HomeMy WebLinkAboutResolution 2025-16 - 2025-26 SB1 Project List.pdf
RESOLUTION NO. 2025-16
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
GILROY ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR
2025-26 FUNDED BY SB 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the
Governor in April 2017 to address the significant multi-modal transportation funding
shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of our City are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to
receive fiscal year funding from the Road Maintenance and Rehabilitation Account
(RMRA), created by SB 1, which must include a description and the location of each
proposed project, a proposed schedule for the project’s completion, and the estimated
useful life of the improvement; and
WHEREAS, the City of Gilroy will receive an estimated $1,601,310 in RMRA
funding in Fiscal Year 2025-26 from SB 1; and
WHEREAS, this is the ninth year in which the City is receiving SB 1 funding and
will enable the City to continue essential road maintenance and rehabilitation projects,
safety improvements, repairing and replacing aging bridges, and increasing access and
mobility options for the traveling public that would not have otherwise been possible
without SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public
input into our community’s transportation priorities/the project list, including the
implementation of an online service request portal called “GilroyConnect” which is
available on the City’s website and as a standalone mobile application, and allows
residents to submit, track, and monitor requests, including requests for street
maintenance and rehabilitation; and
WHEREAS, the City used a Pavement Management System to develop the SB 1
project list to ensure revenues are being used on the most high-priority and cost-
effective projects that also meet the community’s priorities for transportation investment
Docusign Envelope ID: 8DE899C7-C375-4E37-ABF7-1294BD56CD63
Resolution No. 2025-16
List of Projects for Fiscal Year 2025-26 Funded by SB 1
City Council Regular Meeting | May 19, 2025
Page 2 of 4
by considering pavement condition, traffic volumes, complete streets, and prioritizing
streets in critical disrepair; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate
approximately 720,000 square feet of pavement on major collectors and arterials and
work towards implementing the complete streets ordinance; and
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs
Assessment found that the City’s streets and roads are in good condition, and this
revenue will help us increase the overall quality of our road system and keep our streets
and roads in good condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and
roads infrastructure with a focus on basic maintenance and safety, investing in complete
streets infrastructure, and using cutting-edge technology, materials and practices, will
have significant positive co-benefits for those who live, work, and visit the City of Gilroy.
NOW, THEREFORE, IT IS HEREBY RESOLVED, ORDERED AND FOUND by
the City Council as follows:
1. The foregoing recitals are true and correct.
2. The following list of newly proposed projects will be funding in-part or solely
with Fiscal Year 2025-26 Road Maintenance and Rehabilitation Account
revenues:
Project Title: FY26 Citywide Pavement Rehabilitation Project
Project Description: Milling and placement of asphalt concrete
pavement; adjustment of utilities to grade; roadway striping, signage,
and markings; traffic signal loop replacement; and other incidental
work.
Project Location: The following locations identified are subject to
change based on priority needs or available funding: Mantelli Dr from
Santa Teresa Blvd to Church St, Monterey Road from Eighth St to Tenth
St, Murray Ave from I.O.O.F. Ave to Chestnut St, and Sixth St from Wren
Ave to Church St.
Estimated Project Schedule: Start in May 2026 to Completion in
September 2026 based on the component being funded with RMRA
funds
Docusign Envelope ID: 8DE899C7-C375-4E37-ABF7-1294BD56CD63
Resolution No. 2025-16
List of Projects for Fiscal Year 2025-26 Funded by SB 1
City Council Regular Meeting | May 19, 2025
Page 3 of 4
Estimated Project Useful Life: 5 to 10 years
PASSED AND ADOPTED this 19th day of May 2025 by the following roll call vote:
AYES: COUNCIL MEMBERS: Bracco, Cline, Fugazzi, Hilton, Marques,
Ramirez, Mayor Bozzo
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
APPROVED:
______________________________
Greg Bozzo, Mayor
ATTEST:
Bryce Atkins, Acting City Clerk
Docusign Envelope ID: 8DE899C7-C375-4E37-ABF7-1294BD56CD63
Resolution No. 2025-16
List of Projects for Fiscal Year 2025-26 Funded by SB 1
City Council Regular Meeting | May 19, 2025
Page 4 of 4
CERTIFICATE OF THE CLERK
I, BRYCE ATKINS, Acting City Clerk of the City of Gilroy, do hereby certify that
the attached Resolution No. 2025-16 is an original resolution, or true and correct copy
of a City Resolution, duly adopted by the Council of the City of Gilroy at a Regular Meeting
of said held on Council held Monday, May 19, 2025, with a quorum present.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Official
Seal of the City of Gilroy this May 29, 2025.
____________________________________
Bryce Atkins
Acting City Clerk of the City of Gilroy