYAN CT END MIMOCT 10 R AC $5,180 71,083 SEAL CRACKS, DIGOUTS, MICROSURFACING 8911,65521555 82826C MOCKINGBIRD LN RED HAWK DR PHEASANT DR MOCKDR 10 R AC $6,710 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 9115,09634444 84846B MONTICELLI CT HIRASAKI DR CUL DE SAC MONTCT 10 R AC $5,909 32,160 SEAL CRACKS, DIGOUTS, MICROSURFACING 9113,29434391 84845A MORO CT HIRASAKI DR CUL DE SAC MOROCT 10 R AC $8,327 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 8618,73434551 78785A MORO DR HIRASAKI AV PADOVA DR MORODR 90 R AC $8,523 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8419,17634564 76765A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 12 SS1026 MTC StreetSaver 11.A.a Packet Pg. 493 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID MURAOKA DR NAGAREDA DR YAMANE DR MURAOK 010 R AC $19,620 37,005 SEAL CRACKS, DIGOUTS, MICROSURFACING 8844,14545981 81814B NAGAREDA DR FOREST DR MURAOKA DR NAGARE 010 R AC $10,520 37,928 SEAL CRACKS, DIGOUTS, MICROSURFACING 8823,67045526 80804B NAVAJO CT CHEYENNE DR CUL DE SAC NAVACT 10 R AC $1,814 35,500 SEAL CRACKS, DIGOUTS, MICROSURFACING 914,08034120 84846B NECTAR CT END FLORAL ST NECTCT 10 R AC $2,892 38,464 SEAL CRACKS, DIGOUTS, MICROSURFACING 876,50637127 79792B NORTH EGRET CT CREST HILL DR END NEGRCT 10 R AC $2,683 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 896,03534125 82826C NICOLE CT END NICOLE WY NICOCT 10 R AC $4,336 39,825 SEAL CRACKS, DIGOUTS, MICROSURFACING 839,75436240 75757B NICOLE WY MESA RD CARIGNANE DR NICOWY 10 R AC $15,776 39,618 SEAL CRACKS, DIGOUTS, MICROSURFACING 8535,49636986 77777B NINTH ST VALLEY FORGE DR PRINCEVALLE ST NINTST 10 R AC $16,116 37,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 8836,26037980 80801A NONAME UNO AVE LAS ANIMAS RD ADDRESS' 9850 NO. UNO NONUAV 10 A AC $56,100 43,252 SEAL CRACKS, DIGOUTS, MICROSURFACING 75112,200303,740 66664C OAK CT HANNA ST HANNA ST OAKCR 10 R AC $6,036 39,669 SEAL CRACKS, DIGOUTS, MICROSURFACING 8213,58127503 74742B OHLONE WAY SUNRISE DR SPRIG WAY OHLONE 10 R AC $6,408 35,530 SEAL CRACKS, DIGOUTS, MICROSURFACING 8914,41634424 82826B OKEEFE CT HOPI LN E. END CDS OKEECT 10 R AC $9,847 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,15535633 79796B ORCHARD DR TENTH ST 95' N/O DEARBORN PL ORCHDR 10 R AC $12,926 39,662 SEAL CRACKS, DIGOUTS, MICROSURFACING 8229,08237786 74741A ORINDA WY MARIPOSA ST LONG MEADOW DR ORINWY 10 R AC $9,536 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 8821,45636596 80806B PADOVA DR SORRENTO DR MORO DR PADODR 90 R AC $13,767 61,624 SEAL CRACKS, DIGOUTS, MICROSURFACING 8430,97535885 76765A PADOVA DR SIENA CT SORRENTO DR PADOVA 10 R AC $14,326 69,440 SEAL CRACKS, DIGOUTS, MICROSURFACING 8632,23234948 78785A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 13 SS1026 MTC StreetSaver 11.A.a Packet Pg. 494 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID PARTRIDGE DR END CALLE DEL REY PARTDR 10 R AC $15,736 36,886 SEAL CRACKS, DIGOUTS, MICROSURFACING 8835,40535939 81816B PEACOCK CT CALLE DEL REY END PEAKCT 10 R AC $3,816 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 918,58534200 84846B PEREGRINE DR RANCHO HILLS DR EAGLE VIEW WY PEREDR 10 R AC $25,568 39,214 SEAL CRACKS, DIGOUTS, MICROSURFACING 8657,528341,692 78786B PERIWINKLE DR END MANTELLI DR PERIDR 10 R AC $8,063 39,575 SEAL CRACKS, DIGOUTS, MICROSURFACING 8518,14120766 77776C PHEASANT DR THISTLE WY CALLE DEL REY PHEADR 10 R AC $22,667 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 8951,000341,500 82826B PONDEROSA DR THIRD ST CYPRESS CT PONDDR 10 R AC $12,534 38,752 SEAL CRACKS, DIGOUTS, MICROSURFACING 8728,20030940 79791B PRAIRIE OWL CT SPRIG WY N. END CDS PRAICT 10 R AC $4,340 67,108 SEAL CRACKS, DIGOUTS, MICROSURFACING 869,76535279 78786B PUEBLO CT ZUNI LN W. END PUEBCT 10 R AC $6,828 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8915,36327569 82826B QUAILWALK DR PEREGRINE DR 500' SOUTH OF PEREGRINE DR QUAIDR 10 R AC $7,556 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 9117,00034500 84846B RANCHO HILLS DR LONGMEADOW DR 347' N/O LONGMEADOW DR RANHDR 40 C AC $7,634 35,863 SEAL CRACKS, DIGOUTS, MICROSURFACING 8915,26844347 82826B RANCHO HILLS DR 347' N/O LONGMEADOW DR END RANHDR 50 C AC $65,472 35,863 SEAL CRACKS, DIGOUTS, MICROSURFACING 89130,944442,976 82826B RED HAWK DR MOCKINGBIRD LN CALLE DEL REY REDHDR 10 R AC $7,783 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 9117,51034515 84846B RIDGEWAY DR RANCHO HILLS DR FINE DR RIDGDR 10 R AC $13,056 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 9029,37634864 83836B RIO GRANDE WY LAREDO WY SEDONA WY RIGRWY 10 R AC $8,024 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8918,05434531 82826B ROCKROSE CT LARKSPUR LN END ROCKCT 10 R AC $4,054 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 899,12120315 82826C ROGERS LN SIXTH ST LEWIS ST ROGELN 10 R AC $17,067 39,256 SEAL CRACKS, DIGOUTS, MICROSURFACING 8638,400301,280 78784A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 14 SS1026 MTC StreetSaver 11.A.a Packet Pg. 495 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID RONAN AVE WREN AVE CHURCH ST RONAAV 10 R AC $21,560 38,715 SEAL CRACKS, DIGOUTS, MICROSURFACING 8748,510351,386 79792B SADDLER DR WAGON WY SPRIG WY SADDL 10 R AC $15,447 58,997 SEAL CRACKS, DIGOUTS, MICROSURFACING 8134,75535993 72726B SAGEWOOD CT RED HAWK DR NORTH END (CUL-DE-SAC) SAGECT 10 R AC $2,872 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 916,46034190 84846B SANTA INEZ CT SAN MIGUEL ST END SANICT 10 R AC $8,467 39,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 8319,04937466 75751A SANTA FE DR TAOS WY CHURCH ST SANTFE 10 R AC $6,793 39,463 SEAL CRACKS, DIGOUTS, MICROSURFACING 8515,28329527 77772B SEDONA WY SUNRISE DR RIO GRANDE WY SEDOWY 10 R AC $6,472 40,716 SEAL CRACKS, DIGOUTS, MICROSURFACING 8914,56035416 82826B SOUTH EGRET CT END CREST HILL DR SEGRCT 10 R AC $2,940 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 916,61334142 84846C SENEGAL CT CUL DE SAC LOGANBERRY DR SENECT 10 R AC $7,163 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 9116,11634474 84846B SHOOTING STAR CT HOLLYHOCK LANE CUL DE SAC SHOOCT 10 R AC $3,631 77,687 SEAL CRACKS, DIGOUTS, MICROSURFACING 908,16921389 83836C SHOSHONE WY KOSHARE STREET PUBELO COURT SHOSWY 10 R AC $4,831 58,403 SEAL CRACKS, DIGOUTS, MICROSURFACING 9110,86826418 84846B SIENA DR HIRASAKI DR SORRENTO CT SIENAD 10 R AC $10,261 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 8823,08634679 80805A SIENA CT HIRASAKI DR CUL DE SAC SIENCT 10 R AC $9,838 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 8822,13434651 80805A SIXTH ST PRINCEVALLE ST CHURCH ST SIXTST 30 C AC/AC $48,150 61,272 SEAL CRACKS, DIGOUTS, MICROSURFACING 8296,300501,926 73733B SIXTH ST EIGLEBERRY RD RR TRACKS SIXTST 45 C AC/AC $12,348 42,565 SEAL CRACKS, DIGOUTS, MICROSURFACING 8724,69642588 79793B SAN JUSTO ROAD MILLER RD END SNJURD 10 R AC $14,934 71,994 SEAL CRACKS, DIGOUTS, MICROSURFACING 9133,600241,400 84847B SOLANA DR VALBUSA DR LONGMEADOW DR SOLADR 10 R AC $13,440 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 8730,24035864 79796B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 15 SS1026 MTC StreetSaver 11.A.a Packet Pg. 496 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID SOLEDAD ST HERTIAGE WY 248' S/O LERMA LN SOLEST 10 R AC $4,851 32,163 SEAL CRACKS, DIGOUTS, MICROSURFACING 9110,91434321 84846B SOLEDAD ST 248' S/O LERMA LN LERMA LN SOLEST 20 R AC $3,858 37,853 SEAL CRACKS, DIGOUTS, MICROSURFACING 888,68035248 80806B SORRENTO CT HIRASAKI DR CUL DE SAC SORRCT 10 R AC $10,820 32,160 SEAL CRACKS, DIGOUTS, MICROSURFACING 9124,34434716 84845A SORRENTO DR HIRASAKI DR PADOVA DR SORRDR 10 R AC $11,696 60,547 SEAL CRACKS, DIGOUTS, MICROSURFACING 8326,31634774 75755A SPARROW GLEN WAY DOVETAIL WAY SUNRISE DR SPARGL 10 R AC $9,853 38,679 SEAL CRACKS, DIGOUTS, MICROSURFACING 8722,16834652 79796B SPENCER CT MANTELLI DR CUL DE SAC SPENCT 10 R AC $11,328 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 9025,48835677 83835A SPRIG WY SADDLER WY RODEO DR SPRIWY 20 R AC $13,026 63,306 SEAL CRACKS, DIGOUTS, MICROSURFACING 8429,30834862 76766B STARLING DR ALDER ST BABBS CREEK DR STARDR 10 R AC $6,269 60,249 SEAL CRACKS, DIGOUTS, MICROSURFACING 8214,10535403 73737A ST CLAR AVE KERN AVE AVEZAN WAY STCLAR 10 R AC $5,758 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 9012,95434381 83835A ST FRANCIS CT SAN MIGUEL ST END STFRCT 10 R AC $8,582 37,950 SEAL CRACKS, DIGOUTS, MICROSURFACING 8819,30837473 80801A STONECRESS ST COUNTRY DR BANYAN ST STONST 10 R AC $19,964 70,075 SEAL CRACKS, DIGOUTS, MICROSURFACING 8744,919212,139 79796C SUNFLOWER CIR WEST END STRAWBERRY LN SUNCIR 10 R AC $3,814 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 838,58020429 75756C SUNFLOWER CIR STRAWBERRY LN COUNRTY DR SUNCIR 20 R AC $13,538 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 8930,460201,523 82826C SWALLOW LN TWINBERRY WY LOGANBERRY DR SWALLN 10 R AC $9,868 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 9022,20234653 83836B TAOS WAY RONAN AVE LA PRIMAVERA WAY TAOSWY 10 R AC $9,964 35,617 SEAL CRACKS, DIGOUTS, MICROSURFACING 8922,41729773 82822B TAOS WAY TAOS WAY END TAOSWY 20 R AC $1,844 35,617 SEAL CRACKS, DIGOUTS, MICROSURFACING 894,14729143 82822B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 16 SS1026 MTC StreetSaver 11.A.a Packet Pg. 497 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID TATUM AVE KERN AVE AVEZAN WAY TATUMA 10 R AC $5,894 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 9013,26034390 83835A TEAL CT END VINCA CT TEALCT 10 R AC $3,208 57,700 SEAL CRACKS, DIGOUTS, MICROSURFACING 817,21835155 72727A TEA TREE CT CREST HILL WAY END TEATCT 10 R AC $5,882 58,600 SEAL CRACKS, DIGOUTS, MICROSURFACING 8713,23426509 79796C TEA TREE WY TEA TREE COURT END TEATWY 10 R AC $14,579 63,586 SEAL CRACKS, DIGOUTS, MICROSURFACING 8932,802211,562 81816C TENTH ST 150 E/O ROSANNA ST MONTEREY RD TENTST 30 A AC $31,926 44,966 SEAL CRACKS, DIGOUTS, MICROSURFACING 7863,85167953 69691A THIRD ST COBBLESTONE CT/THIRD ST RAB 470FT W/O ROSEMARY WY THIRST 100 R AC $25,667 50,204 SEAL CRACKS, DIGOUTS, MICROSURFACING 9257,750351,650 86867B THIRD ST ISABELLA WY COBBLESTONE CT/THIRD ST RAB THIRST 70 R AC $5,334 44,210 SEAL CRACKS, DIGOUTS, MICROSURFACING 9012,00030400 83837B COBBLESTONE CT/THIRD ST RAB THIRD ST THIRD ST THIRST 75 R AC $1,849 54,590 SEAL CRACKS, DIGOUTS, MICROSURFACING 944,16016260 8888 THISTLE WY PHEASANT DR BRIARBERRY LN THISWY 10 R AC $3,385 32,156 SEAL CRACKS, DIGOUTS, MICROSURFACING 917,61634224 84846B THOMAS RD 675' N/O OAK BROOK WY LUCHESSA AVE THOMRD 60 A AC $3,383 39,835 SEAL CRACKS, DIGOUTS, MICROSURFACING 906,76541165 84847A TWINBERRY WY FINCH LN SWALLOW LN TWINWY 10 R AC $3,400 33,990 SEAL CRACKS, DIGOUTS, MICROSURFACING 907,65034225 83836B UVAS PARK DR THIRD ST LAUREL DR UVAPDR 10 C AC $18,784 34,025 SEAL CRACKS, DIGOUTS, MICROSURFACING 8537,568321,174 77771A VALBUSA DR SOLANA DR JACARANDA WY VALBDR 10 R AC $14,265 33,992 SEAL CRACKS, DIGOUTS, MICROSURFACING 9032,09535917 83836B VALLEY FORGE DR TENTH ST NINTH ST VALFDR 10 R AC $9,752 37,043 SEAL CRACKS, DIGOUTS, MICROSURFACING 8821,94137593 81811A VALLEY OAKS CT CREST HILL DR END VALOCT 10 R AC $6,196 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 9013,94034410 83836C VALLEY OAKS DR CREST HILL DR RANCHO HILLS DR VALODR 10 R AC $25,176 35,533 SEAL CRACKS, DIGOUTS, MICROSURFACING 8956,644341,666 82826C Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 17 SS1026 MTC StreetSaver 11.A.a Packet Pg. 498 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID VENTURE WY CAMINO ARROYO CAMERON BLVD VENTWY 10 C AC $27,016 51,879 SEAL CRACKS, DIGOUTS, MICROSURFACING 8754,032441,228 80807C VICKERY AVE NIGHTINGALE DR WREN AVE VICKAV 20 R AC $10,112 46,438 SEAL CRACKS, DIGOUTS, MICROSURFACING 8822,75035650 80805B VIOLET WY KELTON DR CUL DE SAC VIOLWY 10 R AC $11,838 33,995 SEAL CRACKS, DIGOUTS, MICROSURFACING 9026,63535761 83835A WEAVER CT END WOODWORTH WY WEAVCT 10 R AC $4,024 37,901 SEAL CRACKS, DIGOUTS, MICROSURFACING 889,05230207 80802B WILDROSE CT SUNFLOWER CIR CUL DE SAC WILDCT 10 R AC $3,316 39,818 SEAL CRACKS, DIGOUTS, MICROSURFACING 837,46120232 75756C WILD IRIS DR SOUTH SIDE OF ROUNDABOUT LAVENDER WAY WILIDR 20 R AC $7,823 65,311 SEAL CRACKS, DIGOUTS, MICROSURFACING 8917,60020880 81816C WILLY CT MURRAY AV CUL DE SAC WILYCT 10 R AC $6,970 39,601 SEAL CRACKS, DIGOUTS, MICROSURFACING 8515,68237375 77774B WISTERIA DR HAWTHORNE ST THOMAS RD WISTDR 10 R AC $8,176 35,748 SEAL CRACKS, DIGOUTS, MICROSURFACING 8918,39434541 82827A WREN AVE CITY LIMITS END NORTH WRENAV 100 A AC $30,000 27,867 SEAL CRACKS, DIGOUTS, MICROSURFACING 9460,000481,250 88885B WREN AVE 125' S/O WELBURN AVE 125' S/O LAWRENCE DR WRENAV 20 A AC/AC $28,488 79,823 SEAL CRACKS, DIGOUTS, MICROSURFACING 9056,975431,325 83832B WREN AVE 125' S/O LAWRENCE DR MANTELLI DR WRENAV 30 A AC/AC $34,069 56,460 SEAL CRACKS, DIGOUTS, MICROSURFACING 8268,138621,099 74742B WREN AVE MANTELLI DR RONAN AVE WRENAV 40 A AC $14,549 43,252 SEAL CRACKS, DIGOUTS, MICROSURFACING 8929,09761477 82822B WREN AVE RONAN AVE TATUM AVE WRENAV 50 A AC $19,393 45,011 SEAL CRACKS, DIGOUTS, MICROSURFACING 7838,78643902 69692B WREN AVE FARREL DR CITY LIMITS WRENAV 65 A AC $16,293 46,870 SEAL CRACKS, DIGOUTS, MICROSURFACING 8632,58549665 78785B YUCCA CT CHEYENNE DR CUL DE SAC YUCCCT 10 R AC $1,778 49,369 SEAL CRACKS, DIGOUTS, MICROSURFACING 894,00032125 82826B ZINNIA ST VIOLET WY MANTELLI DR ZINNST 10 R AC $4,736 60,759 SEAL CRACKS, DIGOUTS, MICROSURFACING 8310,65637288 74745A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 18 SS1026 MTC StreetSaver 11.A.a Packet Pg. 499 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID ZINNIA ST MANTELLI DR DAFFODIL PL ZINNST 20 R AC $12,316 39,576 SEAL CRACKS, DIGOUTS, MICROSURFACING 8527,71034815 77775A ZUNI LN SUNRISE DR PUEBLO CT ZUNILN 10 R AC $10,624 73,253 SEAL CRACKS, DIGOUTS, MICROSURFACING 8823,90234703 80806B $2,974,904Treatment Total AYER DR SANTA BARBARA DR END AYERDR 10 R AC $40,624 23,282 SLURRY SEAL W/DIGOUTS 7360,936351,685 63631A BLACKSMITH DR TRAILBLAZER WY SADDLER DR BLACDR 10 R AC $13,394 25,612 SLURRY SEAL W/DIGOUTS 7120,09035574 60606B BLACKWING WY RANCHO HILLS DR EAGLE HILLS WY BLACWY 10 R AC $12,787 28,672 SLURRY SEAL W/DIGOUTS 7119,18035548 61616B BLAKE CT END SANTA THERESA DR BLAKCT 10 R AC $13,161 25,319 SLURRY SEAL W/DIGOUTS 7819,74135508 69691A BURCHELL RD HWY 152 BLUEBELL DR BURCRD 10 R AC $18,216 25,078 SLURRY SEAL W/DIGOUTS 7727,324122,277 68686C BYERS ST SANTA PAULA DR WREN AVE BYERST 10 R AC $21,411 23,961 SLURRY SEAL W/DIGOUTS 7532,11637868 65651A CARIGNANE DR MICHELLE CT MESA RD CARIDR 10 R AC $20,472 22,947 SLURRY SEAL W/DIGOUTS 7230,70836853 62627B CARR PL END SIXTH ST CARRPL 10 R AC $18,401 24,655 SLURRY SEAL W/DIGOUTS 7627,60135735 67671A CHRISTINE CT CARIGNANE DR END CHRICT 10 R AC $3,751 22,947 SLURRY SEAL W/DIGOUTS 725,62628142 62627B CULP DR HOESCH WY KERN AVE CULPDR 10 R AC $18,107 23,697 SLURRY SEAL W/DIGOUTS 7427,16035776 64645A EAST CT WELBURN AVE END EASTCT 10 R AC $4,672 22,986 SLURRY SEAL W/DIGOUTS 727,00837145 62622B EMERSON CT PETERSEN DR END EMERCT 10 R AC $4,854 25,077 SLURRY SEAL W/DIGOUTS 777,28135152 68685A FALCON CT END EAGLE HILLS WY FALCCT 10 R AC $7,939 25,367 SLURRY SEAL W/DIGOUTS 7811,90835289 69696B FOWLER ST HOXETT ST WENTZ DR FOWLST 10 R AC $11,620 24,654 SLURRY SEAL W/DIGOUTS 7617,43035498 67671A HENNESSEY WY CHURCH ST SEVERANCE ST HENNWY 10 R AC $5,582 24,015 SLURRY SEAL W/DIGOUTS 758,37228299 65655B HOESCH WY SILVIA ST CULP DR HOESWY 10 R AC $16,104 24,014 SLURRY SEAL W/DIGOUTS 7524,15636671 65655A KAREN CT CARIGNANE DR END KARECT 10 R AC $7,783 24,332 SLURRY SEAL W/DIGOUTS 7511,67428358 66667B KENSINGTON PL END VICTORIA DR KENSPL 10 R AC $11,831 23,950 SLURRY SEAL W/DIGOUTS 7517,74635451 65657A LA COCHE WY EL CERRITO WY END LACOWY 10 R AC $8,867 25,343 SLURRY SEAL W/DIGOUTS 7813,30019700 69692B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 19 SS1026 MTC StreetSaver 11.A.a Packet Pg. 500 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID LARKSPUR LN HOLLYHOCK LN MANTELLI DR LARKLN 10 R AC $10,254 25,077 SLURRY SEAL W/DIGOUTS 7715,38020769 68686C LEWIS ST FOREST ST ROGERS LN LEWIST 20 R AC $25,387 24,668 SLURRY SEAL W/DIGOUTS 7638,080351,088 67674A LILLY AVE CHURCH ST END LILLAV 10 R AC $15,787 23,671 SLURRY SEAL W/DIGOUTS 7423,68037640 64642B LIMAN AVE CHURCH ST MONTEREY RD LIMAAV 10 R AC $18,720 22,986 SLURRY SEAL W/DIGOUTS 7228,08030936 62622B MILLER AVE 2000' NORTH OF MESA RD SANTA TERESA BLVD MILLAV 60 R AC $65,243 25,026 SLURRY SEAL W/DIGOUTS 7797,864263,764 68687B OAK BROOK WY RAPSBERRY CT THOMAS RD OAKBWY 10 R AC $21,080 25,308 SLURRY SEAL W/DIGOUTS 7831,62034930 69697A OAK BROOK WY RASPBERRY CT GREENFIELD DR OAKBWY 20 R AC $25,931 25,308 SLURRY SEAL W/DIGOUTS 7838,896341,144 69697A OBATA CT OBATA WAY CUL DE SAC OBATCT 10 R AC $16,046 22,459 SLURRY SEAL W/DIGOUTS 7424,06844547 64647C OLD GILROY ST MONTEREY RD CHESTNUT ST OLDGIL 10 R AC $45,000 22,322 SLURRY SEAL W/DIGOUTS 7067,500451,500 60604A OLEA CT W END CDS E END CDS OLEACT 10 R AC $14,238 27,148 SLURRY SEAL W/DIGOUTS 7521,357211,017 65656C ORCHARD DR EIGHTH ST CUMBERLAND DR ORCHDR 30 R AC $24,790 25,037 SLURRY SEAL W/DIGOUTS 7737,185371,005 68683B ORTEGA CIR HACIENDA DR WREN AVE ORTEDR 10 R AC $40,010 22,959 SLURRY SEAL W/DIGOUTS 7260,014371,622 62621B OUSLEY DR MUIR DR SOLIS DR OUSLDR 10 R AC/AC $20,328 32,071 SLURRY SEAL W/DIGOUTS 7830,49236847 69696C OUSLEY DR SOLIS DR WELBURN AV OUSLDR 20 R AC $17,376 22,667 SLURRY SEAL W/DIGOUTS 7126,06436724 61616C PAMPAS LN ORINDA WY JACARANDA WY PAMPLN 10 R AC $10,127 24,397 SLURRY SEAL W/DIGOUTS 7615,19035434 66666B PETERSEN DR GAUNT AVE KELTON DR PETEDR 10 R AC $17,454 25,366 SLURRY SEAL W/DIGOUTS 7826,18035748 69695A RAMONA WY AMANDA AVE WREN AVE RAMOWY 20 R AC/AC $20,128 24,337 SLURRY SEAL W/DIGOUTS 7130,19237816 60605A SANTA PAULA DR CRAWFORD DR SAN MIGUEL ST SANPDR 10 R AC $19,734 25,038 SLURRY SEAL W/DIGOUTS 7729,60037800 68681A SANTA PAULA DR SAN MIGUEL ST HACIENDA DR SANPDR 20 R AC $22,546 25,319 SLURRY SEAL W/DIGOUTS 7833,81837914 69691A SANTA MARIA CT SAN MIGUEL ST END SANTCT 10 R AC $12,650 25,318 SLURRY SEAL W/DIGOUTS 7818,97537464 69691A SANTA THERESA DR SIXTH ST FOURTH ST SANTDR 10 R AC $31,267 25,037 SLURRY SEAL W/DIGOUTS 7746,900351,340 68681A SECOND ST EIGLEBERRY ST MONTEREY RD SECOST 40 R AC $12,174 22,625 SLURRY SEAL W/DIGOUTS 7118,26055332 61613B SEVERANCE ST HENNESSEY WY FARREL AVE SEVRST 10 R AC $10,943 26,576 SLURRY SEAL W/DIGOUTS 7316,41429566 63635B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 20 SS1026 MTC StreetSaver 11.A.a Packet Pg. 501 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID SILVIA ST HOESCH WY HOWARD AVE SILVST 10 R AC $8,954 22,357 SLURRY SEAL W/DIGOUTS 7113,43034395 60605A STEWART DR HERSMAN DR END STEWDR 10 R AC $10,879 25,319 SLURRY SEAL W/DIGOUTS 7816,31835415 69691A TAFT CT MURRAY AVE CUL DE SAC TAFTCT 10 R AC $9,820 24,668 SLURRY SEAL W/DIGOUTS 7614,73033395 67674B THAYER CT CRAWFORD DR CUL DE SAC THAYCT 10 R AC $11,341 25,319 SLURRY SEAL W/DIGOUTS 7817,01135430 69691A TICONDEROGA PL CUL DE SAC CUMBERLAND DR TICOPL 10 R AC $13,218 23,645 SLURRY SEAL W/DIGOUTS 7419,82637487 64643B TRAVEL PARK CIR BOLSA RD MONTEREY RD TRAPCR 10 R AC $32,430 32,009 SLURRY SEAL W/DIGOUTS 7848,645451,081 69697C VICKERY AVE KERN AVE WREN AVE VICKAV 10 R AC $12,000 25,077 SLURRY SEAL W/DIGOUTS 7718,00020900 68685B VILLAGE PL LUCHESA AV RIVERVIEW CIR VILLPL 10 R AC $16,474 23,314 SLURRY SEAL W/DIGOUTS 7024,71035706 60607A VINCA CT CUL DE SAC THOMAS RD VINCCT 10 R AC $14,146 25,836 SLURRY SEAL W/DIGOUTS 7121,21835555 61617A WAGON WY SADDLER DR LONE DEER WY WAGOWY 10 R AC $15,260 25,612 SLURRY SEAL W/DIGOUTS 7122,89035654 60606B WENTZ DR WREN AVE CARR PL WENTDR 10 R AC $27,837 25,318 SLURRY SEAL W/DIGOUTS 7841,755351,193 69691A WILDGRASS CT POPPY FIELD ST CUL DE SAC WILDGR 10 R AC $9,679 25,306 SLURRY SEAL W/DIGOUTS 7814,51834427 69697A WOODWORTH WY CHURCH ST CUL DE SAC WOODWY 10 R AC $12,935 25,063 SLURRY SEAL W/DIGOUTS 7719,40230552 68682B $971,762Treatment Total BROADWAY WAYLAND LN HANNA ST BROAWY 10 R AC $329,241 10,511 RECONSTRUCT SURFACE (AC) 10043,512371,176 10102B CASEY ST END SWANSTON LN CASEST 10 R AC $196,310 10,511 RECONSTRUCT SURFACE (AC) 10025,94447552 20204B COHANSEY AVE NO NAME UNO AVE 350 E OF NONAME UNO AVE COHAAV 05 R AC $45,022 10,511 RECONSTRUCT SURFACE (AC) 1005,95017350 334C COHANSEY AVE 350 E OF NONAME UNO 360 E OF TERI CT COHAAV 15 R AC $92,359 10,511 RECONSTRUCT SURFACE (AC) 10012,20617718 10104C CYPRESS CT LAUREL DR WESTWOOD DR CYPREC 30 R AC $199,397 10,511 RECONSTRUCT SURFACE (AC) 10026,35236732 331B DEVILLE CT END EL DORADO DR DEVICT 10 R AC $94,251 10,511 RECONSTRUCT SURFACE (AC) 10012,45636296 22226C DOWDY ST EIGHTH ST SIXTH ST DOWDST 10 R AC $487,778 10,511 RECONSTRUCT SURFACE (AC) 10064,464481,343 24243B EIGHTH ST ALEXANDER ST CROCKER LN EIGHST 50 R AC $459,986 10,511 RECONSTRUCT SURFACE (AC) 10060,791371,643 21214A EL DORADO DR END TERESA BLVD ELDODR 10 R AC $296,735 10,511 RECONSTRUCT SURFACE (AC) 10039,216361,037 20202B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 21 SS1026 MTC StreetSaver 11.A.a Packet Pg. 502 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID ENGLE WY END LUCHESSA AVE ENGLWY 10 R AC $187,533 10,511 RECONSTRUCT SURFACE (AC) 10024,78437621 117C ESCHENBURG DR MILLER AVE PRINCEVALLE ST ESCHDR 10 R AC $375,716 10,511 RECONSTRUCT SURFACE (AC) 10049,654371,342 21213B GURRIES DR HANNA ST CHURCH ST GURRDR 10 R AC $195,137 10,511 RECONSTRUCT SURFACE (AC) 10025,78937697 332B HORNLEIN CT MONTEREY ST END HORNCT 10 R AC $75,667 10,511 RECONSTRUCT SURFACE (AC) 10010,00050200 16164A JAMIESON WY LUCHESSA AVE END JAMIWY 10 R AC $169,055 10,511 RECONSTRUCT SURFACE (AC) 10022,34237555 17177C JUNIPER DR CYPRESS CT WESTWOOD DR JUNIDR 10 R AC $227,333 10,511 RECONSTRUCT SURFACE (AC) 10030,04437812 20201B KENTWOOD CT WESTWOOD DR WESTWOOD DR KENTCT 10 R AC $286,406 10,511 RECONSTRUCT SURFACE (AC) 10037,851371,023 22221A MAYLOCK RD OBATA WAY ROSSI LN MAYLRD 20 R AC $359,901 10,511 RECONSTRUCT SURFACE (AC) 10047,564471,012 557C MICHELLE CT CARIGNANE DR END MICHCT 10 R AC $56,296 10,511 RECONSTRUCT SURFACE (AC) 1007,44020372 337B MONTE VISTA WY FOUTH ST FOURTH ST MONVWY 10 R AC $222,294 10,511 RECONSTRUCT SURFACE (AC) 10029,37837794 443B PAPPANI WY GAUNT AVE KELTON DR PAPPWY 10 R AC $244,971 10,511 RECONSTRUCT SURFACE (AC) 10032,37537875 21215A PIERCE ST CHURCH ST MONTEREY ST PIERST 10 R AC $215,295 10,511 RECONSTRUCT SURFACE (AC) 10028,45337769 332B PRINCEVALLE ST THIRD ST FIRST ST PRINST 40 R AC $416,750 10,511 RECONSTRUCT SURFACE (AC) 10055,077331,669 003B REDWOOD LN END WESTWOOD DR REDWLN 10 R AC $141,142 10,511 RECONSTRUCT SURFACE (AC) 10018,65337453 19191B $5,374,575Treatment Total ARNOLD DR WAYLAND LN END ARNODR 10 R AC $126,034 38,654 MILL AND THIN OVERLAY 10056,715371,484 42422B CYPRESS CT WEST WOOD DR CUL DE SAC CYPRCT 10 R AC $120,889 38,103 MILL AND THIN OVERLAY 10054,400341,600 4545 DELTA CT END DELTA DR DELTCT 10 R AC $18,323 37,986 MILL AND THIN OVERLAY 1008,24537174 45456C DELTA DR EL DORADO DR MANTELLI DR DELTDR 10 R AC $169,840 38,635 MILL AND THIN OVERLAY 10076,428362,123 42426C DRIFTWOOD TER WESTWOOD DR JUNIPER DR DRIFTR 10 R AC $92,336 39,024 MILL AND THIN OVERLAY 10041,551371,123 40401B EL CAMINITO LERMA LN LONG MEADOW DR ELCAMI 10 R AC $81,667 37,892 MILL AND THIN OVERLAY 10036,750351,050 45456B EL CERRITO WY PARISH WY WREN AVE ELCEWY 10 R AC $51,472 38,224 MILL AND THIN OVERLAY 10023,16237626 44445A EL CERRITO WY WREN AVE WAYLAND LN ELCEWY 20 R AC $92,665 38,244 MILL AND THIN OVERLAY 10041,699371,127 44442B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 22 SS1026 MTC StreetSaver 11.A.a Packet Pg. 503 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID EL TORO WY HANNA ST LA COCHE WY ELTOWY 20 R AC $23,516 36,941 MILL AND THIN OVERLAY 10010,58237286 49492B FAIRVIEW DR PRINCEVALLE ST HANNA ST FAIRDR 10 R AC $87,320 38,266 MILL AND THIN OVERLAY 10039,294371,062 44441A GARY ST LAWRENCE DR WREN AVE GARYST 10 R AC $84,196 37,749 MILL AND THIN OVERLAY 10037,888371,024 46465A GLENWOOD DR EL CERRITO WY WELBURN AVE GLENDR 10 R AC $51,554 38,244 MILL AND THIN OVERLAY 10023,19937627 44442B HACIENDA DR ORTEGA CIR END HACIDR 10 R AC $98,325 38,266 MILL AND THIN OVERLAY 10044,246371,147 44441B HANNA ST FIRST ST WELBURN AVE HANNST 10 R AC $229,263 38,653 MILL AND THIN OVERLAY 100103,168521,984 42422B KELTON DR FIRST ST SWANER DR KELTDR 10 R AC $96,523 38,825 MILL AND THIN OVERLAY 10043,435351,241 41415A KELTON DR SWANER DR VIOLET WY KELTDR 20 R AC $114,723 38,824 MILL AND THIN OVERLAY 10051,625351,475 41415A LEXINGTON PL END PRINCEVALLE ST LEXIPL 10 R AC $52,938 38,470 MILL AND THIN OVERLAY 10023,82237595 43433B LUPINE CT END LIONS CREEK DR LUPICT 10 R AC $30,247 38,369 MILL AND THIN OVERLAY 10013,61135340 43436B MAYLOCK RD END OBATA WY MAYLRD 10 R AC $79,192 38,623 MILL AND THIN OVERLAY 10035,63645670 42427C MILLER AVE SANTA TERESA BLVD UVAS PARK DR MILLAV 10 R AC $363,760 38,276 MILL AND THIN OVERLAY 100163,692364,547 44447A MONTE BELLO DR SANTA BARBARA DR WREN AVE MONBDR 10 R AC $125,472 37,529 MILL AND THIN OVERLAY 10056,462371,526 47471B NINTH ST CHURCH ST MONTEREY RD NINTST 30 R AC $54,720 38,028 MILL AND THIN OVERLAY 10024,62438648 45451A ORCHARD DR CUMBERLAND DR SIXTH ST ORCHDR 40 R AC $31,200 37,093 MILL AND THIN OVERLAY 10014,04036390 48483B PERRELLI ST WREN AVE FILICE DR PERRST 10 R AC $84,525 38,856 MILL AND THIN OVERLAY 10038,036371,028 41411A REA ST FOURTH ST SECOND ST REAST 10 R AC $90,960 36,968 MILL AND THIN OVERLAY 10040,932361,137 49493B SANTA BARBARA DR HERSMAN DR 130' S/O SAN MIGUEL DR SANBDR 10 R AC $38,727 38,267 MILL AND THIN OVERLAY 10017,42737471 44441A SANTA BARBARA DR THIRD ST MONTE BELLO DR SANBDR 30 R AC $67,669 38,673 MILL AND THIN OVERLAY 10030,45137823 42421B SHERWOOD DR WAYLAND LN END SHERDR 10 R AC $123,567 38,653 MILL AND THIN OVERLAY 10055,605371,454 42422B STONEY CT END SIXTH ST STONCT 10 R AC $36,329 37,244 MILL AND THIN OVERLAY 10016,34830524 48484A WESTWOOD DR S END THIRD ST WESTDR 20 R AC $94,145 37,529 MILL AND THIN OVERLAY 10042,365371,145 47471A $2,812,097Treatment Total Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 23 SS1026 MTC StreetSaver 11.A.a Packet Pg. 504 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2020 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID ARROYO CIR CAMINO ARROYO CAMINO ARROYO ARROCR 10 A AC $690,577 26,843 MILL AND THICK OVERLAY 100207,173415,053 69694C CALLE DEL REY LERMA LN LONG MEADOW DR CALDRY 20 C AC $145,875 26,253 MILL AND THICK OVERLAY 10052,515451,167 67676B CAMINO ARROYO PACHECO PASS RD GILMAN RD CAMARR 95 C AC $642,334 27,260 MILL AND THICK OVERLAY 100231,240822,820 63644C CHURCH ST FIRST ST HOWSON ST CHURST 10 C AC $152,523 27,133 MILL AND THICK OVERLAY 10054,908531,036 65652B CHURCH ST MANTELLI DR 98' S/O RONAN CHURST 40 C AC/AC $231,639 21,896 MILL AND THICK OVERLAY 10083,390621,345 68682B EIGHTH ST PRINCEVALLE ST CHURCH ST EIGHST 30 C AC $195,912 26,343 MILL AND THICK OVERLAY 10070,528381,856 66663B FOREST ST LEWIS ST I.O.O.F AVE FOREST 40 C AC/AC $171,289 23,576 MILL AND THICK OVERLAY 10061,664471,312 66664A GILMAN RD ROGERS 560' E/O CAMINO ARROYO GILMRD 10 A AC $280,267 27,485 MILL AND THICK OVERLAY 10084,080402,102 68684C KERN AVE FIRST ST WELBURN AVE KERNAV 20 C AC $180,689 27,092 MILL AND THICK OVERLAY 10065,048471,384 65655A MANTELLI DR CALLE DEL REY SANTA TERESA BLVD MANTDR 40 A AC/AC $254,250 25,522 MILL AND THICK OVERLAY 10076,275451,695 68686C PRINCEVALLE ST TENTH ST EIGHTH ST PRINST 10 C AC/AC $141,523 22,316 MILL AND THICK OVERLAY 10050,948471,084 67671A UVAS PARK DR MILLER AVE TENTH ST UVAPDR 30 C AC $154,023 24,968 MILL AND THICK OVERLAY 10055,448291,912 69701A WESTWOOD DR THIRD ST JUNIPER DR WESTDR 30 C AC $109,973 25,197 MILL AND THICK OVERLAY 10039,590371,070 69691B WREN AVE TATUM AVE FARREL AVE WRENAV 60 A AC $162,190 27,995 MILL AND THICK OVERLAY 10048,65749993 67675B WREN AVE UVAS PARK DR SIXTH ST WRENAV 70 A AC/AC $144,160 27,277 MILL AND THICK OVERLAY 10043,24853816 66661A $3,657,224Treatment Total CHESTNUT ST LUCHESSA AVE 505' N/O STUTZ WY CHESST 30 A AC $1,512,000 12,146 RECONSTRUCT STRUCTURE (AC) 100170,100632,700 23237C LEAVESLEY RD SAN YSIDRO AVE 200' E/O ARROYO CIR LEAVRD 30 A AC $266,667 12,146 RECONSTRUCT STRUCTURE (AC) 10030,00050600 24244C LUCHESSA AVE MONTEREY RD JAMIESON WY LUCHAV 20 A AC $756,836 12,146 RECONSTRUCT STRUCTURE (AC) 10085,144581,468 18187C LUCHESSA AVE JAMIESON WY ROSSI LN LUCHAV 30 A AC $827,680 12,146 RECONSTRUCT STRUCTURE (AC) 10093,114631,478 11117C MONTEREY ST HWY 101 LUCHESSA AVE MONTRD 20 A AC $959,040 12,146 RECONSTRUCT STRUCTURE (AC) 100107,892741,458 18187C $4,322,223Treatment Total $27,840,263Year 2020 TotalYear 2020 Area Total 14,351,710 Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 24 SS1026 MTC StreetSaver 11.A.a Packet Pg. 505 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID THOMAS RD MESA RD SANTA TERESA BLVD THOMRD 10 A AC $36,008 25,513 AC OVERLAY W/FABRIC1007,79041190 49527B $36,008Treatment Total KERN AVE MANTELLI DR 429' N/O MANTELLI DR KERNAV 50 C AC $14,166 95,257 RUB CAPE SEAL W/DIGOUTS 10019,30545429 69725A WAYLAND LN EL CERRITO WY CUL DE SAC WAYLLN 20 C AC $48,680 97,362 RUB CAPE SEAL W/DIGOUTS 10066,341371,793 68712B $62,846Treatment Total ARROYO CIR CAMINO ARROYO LEAVESLEY RD ARROCR 20 C AC $266,333 26,412 2.5 INCH AC OVERLAY W/FABRIC 10079,476741,074 46504C CARMEL ST SIXTH ST THIRD ST CARMST 40 C AC $299,992 25,964 2.5 INCH AC OVERLAY W/FABRIC 10089,520481,865 49533B EIGHTH ST CHURCH ST MONTEREY RD EIGHST 40 C AC $81,754 26,134 2.5 INCH AC OVERLAY W/FABRIC 10024,39638642 48523B SIXTH ST MILLER AVE PRINCEVALLE ST SIXTST 20 C AC $243,794 25,964 2.5 INCH AC OVERLAY W/FABRIC 10072,750501,455 49533B $891,873Treatment Total COHANSEY AVE NIGHTINGALE DR END EAST COHAV 25 R AC $23,712 21,056 SEAL CRACKS, DIGOUTS, MICROSURFACING 9451,30054950 88905B FANTAIL WAY HUMMINGBIRD LANE WREN AVE FANTL 10 R AC $4,045 21,056 SEAL CRACKS, DIGOUTS, MICROSURFACING 948,75025350 88905B GREENFIELD DR OAK BROOK WAY W LUCHESSA AVE GREENF 10 R AC $12,353 16,998 SEAL CRACKS, DIGOUTS, MICROSURFACING 9526,72434786 89917A HUMMINGBIRD LANE COHANSEY AVE VICKERY AVE HUMMN 10 R AC $7,396 21,056 SEAL CRACKS, DIGOUTS, MICROSURFACING 9416,00032500 88905B NIGHTINGALE DR VICKERY AVE WREN AVE NIGHDR 10 R AC $17,796 21,056 SEAL CRACKS, DIGOUTS, MICROSURFACING 9438,500281,375 88905B ROBIN PL WREN AVE NIGHTINGALE DR ROBIPL 10 R AC $8,579 21,056 SEAL CRACKS, DIGOUTS, MICROSURFACING 9418,56032580 88905B TENTH ST PRINCEVALLE ST 150' E/O ROSANNA ST TENTST 20 A AC $58,009 42,451 SEAL CRACKS, DIGOUTS, MICROSURFACING 77111,555671,665 67701A WINDSONG WY NIGHTINGALE DR HUMMINGBIRD LN WNDSWY 10 R AC $10,054 21,056 SEAL CRACKS, DIGOUTS, MICROSURFACING 9421,75025870 88905B $141,944Treatment Total ALEXANDER ST S END(CUL-DE- SAC) NINTH ST ALEXST 20 R AC $47,609 24,451 SLURRY SEAL W/DIGOUTS 7868,666481,394 69717C Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 25 SS1026 MTC StreetSaver 11.A.a Packet Pg. 506 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID ANSON CT LEARNARD WY END ANSOCT 10 R AC $11,233 24,508 SLURRY SEAL W/DIGOUTS 7816,20134424 69716B CHESBRO WY GAUNT AVE KELTON DR CHESWY 10 R AC $19,170 24,178 SLURRY SEAL W/DIGOUTS 7827,64836768 68705A FIFTH ST MILLER AVE PRINCEVALLE ST FIFTST 10 R AC $29,436 24,151 SLURRY SEAL W/DIGOUTS 7742,455351,213 68703B HAGEN CT END WENTZ DR HAGECT 10 R AC $10,873 24,151 SLURRY SEAL W/DIGOUTS 7715,68135392 68701A HOLLOWAY RD BREM LN SILACCI WY HOLLRD 10 R AC $89,842 24,451 SLURRY SEAL W/DIGOUTS 78129,579472,757 69717C HOXETT ST CHADWICK ST FOWLER ST HOXEST 10 R AC $16,357 24,151 SLURRY SEAL W/DIGOUTS 7723,59135618 68701A MARIPOSA ST ORINDA WY JACARANDA WY MARIST 10 R AC $10,872 24,178 SLURRY SEAL W/DIGOUTS 7815,68035448 68706B MILIAS CT END BYERS ST MILACT 10 R AC $10,111 24,462 SLURRY SEAL W/DIGOUTS 7814,58337343 69711A MILLER AVE MESA RD 2000' NORTH OF MESA RD MILLAV 70 R AC $37,440 24,452 SLURRY SEAL W/DIGOUTS 7854,000272,000 69717B NANTUCKET PL END CUMBERLAND DR NANTPL 10 R AC $9,642 24,463 SLURRY SEAL W/DIGOUTS 7813,90637327 69713B ORCHARD DR 95' N/O DEARBORN PL EIGHTH ST ORCHDR 20 R AC $12,480 24,151 SLURRY SEAL W/DIGOUTS 7718,00036500 68701A OTOOLE CT PETERSEN DR END OTOOCT 10 R AC $5,255 31,177 SLURRY SEAL W/DIGOUTS 787,57835158 69705A POPPYFIELD ST OAK BROOK WY CUL DE SAC POPPYF 10 R AC $16,667 24,144 SLURRY SEAL W/DIGOUTS 7724,03834707 68707A SAN MIGUEL ST SANTA BARBARA DR WREN AVE SANMST 10 R AC $52,898 24,462 SLURRY SEAL W/DIGOUTS 7876,294372,062 69711A STRAWBERRY LN SUNFLOWER CIR COUNTRY DR STRALN 10 R AC $5,700 24,178 SLURRY SEAL W/DIGOUTS 788,22020411 68706C WHEATFIELD CT HAYFIELD ST CUL DE SAC WHEATF 10 R AC $5,234 24,451 SLURRY SEAL W/DIGOUTS 787,54834222 69717A $390,819Treatment Total CLUB DR SANTA TERESA BLVD GRENACHE WY CLUBDR 10 R AC $495,768 10,107 RECONSTRUCT SURFACE (AC) 10063,000601,050 23267A EAST ST EIGHTH ST SEVENTH ST EASTST 10 R AC $234,428 10,107 RECONSTRUCT SURFACE (AC) 10029,79045662 23264A EL ROBLE CT SAN MIGUEL ST END ELROCT 10 R AC $134,810 10,107 RECONSTRUCT SURFACE (AC) 10017,13137463 22251A NINTH ST CHESTNUT ST CROCKER LN NINTST 50 R AC $383,709 10,107 RECONSTRUCT SURFACE (AC) 10048,760461,060 23264A OBATA WY MAYLOCK RD OBATA CT OBATWY 10 R AC $649,102 10,107 RECONSTRUCT SURFACE (AC) 10082,485471,755 23267C SARGENT ST FIRST ST BROADWAY SARGST 10 R AC $92,300 10,107 RECONSTRUCT SURFACE (AC) 10011,72937317 692B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 26 SS1026 MTC StreetSaver 11.A.a Packet Pg. 507 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID SECOND ST PRINCEVALLE ST CARMEL ST SECOST 20 R AC $120,118 10,107 RECONSTRUCT SURFACE (AC) 10015,26448318 373B SEVENTH ST FOREST ST EAST ST SEVEST 30 R AC $341,215 10,107 RECONSTRUCT SURFACE (AC) 10043,360401,084 23264A SILACCI WY END PACHECO PASS HWY SILAWY 10 R AC $564,775 10,107 RECONSTRUCT SURFACE (AC) 10071,769471,527 597C SOUTHSIDE DR OBATA WAY ROAD NARROWS SOUTDR 10 R AC $182,443 10,107 RECONSTRUCT SURFACE (AC) 10023,18428828 11147C SUSAN CT CUL DE SAC CARIGNANE DR SUSACT 10 R AC $29,337 10,107 RECONSTRUCT SURFACE (AC) 1003,72816233 597B SWANER DR GAUNT AVE KELTON DR SWANDR 10 R AC $247,035 10,107 RECONSTRUCT SURFACE (AC) 10031,39236872 20245A WHEELER ST END SWANSTON LN WHEEST 10 R AC $103,947 10,107 RECONSTRUCT SURFACE (AC) 10013,20937357 484B WILLARD CT CUL DE SAC WREN AVE WILACT 10 R AC $183,387 10,107 RECONSTRUCT SURFACE (AC) 10023,30436595 155A $3,762,374Treatment Total DAWN WY END MESA RD DAWNWY 10 R AC $86,140 35,311 MILL AND THIN OVERLAY 10037,272311,132 49527B LA PALOMA WY WREN AVE WELBURN AVE LAPAWY 10 R AC $84,828 35,860 MILL AND THIN OVERLAY 10036,70437992 48502B MARIA WY AMANDA WY WREN AVE MARIWY 10 R AC $70,291 35,838 MILL AND THIN OVERLAY 10030,41437822 48505A NINTH ST PRINCEVALLE ST CHURCH ST NINTST 20 R AC $159,097 35,604 MILL AND THIN OVERLAY 10068,840401,721 48511A TATUM AVE WREN AVE KERN AVE TATUMA 20 R AC $62,400 35,629 MILL AND THIN OVERLAY 10027,000201,350 48505A VISTA DEL SUR GATE RANCHO REAL VISDLS 10 R AC $9,707 35,895 MILL AND THIN OVERLAY 1004,20025168 48506C $472,463Treatment Total LONGMEADOW DR TRAILBLAZER WY RODEO DR LONMDR 20 C AC $190,921 24,194 MILL AND THICK OVERLAY 10066,088441,502 69726B THOMAS RD 105' N/O ALDER ST 255' S/O VINCA CT THOMRD 40 A AC $32,854 26,037 MILL AND THICK OVERLAY 1009,47727351 68717B $223,775Treatment Total BREM LN S END HOLLOWAY RD BREMLN 10 C AC $157,976 9,311 RECONSTRUCT STRUCTURE (AC) 10017,64028630 067C CARMEL ST THIRD ST FIRST ST CARMST 50 C AC $659,846 9,311 RECONSTRUCT STRUCTURE (AC) 10073,680481,535 12183B CHESTNUT ST 689' S/O TENTHST TENTH ST CHESST 50 A AC $394,905 11,679 RECONSTRUCT STRUCTURE (AC) 10042,71862689 23277C FOURTH ST EIGLEBERRY ST MONTEREY RD FOURST 30 C PCC $139,776 7,517 RECONSTRUCT STRUCTURE (AC) 10012,60040315 16193B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 27 SS1026 MTC StreetSaver 11.A.a Packet Pg. 508 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2021 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID LAS ANIMAS AV NONAME UNO AVE 792' E/O SAN YSIDRO AVE LASAAV 20 C AC $216,725 9,311 RECONSTRUCT STRUCTURE (AC) 10024,200201,210 034C MANTELLI DR WREN AVE CHURCH ST MANTDR 80 A AC $1,139,868 11,679 RECONSTRUCT STRUCTURE (AC) 100123,303691,787 24282B MILLER AVE SARATOGA PL SIXTH ST MILLAV 30 C AC $349,984 9,311 RECONSTRUCT STRUCTURE (AC) 10039,08040977 293B MURRAY AVE CHESTNUT ST I.O.O.F AVE MURRAV 40 C AC $616,143 9,311 RECONSTRUCT STRUCTURE (AC) 10068,800641,075 12194A PRINCEVALLE ST WEST LUCHESSA AVE 140' N/O FILBRO DR PRINST 50 C AC $722,579 9,311 RECONSTRUCT STRUCTURE (AC) 10080,685451,793 4117A RENZ LN CUL DE SAC (NW)1085' W. OF CAMINO ARROYO RENZLN 10 C AC $372,999 9,311 RECONSTRUCT STRUCTURE (AC) 10041,650351,190 19254C ROSSI LN MAYCOCK RD LUCHESSA AVE ROSSLN 20 C AC $288,728 9,311 RECONSTRUCT STRUCTURE (AC) 10032,24040806 9157C SAN YSIDRO AVE 1478' S/O LAS ANIMA RD LAS ANIMAS RD SANYAV 30 C AC $436,799 9,311 RECONSTRUCT STRUCTURE (AC) 10048,774331,478 16224C UVAS PARK DR WREN AVE MILLER AVE UVAPDR 20 C AC $305,680 9,311 RECONSTRUCT STRUCTURE (AC) 10034,133291,177 16211A WELBURN AVE WREN AVE WAYLAND LN WELBAV 70 C AC $320,421 9,311 RECONSTRUCT STRUCTURE (AC) 10035,77937967 12192B WELBURN AVE WAYLAND LN HANNA ST WELBAV 80A C AC $412,538 9,311 RECONSTRUCT STRUCTURE (AC) 10046,065371,245 21272B $6,534,967Treatment Total $12,517,069Year 2021 TotalYear 2021 Area Total 2,695,832 TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID MONTEREY ST COHANSEY AVE BUENA VISTA AVE MONTRD 70 A AC $947,482 25,051 AC OVERLAY W/FABRIC100197,100732,700 46534B THOMAS RD SANTA TERESA BLVD 123' S/O WISTERIA DR THOMRD 20 A AC $55,042 24,881 AC OVERLAY W/FABRIC10011,45025458 47537B WREN AVE FIRST ST 125' S/O WELBURN AVE WRENAV 10 A AC/AC $325,865 24,864 AC OVERLAY W/FABRIC10067,788631,076 47532B $1,328,389Treatment Total CAMINO ARROYO ARROYO CIR END CAMARR 20 C AC $44,564 94,637 RUB CAPE SEAL W/DIGOUTS 10058,396421,248 67734C CAMINO ARROYO VENTURE WAY PACHECO PASS RD CAMARR 90 C AC $134,540 87,920 RUB CAPE SEAL W/DIGOUTS 100176,300822,150 69747C CHESTNUT ST SIXTH ST END CHESST 10 C AC $34,440 94,628 RUB CAPE SEAL W/DIGOUTS 10045,12949921 67734A EAST CT WELBURN AVE END EASTCT 10 R AC $5,349 78,928 RUB CAPE SEAL W/DIGOUTS 1007,00837145 69622B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 28 SS1026 MTC StreetSaver 11.A.a Packet Pg. 509 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID FOREST ST EIGHTH ST SIXTH ST FOREST 60 C AC $36,631 92,779 RUB CAPE SEAL W/DIGOUTS 10048,000401,200 68744A LIMAN AVE CHURCH ST MONTEREY RD LIMAAV 10 R AC $21,429 78,928 RUB CAPE SEAL W/DIGOUTS 10028,08030936 69622B ORTEGA CIR HACIENDA DR WREN AVE ORTEDR 10 R AC $45,799 79,062 RUB CAPE SEAL W/DIGOUTS 10060,014371,622 69621B OUSLEY DR SOLIS DR WELBURN AV OUSLDR 20 R AC $19,891 80,571 RUB CAPE SEAL W/DIGOUTS 10026,06436724 68616C RAMONA WY AMANDA AVE WREN AVE RAMOWY 20 R AC/AC $23,041 79,559 RUB CAPE SEAL W/DIGOUTS 10030,19237816 68605A RANCHO HILLS DR VALLEY OAKS DR LONG MEADOW DR RANHDR 30 C AC $49,726 94,388 RUB CAPE SEAL W/DIGOUTS 10065,160451,448 67736B RENZ LN CAMINO ARROYO CUL DE SAC EAST RENZLN 30 C AC $56,496 94,637 RUB CAPE SEAL W/DIGOUTS 10074,032561,322 67734C $471,906Treatment Total CHESTNUT ST LEWIS ST MURRAY ST CHESST 20 C AC $120,761 25,034 2.5 INCH AC OVERLAY W/FABRIC 10034,65050693 49564A CHURCH ST WELBURN AVE MANTELLI DR CHURST 30 C AC/AC $373,480 24,591 2.5 INCH AC OVERLAY W/FABRIC 100107,163631,701 48532B SEVENTH ST PRINCEVALLE ST CHURCH ST SEVEST 10 C AC $308,646 25,216 2.5 INCH AC OVERLAY W/FABRIC 10088,560481,845 48553B SIXTH ST WREN AVE MILLER AVE SIXTST 10 C AC $241,173 25,354 2.5 INCH AC OVERLAY W/FABRIC 10069,200501,384 47541A $1,044,060Treatment Total ARBOR ST MANTELLI DR EDEN ST ARBOST 10 R AC $7,605 18,805 SEAL CRACKS, DIGOUTS, MICROSURFACING 9415,82035452 88932B BOGIALA WY MARSANNE LN DE ANZA PL BOGAWY 10 R AC $12,980 19,123 SEAL CRACKS, DIGOUTS, MICROSURFACING 9427,00036750 88937A CHARLES LUX DR CIMINO ST TENTH ST/CHARLES LUX DR RAB CHRLUX 20 R AC $10,816 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 9022,50030750 83867A CINNAMON WY PEPPERMINT ST CULDESAC SOUTH CINNMN 10 R AC $21,075 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 8843,840321,370 81847B CLOVE PL CINNAMON ST COBBLESTONE CT CLOVPL 10 R AC $4,000 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 888,32032260 81847B COBBLESTONE CT THIRD ST PEPPERMINT ST COBBSTN 10 R AC $18,844 50,813 SEAL CRACKS, DIGOUTS, MICROSURFACING 9439,200281,400 88907B DE ANZA PL TENTH ST LOPEZ WY DEANZ 10 R AC $8,480 19,123 SEAL CRACKS, DIGOUTS, MICROSURFACING 9417,64036490 88937A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 29 SS1026 MTC StreetSaver 11.A.a Packet Pg. 510 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID GRASSLAND WY THIRD ST RAB END EAST GRASLND 10 R AC $18,844 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 9039,200281,400 83867B LONE OAK LN THIRD ST RAB 360FT W/O RAB LONOAK 10 R AC $4,846 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 9210,08028360 86887B LOPEZ WY CHARLES LUX DR DE ANZA PL LOPEWY 10 R AC $15,056 19,123 SEAL CRACKS, DIGOUTS, MICROSURFACING 9431,32036870 88937A LUCHESSA AVE MILLER AVE TENTH ST/LUCHESSA AVE RAB LUCHAV 40 R AC $10,384 19,123 SEAL CRACKS, DIGOUTS, MICROSURFACING 9421,60036600 88937A TENTH ST/LUCHESSA AVE RAB LUCHESSA AVE WEST LUCHESSA AVE EAST LUCHAV 45 R AC $3,173 46,122 SEAL CRACKS, DIGOUTS, MICROSURFACING 926,60020330 86887A LUCHESSA AVE THOMAS DR END OF BRIDGE EAST LUCHAV 70 R AC $8,153 41,798 SEAL CRACKS, DIGOUTS, MICROSURFACING 9016,96032530 84864B MANTELLI DR ZINNIA ST HIRASAKI AVE MANTDR 50 A AC $17,352 40,761 SEAL CRACKS, DIGOUTS, MICROSURFACING 7732,08569465 67725A MARSANNE LN BOGIALA WY LOPEZ WY MARSNN 10 R AC $5,192 19,123 SEAL CRACKS, DIGOUTS, MICROSURFACING 9410,80036300 88937A PEPPERMINT ST COBBLESTONE ST CINNAMON ST PPRMNT 10 R AC $4,615 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 889,60032300 81847B TARRAGON DR COBBLESTONE CT CINNAMON WY TARGN 10 R AC $3,846 37,689 SEAL CRACKS, DIGOUTS, MICROSURFACING 888,00032250 81847B TENTH ST/CHARLES LUX DR RAB TENTH ST NORTH TENTH ST SOUTH TENTST 55 R AC $2,462 18,614 SEAL CRACKS, DIGOUTS, MICROSURFACING 945,12016320 8893 THIRD ST 470 FT W/O ROSEMARY DR THIRD ST/GRASSLAND WY RAB THIRST 80 R AC $33,987 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 9070,700352,020 83867B GRASSLAND WY/THIRD ST RAB THIRD ST THIRD ST THIRST 85 R AC $2,000 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 904,16016260 8486 THIRD ST GRASSLAND WY/THIRD ST RAB LONE OAK LN/THIRD ST RAB THIRST 90 R AC $11,307 41,706 SEAL CRACKS, DIGOUTS, MICROSURFACING 9023,52028840 83867B LONE OAK LN/THIRD ST RAB THIRD ST LONE OAK LN THIRST 95 R AC $2,077 41,954 SEAL CRACKS, DIGOUTS, MICROSURFACING 904,32018240 8486 $227,094Treatment Total Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 30 SS1026 MTC StreetSaver 11.A.a Packet Pg. 511 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID BLACKBERRY CT OAK BROOK WY END BLACCT 10 R AC $14,720 30,080 SLURRY SEAL W/DIGOUTS 7820,41335532 68717A BLACKSMITH DR TRAILBLAZER WY SADDLER DR BLACDR 10 R AC $14,487 27,718 SLURRY SEAL W/DIGOUTS 7720,09035574 68606B BLACKWING WY RANCHO HILLS DR EAGLE HILLS WY BLACWY 10 R AC $13,831 32,699 SLURRY SEAL W/DIGOUTS 7819,18035548 69616B CARIGNANE DR MICHELLE CT MESA RD CARIDR 10 R AC $22,143 23,355 SLURRY SEAL W/DIGOUTS 7830,70836853 69627B CHRISTINE CT CARIGNANE DR END CHRICT 10 R AC $4,057 23,355 SLURRY SEAL W/DIGOUTS 785,62628142 69627B HOWARD CT END HOWARD AVE HOWACT 10 R AC $4,478 23,341 SLURRY SEAL W/DIGOUTS 786,21037119 69725A LONE DEER WY LONGMEADOW DR END LONDWY 10 R AC $11,657 32,466 SLURRY SEAL W/DIGOUTS 7816,16635413 69716B MONTICELLI DR HIRASAKI AV PADOVA DR MONTDR 90 R AC $24,153 30,673 SLURRY SEAL W/DIGOUTS 7833,49535957 69725A RAMONA WY KERN AVE AMANDA AVE RAMOWY 10 R AC/AC $16,304 32,254 SLURRY SEAL W/DIGOUTS 7822,61038595 69725A RASPBERRY CT OAK BROOK WY END RASPCT 10 R AC $16,327 30,080 SLURRY SEAL W/DIGOUTS 7822,64234611 68717A SECOND ST EIGLEBERRY ST MONTEREY RD SECOST 40 R AC $13,167 23,162 SLURRY SEAL W/DIGOUTS 7718,26055332 68613B SNOWBERRY CT OAK BROOK WY END SNOWCT 10 R AC $14,862 30,080 SLURRY SEAL W/DIGOUTS 7820,61135540 68717A SPRINGDALE ST CUL DE SAC CUL DE SAC SPRIST 10 R AC $33,203 23,307 SLURRY SEAL W/DIGOUTS 7846,046351,211 69724B TAPESTRY WY SUNRISE DR N. END TAPEWY 10 R AC $17,944 29,458 SLURRY SEAL W/DIGOUTS 7724,88535711 68716B TRIMBLE CT CHURCH ST CUL DE SAC TRIMCT 10 R AC $10,146 29,458 SLURRY SEAL W/DIGOUTS 7714,07035402 68715B VILLAGE PL LUCHESA AV RIVERVIEW CIR VILLPL 10 R AC $17,818 23,738 SLURRY SEAL W/DIGOUTS 7724,71035706 68607A VINCA CT CUL DE SAC THOMAS RD VINCCT 10 R AC $15,300 27,794 SLURRY SEAL W/DIGOUTS 7821,21835555 68617A WAGON WY SADDLER DR LONE DEER WY WAGOWY 10 R AC $16,506 27,718 SLURRY SEAL W/DIGOUTS 7722,89035654 68606B $281,103Treatment Total CHIESA DR END LA PALOMA WY CHIEDR 10 R AC $129,301 9,718 RECONSTRUCT SURFACE (AC) 10015,79937427 24302B FERNWOOD LN END WESTWOOD DR FERNLN 10 R AC $163,470 9,718 RECONSTRUCT SURFACE (AC) 10019,97437491 22281A SANTA BARBARA DR 130' S/O SAN MIGUEL DR THIRD ST SANBDR 20 R AC $255,737 9,718 RECONSTRUCT SURFACE (AC) 10031,24836868 24301A SECOND ST MILLER ST PRINCEVALLE ST SECOST 10 R AC $149,696 9,718 RECONSTRUCT SURFACE (AC) 10018,29139469 22283B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 31 SS1026 MTC StreetSaver 11.A.a Packet Pg. 512 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2022 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID SECOND ST END MILLER ST SECOST 15 R AC $259,175 9,718 RECONSTRUCT SURFACE (AC) 10031,66839812 22281A $957,379Treatment Total CARLA WY AMANDA AV WREN AVE CARLWY 10 R AC $76,748 34,227 MILL AND THIN OVERLAY 10031,93137863 48535A GEORGETOWN PL END PRINCEVALLE ST GEORPL 10 R AC $44,541 34,275 MILL AND THIN OVERLAY 10018,53137452 48533B HANNA ST WELBURN AVE END HANNST 20 R AC $73,369 34,250 MILL AND THIN OVERLAY 10030,52537825 48532B IRISH CT END PARISH WY IRISCT 10 R AC $24,142 34,503 MILL AND THIN OVERLAY 10010,04436229 47525A LA ALONDRA WY WREN AVE WELBURN AVE LAALWY 10 R AC $68,300 34,524 MILL AND THIN OVERLAY 10028,41637768 47522B MAPLE ST SEVENTH ST SIXTH ST MAPLST 10 R AC $67,262 34,535 MILL AND THIN OVERLAY 10027,98448583 47524A OLD GILROY ST CHESTNUT ST CROCKER LN OLDGIL 20 R AC $111,785 34,536 MILL AND THIN OVERLAY 10046,508441,057 47524A ROYAL WY FILBRO DR IMPERIAL DR ROYAWY 10 R AC $18,844 33,983 MILL AND THIN OVERLAY 1007,84035224 49547A SAGE HILL DR RODEO DR BENBOW DR SAGHDR 10 R AC $55,859 34,526 MILL AND THIN OVERLAY 10023,24035664 47526B STEPHAN CT PRINCEVALLE ST END STEPCT 10 R AC $43,411 34,288 MILL AND THIN OVERLAY 10018,06135460 48537A $584,261Treatment Total CHURCH ST 100' N/O HENNESSEY WY FARRELL AVE CHURST 80 C AC/AC $55,354 21,367 MILL AND THICK OVERLAY 10018,42449376 68725B FOREST ST SIXTH ST LEWIS ST FOREST 30 C AC/AC $145,728 20,054 MILL AND THICK OVERLAY 10048,504471,032 68724A MANTELLI DR KERN AVE WREN AVE MANTDR 70 A AC $371,660 25,647 MILL AND THICK OVERLAY 100103,086691,494 67725A $572,742Treatment Total $5,466,934Year 2022 TotalYear 2022 Area Total 2,582,575 TreatmentYear:2023 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID FARRELL AVE WREN AVE MONTEREY RD FARRAV 10 A AC $417,480 23,737 AC OVERLAY W/FABRIC10083,506431,942 48565B MONTEREY ST LEAVESLEY RD PIERCE ST MONTRD 10 A AC/AC $394,243 23,797 AC OVERLAY W/FABRIC10078,858781,011 48564B MONTEREY ST TENTH ST EIGHTH ST MONTRD 100 A AC $265,518 23,668 AC OVERLAY W/FABRIC10053,110471,130 49584A MONTEREY ST PIERCE ST LAS ANIMAS RD MONTRD 30 A AC $1,159,330 23,668 AC OVERLAY W/FABRIC100231,894782,973 49584B WREN AVE THIRD ST FIRST ST WRENAV 90 A AC/AC $623,625 23,580 AC OVERLAY W/FABRIC100124,740631,980 49571B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 32 SS1026 MTC StreetSaver 11.A.a Packet Pg. 513 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) $2,860,196Treatment Total ANTONIO CT END PRINCEVALLE ST ANTOCT 10 R AC $9,925 75,689 RUB CAPE SEAL W/DIGOUTS 10012,50532333 69747A AYER DR SANTA BARBARA DR END AYERDR 10 R AC $48,363 77,718 RUB CAPE SEAL W/DIGOUTS 10060,936351,685 68631A BARRON PL END VICTORIA DR BARRPL 10 R AC $16,029 75,689 RUB CAPE SEAL W/DIGOUTS 10020,19635521 69747A BURKE DR MURRAY AV END BURKDR 10 R AC $13,856 75,560 RUB CAPE SEAL W/DIGOUTS 10017,45837423 69744B CHURCH ST FARRELL AV N. END CHURST 85 C AC $30,822 88,492 RUB CAPE SEAL W/DIGOUTS 10038,83545863 67745B CULP DR HOESCH WY KERN AVE CULPDR 10 R AC $21,556 75,705 RUB CAPE SEAL W/DIGOUTS 10027,16035776 69645A DEARBORN PL END ORCHARD DR DEARPL 10 R AC $10,243 77,752 RUB CAPE SEAL W/DIGOUTS 10012,90633327 68731A LERMA LN CALLE DEL REY SOLEDAD ST LERMLN 10 R AC $20,212 75,366 RUB CAPE SEAL W/DIGOUTS 10025,46634749 69746B LILLY AVE CHURCH ST END LILLAV 10 R AC $18,794 75,826 RUB CAPE SEAL W/DIGOUTS 10023,68037640 69642B LONDON PL CHURCH ST CUL DE SAC LONDPL 10 R AC $14,335 77,810 RUB CAPE SEAL W/DIGOUTS 10018,06135460 68737A MESA RD GAVILAN COLLEGE THOMAS RD MESARD 10 C AC $61,410 90,141 RUB CAPE SEAL W/DIGOUTS 10077,376312,496 68767B MONTEREY ST EIGHTH ST SIXTH ST MONTRD 110 C AC $51,775 87,527 RUB CAPE SEAL W/DIGOUTS 10065,236471,388 69774A RANCHO HILLS DR MANTELLI DR CARRIAGE DR RANHDR 10 C AC $20,001 87,729 RUB CAPE SEAL W/DIGOUTS 10025,20045560 69776B REVERE PL END EIGHTH ST REVEPL 10 R AC $8,436 75,631 RUB CAPE SEAL W/DIGOUTS 10010,62933258 69741A SEVERANCE ST HENNESSEY WY FARREL AVE SEVRST 10 R AC $13,028 72,968 RUB CAPE SEAL W/DIGOUTS 10016,41429566 69635B SIXTH ST RR TRACKS CHESTNUT ST SIXTST 50 C AC $39,461 89,956 RUB CAPE SEAL W/DIGOUTS 10049,720401,243 68764A TICONDEROGA PL CUL DE SAC CUMBERLAND DR TICOPL 10 R AC $15,735 75,950 RUB CAPE SEAL W/DIGOUTS 10019,82637487 69643B $413,981Treatment Total CARMEL ST EL CERRITO WY SHERWOOD DR CARMST 20 C AC $188,347 24,416 2.5 INCH AC OVERLAY W/FABRIC 10051,964441,181 46572B CHURCH ST LIMAN AVE LAS ANIMAS AV CHURST 60 C AC/AC $169,086 23,727 2.5 INCH AC OVERLAY W/FABRIC 10046,65050933 47552B FOURTH ST PRINCEVALLE ST EIGLEBERRY ST FOURST 20 C AC $323,166 24,434 2.5 INCH AC OVERLAY W/FABRIC 10089,160402,229 46573B MURRAY AVE I.O.O.F. AVE LEAVESLEY RD MURRAV 50 C AC $415,375 24,120 2.5 INCH AC OVERLAY W/FABRIC 100114,600502,292 49594B SAN YSIDRO AVE 1064' N/O LEAVESLEY RD 1478' S/O LAS ANIMAS RD SANYAV 20 C AC $200,743 24,426 2.5 INCH AC OVERLAY W/FABRIC 10055,384431,288 46574C $1,296,717Treatment Total Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 33 SS1026 MTC StreetSaver 11.A.a Packet Pg. 514 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2023 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID OBATA CT OBATA WAY CUL DE SAC OBATCT 10 R AC $18,049 20,965 SLURRY SEAL W/DIGOUTS 7824,06844547 69647C $18,049Treatment Total HANNA ST TENTH ST EIGHTH ST HANNST 31 R AC $449,406 9,345 RECONSTRUCT SURFACE (AC) 10052,800481,100 24321A HANNA ST EIGHTH ST SEVENTH ST HANNST 35 R AC $305,188 9,345 RECONSTRUCT SURFACE (AC) 10035,85648747 24323B IVY ST FOREST ST SPRINGDALE ST IVYST 10 R AC $59,581 9,345 RECONSTRUCT SURFACE (AC) 1007,00035200 24334B RONAN AVE CHURCH ST MONTEREY RD RONAAV 20 R AC $320,508 9,345 RECONSTRUCT SURFACE (AC) 10037,656361,046 21312B ROSANNA ST EIGHTH ST SEVENTH ST ROSAST 10 R AC $309,682 9,345 RECONSTRUCT SURFACE (AC) 10036,38448758 24323B ROSANNA ST TENTH ST EIGHTH ST ROSAST 15 R AC $437,967 9,345 RECONSTRUCT SURFACE (AC) 10051,456481,072 24321A ROSSI CT CUL DE SAC ROSSI LN ROSSCT 10 R AC $168,077 9,345 RECONSTRUCT SURFACE (AC) 10019,74745323 23327C SANTA THERESA DR FOURTH ST END SANTDR 20 R AC $483,375 9,345 RECONSTRUCT SURFACE (AC) 10056,791351,569 22311A SWANSTON LN LEAVESLEY RD FOREST ST SWANLN 10 R AC $656,933 9,345 RECONSTRUCT SURFACE (AC) 10077,182372,086 23324B WALNUT LN FOREST ST FOREST ST WALNLN 10 R AC $450,028 9,345 RECONSTRUCT SURFACE (AC) 10052,873371,429 21314A $3,640,745Treatment Total ANGELA CT END PRINCEVALLE ST ANGECT 10 R AC $23,083 32,989 MILL AND THIN OVERLAY 1009,23433226 48557A CARLYLE CT CHURCH ST END CARLCT 10 R AC $42,205 32,654 MILL AND THIN OVERLAY 10016,88436419 49562B EL TORO WY WAYLAND LN CARMEL ST ELTOWY 10 R AC $43,933 32,955 MILL AND THIN OVERLAY 10017,57537475 48552B PARISH WY EL CERRITO WY WELBURN AVE PARIWY 10 R AC $67,702 32,932 MILL AND THIN OVERLAY 10027,08437732 48555A QUAILWALK DR 500' SOUTH OF PEREGRINE DR EAGLE VIEW WY QUAIDR 20 R AC $73,347 32,570 MILL AND THIN OVERLAY 10029,34234863 49556B RYAN CT PARISH WY CUL DE SAC RYANCT 10 R AC $41,306 33,202 MILL AND THIN OVERLAY 10016,52436409 47545A TARYN LN CALABRESE WY WELBURN AV TARYLN 10 R AC $60,118 33,203 MILL AND THIN OVERLAY 10024,05037650 47546C WILD IRIS DR MANTELLI DR SOUTH SIDE OF ROUNDABOUT WILIDR 10 R AC $9,999 32,943 MILL AND THIN OVERLAY 1004,00020200 48546C $361,693Treatment Total BOLSA RD 1076' S/O TR PRK CIR TRAVEL PARK CIR BOLSRD 20 A AC $882,214 10,798 RECONSTRUCT STRUCTURE (AC) 10088,232821,076 23357C Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 34 SS1026 MTC StreetSaver 11.A.a Packet Pg. 515 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2023 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID KERN AVE WELBURN AVE CULP DR KERNAV 30 C AC $355,682 8,608 RECONSTRUCT STRUCTURE (AC) 10036,72045816 24395A MONTEREY ST LUCHESSA AVE TENTH ST MONTRD 40 A AC $2,539,373 10,798 RECONSTRUCT STRUCTURE (AC) 100253,968743,432 22347C WAYLAND LN FIRST ST EL CERRITO WY WAYLLN 10 C AC $347,643 8,608 RECONSTRUCT STRUCTURE (AC) 10035,89037970 22372B WELBURN AVE RANCHO REAL 100' E/O TARYN LN WELBAV 20 C AC $249,327 8,608 RECONSTRUCT STRUCTURE (AC) 10025,74030858 23386C WELBURN AVE 100' E/O TARYN LN SANTA TERESA BLVD WELBAV 30 C AC $201,902 8,608 RECONSTRUCT STRUCTURE (AC) 10020,84436579 19356C WESTWOOD DR FIRST ST WELBURN AVE WESTDR 10 C AC $679,245 8,608 RECONSTRUCT STRUCTURE (AC) 10070,124471,492 22375A $5,255,386Treatment Total $13,846,767Year 2023 TotalYear 2023 Area Total 2,579,494 TreatmentYear:2024 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID TENTH ST 150 E/O ROSANNA ST MONTEREY RD TENTST 30 A AC $207,491 27,338 THICK HMA OVERLAY 2"10063,85167953 69691A WREN AVE RONAN AVE TATUM AVE WRENAV 50 A AC $126,040 27,283 THICK HMA OVERLAY 2"10038,78643902 69692B $333,531Treatment Total EIGLEBERRY ST TENTH ST EIGHTH ST EIGLST 10 R AC/AC $27,254 43,471 SEAL CRACKS/SLURRY SEAL 9252,416481,092 85901A EIGLEBERRY ST EIGHTH ST SIXTH ST EIGLST 15 R AC/AC $33,917 43,471 SEAL CRACKS/SLURRY SEAL 9265,232481,359 85903B EIGLEBERRY ST SIXTH ST FOURTH ST EIGLST 20 R AC/PCC $33,146 40,988 SEAL CRACKS/SLURRY SEAL 9163,750511,250 84893B EIGLEBERRY ST FOURTH ST SECOND ST EIGLST 30 R AC/PCC $34,446 43,471 SEAL CRACKS/SLURRY SEAL 9266,249511,299 85903B EIGLEBERRY ST SECOND ST FIRST ST EIGLST 40 R AC/AC $14,107 43,471 SEAL CRACKS/SLURRY SEAL 9227,13251532 85903B $142,870Treatment Total BYERS ST SANTA PAULA DR WREN AVE BYERST 10 R AC $26,509 74,609 RUB CAPE SEAL W/DIGOUTS 10032,11637868 68651A HENNESSEY WY CHURCH ST SEVERANCE ST HENNWY 10 R AC $6,911 74,362 RUB CAPE SEAL W/DIGOUTS 1008,37228299 68655B HOESCH WY SILVIA ST CULP DR HOESWY 10 R AC $19,939 74,365 RUB CAPE SEAL W/DIGOUTS 10024,15636671 68655A KENSINGTON PL END VICTORIA DR KENSPL 10 R AC $14,648 74,662 RUB CAPE SEAL W/DIGOUTS 10017,74635451 68657A Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 35 SS1026 MTC StreetSaver 11.A.a Packet Pg. 516 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2024 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID MONTEREY ST SIXTH ST THIRD ST MONTRD 120 C AC $71,575 85,782 RUB CAPE SEAL W/DIGOUTS 10086,715471,845 69804A MUIR DR OUSLEY DR MANTELLI DR MUIRDR 10 R AC $6,775 73,694 RUB CAPE SEAL W/DIGOUTS 1008,20836228 68756C PAMPAS LN ORINDA WY JACARANDA WY PAMPLN 10 R AC $12,538 72,615 RUB CAPE SEAL W/DIGOUTS 10015,19035434 69666B POPLAR DR MANTELLI DR BAY TREE DR POPLDR 10 R AC $18,085 71,633 RUB CAPE SEAL W/DIGOUTS 10021,91035626 69766B SIXTH ST CHESTNUT ST 308 E/O CHESTNUT SIXTST 60 C AC $10,169 85,066 RUB CAPE SEAL W/DIGOUTS 10012,32040308 69794A STRATFORD PL HYDE PARK DR END STRFPL 10 R AC $13,319 71,940 RUB CAPE SEAL W/DIGOUTS 10016,13635405 69767A VICTORIA DR CHURCH ST CUL DE SAC (EAST) VICTDR 20 R AC $28,601 74,005 RUB CAPE SEAL W/DIGOUTS 10034,650331,050 68757A $229,069Treatment Total MILLER AVE SIXTH ST THIRD ST MILLAV 40 C AC/AC $54,984 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 8394,000472,000 74813B MILLER AVE THIRD ST FIRST ST MILLAV 50 C AC/AC $50,420 41,266 SEAL CRACKS, DIGOUTS, MICROSURFACING 8386,198471,834 74813B MURRAY AVE LINCOLN CT LAS ANIMAS AVE MURRAV 20 A AC/AC $31,039 58,514 SEAL CRACKS, DIGOUTS, MICROSURFACING 7853,064361,474 68754B THIRD ST SANTA THERESA DR MILLER AVE THIRST 10 C AC/AC $15,653 39,638 SEAL CRACKS, DIGOUTS, MICROSURFACING 7926,76040669 70771A THIRD ST MILLER AVE PRINCEVALLE ST THIRST 20 C AC/AC $18,016 28,546 SEAL CRACKS, DIGOUTS, MICROSURFACING 8030,80040770 72813B THIRD ST WREN AVE SANTA THERESA DR THIRST 30 C AC/AC $19,210 36,307 SEAL CRACKS, DIGOUTS, MICROSURFACING 8632,84040821 78861A WELBURN AVE HANNA ST CHURCH ST WELBAV 80B C AC/AC $16,297 33,773 SEAL CRACKS, DIGOUTS, MICROSURFACING 9027,86137753 84922B $205,619Treatment Total KAREN CT CARIGNANE DR END KARECT 10 R AC $9,105 21,633 SLURRY SEAL W/DIGOUTS 7811,67428358 69667B OLEA CT W END CDS E END CDS OLEACT 10 R AC $16,657 24,711 SLURRY SEAL W/DIGOUTS 7821,357211,017 69656C $25,762Treatment Total CEDAR CT END WESTWOOD DR CEDACT 10 R AC $170,028 8,985 RECONSTRUCT SURFACE (AC) 10019,20837468 24361B Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 36 SS1026 MTC StreetSaver 11.A.a Packet Pg. 517 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2024 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID CROCKER LN NINTH ST EIGHTH ST CROCLN 10 R AC $230,009 8,985 RECONSTRUCT SURFACE (AC) 10025,98429896 24374A DEL REY CT END MANTELLI DR DELRCT 10 R AC $81,314 8,985 RECONSTRUCT SURFACE (AC) 1009,18629230 22346C DORIS CT WELBURN AVE END DORICT 10 R AC $188,759 8,985 RECONSTRUCT SURFACE (AC) 10021,32436540 24362B EL CERRITO WY WAYLAND LN LA COCHE WY ELCEWY 30 R AC $472,941 8,985 RECONSTRUCT SURFACE (AC) 10053,428371,444 23352B GAVILAN CT MURRAY AV END GAVICT 10 R AC $159,441 8,985 RECONSTRUCT SURFACE (AC) 10018,01236448 23354B NINTH ST END CHESTNUT ST NINTST 40 R AC $306,614 8,985 RECONSTRUCT SURFACE (AC) 10034,63846753 22344A PRINCEVALLE ST SIXTH ST THIRD ST PRINST 30 R AC $530,187 8,985 RECONSTRUCT SURFACE (AC) 10059,895331,815 22343B RAILROAD ST OLD GILROY SIXTH ST RAILST 20 R AC $178,925 8,985 RECONSTRUCT SURFACE (AC) 10020,21341493 23354A RODEO DR LONG MEADOW DR END RODEDR 10 R AC $315,395 8,985 RECONSTRUCT SURFACE (AC) 10035,630351,018 23366B WETSAND CT LONG MEADOW DR CUL DE SAC WETSCT 10 R AC $78,969 8,985 RECONSTRUCT SURFACE (AC) 1008,92135206 24366B $2,712,582Treatment Total CALABRESE WY END DELTA DR CALAWY 10 R AC $90,306 31,938 MILL AND THIN OVERLAY 10034,73737890 47566C CATHERINE CT PRINCEVALLE ST END CATHCT 10 R AC $19,550 31,428 MILL AND THIN OVERLAY 1007,52033169 49587A DARTMOUTH PL END PRINCEVALLE ST DARTPL 10 R AC $34,753 31,417 MILL AND THIN OVERLAY 10013,36833341 49581A ELM ST FOREST ST SPRINGDALE ST ELMST 10 R AC $18,289 31,406 MILL AND THIN OVERLAY 1007,03535201 49584B FILBRO DR ROYAL WY PRINCEVALLE ST FILBDR 10 R AC $56,323 31,428 MILL AND THIN OVERLAY 10021,66535619 49587A IMPERIAL DR ROYAL WY PRINCEVALLE ST IMPEDR 10 R AC $32,120 31,725 MILL AND THIN OVERLAY 10012,35535353 48577A LA SIERRA WY WAYLAND LN HANNA ST LASIWY 10 R AC $111,098 31,394 MILL AND THIN OVERLAY 10042,735371,155 49582B SOLIS DR OUSLEY DR DELTA DR SOLIDR 10 R AC $33,037 31,938 MILL AND THIN OVERLAY 10012,70836353 47566C THIRD ST THIRD ST/SANTA TERESA BLVD ISABELLA WY THIRST 65 R AC $38,528 31,725 MILL AND THIN OVERLAY 10014,82039380 48577B WEST HILLVIEW CT END TARYN LN WHILCT 10 R AC $46,270 31,938 MILL AND THIN OVERLAY 10017,79837375 47566C $480,274Treatment Total LEAVESLEY RD 200' E/O ARROYO CIR CITY LIMIT LEAVRD 10 A AC $835,436 10,383 RECONSTRUCT STRUCTURE (AC) 10080,340302,678 24394C Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 37 SS1026 MTC StreetSaver 11.A.a Packet Pg. 518 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation) TreatmentYear:2024 Street Name Begin Location End Location Street ID Section ID FC Surf Type Cost Rating TreatmentPCI After Length Width Area Current PCI PCI Before Area ID MANTELLI DR HIRASAKI AVE KERN AVE MANTDR 60 A AC $886,129 10,383 RECONSTRUCT STRUCTURE (AC) 10085,215691,235 21375A TENTH ST UVAS PARK DR PRINCEVALLE ST TENTST 10 A AC/AC $1,299,760 10,383 RECONSTRUCT STRUCTURE (AC) 100124,992631,984 21371A WREN AVE SIXTH ST THIRD ST WRENAV 80 A AC/AC $1,033,376 10,383 RECONSTRUCT STRUCTURE (AC) 10099,375531,875 24391A $4,054,701Treatment Total $8,184,408Year 2024 TotalYear 2024 Area Total 1,920,591 $67,855,441Grand Total24,130,202Total Section Area: Interest: .00% CITY OF GILROY Scenarios - Sections Selected for Treatment Inflation: 4.00%Printed: 12/27/2019 Scenario: #Optimal PCI Scenarios Criteria: ** - Treatment from Project Selection 38 SS1026 MTC StreetSaver 11.A.a Packet Pg. 519 Attachment: Pavement Managemetn Report 2020 (2517 : State of the Streets 2020 Presentation)